HomeMy WebLinkAboutPR 24701: RATIFY AND AUTHORIZE PAYMENT FOR THE EMERGENCY REPAIR OF THE SEWER MAIN ON VICKSBURG AVE. AND 5TH ST. ( ir. nrt rtlrtr�i `y_ friar INTEROFFICE MEMORANDUM Date: January 21, 2026 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 24701 —Ratify and Authorize Payment for the Emergency Repair of the Sewer Main on Vicksburg Ave. and 5th St. Introduction: The intent of this Agenda Item is for the City Council to ratify the repairs and authorize the payment to Global Drilling, Inc. of Winnie, Texas for the emergency repair to the sewer main located on Vicksburg Ave. and 5th St. in the amount of$110,000.00. Background: The sanitary sewer main on Vicksburg Ave. and 5th St. needed repair after a collapse at a manhole that receives the 16" Force Main from the 19th St. Lift Station where the trunk main turns from Vicksburg Ave. to 5th St. The manhole at the collapse receives the 16" trunk main on Vicksburg Ave., the force main, and a 10" sewer from the south with a 28"discharge sewer along 5th St. On November 20, 2025, an Emergency Memo was issued for the repair by Global Drilling, Inc. and has since completed the repair in the amount of$110,000.00. The scope of work for the emergency repair included excavation of the area, demolition of the old collapsed manhole, supplying and installation of a new 72"Manhole,bypass pumping,and restoration of the surface area including asphalt works. Budget Impact: The budgetary impact is$110,000.00 and funding in CIP Account 405-40-000-8516-00-00-000, Project No. WS0032.OTH Recommendation: It is recommended that City Council approve PR No. 24701 ratifying and authorizing the payment of$110,000.00 for the emergency repairs as discussed/outlined above. PR No. 24701 1/21/26 cm-tnr RESOLUTION NO. A RESOLUTION RATIFYING THE CITY MANAGER'S AUTHORIZATION OF AN EMERGENCY WORK AND AUTHORIZING PAYMENT TO GLOBAL DRILLING, INC., OF WINNIE, TEXAS, FOR EMERGENCY REPAIRS TO SANITARY SEWER LINES AND A MANHOLE LOCATED AT VICKSBURG AVENUE AND 5TH STREET,IN AN AMOUNT NOT TO EXCEED$110,000.00,WITH FUNDING FROM CIP ACCOUNT NO. 405-40-000-8516-00-00-000 PROJECT NO. WS0032.OTH. WHEREAS, a failure of the sanitary sewer line at the intersection of Vicksburg Avenue and 5th Street resulted in the collapse of a manhole, creating an immediate threat to public health, safety, and municipal infrastructure; and WHEREAS, the collapsed manhole serves as a critical junction receiving a 16-inch trunk main along Vicksburg Avenue, a force main from the 19th Street Lift Station, a 10-inch sewer line from the south, and a 28-inch discharge sewer along 5th Street, thereby necessitating immediate emergency repair to prevent system failure and environmental harm; and WHEREAS, due to the emergent nature of the collapse, an Emergency Memorandum dated November 20, 2025, was issued authorizing immediate repair