Memorandum
City of Port Arthur, Texas
Robert A. "Bob"Bowers Civic Center
To: The Honorable Mayor and City Council
Through: Ron Burton, City Manager
From: Adam J Saunders, Civic Center Dir
RE: Proposed Resolution No. 24892
The City Council approved Resolution No. 25-040 in January of 2025 for Phase IV repairs to
Rosehill Manor. The City Council approved Resolution Number 23-133 in March of 2023 for
architectural plans, drawings, and paperwork needed for approval from the Texas Historical
Commission and oversight of correct restoration and repairs.
ANALYSIS/CONSIDERATION:
Phase IV repairs and renovations to Rosehill Manor have been completed by Marsh
Waterproofing, Inc., of Vidor, Texas, in accordance with the contract approved by City Council
pursuant to Resolution No. 25-040.
Previously, the City Council approved Resolution No. 23-133, authorizing LaBiche Architectural
Group to provide architectural plans, construction oversight, and coordination with the Texas
Historical Commission for the restoration and repair work associated with Rosehill Manor.
Thereafter, the City publicly solicited bids for Phase IV repairs and renovations, which were
advertised in The Port Arthur News on July 31, 2024, and August 7, 2024. Marsh Waterproofing,
Inc. submitted the sole responsive bid in the amount of $375,000.00 and was subsequently
awarded the contract.
The contractor has now completed all work required under the contract and has submitted all
required project closeout documentation, including the Certificate of Substantial Completion
dated March 2, 2026, Contractor's Certificate and Release, Contractor's Warranty, Contractor's
Guarantee, Contractor's Certificate of Debts Paid, and Request for Release of Retainage.
City staff and LaBiche Architectural Group have inspected the completed work and determined
that the project has been satisfactorily completed in accordance with the approved plans,
specifications, and contract documents.
RECOMMENDATION
A resolution authorizing the city manager to accept close-out documents submitted by Marsh
Waterproofing, Inc of Vidor, Texas, and approve the release of retainage of$18,750.00 for Phase
IV repairs and renovations to Rosehill Manor.
BUDGETARY AND FISCAL EFFECT
Funds are available in account No. 307-00-000-2050-00-00-000-, Project No. BU0014
P.R. No. 24892
04/28/2026 AJS- TNR
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO ACCEPT THE CLOSE-OUT DOCUMENTS
SUBMITTED BY MARSH WATERPROOFING, INC. OF
VIDOR, TEXAS, FOR PHASE IV REPAIRS AND
RENOVATIONS TO ROSEHILL MANOR; AND
APPROVING THE RELEASE OF RETAINAGE IN THE
AMOUNT OF $18,750.00; FUNDING AVAILABLE IN
ACCOUNT NO. 307-00-000-2050-00-00-000, PROJECT NO.
BU0014.
WHEREAS, pursuant to Resolution No. 23-133, the City authorized a contract with
LaBiche Architectural Group for the preparation of architectural plans and specifications,
submission of required documentation to the Texas Historical Commission, and construction
oversight for restoration and repair associated with Phase IV renovations to Rosehill Manor; and
WHEREAS, the City of Port Arthur Purchasing Division advertised for bids for Phase
IV repairs and renovations to Rosehill Manor in The Port Arthur News on July 31, 2024, and
August 7, 2024; and
WHEREAS, Marsh Waterproofing, Inc., of Vidor, Texas, submitted the sole responsive
bid in the amount of $375,000.00, after a thorough review, the contract was subsequently
awarded via Resolution No. 25-040, in January 2025, to Marsh Waterproofing, Inc., and
WHEREAS, Marsh Waterproofing, Inc. has completed all work required under the
contract and has submitted all required closeout documents, including the Certificate of
Substantial Completion dated March 2, 2026, attached hereto as (Exhibit"A") together with the
Contractor's Certificate and Release (Exhibit "B"), Contractor's Certificate of Warranty
(Exhibit "C"), Contractor's Certificate of Guarantee (Exhibit "D"), Contractor's Certificate of
Debts Paid(Exhibit"E"), and Release of Retainage Request(Exhibit"F"); and
WHEREAS, the work has been inspected by City staff and LaBiche Architectural Group
and has been found to be complete and satisfactory in accordance with the contract documents;
and
WHEREAS, pursuant to the terms of the contract, five percent (5%) retainage was
withheld from payments made to Marsh Waterproofing, Inc., and the contractor has requested
release of retainage in the amount of Eighteen Thousand Seven Hundred Fifty Dollars
($18,750.00), as reflected in the Release of Retainage request attached hereto as Exhibit"F"; and
WHEREAS, the City staff finds that acceptance of the project close-out documents,
execution of the Certificate of Acceptance, and release of retainage are in the best interests of the
City of Port Arthur.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR,TEXAS:
P.R. No. 24892
04/28/2026 AJS- TNR
THAT,the facts and opinions in the preamble are true and correct.
