HomeMy WebLinkAboutPR 24903: AUTHORIZING THE EDC TO ACCEPT A QUOTE FROM IMAGE 360 FOR THE SPUR 93 BUSINESS PARK MONUMENT SIGN REFURBISHMENT & RENAMING 411 )ji)OR'l'*\RTIII ti.i1itUi.to"1,01/ t ttOt%Ito%,
INTEROFFICE MEMORANDUAM
Date: April 14, 2026
To: Port Arthur City Council
Through: Ron Burton, City Manager
From: Krystle Muller, Interim CEO
RE: PR 24903 —AUTHORIZING THE PORT ARTHUR ECONOMIC DEVELOPMENT
CORPORATION TO ACCEPT A QUOTE FROM IMAGE 360 OF BEAUMONT,TX FOR
THE SPUR 93 BUSINESS PARK MONUMENT SIGN REFURBISHMENT AND
RENAMING
The intent of this Agenda Item is to seek the City Council's approval for authorizing the Port Arthur
Economic Development Corporation to accept a quote from Image 360 of Beaumont, Texas for the
Spur 93 Business Park monument sign refurbishment and renaming.
Background:
The Port Arthur Economic Development Corporation reviewed quotes received from qualified
local vendors for the renaming and refurbishment of signage at the Port Arthur Business Park.
After careful consideration,the PAEDC finds and determines that Image 360 of Beaumont,Texas
has provided a proposal that meets the needs and expectations set forth by the PAEDC Board of
Directors. The PAEDC Board is committed to enhancing the visibility and branding of the
Business Park while ensuring quality and value.
Budgetary Impact:
The budgetary impact of this item will be $55.090: funds available in PAEDC Account No. 120-80-
625-5322-00-00-000.
Recommendation:
It is recommended that the City Council approve the Port Arthur Economic Development
Corporation's acceptance of Quote#E-20218 from Image 360 for the refurbishment and renaming
of the monument signs at the Port Arthur Business Park.
M
PR 24903
04/13/2026 DMB
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE PORT ARTHUR
ECONOMIC DEVELOPMENT CORPORATION TO ACCEPT A
QUOTE FROM IMAGE 360 OF BEAUMONT, TEXAS FOR THE
SPUR 93 BUSINESS PARK MONUMENT SIGN
REFURBISHMENT AND RENAMING IN A ONE-TIME AMOUNT
NOT TO EXCEED $55,090; FUNDS AVAILABLE IN PAEDC
ACCOUNT NO. 120-80-625-5322-00-00-000 (OTHER
MAINTENANCE)
WHEREAS, the Port Arthur Economic Development Corporation ("PAEDC") owns and
maintains the Spur 93 Business Park, a key industrial and commercial asset supporting economic
development and job creation within the City of Port Arthur; and
WHEREAS, at its regular Board meeting held on February 2, 2026, the PAEDC Board of
Directors voted to rename the Spur 93 Business Park from "Port Arthur Business Park" to the "Floyd
Batiste Port Arthur Business Park"in honor of Mr. Floyd Batiste's 17 years of service as Chief Executive
Officer and his lasting contributions to economic development in the Port Arthur community; and
WHEREAS,the PAEDC seeks to refurbish and update two(2)existing monument signs located
at the Spur 93 Business Park to reflect the new name and improve the overall appearance and branding
of the site; and
WHEREAS,PAEDC received quotes from qualified local companies for the refurbishment and
renaming of the monument signs at the Spur 93 Business Park, and such quotes are attached hereto and
incorporated herein for all purposes as Exhibit"A"; and
WHEREAS,at its regular Board meeting held on April 6, 2026,the PAEDC Board of Directors
selected and approved the design and proposal submitted by Image 360 of Beaumont, Texas, as outlined
in Exhibit"B", in a total amount not to exceed $55,090; and
WHEREAS, funds are available in the PAEDC FY 2025-2026 budget under Account No. 120-
80-625-5322-00-00-000 (Other Maintenance).
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PORT ARTHUR,TEXAS:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That PAEDC is hereby authorized to accept a quote from Image 360 of Beaumont,
Texas for the renaming and refurbishment of two monument signs at the Spur 93 Business Park in an
amount not to exceed $55,090, as outlined in Exhibit "A", and consistent with the design reflected in
Exhibit "B", with funds available in PAEDC Account No. 120-80-625-5322-00-00-000 (Other
Maintenance).
Section 3. That a copy of the caption of this Resolution shall be spread upon the Minutes of the
City Council.