services by Global Drilling, Inc., of Winnie, Texas, as attached hereto as Exhibit "A"; and WHEREAS, Global Drilling, Inc. completed the emergency work, which included excavation, demolition, and removal of the collapsed manhole, installation of a new 72-inch manhole, sewer line repairs, bypass pumping, and restoration of the affected surface area, including asphalt work; and WHEREAS, Global Drilling, Inc. has submitted an invoice and daily work reports documenting the emergency repairs in the total amount of $110,000.00, as attached hereto as Exhibit "B"; and WHEREAS, pursuant to Section 252.022(a)(1) and 252.022(a)(2) of the Texas Local Government Code, this purchase is authorized due to a public calamity that requires the immediate appropriation of money to alleviate the necessity of the municipality's residents or to protect the property of the municipality; and to preserve or protect the public health or safety of the municipality's residents. WHEREAS, it is in the best interest of the City of Port Arthur to ratify the emergency work performed and to authorize payment for the completed repairs to protect public health, safety, and critical wastewater infrastructure. PR No.24701 1/21/26 cm-tor NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct; and THAT, the City Council hereby ratifies the City Managers decision to authorize emergency sewer line and manhole repair work performed by Global Drilling, Inc., of Winnie, Texas, at Vicksburg Avenue and 5th Street, and authorizes payment in an amount not to exceed $110,000.00, as delineated in(Exhibit"A"); and THAT,the funding for this expenditure is available in CIP Account No. 405-40-000-8516- 00-00-000, Project No. WS0032.OTH. THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the Meeting of the City Council. READ, ADOPTED, AND APPROVED this day of , 2026 at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: AYES: Mayor Councilmembers: NOES: Charlotte M. Moses Mayor ATTEST: Sherri Bellard City Secretary PR No. 24701 1/21/26 cm Page 3 of 3 APPROVED AS TO FORM: Roxann Pais Cotroneo City Attorney APPROVED FOR ADMINISTRATION: c, ;I:V/2M) Ronald Burton, CPM City Manager Suhail Kanwar, P.E. Director of Public Services l ; Calvin Matthews, P.E. Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: Lynn yn oswell, MA CMA-CM Finance Director Clifton E. Williams Jr. CPPB Purchasing Manager Exhibit "A" (Emergency Memo) City of MI • • nrt rthu�r °r— Te r.1s INTEROFFICE MEMORANDUM Date: November 20,2025 To: Ronald Burton, C.P.M., City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: Approval for Emergency Repair to Sanitary Sewer Main on Vicksburg at 5th St. A sanitary sewer main on Vicksburg Ave. at 5th St.is in need of immediate repair.This is a main trunk line that conveys sewage from a large portion of the city. The main has collapsed at a manhole that receives the 