RE: PR No. 24879—Ratify and Authorize Payment for the Emergency Contract to
Install Insert Valves on the Atlanta Waterline
Introduction:
The intent of this Agenda Item is for the City Council to ratify the emergency contract and
authorize the payment to Global Drilling, Inc. of Winnie, Texas for the emergency installation
of insert valves on the Atlanta Waterline in the total amount of$275,000.00.
Background:
Under the Atlanta Waterline Replacement project contract the City is responsible to isolate the
laterals to allow the Contractor to perform the tie-ins necessary to complete the new 20-inch
waterline installation. However, due to the aging water distribution infrastructure, existing
waterline valves are not providing full shutoff necessary to perform the tie-ins. The project had
12 remaining tie-ins that required the installation of 13 insert valves in order to isolate the
laterals to perform the tie-ins.
On December 10,2025, an Emergency Memo was issued for the installation of the insert valves
by Global Drilling,Inc because of existing water leaks with the potential of boiling water notices.
The work was completed in the amount of$275,000.00 which included the installation of two
12"insert valves, one 8" insert valve, and ten 6" insert valves.
Budget Impact:
The budgetary impact is$275,000.00 and funding in CIP Account 405-40-000-8516-00-00-000,
Project No. WS0032.OTH
Recommendation:
It is recommended that City Council approve PR No. 24879 ratifying the work and authorizing
the payment of$275,000.00 for the emergency contract as discussed/outlined above.
"Remember, He are here to serve the Citizens of Port Arthur"
PR No. 24879
3/4/26 cm
Page 1 of 3
RESOLUTION NO.
A RESOLUTION RATIFYING THE WORK AND AUTHORIZING
PAYMENT FOR THE EMERGENCY CONTRACT TO INSTALL INSERT
VALVES NECESSARY FOR THE COMPLETION OF THE ATLANTA
WATERLINE PROJECT IN THE AMOUNT OF $275,000.00 TO GLOBAL
DRILLING, INC., OF WINNIE, TEXAS, WITH FUNDING FROM CIP
ACCOUNT NO. 405-40-000-8516-00-00-000 PROJECT NO.WS0032.OTH.
WHEREAS, as per Resolution No. 24-021, City Council approved the Atlanta Waterline
project which consisted of the construction of 4,600 linear feet of 20-inch HDPE waterline to
replace the existing 16-inch AC waterline; and
WHEREAS, as per the project contract, the City is responsible to isolate the laterals to
allow the Contractor to perform the tie-ins necessary to complete the new 20-inch waterline
installation; and
WHEREAS, due to the City's aging water distribution infrastructure, existing waterline
valves are not providing full shutoff necessary to perform tie-ins, and, as such, required the
installation of insert valves to perform the tie-ins; and,
WHEREAS, on December 10, 2025, an Emergency Memo was issued for an emergency
contract for the installation of the insert valves by Global Drilling, Inc. because of existing water
leaks with the potential of boiling water notices(Exhibit"A"); and
WHEREAS, Global Drilling, Inc. has completed the installation of two 12" insert valves,
one 8" insert valve, and ten 6" insert valves and has submitted invoice payment of$275,000.00
(Exhibit"B"); and
WHEREAS,pursuant to Section 252.022(a)(1)of the Texas Local Government Code,this
purchase is authorized because of a public calamity that requires the immediate appropriation of
money to relieve the necessity of the municipality's residents or to preserve the property of the
municipality; and
WHEREAS, it is further authorized pursuant to Section 252.022(a)(2) of the Texas Local
Government Code to preserve or protect the public health or safety of the municipality's residents.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR,TEXAS:
THAT,the facts and opinions in the preamble are true and correct; and
THAT, the funding from CIP Account 405-40-000-8516-00-00-000, Project No.
WS0032.OTH; and
PR No. 24879
3/4/26 cm
Page 2 of 3
THAT,the City Council hereby ratifies the emergency contract and authorizes the payment
to Global Drilling, Inc. Of Winnie, Texas for the emergency installation of the tie-ins for the
Atlanta Waterline project in the amount of$275,000.00 (Exbibit"B"); and
THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the
Meeting of the City Council.