THAT,The City Manager is hereby authorized to accept the project closeout documents
submitted by Marsh Waterproofing, Inc., including the Certificate of Substantial Completion
(Exhibit"A"), Contractor's Certificate and Release(Exhibit"B"), Contractor's Certificate of
Warranty (Exhibit"C"), Contractor's Certificate of Guarantee (Exhibit"D"),Contractor's
Certificate of Debts Paid (Exhibit"E"), and Release of Retainage Request (Exhibit"F").
THAT, The City Manager is hereby authorized to execute the Certificate of Acceptance
attached hereto as (Exhibit"G") on behalf of the City of Port Arthur, Texas, evidencing final
acceptance of Phase IV repairs and renovations to Rosehill Manor.
THAT, That the City Council hereby authorizes the release of retainage in the amount of
$18,750.00 to Marsh Waterproofing, Inc., as reflected in (Exhibit"F") with funding available in
Account No. 307-00-000-2050-00-00-000, Project No. BU0014.
THAT a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
READ, ADOPTED, AND APPROVED, this day of 2026 AD, at a
Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote:
AYES: Mayor:
Councilmembers:
NOES:
Charlotte Moses, Mayor
ATTEST:
Sherri Bellard, City Secretary
P.R. No. 24892
04/28/2026 AJS- TNR
APPROV •
Roxann Pais Cotroneo, City Attorney
APPROVED FOR ADMINISTRATION:
Ronald rton, City Manager
APPR V AS TO F AVAILABILI Y:
Lynd oswe 1, .A A-CM Direc or of Finance
`u !!t
tit,
Clifton Kiams, CPPB, Purchasing Manager
EXHIBIT "A"
CERTIFICATE OF SUBSTANTIAL COMPLETION
PROJECT: Rose Hill Phase IV ARCHITECT:The LaBiche Architectural Group, Inc
PROJECT NO.:#22035
OWNER: City of Port Arthur CONTRACTOR: Marsh Waterproofing
3401 Culture Ctr. Dr
Port Arthur,Texas 77642 CONTRACT FOR: Historic Restoration
DATE OF ISSUANCE: March 2,2026 CONTRACT DATE: March 30, 2023
PROJECT OR DESIGNATED PORTION SHALL INCLUDE: ALL WORK
The Work performed under this Contract has been reviewed and found to be substantially complete.
The Date of Substantial Completion of the Project or portion thereof designated above is hereby
established as March 2, 2026 which is also the date of commencement of applicable warranties
required by the Contract Documents, except as stated below.
DEFINITION OF DATE OF SUBSTANTIAL COMPLETION
The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by
the Architect when construction is sufficiently complete, in accordance with the Contract Documents,
so the Owner can occupy or utilize the Work or designated portion thereof for the use for which it is
intended,as expressed in the Contract Documents.
A list of items to be completed or corrected, prepared by the ContractorED
and verified and amended by the Architect is attached hereto. The failure?' A90
to include any items on such list does not alter the responsibility of the *1 �aB%
Contractor to complete all Work in accordance with the Contract 1w,o_ mf.'In}i
Documents. The date of commencement of warranties for items on the ;� , 21:4/11
attached list will be the date of final paym t s therwise agreed to in s :: 11592
writing. OF
��+
'aft•-
The LaBiche Architectural Group, Inc " 2
ARCHITECT D
The Contractor will complete or correct th on the list of items attached hereto within fifteen(15)
days from the Date of Substanti lesion.