16"Force Main(FM) from 19th St. Lift Station where the trunk main turns from Vicksburg Ave. to 5th St. The manhole at the collapse receives the 16"trunk main on Vicksburg Ave.,the force main, and a 10"sewer from the south with a 28"discharge sewer along 5th St. Emergency approval is requested of the City Manager to hire Global Drilling to repair of 16" sanitary sewer lines,manhole,and force main, and approve the purchase of materials for this repair. A total cost of$110,000 is estimated for the repair. A proposed resolution will be presented to City Council for ratification. I,Ronald Burton,hereby approve the emergency repair of the sanitary sewer main on Vicksburg Ave. at Arik Ron Burttr .M. Suhail Kanwar, P.E. City M . .ger Director of Public Services & City Engineer "Remember, we are here to serve the Citizens of Port Arthur" . . Cavity on Vicksburg Ave. arid 5th St. ... • „. •- oliger, ,,,,,:- -„--- , • •-• . .. . „.• . - .•• .-- ' „.„......-ci- . . . . - — - • ,.. . •. _, , .. . .. ._ - . Op_ f . ..,. . .. . - • - . .. ..- #741/1". • . , . , . _ • . , . . ., ._. ,... . . ., .,,,. . • • - . - f . .- - . . ..' • „. - ... . . . . -__ ._ . ....,- . • ..-- . • . • • . •.•• • '-•-•,•-•._ •..,..••••!.•-...,••-•----• --,-,•••••••• -•••--:.,, .:-,-.3----:•,-._.--,_•.,•" ----, • . - .. .. .••• , - .-.- •,„ . •.-...- ..,,,,t.:-..-;:-..,..-:,:.,.:44-...-„A-•,-,---,&•ti -;•,-: • ...:••ki.... ..-::---: -..,,.... • • .2- ••- ,---,-,..;-_--",-.-',•••-•-••:?.L.-: -•z.-L-f-::-:,., .-1--4.7.-....-,,,x;Ati.-•----:zk', ..,„.. --,.-_-- --_,T---...--, .- ..- . - . -----',-- -- --....,-.-7•-•,.......:--..- -*,..,.:.t---.1,-t,..,...-1.,,,......:.:-:.- .: 1-,•,--;-..$4-'-'W-....='---r-z,,t-:-—...---'.'.--..--.•-• <=---, ='-,- .. l'c _. • . . • _ "T‘ • ' PI ...r.j. • # -,.- „ ,,, . , ....... ,: -1' - 18"gravity ''.. - A f- r • . ...,-- .- .. O .„. 'V-,..r., . ,. 0 . -. .g. . .. : i,;_,..; .:-..1,'.... . 16" Frsil :=.: .i- .. • do 28"gravity _ ,....... ..if„,-.. , - 74 slam ,..T. . . ' . .. NISI or,co ',.. c•te . - - , . 7 . ., . ... ?':"A;nram, ..' , ' el-' ' ;. .,,,.,,,..., Si' '''' 4.•.:7. .t.' ' • '' . . - w; r• .-y•gni 77-7, - t`-:•- - - 1,... =I... -.. .4. f cm • :' i r 1 --'. ---'1, ' - - 'n all . , 0 _ _ çii 1, --I E • 7-killi'kri: S::' .1 NICI&r; rt..74"11:-.. . -' -I..1:147.l'.r'-..' 167: -...72.4."1 1: '' ' ' f ' • =--, 'rife, 1 4 . ri . . mei Jr,-. ...-. = ii.:11. a di r-7...--s) I' t I. two - -. „ , .,..* , • Ar: '.-- . :_ .;;-. , i f .. I .me .... • * -0 , 3 "_," -. _••,, :: - - ' :. , gerri , ' ... , =.