HomeMy WebLinkAboutPR 24766 REQUEST FOR APPROVAL OF CHANGE ORDER NO.1- 13TH STREET REHABILITATION PROJECT Ciryvf nrt rthul t www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: February 18, 2026 To: The Honorable Mayor and City Council Through: Ron Burton, CPM, City Manager From: Suhail Kanwar, P.E., M.S., CFM,Director of Public Services/City Engineer RE: PR No. 24766: Request for Approval of Change Order No. 1 — 13th Street Rehabilitation Project —Sabine Ave to Neches Ave.Project No. ST5095.CON Street Capital Account No. 307-21-053- 8517-00-10-000. PaveCon, LTD, of Houston, Texas Introduction: The intent of this memorandum is to request City Council's approval of Change Order No. 1 to the construction agreement with PaveCon,LTD,of Houston,Texas(PaveCon),for the 13th Street Rehabilitation Project—Sabine Avenue to Neches Avenue,with no funding impact to the contract amount. Background: Due to the large number of streets needing repair, Purchasing has sought additional ways to bring in more contractors to repair them. Purchasing found PaveCon as a contractor on the BuyBoard Cooperative Contract for road repair. Purchasing and Engineering met with the PaveCon representative and requested a quote for the rehabilitation of 13th Street. PaveCon also met with the Water Utilities for utility work needed on 13th Street. PaveCon submitted a quote in the amount of$406,888.64 for this work. Pursuant to Resolution No.25-312,the City Council awarded the construction contract to PaveCon for a contract amount of$406,888.63 for the rehabilitation of 13th Street,extending from Sabine Avenue to Neches Avenue,at either end of the street. Change Order No. 1 submitted by PaveCon,Ltd.,which(i)adds the placement and compaction of six-inch(6")flex base in the amount of$23,872.10, and (ii) removes the previously included line item for installation of a manhole at Sabine Avenue in the amount of $23,872.10, based upon a field determination that the existing manhole is in satisfactory condition and replacement is unnecessary. Bud2et Impact: Funds are not impacted by this request.Project No. ST5095.CON. Recommendation: It is recommended that the City of Port Arthur's City Council approve PR No. 24766 for Change Order No. 1 to the construction agreement with PaveCon,for the 13d'Street Rehabilitation Project—Sabine Avenue to Neches Avenue,with no funding impact to the contract amount.Project No. ST5095.CON. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 C:\Users\troti bi_ch\AppData\Local\Microsoft\Olk\Attachments\ooa-d7e954fa-90ac-4575-8ab5-16073aacf6dc\b75d 38fd5c9b1919e5b10623990f6bOb170eb04776fOf716c6901cefdcb368f0\Agenda Memo_PaveCon CO 1.docx PR 24766 02/18/2026 RLD Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONSTRUCTION CONTRACT WITH PAVECON LTD, OF HOUSTON, TEXAS, FOR THE 13TH STREET REHABILITATION PROJECT, SABINE AVENUE TO NECHES AVENUE. FUNDING IS NOT IMPACTED. PROJECT NO. ST5095.CON. WHEREAS, the Engineering Department, based on historical data and roadway condition assessments, identified various City streets in deteriorated condition and recommended them for reconstruction, remediation, or rehabilitation, which recommendations were duly presented to the City Council for review and consideration; and, WHEREAS, in light of the volume of required street rehabilitation, the Purchasing Division explored additional procurement options to expand contractor participation, including the utilization of cooperative purchasing contracts; and, WHEREAS, the Purchasing, Utilities, and Engineering Departments jointly identified PaveCon, Ltd. as a qualified vendor through the BuyBoard Cooperative Purchasing Program; and, WHEREAS, said departments provided PaveCon, Ltd. with a bid table and layout, along with the City of Port Arthur's standards and specifications, in order to obtain a cost proposal for the rehabilitation of 13th Street, extending from Sabine Avenue to Neches Avenue, at either end of 13th Street; and, WHEREAS, PaveCon, Ltd. submitted a BuyBoard-compliant proposal in the amount of $406,888.63 for the rehabilitation of 13th Street, extending from Sabine Avenue to Neches Avenue, at either end of 13th Street; and, WHEREAS, staff from the Utilities and Engineering Departments reviewed the cost proposal submitted by PaveCon, Ltd. and determined that the proposed pricing is competitive with similar projects recently bid; and, WHEREAS, Chapter 271 Subchapter D of the Texas Local Government Code authorizes municipalities to participate in cooperative purchasing