Marsh Waterproofing 6//1/16 , 13 121e
CONTRACTOR BY DAT
The Owner accepts the Work or designated portion thereof as substantially complete and will assume
full possession thereof at 8:00 a.m.on March 3,2026.
City of Port Arthur
OWNER BY DATE
The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the
Work and insurance shall be as follows: Owner will assume responsibility for maintenance,security, and damage
to the Work on the Date of Substantial Completion except for damage done by Contractor or Subcontractors
during final completion. Owner assumes responsibility for insurance of the Project on March 3, 2026. The
Contractor will submit to the Owner the executed warranties, maintenance agreements, inspection certificates,
record documentation, maintenance manuals, tools, spare parts, keys and similar operational items by April 3,
2026.
CERTIFICATE OF SUBSTANTIAL COMPLETION
Purchase Order No.: #22035
Project Name: Rose Hill Manor- Phase IV
Contractor: Marsh Waterproofing,Inc.
Description of Work: Historic Restoration
The work performed under this contract has been reviewed and found to be substantially complete.The
date of substantial completion is hereby established as March 2, 2026 .
KNOW ALL MEN BY THESE PRESENTS:
1.) The stage of construction where, in the opinion of the City of Port Arthur,all items of the work necessary
to enable the assets to be utilized without restrictions for the purpose for which the asset was constructed
have been completed;and
2.) All pay items are complete and all necessary testing as required by the Laws and Regulations and/or
Contract Documents have all been completed.
Punch List
All list of items to be completed or corrected,prepared by the CONTRACTOR and verified and amended by the
ENGINEER, is attached hereto.The failure to include any items on such list does not alter the responsibility of
the CONTRACTOR to complete all work in accordance with the contract documents. The CONTRACTOR shall
complete or correct the work on the list of items attached hereto within in 60 days from the above date of
substantial completion.The responsibilities shall be as set out in the Contract Documents or on the attached
hereto. If not specified in and an attachment or in the Contract Documents the CONTRACTOR is responsible for
maintenance, utilities and insurance.
Marsh Waterproofing,Inc. /1x 7y1- 4/14/26
CONTRACTOR NAME SIGNATURE DATE
REC CCEPTANCE
2/
�•�� B/Cl E Si a DA
The City of Port Arthur accepts the work as Substantially Complete.City of Port Arthur, Department of Public
Works.
PROJECT MANAGER SIGNATURE DATE
CITY ENGINEER SIGNATURE DATE
PUBLIC WORKS DIRECTOR SIGNATURE DATE
EXHIBIT "B"
CONTRACTOR'S CERTIFICATE AND RELEASE
FROM: Marsh Waterproofing Inc.
(,lame of Contractor)
TO: City of Port Arthur
(Owner)
REFERENCE CONTRACT NO.: 22035
CONTRACT ENTERED INTO THE 30 DAY OF March, 2023 BETWEEN THE
CITY OF PORT ARTHUR AND Tim Marsh
OF Marsh Waterproofing Inc.
FOR THE PROJECT Rose Hill Manor- Phase IV
KNOW ALL MEN BY THESE PRESENTS:
I.) The undersigned hereby certifies that there is due from,and payable by,the Owner to the Contractor
under the contract and duly approve Change Orders and modification the balance of
.
2.) The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are
outstanding and unsettled the following items which he claims are just and due and owing by the Owner
to the Contractor:
a.
b.
c.
d.
(ttcrn,2 claims and amounts due.if none,so state)
3.) The undersigned further certifies that all work required under this contract, including work required under
Change Order(s)numbered ,has been performed in accordance with the terms thereof,and that
there are no unpaid claims for materials,supplies,or equipment and no claims of'laborers or mechanics
for unpaid wages arising out of the performance of this contract,and that the wage rates paid by the
contractor were in conformity with the contract provisions relating to said wage rates. •
4.) Except for the amounts stated under Paragraphs I and 2 hereof,the undersigned has received from the
Owner all sums of money payable to the undersigned under,or pursuant to,the above-mentioned contract
or any modifications or changes thereof.