__' 1 I I Exhibit "B" (Final Payment Invoice with the Daily Reports) GLOBAL DRILLING,INC. CLOB AL 44994 Interstate 10 Wnnie,Texas 77665,USA DRILLING.INC. T:+1 800 956 8720;E info@globaldrillingequipment.com, W:www.alobaldrillinaeauioment.com INVOICE Date Attn: ACCOUNTING January 15,2026 444 4th STREET PORT ARTHUR,TEXAS 776040 Project Name: REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. Ref.No. As per Interoffice Memorandum dated November 20, 2025 PA2026-003 ACTUAL COMPLETED WORK ITEM TOTAL DESCRIPTION UNIT - -- - UNIT PRICE TOTAL PRICE REMARKS NO. QTV TOTAL TO % PREVIOUS DATE 1 REPAIR TO SANITARY SEWER MAIN ON 1 LS 100.00% 1 110,000.00 110,000.00 VICKSBURG AT 5TH ST 1.1 Mobilization,Site Clearing,Excavation 1.2 Demolition of old collapsed manhole 1.3 Supply and Installation of new 72°Cylindrical Manhole 1.4 Bypass Pumping 1.5 Set-Up temporary sewer line for Force Main 1.6 Restoration of surface area including Asphalt works TOTAL DUE: 110,000.00 Terms and Conditions: Amount in Words(US Dollars):One Hundred Ten Thousand Only For GLOBAL DRILLING, JASMI SOBI Page 1 of 1 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. Location : Intersection between Vicksburg Ave and 5th St November 26, 2025—Meet with the City in the jobsite to check on the collapsed manhole and 16", 18"and 28" FM pipes. December 8, 2025—Started excavation around the collapsed manhole J x`Yr �E J 3 ..AM1 00,425, , } „...,,,,„,..., s„......t,,,,,,,,,.. S ,0 ♦..-,J,,..t liDec i ,yr'`1 - k'� ik. i z, Y .,... Yt : r' 1.•� 7 a ri i y _ nv, "Sy,',R .•� 4 4`+ i, ,,, ,a 1"'��',ry.grh i�,. c° '�`kvry i.s it;'� Y''Z t.v,�"� : .��96 ,,,,t.„, Pictures Page 1 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. 4 08.12 AM Dec 08 2025 LJI Mon t� • r Arthur,TX E_'D Company Global Dolling Timemark December 9, 2025—Excavation for FM Line and 8" Line.Set-up Flow-thru plugs.Set-up 2- Bypass Pumps. lf 41,00. ry y - a 4 E law 18ir Pictures Page 2 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. r ,� e A. 411e•AS jn' !i S 4 tom -- M �ue : -. t.Qf, * 1� � ',.11` �' �� . i. gib, ~. /'R ' St,Port Arthiur TX 77 A'•=r,' i M i''. A�'E Ili •t.' `,�lOb21 Qfllilrlg •` ' r �. (. '..' ' • "# v = a' � 4 / z :t.".- , •ir,-**-1%. ...4„, ,>A4,5: -i„;,.: *.....—..: - ,k ' : .• - t ttri " f Y4:4''S.• ice, •- •` ` ..` Pictures Page 3 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST.it.....-44( `'•1.• ,.. '+� 4 i. sr 4 love, _ *tip -n sli * 4' ' s, i, 'u' o tt ./..„ , . . , , 9 p 4 Y 7XJ 4 '.!. ... 4 �„a.,. a,s,o.,.,,. t ,, . ..._ .....„ .v . if:74_14-1 , ,, l ' i r + fit • . • ' x. Yr . rt i k y7 in , n/ O!.IL r.;K 9,2025 •,, O2AMI '� es 1749 Falh St,Port Arthur TX 77640 ,.9 .fifth St Port Goan,,•Gloh.l Dulling ,,, ... !"9' pany:Global r ` a.� _M;y., 1 Pictures Page 4 I REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. X ` c • r, , ..4.Z.,..,-,,....- v. A, .• , . _,.,44‘.: — . —zi____. Ark- as e� r t t! 4:' i h fi ^ - a t 1 , h rW k fx ss•rota%+. ` 4 _ 4., II 7I PM Dec I 09,2025 M8 '-1I ' '. ,f Tues •. i -,.b ur, TX 77640, _ "^ 4g#i i Port Art .T. I_ oili /I . 4 'any ldbal rn1 - .:., > 7rlernat ...., amgnft< - . r ' f rx •a, ' 1 1 , AT. !i j".� ` J -•t- ,.; '( R ; ' 2 f P bse S3i� k yJ _,,�. .