programs through a resolution adopted by their governing bodies, including programs such as (BuyBoard), as an alternative to the formal bidding process; and, PR 24766 02/18/2026 RLD Page 2 of 4 WHEREAS, pursuant to Resolution No. 25-312, the City of Port Arthur entered into a construction contract with PaveCon, Ltd., of Houston, Texas, for the amount of$406,888.63, for the rehabilitation of 13`h Street, extending from Sabine Avenue to Neches Avenue, at either end of 13th Street; and, WHEREAS, Change Order No. 1 submitted by PaveCon, Ltd. includes the addition of a line item for the placement and compaction of a six-inch (6") flex base in the amount of $23,872.10; and WHEREAS, the original contract included a line item for the installation of a manhole at Sabine Avenue in the amount of$23,872.10; and WHEREAS, upon further field review, it was determined that the existing manhole at Sabine Avenue is in satisfactory condition and replacement is unnecessary, and therefore the manhole installation line item has been removed from the contract through a deductive change order in the amount of$23,872.10; and WHEREAS, the addition of the flex base work and the corresponding removal of the manhole installation result in no net increase or decrease to the total contract price; and, WHEREAS, approval of PR No. 24766 for Change Order No. 1 is herein deemed an appropriate action. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Council hereby approves Change Order No. 1 submitted by PaveCon, Ltd., which (i) adds the placement and compaction of six-inch (6") flex base in the amount of $23,872.10, and (ii) removes the previously included line item for installation of a manhole at Sabine Avenue in the amount of$23,872.10, based upon a field determination that the existing manhole is in satisfactory condition and replacement is unnecessary, see Exhibit A; and, THAT, the additive and deductive components of Change Order No. 1 offset one another, resulting in no net change to the total contract amount. The City Manager is authorized to execute Change Order No. 1 with PaveCon, Ltd., of Houston, Texas, in substantially the same form, attached hereto as Exhibit B; and, THAT, a copy of the Resolution shall be spread upon the Minutes of the City Council. PR 24766 02/18/2026 RLD Page 3 of 4 READ,ADOPTED AND APPROVED this the day of , A.D., 2026, at a of the City Council of the City of Port Arthur, Texas,by the following vote: Ayes: Mayor: Councilmembers: Noes: Charlotte M. Moses Mayor PR 24766 02/18/2026 RLD Page 4 of 4 ATTEST: Sherri Bellard, TRMC City Secretary APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION 4111% 040e, Roxann Pais Cotroneo, Esq. Ron Burton, CPM City Attorney City Manage APPROVED AS TO AVALIABILITY OF FUNDS: Lynda (Lyn Boswell, MA, ICMA-CM Finance Director Suhail Kanwar, PE Director of Public Services/City Engineer Clifton illiams, CPPB Purchasing Manager EXHIBIT A PAVECON PROPOSAL PACKAGE VE44n44 '4 13th St Rehab - CO 1 Add 6" Base 13th St Port Arthur Tx Prepared for: City of Port Arthur Public Works • Nti ,tll°i +" :-.. y r S ` t., �'v `* S. . • ;. r .. .`"e• '.. t ..`t ' . 3., *N,' 7 i- PROPOSAL & CONTRACT PAVE 13th St Rehab - CO 1 Add 6" Base Houston Division 13th St Port Arthur Tx 9900 Windfern Rd City of Port Arthur Public Works Houston, TX 77064 Office 281-571-8040 BUYBOARD# 700-23 SOW Description Quantity Unit Unit Price Total Flexbase Place and Compact 6" Flexbase 960 SY $ 25.74 $ 23,872.10 Utilities Install Manhole at Sabine -1 EA $ (23,872.10) $ (23,872.10) Total Change Order Cost = NO CHANGE PAVECON, Ltd.will furnish all labor, materials and equipment required for the performance of the following described work in connection with construction or improvements. Please see following pages to view repair details, inclusions, exclusions, and our terms and conditions. Please sign below to accept this proposal. ACCEPTED: PAVECON, LTD. Tristan Frerich Senior Project Manager December 4, 2025 Corporate Office P.O.Box 535457,Grand Prairie,TX 75053 > 3022 Roy Orr Blvd.,Grand Prairie,TX 75050 PROPOSAL & CONTRACT PA DESCRIPTION OF WORK: Manhole at Sabine Deduct No new manhole needed on Sabine due to existing being in very good condition. Place and Compact 6"Flexbase Place and compact 6"of new flexbase. Flexbase will be placed on current road surface raising the elevation of the road an additional 6".All intersections and driveways will be sloped with flexbase to allow resident access. PROPOSAL & CONTRACT TERMS AND CONDITIONS 1.PAVECON, Ltd.,(PAVECON)will carry workmen's compensation insurance covering its employees and shall provide public liability and property damage insurance. 