5.) That in consideration of the payment of the amount stated in Paragraph 1 hereof.the undersigned does
hereby release the Owner and Operator from any all claims arising under or by virtue of this contract.
except the amount listed in Paragraph 2 hereof due from the owner,provided however,that if any reason
the Owner does not pay the full amount stated in Paragraph I hereof,said deduction shall not affect the
validity of this release,but the amount so deducted shall be automatically included under Paragraph 2 as
an amount which the Contractor has not released but will release upon payment thereof.The Contractor
further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of an amount
which may be deducted from Paragraph I hereof,he will release the Owner and Operator from any and
all claims of any nature whatsoever arising out of paid contract modification thereof,and will execute
such liirther releases or assurances of the Owner and Operator may request.
IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 6 day of
March 2022.
Marsh Waterproofing Inc.
(SEAL) (Contractor)
•
BY: f j
(Signature
Tim Marsh - President
(Printed Name/Title of Officer)
Tim Marsh ,being first duly sworn on oath,deposes and says,First,that,he/she is the
(Affiant)
President Marsh Waterproofing Inc.
of •
(Title) (Name of Company)
Second,that he/she has read the foregoing certificate by him/her subscribed as President
(Title.)
of Marsh Waterproofing Inc. .
(Name of Company)
Affiant further states that the matters and things stated herein are true.
__ -. - 9n2.406..
r:-1 ffrant)
Subscribed and sworn to before me this 6 day of March .20?2.
My commission expires 8/25/2026
AirjatooW
s VOTARY
'°je. MICHELLE NEILL
Notary ID#125316919
C. ' My Commission Expires
oo 0,4 August 25,2026
EXHIBIT "C"
CONTRACTOR'S CERTIFICATE OF WARRANTY
FROM: Marsh Waterpoofing Inc.
(Name of Contractor)
TO: City of Port Arthur
(Owner) — — --
REFERENCE CONTRACT NO.: 22035
CONTRACT ENTERED INTO THE 30 DAY OF March, 2023 BETWEEN THE
CITY OF PORT ARTHUR AND Tim Marsh
OF Marsh Waterproofing Inc.
FOR THE PROJECT Rose Hill Manor- Phase IV
KNOW ALL MEN BY THESE PRESENTS:
I.) Marsh Waterproofing Inc. does hereby guarantee all of the work done under the
(Vanne of Contractor)
above referenced contract to be free from faulty materials in every particular,and free from improper
workmanship,and against injury from proper and usual wear;and agrees to replace or re-execute without
cost to the Owner and Operator such work as may be found to be improper or imperfect,and to make
good all damage caused to other work or materials due to such required replacement or re-execution.
2.) This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this
contract by Owner,as evidenced by the Contractor's Certificate of Completion.
3.) This Certificate is given in connection with the final payment under the contract between the Owner and
Marsh Waterproofing Inc. ,and with the knowledge that it will be relied upon in
(Name of Contractor)
Making such payment and that such payment would not be made except upon the truth of the matter
contained in this affidavit.
IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this 6 day of
March ,2Q
#1.,
Marsh Waterproofing Inc.
IS1. Li (Contractor)
BY: fie
(.Signature)
Tim Marsh - President
(Printed.'Vanre./Titte of Officer)
I-Warranty
Tim Marsh ,being first duly sworn on oath,deposes and says,First,that,he/she is the
(Affiant)
President of Marsh Waterproofing, Inc. ,
!Title) (Name of Company)
Second,that he/she has read the foregoing certificate by him/her subscribed as President _
/Title)
of Marsh Waterproofing Inc_
(Name of Company)
Affiant further states that the matters and things stated herein are true.
flfant)
t Subscribed and sworn to before me this 6 day of March ,20, ,
My commission expires 08/25/2026
f //t
7.; :::,,:ryicH,DEL,LiEnTiL61;4,9 NOTARY
i+�i
� 4 My Commission Expires
•,;.;;0. August 25,2026
w
2-Warranty
EXHIBIT "D"
CONTRACTOR'S CERTIFICATE OF GUARANTEE
FROM: Marsh Waterproofing, Inc.
