Loading...
HomeMy WebLinkAboutPR 24903: AUTHORIZING THE EDC TO ACCEPT A QUOTE FROM IMAGE 360 FOR THE SPUR 93 BUSINESS PARK MONUMENT SIGN REFURBISHMENT & RENAMING 411 )ji)OR'l'*\RTIII ti.i1itUi.to"1,01/ t ttOt%Ito%, INTEROFFICE MEMORANDUAM Date: April 14, 2026 To: Port Arthur City Council Through: Ron Burton, City Manager From: Krystle Muller, Interim CEO RE: PR 24903 —AUTHORIZING THE PORT ARTHUR ECONOMIC DEVELOPMENT CORPORATION TO ACCEPT A QUOTE FROM IMAGE 360 OF BEAUMONT,TX FOR THE SPUR 93 BUSINESS PARK MONUMENT SIGN REFURBISHMENT AND RENAMING The intent of this Agenda Item is to seek the City Council's approval for authorizing the Port Arthur Economic Development Corporation to accept a quote from Image 360 of Beaumont, Texas for the Spur 93 Business Park monument sign refurbishment and renaming. Background: The Port Arthur Economic Development Corporation reviewed quotes received from qualified local vendors for the renaming and refurbishment of signage at the Port Arthur Business Park. After careful consideration,the PAEDC finds and determines that Image 360 of Beaumont,Texas has provided a proposal that meets the needs and expectations set forth by the PAEDC Board of Directors. The PAEDC Board is committed to enhancing the visibility and branding of the Business Park while ensuring quality and value. Budgetary Impact: The budgetary impact of this item will be $55.090: funds available in PAEDC Account No. 120-80- 625-5322-00-00-000. Recommendation: It is recommended that the City Council approve the Port Arthur Economic Development Corporation's acceptance of Quote#E-20218 from Image 360 for the refurbishment and renaming of the monument signs at the Port Arthur Business Park. M PR 24903 04/13/2026 DMB RESOLUTION NO. A RESOLUTION AUTHORIZING THE PORT ARTHUR ECONOMIC DEVELOPMENT CORPORATION TO ACCEPT A QUOTE FROM IMAGE 360 OF BEAUMONT, TEXAS FOR THE SPUR 93 BUSINESS PARK MONUMENT SIGN REFURBISHMENT AND RENAMING IN A ONE-TIME AMOUNT NOT TO EXCEED $55,090; FUNDS AVAILABLE IN PAEDC ACCOUNT NO. 120-80-625-5322-00-00-000 (OTHER MAINTENANCE) WHEREAS, the Port Arthur Economic Development Corporation ("PAEDC") owns and maintains the Spur 93 Business Park, a key industrial and commercial asset supporting economic development and job creation within the City of Port Arthur; and WHEREAS, at its regular Board meeting held on February 2, 2026, the PAEDC Board of Directors voted to rename the Spur 93 Business Park from "Port Arthur Business Park" to the "Floyd Batiste Port Arthur Business Park"in honor of Mr. Floyd Batiste's 17 years of service as Chief Executive Officer and his lasting contributions to economic development in the Port Arthur community; and WHEREAS,the PAEDC seeks to refurbish and update two(2)existing monument signs located at the Spur 93 Business Park to reflect the new name and improve the overall appearance and branding of the site; and WHEREAS,PAEDC received quotes from qualified local companies for the refurbishment and renaming of the monument signs at the Spur 93 Business Park, and such quotes are attached hereto and incorporated herein for all purposes as Exhibit"A"; and WHEREAS,at its regular Board meeting held on April 6, 2026,the PAEDC Board of Directors selected and approved the design and proposal submitted by Image 360 of Beaumont, Texas, as outlined in Exhibit"B", in a total amount not to exceed $55,090; and WHEREAS, funds are available in the PAEDC FY 2025-2026 budget under Account No. 120- 80-625-5322-00-00-000 (Other Maintenance). NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: Section 1. That the facts and opinions in the preamble are true and correct. Section 