- Yi ) l l4 r hU� s � ' im�i :Gla2i i t Ye -' . k=; r .,:fit 4 . i ra 'ark Pictures Page 5 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. December 10, 2025—Finished setting up ByPass Pumps and pipe plugs. Dig and demolish old manhole. .„.. .. . .„. „_„. ...„...., ..., . ,.„ .,.. ,..... ....,, . , .„. „...„.. ..„„... ,, ..., :.. ,., 3.„ ,. .. .,.. .,. , . , ,..... ,,,„ .,.., ,, . ,,,..,„,,, ,,,....,,.., -.E. irt .. „ , ..„....„, , 8a, Z , .'- 4 -S �' :* ^'4 `%:Icy, 'i `f5 `.. J 07:17 -.Tz --- P r .. v'•./j 5 u ,4Ir�n, .'y H�e °oft k' , � TX r 1610 w ' 4. eil `4'i fir «;. }'fr i'Y' * > c .f t ',N u,, "• ,� r,x� � �.z yK �� ,»� r� � �b tw �. r �+�: ,� $ . �.< '. ' • t / F n ci+ - AM Dec0 2( '-t„,„ O9:34 s h 4. ,{ ,• Wed s i v , 500-598 Vicksburg Ave,Port‘ , r `'� �'..! :v TX 77640 \ t ' •= r` \ "art ,rs....... 4-... ‘ Company:Global Drilling %r ` ---- - Photo by', '- Timemark; Page 6 Pictures REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. t 1 6:11 -Company Global Trilirng '. Tsmemark ut it- X 9.23 PM Geo Jed1A,2025 .q lo-�� M Dec10,2025 500-598 Vicksburg Aye,Port Arthur, Wed TX 77640 `1 St4 ,1.PG rthur,TX 77640 - Company.Global Drilling .. nv !Itrt111 Drilling Pi4:,uu4 Timemark Timemark Pictures Page 7 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. December 11, 2025 —Demolished the old manhole. Fused 12" HDPE pipes for temporary FM line. ' =mot 1' .,. // 7 ,. _ t ; y...., -*w. 07 .m. ' .4,' . . - � . ram`. , ,..."4.- ,. .,,,,r,..._ • �: ' VP . `- _� , .r ,. ' . I 1 , #t, , er ....,pry, : Y_t ..,, AP 4, _ .: .,.,_ „„,,,, .. ., ..„ ... , ,.... . _ . _ .,. . ..„.. _ _ .. ...... . ...,.... , ..,...,, ,.., _ , _,„., _ ,„,. ...._ ,. . ... ,. . 4.* -.4, z., n - --....-4.- -tr, - t •4Alii a- .... r ' n n �A191ec1'. i0: / 1 b 0 ' .. ", Thui,s- yv,' ,�:.. ticks7U,rc ve,PI4Arthttt TX ,,64.. "� .. + r y 6lobal 6r- ., ; Timem ark 3y� ,' f Page 8 Pictures REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. i ` a 7, E Imo} 'ta ,�/ Z ' LL d _ a 5PMDec1 . Thurs ` 1900 Fifth St, Port Arthur,TX 77640 -" #P . . Company: Global Drilling anoj, ' Timem r „ ,Es" - ;.""' per a - i I:4,4_ •erg. i. _� } i v i .dr F' Aft$" t , :ate .: ' �• ' �a �` 5 1 , - g -- - a`" Dec 1 ` i i-� $ • - 5.15 .� ._ , . A € 4 r.';3 182E i:n\ or •'tN-T ls; ° -..3..- }hp Com} r*Ai } '• . ; Page 9 Pictures REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. t, .4)i- * 4' • . ' ' r * 10 t ♦ r N• t'.1 t ' 1 y ( ' ' n 1 i 4 111;:. p. ..b t.:1;3114:14* eb..;,t7;..II.1 . ., ,:, , . 1 .‘,..11 ' ",...41/4...s1 441P-''II l‘klb411°,*,i„,14,..:1" t,iA., ,jok liop 1 ifir Dec11,2025; r ' � 7t449PM: Thurs. 1 IV '1848 F.f?h StfPOrt iUr,TX '7640 .s. ' , 111 illftnpany701641tVgyila. A... A t:7 ..",m.'` N December 12, 2025—Pump down FM line and dig around the manhole.Set-up trench protection. Start setting-up the temporary FM line § ... ; . �`. s ..MZSc „yxF' _ Y C� t Q 1 _ 2 m T t4 2:5220 I Fr• .