TO: City of Port Arthur
FOR: Exterior Restoration of Rose Hill
REFERENCE CONTRACT NO. 24107 ENTERED INTO THE 19
DAY OF January , 2025, BETWEEN THE CITY OF PORT ARTHUR
AND Marsh Waterproofing,Inc.
(CONTRACTOR)
Vidor, Texas
OF
(CITY/STATE)
FOR: Rose Hill Manor - Phase IV
(PROJECT)
KNOW ALL MEN BY THESE PRESENTS:
I. Marsh Waterproofing,Inc. does hereby guarantee all of the work done under the
above referenced contract to be free from faulty materials in every particular, and free
improper workmanship, and against injury from proper and usual wear; and agrees to
replace or re-execute without cost to the Owner and Operator such work as may be found
to be improper or imperfect, and to make good all damage caused to other work or
materials, due to such require replacement or re-execution.
2. This guarantee shall cover a period of one(I)year from the date of acceptance of all work
under this Contract,as evidenced by the Engineer's Certificate of Completion.
IN WITNESS THEREOF, the undersigned has signed and sealed this instrument this the
1 day of CL 2 . 2025. Z UZ(p
COMPANY
SEAL
Marsh Waterproofing,Inc.
(C oN1PANY NAME)
Q4 11101CatilAL-- —
(OWNER,SIGNATURE/RITLE)
..ram
f Actx.
(PRINT)
"1
SUBSCRIBED AND SWORN to before me this a ci day of afk-
My commission expires ?" 2- S -2 C
(DATE)
°'% MICHELLE NEILL
2 r Notary ID#125816919
; My Commission Expires
'Z'of'6# August 25,2026 ()TA PUBLIC)
`:OT.ARY SEAL
EXHIBIT "E"
CONTRACTOR'S CERTIFICATE OF DEBTS PAID
PROJECT: Rose Hill Manor- Phase IV
LOCATION: Port Arthur,Texas
OWNER: City of Port Arthur
STATE OF TEXAS;
COUNTY OF JEFFERSON;
The undersigned hereby certifies that,except as listed below,payment has been made in full and all
obligations have otherwise been satisfied for all materials and equipment furnished for all work, labor,
and services preformed and for all known indebtedness and claims against the Contractor for damages
arising in any manner in connection with the performance of the Contract referenced above for which
the Owner's property might in a way be held responsible or encumbered.
Exceptions:
Contractor: Marsh Waterproofing Inc. Texas
Signature: +� 7),eiasetirti
Printed Name: Tim Marsh
Date: 03/06/2026
Subscribed and sworn to before me this 6 day of March , 7Q
My commission expires: 08/26/2026
•
NOTARY
�ki`e4o�d�CST
,00 gag MICHELLE NEILL
° Notary ID#125816919
�/�� My Commission Expires
'?or August 25,2026
EXHIBIT "F"
a° The LaBiche
I ARCHITECTURAL GROUP,INC.
Dohn H.LaBiche, FAIA April 10, 2026
Principal
Greg Wall,AIA
Principal
Mr. Ron Burton, City Manager
/999 Gladys,Suite 101 City of Port Arthur
Beaumont, ►exas 77706 3401 Culture Ctr, Dr
(409)860 0197
Fax:(409)860 0198 Port Arthur, Texas 77642
www.labiche.com
RE: COPA —Rose Hill Phase IV
Dear Mr. Burton,
Enclosed herewith is the Contractor's Application and Certificate
for Payment No. 3, retainage in the amount of$18,750.00. This
application has been reviewed, and is recommended for
payment.
r-• .c P AR :,
Sincerely, 7 i�ta N• La 'V S'
H.W C) -,
_:,
Jr.%
t�t•�y,,{`�115,,,.--►YTy+P
Dohn H. LaBiche, FAIA
EpF '(�
DHL/bo
Enclosure
CC: Marsh Waterproofing
Project#: 22035
ARCHITFCTURL
PROJECT CONSUL T ING
PLANNING
IN I ERIOR DLSIGN
1
Marsh Waterproofing, Ine. Invoice
240 South Main St. Skit 2
P.O. Box 968 Date Invoice#
Vidar, TX 77670
418;2.026 12250
Bill 1'o
City of Port Arthur
PO Box 1089
Port Arthur l'X 77641
Terms I Project
FINAL. j Roe Hill•Phase IV
Description Qty Rate Amount
City of Port Arthur-
RJ?:Rose 1101 Manor-Phase IV
Final Pay App 375,000 0.05 18,750.00
Subtotal S18,750.00
Sales Tax (8.25%) $o.o0
Total S18,750.00
Payments/Credits
Phone# Balance Due $18,750.00
409-769-0459
702 APPLICATION and CERTIFICATE for PAYMENT
To: City of Port Arthur Project: COPA-Rose Hill-IV Application No: FINAL Distribution to.