READ, ADOPTED AND APPROVED on this day of A.D., 2026, at a
Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES:
Mayor
Councilmembers
NOES:
Charlotte M. Moses,Mayor
#2546396 Page 2
ATTEST:
Sherri Bellard, City Secretary
APPROVED:
r
ihk_tAQ1__
Krystle uller, PAEDC Interim Chief Executive Officer
APP 0 .ED AS TO 'ORM:
i
av dA____
Guy N. Goodson, PAEDC Attorney
APPROVED AS TO FORM:
Roxann Pais Cotroneo,City Attorney
APPROVED AS TO AVAILABILITY OF FUNDS:
rldk ieW(A)-
.,yn a Boswell, Finance Director
I
i
#2546396 Pagc 3
Exhibit "A"
#2498847 Page 4
PORT*ARTHUR:uw [it c,�a►
VENDOR PRODUCT SUMMARY PRICE
FAST SIGNS ACM PANELS WITH LAMINATION AND $7,050
1415 S HWY 69 INSTALLATION [32FTX4FT (2)]
NEDERLAND, TX 77627
FAST SIGNS ACM PANELS WITH LAMINATION AND $6,750
1415 S HWY 69 INSTALLATION [30FTX4FT(2)]
NEDERLAND, TX 77627
SERVICE GRAPHICS FAUX STACKED STONE $44,900
48 N MAJOR DR MANUFACTURED BRUSHED ALUMINUM
BEAUMONT, TX 77707 CHANNEL LETTERS (2)
IMAGE 360 FAUX STONE PANELS WITH FABRICATED $55,090
3930 PHELAN BLVD METAL LETTERS
BEAUMONT, TX 77707
FASI'SIGNS 1415SHighway69 ESTIMATE
Make Your Statement' Nederland,TX 77627
(409)344-8440
EST-10124
fastsigns.com/2111 Payment Terms:Cash Customer
Created Date:3/17/2026
DESCRIPTION:Alluminum compost metal panels with lamination and installation
Bill To: Economic Development Center Pickup At: FASTSIGNS-PORT ARTHUR
501 Proctor St 1415 S Highway 69
Port Arthur,TX 77640 Nederland,TX 77627
US US
Requested By: Dylan Bennett Salesperson: Jasmine Momin
Email: dbennett@paedc.org
Cell Phone: (409)880-5451
Tax ID: **********
NO. Product Summary QTY UNIT PRICE TAXABLE AMOUNT
ACM panels with lamination and installation 32 ft x 4ft 2 $3,525.00 $0.00 S7,050.00
(qty 2)
1.1 Dibond/Max Metal 3mm-
Part Qty:1
Width:32.00'
Height:4.00'
Sides:1
Text:
Customer will provide the logo and
details
Notes:
4 Panels
each panel is 8 ft x 4 ft
qty 2 brick monuments
1.2 Overlaminates-3 mil UV Gloss-
Part Qty:1
Width:32.00'
Height:4.00'
1.3 Installation-
Text:
Installing 4 panels on both side
concrete brick monuments
total panels will be 4 which makes
total size of 32ft x 4ft
Generated On:3/17/2026 4:16 PM Page 1 of 2
Subtotal: $7,050.00
Taxable Amount: $0.00
Taxes: $0.00
Grand Total: $7,050.00
Signature: Date:
Genf i a ( O /1 ';_'O r:4.i
FA TSIGIVS
1415 S Highway 69
Make Your Statement' Nederland,TX 77627 ESTIMATE
(409)344-8440
EST-10127
fastsigns.com/2111 Payment Terms:Cash Customer
Created Date:3/17/2026
DESCRIPTION:Alluminum compost metal panels with lamination and installation
Bill To: Economic Development Center Pickup At: FASTSIGNS-PORT ARTHUR
501 Proctor St 1415 S Highway 69
Port Arthur,TX 77640 Nederland,TX 77627
US US
Requested By: Dylan Bennett Salesperson: Jasmine Momin
Email: dbennett@paedc.org
Cell Phone: (409)880-5451
Tax ID: ***********
NO. Product Summary QTY UNIT PRICE TAXABLE AMOUNT
1 ACM panels with lamination and installation 30 ft x 4ft
(qty 2) 2 $3,375.00 $0.00 $6,750.00
1.1 Dibond/Max Metal 3mm-
Part Qty:1
Width:30.00'
Height:4.00'
Sides:1
Text:
Customer will provide the logo and
details
Notes:
3 Panels
each panel is 10 ft x 4 ft
qty 2 brick monuments
1.2 Overlaminates-3 mil UV Gloss-
Part Qty: 1
Width:30.00'
Height:4.00'
1.3 Installation-
Text:
Installing 3 panels on both side
concrete brick monuments
total panels will be 3 which makes
total size of 30ft x 4ft
Genet ated On:3/17/2026 4:12 PM Page 1 of 2
Subtotal: $6,750.00
Taxable Amount: $0.00
Taxes: $0.00
Grand Total: $6,750.00
Signature: Date:
ANtt
441% 4P/-40 LLC
48 N.Major Dr. 409-860-4005
Beaumont,Tx 77707 Fax:409-860-4228
sales@servicegraphicstx.com
www.servicegraphicstx.com
Port Arthur Business Park
Attn: Dylan Bennet
RE: Monument Reface
Permit staff time $250. Permit at cost (if applicable)
Manufacture brushed aluminum channel letters (2) sets
Supply enough faux stacked stone & materials to cover front, sides and tops of two 40'x 6' monument
signs.