-. ...- -,..-: : 345 Firth St,Part Arthur,TX , ' tompary. ab Dh Ding +„ ¢. Ibr3l 7rihIng ' imemark r* •"" _ • ..:G Tin -mark Pictures Page 10 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. i.. a ..gy�p •a.. \I *rr lok •,,,,,,,. e -- ' -- .. ., „,,.._,„ „,„:„.,....,.. ...4, - :------.... ..:-..444,j {t ' f; .R '�~ ��( f.'I f`h .eye. y .- `mac•.Yl' M1-l. 'I - .. ' 2.5 ' x 4 ,.rt4 .� �' r` • °-- • it `yx", r-. 4sburgAve, (� « . ;Wr lobal Drilling ," " Timemark s9 S 1. ' t # ' s d x s� ,i:�'`d��FF^} .''v'*iz �' r�'`*t' • Sty♦: .t g1..,•,_,,,,.,•„,,.,..,4, ,.,,,.....„ .., ,,,,...,,,,„„,,,., ? ^A _, ,,.,,,.. yy[[ }A4, br•. s .. , . el"f' ..:,( ttkbut0Avttf,y,tv:Ne--pr,kiv: ,;,,,-•—, ',..;:...-*1,,,... 3• . Page 11 Pictures REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. r:4 1-,- e r ��Y^^Y''� h /'sj' r •F C v - ;,l t4- , � , YR .at.� y 5 V" w a 3 r ` ..,4.N.%.,441111;:::..'5-: '.. a � 8:43 PM.,Dq 14. �_ 18'3?fi F`f `i. ' : hut,TX 77640 , } 'obi e -ni ai v I,:jal�'d mg ° 4 p. Timemar Timemark pmpanyi December 15, 2025-Pump and clean out the bottom of the hole to set up 8" and 28" pipe plugs. Ai 4 -i,14,1,11.,. „.,.:.,_,.J.4,4„....,,.. I.,, ... .......... _ _. , _:::,..tdr.:L4 ,4. ---- - 11:- bt - - l' -,:r. .0,1101friz 4%.iiKo.Li:- -.,,;-.: ..*-- -,....- .,... 7-- . , - -,c•cf--.....--,.._N..-*-- --$,,.,-4,....19 lsot -1-., :-‘:-.*" ,.'' : ,-,sitir , „,4. ....,*,701.....e_., ..:,., --_,- __ --A,24A-fir- , 4- --t...4 ' . a M ra r gym{" _ erg.. r e� : tiN ;r E . *4 2:35 . Dec ,, ,.. . .w 2:34 PM Dec 25 1 U , . . Mon 7644� ` �Fsburg Ave,Port Arthur,T' 7640 -1 .. Company :,I, .I r or' Company:Global Drilling. sa r, Timemark :+a`- ' Timemark Page 12 Pictures REPAIR TO SANITARY SEWER MAIN ON VICKSBURG i. AT 5TH ST. , am 'C '1:4 a� -', {' „ 1. iiiiiiirm ti y Y 1 r SsYY.t r SS� t� nNMp yt � tr 2:34 obal Orin,�gv :m,p:n . lob I Drilling sir December 17, 2025—Cleaned up around 16",28"and 16" lines.Start installation of new manhole. `. a sit • Page 13 Pictures REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. 1y, i ,- +- -� • SR �I Y 1►` fr ��p pi, _ , . . 0......" , "., ______- '',.. ____---_ fT - Pictures Page 14 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. December 18, 2025—Continuation of installation of new manhole. Poured co nc@t at the bottom of manhole. , > « . » 4 ?<% \/ . xyam y . . . w> � . z . . � ,.a y ®,wz�y.: .: t f . . . . _ z \: %, �2 � _- 7 \\: ` e d� y � - , .S Pictures Page 15 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. December 19, 2025—Sealed new manhole. Al --t, ,• ,{ w . .� s s a v Pt ..Fri r rt 1.0 O PM ( Dec 19,2025 r 4.0 U Fri \\r. 4 F' .S!,P rt Arthur,TX 77640 1748 Firth St,Port Arthur,TX 77640 Comp rrry.Global Drilling aira Photo by Company:Global Drilling Photo by Wir Timemark Timemark 0 ti p,+t- .v. I' 4 .. par. , . , . ,......... . .. 