2. That PAEDC is hereby authorized to accept a quote from Image 360 of Beaumont, Texas for the renaming and refurbishment of two monument signs at the Spur 93 Business Park in an amount not to exceed $55,090, as outlined in Exhibit "A", and consistent with the design reflected in Exhibit "B", with funds available in PAEDC Account No. 120-80-625-5322-00-00-000 (Other Maintenance). Section 3. That a copy of the caption of this Resolution shall be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED on this day of A.D., 2026, at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers NOES: Charlotte M. Moses,Mayor #2546396 Page 2 ATTEST: Sherri Bellard, City Secretary APPROVED: r ihk_tAQ1__ Krystle uller, PAEDC Interim Chief Executive Officer APP 0 .ED AS TO 'ORM: i av dA____ Guy N. Goodson, PAEDC Attorney APPROVED AS TO FORM: Roxann Pais Cotroneo,City Attorney APPROVED AS TO AVAILABILITY OF FUNDS: rldk ieW(A)- .,yn a Boswell, Finance Director I i #2546396 Pagc 3 Exhibit "A" #2498847 Page 4 PORT*ARTHUR:uw [it c,�a► VENDOR PRODUCT SUMMARY PRICE FAST SIGNS ACM PANELS WITH LAMINATION AND $7,050 1415 S HWY 69 INSTALLATION [32FTX4FT (2)] NEDERLAND, TX 77627 FAST SIGNS ACM PANELS WITH LAMINATION AND $6,750 1415 S HWY 69 INSTALLATION [30FTX4FT(2)] NEDERLAND, TX 77627 SERVICE GRAPHICS FAUX STACKED STONE $44,900 48 N MAJOR DR MANUFACTURED BRUSHED ALUMINUM BEAUMONT, TX 77707 CHANNEL LETTERS (2) IMAGE 360 FAUX STONE PANELS WITH FABRICATED $55,090 3930 PHELAN BLVD METAL LETTERS BEAUMONT, TX 77707 FASI'SIGNS 1415SHighway69 ESTIMATE Make Your Statement' Nederland,TX 77627 (409)344-8440 EST-10124 fastsigns.com/2111 Payment Terms:Cash Customer Created Date:3/17/2026 DESCRIPTION:Alluminum compost metal panels with lamination and installation Bill To: Economic Development Center Pickup At: FASTSIGNS-PORT ARTHUR 501 Proctor St 1415 S Highway 69 Port Arthur,TX 77640 Nederland,TX 77627 US US Requested By: Dylan Bennett Salesperson: Jasmine Momin Email: dbennett@paedc.org Cell Phone: (409)880-5451 Tax ID: ********** NO. Product Summary QTY UNIT PRICE TAXABLE AMOUNT ACM panels with lamination and installation 32 ft x 4ft 2 $3,525.00 $0.00 S7,050.00 (qty 2) 1.1 Dibond/Max Metal 3mm- Part Qty:1 Width:32.00' Height:4.00' Sides:1 Text: Customer will provide the logo and details Notes: 4 Panels each panel is 8 ft x 4 ft qty 2 brick monuments 1.2 Overlaminates-3 mil UV Gloss- Part Qty:1 Width:32.00' Height:4.00' 1.3 Installation- Text: Installing 4 panels on both side concrete brick monuments total panels will be 4 which makes total size of 32ft x 4ft Generated On:3/17/2026 4:16 PM Page 1 of 2 Subtotal: $7,050.00 Taxable Amount: $0.00 Taxes: $0.00 Grand Total: $7,050.00 Signature: Date: Genf i a ( O /1 ';_'O r:4.i FA TSIGIVS 1415 S Highway 69 Make Your Statement' Nederland,TX 77627 ESTIMATE (409)344-8440 EST-10127 fastsigns.com/2111 Payment Terms:Cash Customer Created Date:3/17/2026 DESCRIPTION:Alluminum compost metal panels with lamination and installation Bill To: Economic Development Center Pickup At: FASTSIGNS-PORT ARTHUR 501 Proctor St 1415 S Highway 69 Port Arthur,TX 77640 Nederland,TX 77627 US US Requested By: Dylan Bennett Salesperson: Jasmine Momin Email: dbennett@paedc.org Cell Phone: (409)880-5451 Tax ID: *********** NO. Product Summary QTY UNIT PRICE TAXABLE AMOUNT 1 ACM panels with lamination and installation 30 ft x 4ft (qty 2) 2 $3,375.00 $0.00 $6,750.00 1.1 Dibond/Max Metal 3mm- Part Qty:1 Width:30.00' Height:4.00' Sides:1 Text: Customer will provide the logo and details Notes: 3 Panels each panel is 10 ft x 4 ft qty 2 brick monuments 1.2 Overlaminates-3 mil UV Gloss- Part Qty: 1 Width:30.00' Height:4.00' 