Brick Mason labor to install stone
Labor to install sign letters
$44,900. Plus, sales tax
Option: Manufacture brushed aluminum letters (2) sets
Labor to install sign letters only on 2 monuments in Port Arthur.
$31,000. Plus, sales tax.
3930 Phelan Blvd.
°r'P36a) eau 892-9,TX 50377707 E ST I MATE
9) E-20218
www.image360Beaumont.com Payment Terms: Cash Customer- Pmt req'd
76-0633037
Region5 ESC Purchasing CO-OP Vendor#20250802
DESCRIPTION:BUDGET QUOTE:Refurbishment/Renaming of PABP Identity Signs
Bill To: Port Arthur Econimic Development Foundation Installed: Port Arthur Econimic Development Foundation
501 Procter Street Port Arthur Business Park
Ste:100 West Port Arthur Road
Port Arthur,TX 77659 Port Arthur,TX,TX 77659
US US
Requested By: Dylan Bennett Salesperson: Robert Blackwell, Image360
Email:dbennett@paedc.org Work Phone:409-892-9503
Work Phone:(409)963-0579 x 201 Cell Phone:409-504-1962
Entered By: Robert Blackwell,Image360
PRODUCTS QTY UNIT PRICE TAXABLE TOTALS
Furnish&Install Faux Stone Exterior&new Metal1 2 $27,545.00 $0.00 $55,090.00
Letters
1.1 Custom Product-Faux Stone Panels
1.2 Custom Product-Furnish&Install New Fabricated Metal letters
1.3 Installation-
1.4 Custom Product-Hardware
1.5 Design Service-
Subtotal: $55,090.00
This estimate covers only the services outlined above. If the scope of the work Taxable Amount: $0.00
changes from the original estimate,approved revisions and additions will be Taxes: $0.00
charged accordingly.
If you require changes to your design after it has been designed and approved, Grand Total: $55,090.00
charges for additional design time as well as any restocking charges incurred will Deposit Required: $27,545.00
apply.Sizes shown are NOMINAL sizes and may not be exact. If your require
exact sizing, please let us know immediately.
Electrical installation,service or connection by others when required.
Image360 is not licensed by the State of Texas for electrical installations.
Please submit purchase orders to:orders@image360beaumont.com
Estimate valid for 30 Days.
Ceoerated On:4/3/2026, 1:31 PM Page 1 of 1
Exhibit "B"
#2498847 Page 5
MI, - s
PORT ARTHUR ECONOMIC DEVELOPMENT CORP. INSTALL ADDRESS: _ �1
Port Arthur,TX •
•�
Initial Concepts/Port Arthur Business Park- Sign Renaming& Refurbishment
' Graphics>Signage>Displays`..00
r.`,:�' ORDER NUMBER: TBD
.,, DESCRIPTION:
SCOPE:Center section to be
c covered with EFIS faux stone
panels
New Signage to consist of
5 s ',rf. fabricated aluminum letters stud
K',, ; ' .'t+, -mounted to surface.
{� DIMENSIONS:
V 72"X 42'
r
Floyd Batiste si
Port Arthur Business Park
,volowelosyy. y. COLORS:
ter*- ❑ BRUSHED
ALUMINUM
,
4�a a ,.
-
CONTACT INFO:
�-• -�•- - a A. Robert Blackwell
Example-Faux Stone Panels robert@image360beaumont.com
(multiple styles/colors available) 409.892.9503
beaumonttx.image360.com
(multiple styles/colors available
SIZES SHOWN IN THE MOCKUPS ARE AN ESTIMATE
ALL MEASUREMENTS TO BE CONFIRMED PRIOR TO PRODUCTION