4 06 PM 1Dec19 ,2025. Fri , y 1826 Fifth St Port Arthur,TX 77640 . _ 4'e Company:Global Drilling t i Pr., oy �rrmemarjc 0 Pictures Page 16 0 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. ., ' �" :� r : tfi g. ; '.- ' i a I" 4t ` Z .., ' .� ie..te .,sta. .:...„..4 ., . __,.., ,.. ------ . -....,;i0p- . , . ..... . . . ___. . , _,_ ,.,, _ , .. ......,.... ... . ....- „,--_-.0!!--.---- . ,A:, -. -.- ., ,,,,., ',, ,,,, :\ , 4.14i -.,,,/- PM Dec 14,2025 i" 4:u o 1 Fri � �� : �� � � � � 1748 Fifth St,Port Arthur,TX 77640 f o `�'� 64i 'v ,� Company:Global Drilling Photo by t ' a I Dr�ging � �r,�;; Timemark _ i,^tom.. ""• x �. J.ark 0 ..: .- ii ?At_ . . 4,..,, , -.r,' 1 ,. IPM i Dec 19 ,r.. - ° .' 3.49 I Fti „y. zr 1841 Fifth St,Port Arthur,TX 776 a xf Timemark Pictures Page 17 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. December 20, 2025—Removed temporary FM line.Connect/installed the 16" FM. yam 1 I ,� - -� —. 7 $ x ,. , ' s r ..� �� 4, . F 4 tom+--, . , 4' =t- /? --.. ...; (v ilr„,.. ',;(4. ak. t =— --1 4, ,, fr,,... , ..,,.,.,,, _ : ., . r.,. , .„.„.., ,, . t . . ,..,.i., .- 1 4 4,441- ,40. , ' , ,-- , t' ram M, off" AM Dec 20,202 `; ,, PM Dec 20,2025 08:49 I Sat 11(x� �,TI V Sai "" e 1845 Fifth St,Port Arthur,TX h 0 1837 Fifth St,Port Arthur,TX 77640 } >�' Company:Global Drilli r , , 44'0tebg> . t :Global Drilling ;, r i emarlC" ry iji i raj z 1- I • y f' m ti 1 Q ) c 20,2025= PM D 2025 ,ti i 12: 9 t } 1:01Is .� Yt 1. 4' .u,,5:8 c.e .up ' , ort Arthur, a 1748 Fifth St,Port Arthur,TX 77640 %hi Company:Global()rifling i nmrar ` .o s1 Photo by T'itr•crmark Timemark Page 18 Pictures REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. •_ rtit � " ''' ',,,:: All \ ,,, .:,,,i e q�n.} -" ti . E E .',$fig,` w;a . ? •.. + ` .‘ 3 "J(•�- Al Y 0 d x x a Iv } - •` .. 1255 PM Dec 20,202 < PM Dec 20 '" '`` I sat 12:28 I sat }��. e i:i : 500-598 Vicksburg Ave,Port Arthur, a `�- '0-59.8':'.cksburg Ave,P. " hUr, :1.,--,-.' 77640 i s X 7 40 i .bal Drilling Sian:C�obal Drilhn , '•� S t emark r•: :ni rk + n ' ., ` ', `d� `',.`rnera . z . re: rx r - nr c 20 2025; , .� 08:09 � t ` ,?a k .k :. P-t TX '7640 iCc�mranyr: Giotf •a� r, yr T imemark Pictures Page 19 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. 1.41 PM Dec 20,2025 Sat 500-598 Vicksburg Ave,Port Arthur, TX 77640 ompany:Global Drilling Photo by- Timemark 3• _01 Prd Dec 202025 IP lei Fhh Si.Pon Arthur,TX 77640 Ploy GinbaldnfU� s s Pictures Page 20 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. December 22, 2025—Cover up ad installed rings on new manhole. Backfilling works/restoration of surface area. k t:tea i ' \ 4 4 •t .