3401 Culture Ctr Dr 0 OWNER
Port Arthur,TX 77642 App.Date: April 8,2026 D CONSTRUCTION MGR.
Period to: ®ARCHITECT
From. Marsh Waterproofing Inc. ❑CONTRACTOR
Box 968 Project No: 24107 ❑OTHER
Vidor TX 77670 Contract Date: January 19,2025
Contract For: Exterior Via Architect: LaBiche Architectural Group
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge,
information and belief the Work covered by this Application for Payment has been completed
Application Is made for payment,as shown below,in connection with the Contract. in accordance with the Contract Documents,that all amounts have been paid by the
Continuation Sheet,703,is attached. Contractor for Work for which previous Certificates for Payment were issued and payments
1 ORIGINAL CONTRACT SUM 375,000.00 received from the Owner and that current payment shown herein is now due
2. Net Change By Change Orders 0.00 CONTRAC`'4R.1 Marsh Waterproofng Inc.
3. CONTRACT SUM TO DATE 375,000.00 By: .,/ Ij A Date: 1 "
4 TOTAL COMPLETED AND STORED TO DATE 375,000.00 ent
(� Tim Marsh-Pre ident
5 RETAINAGE t State of: Texas County of:
//'Oyrange ? 1
a. of Completed Work 0.00 Subscribed and sworn before me this " day of LL /t'_ (�..,p• ,t
}
b_ of Stored Material 0.00 Tim Marsh-President personally appeared before me.the,undersrgned`tfy public,and
provided satisfactory evidence of identification to be th4ersortrtuho signe 4his.`dohumentin':
TOTAL RETAINAGE 0.00 my presence and swore or affirmed to me that the conteilts/4f this docurrfenf t ,truthful aside'
accurate to the bes of his/her kn Wedge and belie 'f y Cc ,Ti,, t"
6 TOTAL EARNED LESS RETAINAGE 375,000.00 ` Au us+ j `
Notary Public: �l ) L1 +My C mmissiofi X fires:
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT 356,250.00 ARCHITECT'S CERTIFI/GATE F R PAYMENT
8. CURRENT PAYMENT DUE 18,750.00 In accordance with the Contract Documents,based on on-site observations and the data
9 BALANCE TO FINISH, INCLUDING RETAINAGE 0 00 comprising this application,the Architect certifies to the Owner that to the best of the
Architect's knowledge,information and belief the Work has progressed as indicated,the
quality of the Work is in accordance with the Contract Documents,and the Contractor is
entitled to payment of the AMOUNT CERTIFIED /Q �7
CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS AMOUNT CERTIFIED 'tSC/!// / 50
Total changes approved in 0.00 0.00 (Attach explanation if a (runt lifted differs from the amount applied for. Initial all figures
previous months by Owner on this Application an ' t li ation Sheet that are changed to conform to the
Total approval this Month 0.00 0.00 amount certified.)
TOTALS 0.00 0.00 ARCHITECT:
NET CHANGES by Change Order 0.00 Date: 4 Zi 2 .
By:
This Certifrc a is not negotiable. The AMOUNT CERTIFIED is payable only to the
Contractor named herein Issuance,payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract
CAUTION You should use an original document which has this caution printed in red.An original assures that changes will not be obscured as may occur when documents are reproduced.