2.Any changes from the specifications or modifications of the terms of this contract shall be set put in writing and signed by both parties. 3.This proposal expires 30 days from the date hereof but may be accepted at any later date at the sole option of the Company. 4.By accepting this proposal,Owner agrees to indemnify to the extent authorized by law and to hold PAVECON,Ltd.harmless from all claims,including its reasonable attorneys'fee incurred in defending any claim,resulting from damages to any utility line,irrigation line,private electrical,or sub structure not identified or clearly marked.Any damage to clearly marked utility lines,irrigation line,private electrical lines,or sub structures shall be the responsibility of PAVECON,Ltd. 5.Unless a lump sum price is to be paid for the foregoing work and is clearly so stated it is understood and agreed that the quantities referred to above are estimates only and that payment shall be made at the stated unit prices on the actual quantities of work performed by PAVECON as determined upon completion of the work. 6.PAVECON shall not be responsible for any damage to or deterioration of any of our work,whether completed or in process,resulting from any cause or causes beyond our control,but not limited to failure of subgrade, including soil volume changes,or failure of inadequacy of any labor or materials not furnished and installed by us,whether or not such failure or inadequacy was or could have been known at the time our work was undertaken. 7.PAVECON is not responsible for removing vehicles from repair areas.PAVECON will notify you in advance and you must make arrangements to have vehicles removed at your expense. 8.In the event all work under this contract is not completed in one operation,Company shall be paid in full for all items of work completed upon the completion thereof.Any work under this contract for which PAVECON has not received a"work order"calling for completion within one year from the date of this agreement will be subject to renegotiations of prices,or cancellation at PAVECON's option. 9.Terms of Payment-Final and complete payment for all work performed herein shall be made within 30 days of invoice date. Interest at the rate of(18)percent per annum shall be charged you and paid by you on all unpaid balances from the due date to the date of receipt of payment by PAVECON. Reasonable attorney's fees and cost of collection shall be charged you and paid by you,if incurred by PAVECON. PROPOSAL & CONTRACT 12A INCLUSIONS: Unit pricing prevails on all items unless otherwise noted. PAVECON,Ltd.guarantees this work for materials and workmanship for a period of 1-year from installation,excluding unusual abuse or neglect. BUYBOARD#700-23 EXCLUSIONS: Testing Taxes(Resale or Exempt must be provided). Utility relocation/adjustment,irrigation,or landscape repair. Back-fill walks,curbs,&islands. Rock excavation,soil treatments,tree removal. Demo,sawing,haul off of spoils created by others. Pavement markings,wheel stops,signage. Sleeves for Irrigation. Dewatering. EXHIBIT B CITY OF PORT ARTHUR Public Works Engineering DATE: FEBRUARY 18,2026 PROJECT: 13TH STREET REHABILITATION PROJECT OWNER: CITY OF PORT ARTHUR CONTRACTOR: PAVECON,LTD CHANGE ORDER NO.: I THE FOLLOWING CHANGES IN THE PLANS AND/OR SPECIFICATIONS ARE HEREBY MADE: Adjust the Estimated Quantities to reflect the Actual Quantities used in the completion of the project: Item Original No. Description Unit Unit Price Original Amount Total t/ New Anweet Quantity SCOPE _... 1 Place and Compact 6"Flexbase SY $ 25.74 960 $ 23,872.10 2 Install Manhole at Sabine EA $ 23,872.10 1 $ (23,872.01) No additional Calendar Days added at this time. TOTAL CHANGE ORDER $ - I ORIGINAL CONTRACT AMOUNT I$ 406,888.63 I NEW CONTRACT AMOUNT 406,888.63 ORIGINAL CONTRACT AMOUNT:I$ 406,888.63 TOTAL AMOUNT OF CHANGE ORDER NO.1: $ TOTAL PERCENT CHANGE ORDER No.1: NEW CONTRACT AMOUNT: $ 406,888.63 r PREPARED BY: "" APPROVED BY: Ir ' Roeisha L Diaz,CoPA Engineering Administ n Suhail Kanwar,PE,City Engineer ra APPROVED BY: APPROVED BY: / „,1t,ediee-dt4.,, PAVECON,LTD. Clifton Williams,CPPB,Purchasing Manager APPROVED BY: APPROVED BY: Gr 9 smire,CoPA Roadway Design Engine r Ron Burton,CPM i anager S:\Engineering\PUBLIC WORKS\PW-ENGINEERING\C.I.P.PROJECTS\Year 2025\7th ST.Stadium Rd to Duff Dr\Change Orders\Change Order 1\7th Street_CO 1_Elite