1.3 Installation- Text: Installing 3 panels on both side concrete brick monuments total panels will be 3 which makes total size of 30ft x 4ft Genet ated On:3/17/2026 4:12 PM Page 1 of 2 Subtotal: $6,750.00 Taxable Amount: $0.00 Taxes: $0.00 Grand Total: $6,750.00 Signature: Date: ANtt 441% 4P/-40 LLC 48 N.Major Dr. 409-860-4005 Beaumont,Tx 77707 Fax:409-860-4228 sales@servicegraphicstx.com www.servicegraphicstx.com Port Arthur Business Park Attn: Dylan Bennet RE: Monument Reface Permit staff time $250. Permit at cost (if applicable) Manufacture brushed aluminum channel letters (2) sets Supply enough faux stacked stone & materials to cover front, sides and tops of two 40'x 6' monument signs. Brick Mason labor to install stone Labor to install sign letters $44,900. Plus, sales tax Option: Manufacture brushed aluminum letters (2) sets Labor to install sign letters only on 2 monuments in Port Arthur. $31,000. Plus, sales tax. 3930 Phelan Blvd. °r'P36a) eau 892-9,TX 50377707 E ST I MATE 9) E-20218 www.image360Beaumont.com Payment Terms: Cash Customer- Pmt req'd 76-0633037 Region5 ESC Purchasing CO-OP Vendor#20250802 DESCRIPTION:BUDGET QUOTE:Refurbishment/Renaming of PABP Identity Signs Bill To: Port Arthur Econimic Development Foundation Installed: Port Arthur Econimic Development Foundation 501 Procter Street Port Arthur Business Park Ste:100 West Port Arthur Road Port Arthur,TX 77659 Port Arthur,TX,TX 77659 US US Requested By: Dylan Bennett Salesperson: Robert Blackwell, Image360 Email:dbennett@paedc.org Work Phone:409-892-9503 Work Phone:(409)963-0579 x 201 Cell Phone:409-504-1962 Entered By: Robert Blackwell,Image360 PRODUCTS QTY UNIT PRICE TAXABLE TOTALS Furnish&Install Faux Stone Exterior&new Metal1 2 $27,545.00 $0.00 $55,090.00 Letters 1.1 Custom Product-Faux Stone Panels 1.2 Custom Product-Furnish&Install New Fabricated Metal letters 1.3 Installation- 1.4 Custom Product-Hardware 1.5 Design Service- Subtotal: $55,090.00 This estimate covers only the services outlined above. If the scope of the work Taxable Amount: $0.00 changes from the original estimate,approved revisions and additions will be Taxes: $0.00 charged accordingly. If you require changes to your design after it has been designed and approved, Grand Total: $55,090.00 charges for additional design time as well as any restocking charges incurred will Deposit Required: $27,545.00 apply.Sizes shown are NOMINAL sizes and may not be exact. If your require exact sizing, please let us know immediately. Electrical installation,service or connection by others when required. Image360 is not licensed by the State of Texas for electrical installations. Please submit purchase orders to:orders@image360beaumont.com Estimate valid for 30 Days. Ceoerated On:4/3/2026, 1:31 PM Page 1 of 1 Exhibit "B" #2498847 Page 5 MI, - s PORT ARTHUR ECONOMIC DEVELOPMENT CORP. INSTALL ADDRESS: _ �1 Port Arthur,TX • •� Initial Concepts/Port Arthur Business Park- Sign Renaming& Refurbishment ' Graphics>Signage>Displays`..00 r.`,:�' ORDER NUMBER: TBD .,, DESCRIPTION: SCOPE:Center section to be c covered with EFIS faux stone panels New Signage to consist of 5 s ',rf. fabricated aluminum letters stud K',, ; ' .'t+, -mounted to surface. {� DIMENSIONS: V 72"X 42' r Floyd Batiste si Port Arthur Business Park ,volowelosyy. y. COLORS: ter*- ❑ BRUSHED ALUMINUM , 4�a a ,. - CONTACT INFO: �-• -�•- - a A. Robert Blackwell Example-Faux Stone Panels robert@image360beaumont.com (multiple styles/colors available) 409.892.9503 beaumonttx.image360.com (multiple styles/colors available SIZES SHOWN IN THE MOCKUPS ARE AN ESTIMATE ALL MEASUREMENTS TO BE CONFIRMED PRIOR TO PRODUCTION