TORGO SOFTWARE a TopFioorSiore corn fit Copyright r-J 1996.2026 ALL RIGHTS RESERVED
CONTINUATION SHEET 703 PROJECT: COPA-Rose Hill-IV Marsh Waterproofing Inc. Page 1 of 1
Document 702,APPLICATION AND CERTIFICATE FOR PAYMENT,containing Application No: FINAL
Contractors signed Certification is attached. App.Date: April 8,2026
Use Column I on Contracts where variable retainage for line items may apply. Period to:
Project No: 24107
A B C D E F G H I
Item Descr ption of Work Schedule Work Completed Materials Total Completed % Balance Retainage
# of From Previous This Stored&Used and Stored to Finish
Values Application(s) Period Prior+Current To Date
1 Div 01-010100-General Requirements _ 6,825.00 6,825.00 0.00 6,825.00 100.00 0.00 0.00
2 Div 02-022210-Select Demo 9,375.00 9,375.00 0.00 9,375.00 10C.00 0.00 0.00
3 Div 06-062000-Finish Carpentry 180,000.00 180,000.00 0.00 180,000.00 100.00 0.00 0.00
4 Div 07-076200-Flash/Sheet Metal 2,000,00 2,000.00 0.00 2,000.00 100.00 0.00 0.00
5 Div 07-079200-Joint Sealants 1,800.00 1,800.00 0.00_ 1,800.00 100.00 0.00 0.00
6 Div 08-085500-Historic Window Rehab 20,000.00 20,000.00 0.00 - 20,000.00 100.00 0.00 0.00
7 Div 08-087000-Finish Hardware Window 5,000.00 5,000.00 0.00 5,000.00 100.00 0.00 0.00
8 Div 08-088000-Class&Glazing 2,500,00 2,500.00 0.00 2,500.00 100.00 0.00 0.00
9 Div 09-090190-Paint&Graffit Remove 60,000.00 60,000.00 0.00 60,000.00 100.00 0.00 0.00
10 Div 09-099113-Exterior Painting 40,000.00 40,000 00 0.00 40,000.00 100.00 0.00 0.00
11 Div 09-099123-Interior Painting _ 6,000.00 6,000.00 0.00 6,000.00 100 00 0.00 0.00
12 Div 09-Ext Paint&Finish Analysis 1,500.00 1,500.00 0.00 1,500-00 100.00 0.00 0.00
13 Div 10-Contengency 40,000.00 40,000.00 0.00 40,000.00 100.00 0.00 0.00
GRAND TOTAL: 375,000.001 375,000.00 0.00 375,000.00 100.00 0.001 0.00
A=line item Number B=Brief Item Description C=Total Value of Item D=Total of D and E From Previous Application(s)(If Any) E=Total Work Completed For This Application
F=Materials Purchased and Stored for Project G=Total of All Work Completed and Materials Stored for Project H=Remaining Balance of Amount to Finish 1=Amount Withheld from G
TOROO SOF T WARE a TopFoo:Scae.com®Gopyr gM C 1E96-2026 ALL RIGHTS RESERVED
EXHIBIT "G"
3y�aart`'
t trl of ort rthu
www.PortArthurTx.gov
CERTIFICATE OF COMPLETION
Date: 4/28/2026
Project: Phase IV repairs and renovations to Rosehill; Release of Retainage.
To: All Concerned
I HEREBY CERTIFY THAT this project was completed on March 2, 2026 and that the work was
under periodic inspection during construction by LaBiche Architectural Group and myself and City
Inspectors. That to the best of my knowledge,the project was constructed substantially in accordance
with the plans and specifications.
Submitted by:
"foam)Sau«de4
Adam J Saunders
Civic Center Director
3401 Cultural Center Drive—Port Arthur,TX 77642—409-985-8801
CITY OF PORT ARTHUR, TEXAS
CIVIC CENTER DEPARTMENT
CERTIFICATE OF ACCEPTANCE FOR...
Rosehill Phase IV
To: Marsh Waterproofing, Inc
This document is to certify that the City of Port Arthur,Texas accepts the completion of the Phase
IV repairs and renovations to Rosehill, on the basis of the recommendation of the City of Port
Arthur's Civic Center Department and receipt of the Certificate of Completion, Contractor's
Affidavit of All Debts Paid, Contractor's Certificate of Release, Contractor's Certificate of
Warranty executed by Marsh Waterproofmg, Inc.
Ron Burton, CPM
City Manager
Sherri Bellard
City Secretary