-gyp`,. \ .i4 [`f� r 'J. _ - __ Xv ri (tb 5_S .rcksburg Aye,lPort „cr, IP 9:0 - patty:Global Dhllinn ' •# =r ' Timemark'r r. —s�- I ' _ � I 1 pm Dec..2#. D25- , +'d -:0V Manger .Th45 nfth St,Port;,-''m, i n bdu • rt,ary Global!?r,,,ra 'remark Pictures Page 21 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. x c C' 7.3.5 6 �n PM Dec22,%u25 103 Fifth St Poi firth,r"y —:640 Company:Global Diann Timemark flk ''''ft ,. .T - a a 1. ' 4 fir . 9.f ,.1 n • 'yt y. N P r , 1p.11 1 ,,In,m, Po . •4 ' i ,. ;, '' 0. A . l "� a der any. Glc�hal Dtilluug + ; t ', ;. Pictures Page 22 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST._-k'„. ..:::'- ' , '• g,..- .., . . A. ... , , A...4r.....--";,;. • .i'-;....-7-..,A4 .40:e;'•‘., .....:s '77' .:,-; . . , ,, . - •.e. — - • . ' - • ''.- •''',.. ,:,- • ' -7 . .• -- . . , . . _ 3:02 ' -s):-r-'.' • •„„„,71,.770,-_, - - Photo by V COMPahV.kt)._•I..! .., .t Timemark December 30, 2025—Continuation of restoration of surface area. Backfilling works. - ::,....,,_41,.- • -4,';',:-;',,A.:,,;,. ...:4-!,-,-. ,,,..!, i .4.a,ri " , -- -, --47k '-...i:040*- -..;L,.,,,41'i.'..gt,;1440, ?...:, est'A.'''''':;%';','0,• , ... .'4317 47 "..::.,, r 4 *A'AZtr--,.:.4_,V-_-.5,-,r-`,viA4'...,,,,_,,,;•4,_-.. :,41,-,*•- ,A4i41!14.t1441 '! ,... -''T 4,4'. jai. -14,1*$.:"1 -1Q06..,..; :-„ 4 ,t-ex, •, ,v.---, ,.. 1Ttilt ''!'=:;.-,----4Virt_' 4,' 7 -,-yr- '.. -t2 li..447':' ,,,,Z ', .:: "41,..-4.v..„.,„ 4..-.,,,.f, -,,,, , 'EPA,i;,. . .' *--101 :iipt, 14.. ,00-0el ,47-,V44,..-me ..,,,. ,.......,,,,,„ .--.%,?' ..• , te •410 to:VA'''.7 ,,,i ; .-; '04111cw‘' i...:f1,04w-:-7714.,;:;:. . ::•:l4k*:..:rltiH.::::t;.::;7111f1*':4,44t7::::':''' ;... '.- :,'. 47 .,;,„.%-- .,,,-,,,-,h 4,-.1;%,,,,,, ,, ,,IV;'.-lie:I"'"•-• kt''. 1/1Tr: i '.: r'..S...'•- 4. . fir ., 4! ,: .',A,...,,•,' - . . . ---.. ,-.1..4; .,-..,,,,-,—„,„,_` ,ty4 ft -, De6 :' 07:45 -41ttiq ;'° 111,1•14, .- - 034:4;. . 1. *..4, „MO u r,TX I:it:A. 4_ 4e;44, i•- .10, ,,,Pr„VArio-, '.,'„-•;43 .. . i Page 23 Pictures REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. �_ _ ; if. -�. �''`, . � -• _ .4,-4' Tr w..R at S- i . , to; tf # ,� r. zx h 'Y•+t' Pam " { y ! ' F �.: f - ^R„ -+s. { ,,. „., 'it - + 0AM • ec30 �_ -'" , :rues 0 �� 09: 0 _� a .'y' _. R bur P+ ti iobal Drillin .•M. Tirne iart - , Li - 4 WK ' x ' - YL a I7:57A 1801 041 cit Pori X ,''.•.: ti `:.. C are Glohal Cr;',..a . 4 Timemark • Page 24 Pictures REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. December 31, 2025—Cleaning up. Leveling surface area. 1. xyo. '-fry.; ...: - �^'�-- • .,yam..r _ - x,.�+- , C.. t w .4.._ ^t's - 7.k ,yam. i i P 2. '� ' 12:40 • y ,bal Drilling Pho!o by Coy .I ,,_,i r , Timemark ,irrt<rnark .4.c.. r i,s,:- . .:, ': ' x§, •c 31,2025 2. 1 Wed l ar ih St,Port Arthur,TX 77640 emgany:Global Drilling Photo by Timemark Pictures Page 25 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. January 13, 2026 -Restoration of surface area. Asphalt works. 44impw _ Pictures Page 26 REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 5TH ST. re 1 y J 411111.111 .. _ __ Pictures Page 27