READ, ADOPTED, AND APPROVED this day of , 2026
at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES: Mayor
Councilmembers:
•
NOES:
Charlotte M. Moses
Mayor
ATTEST:
Sherri Bellard
City Secretary
PR No. 24879
3/4/26 cm
Page 3 of 3
APPROVED AS TO FORM:
Roxann Pais Cotroneo
City Attorney
APPROVED FOR ADMINISTRATION:
Ronald Burto ,
City Mana
Suhail Kanwar, P.E.
Director of Public Services WCalvi Matthews, P.E.
Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS•
_2(\'7/ •e; J zdr
Lyn) Boswell, MA CGFO
Finance Director
dt'; ,
Clifton . Williams Jr.,CPPB
Purchasing Manager
Exhibit "A"
(Emergency Memo)
Ctn.of AC
art ^
rthu
re
ras
INTEROFFICE MEMORANDUM
Date: December 10, 2025
To:
Ronald Burton, C.P.M., City Manager
From: �
Calvin Matthews, P.E., Water Utilities Director "•11/041111
RE: Approval for Emergency Contract to Install Insert Valves on Existing Laterals to Allow
Connection of New 20" Atlanta Waterline to System.
The Atlanta Waterline project consists of the construction of 4,600 feet of 20-inch HDPE water line to replace the
existing 16-inch A/C line,which is at the end of its useful life and is experiencing excessive breaks and leaks.This line is
the main supply line to the downtown area of the City of Port Arthur.
The contractor on the project,Global Drilling,has installed the main line and has been working to complete the tie-ins of
the line to the existing lateral lines that cross it in the alleyways from 18th Street to Procter Street.
Under the contract,City forces have the responsibility to isolate the laterals to allow the Contractor to perform the tie-
ins.City Crews have been working to perform these isolations but have been hampered by line valves not providing full
shutoff and leaking after attempts to operate due to the age of the valves.
The project has 12 remaining tie-ins that cannot be isolated with the existing valves.These tie-in locations will require
the installation of insert valves and line stops to provide the required line closures.City crews cannot install these
products as they are licensed by their manufacturers to specific companies to provide service.
Emergency approval is requested of the City Manager to hire Global Drilling to provide for the installation of the
required insert valves and line stops at these locations.
A total cost of$275,000 is estimated for the repair.A proposed resolution will be presented to the City Council for
ratification.
1,Ronald Burton,hereby approve the emergency repair contract.
a F4*
Ron Burtoni.P. . Suhail Kanwar,P.E.
City Man.:er Director of Public Services&City Engineer
"Remember, we are here to serve the Citizens of Port Arthur"
Exhibit "B"
(Payment Invoice)
_GLC�B A L GLOBAL DRILLING,INC.
44994 Interstate 10 Winnie,Texas 77665,USA
loll(IC,!,-. T +1 BOO 956 8720,E mfogglobaldrillingequipment.cam.
W wnw.alobaldnlfnoeouioment.com
INVOICE
Date•
Attn: ACCOUNTING March 20,2026
444 4th STREET PORT ARTHUR,TEXAS 776040
Project Name:Emergency Contract to Install Insert Valves on Existing Laterals to Allow Connection Ref.No.
of New 20"Atlanta Waterline to System
As per Interoffice Memorandum dated December 10,2025 PA2026-006
e I �
ITEM TOTAL ACTUAL COMPLETED WORK
NO. DESCRIPTION UNIT I UNIT PRICE TOTAL - ,- -- - QUANTITY TOTAL PRICE REMARKS
QTM I TOTAL TO
% PREVIOUS
DATE
Emergency Contract to Install Insert Valves on Existing Laterals to Allow LS 1.00 275,000.00 275,000.00 100.00% 1.00 1.00 275,000.00
Connection of New 20"Atlanta Waterline to System
1 Installation of 12"Insertion Valve EA 2.00 33,000.00 66,000.00
2 Installation of 8"Insertion Valve EA 1.00 16,000.00 16,000.00
3 Installation of 6"Insertion Valve EA 10.00 16,000.00 160,000.00
4 Additional costs for Materials only for the extra fittings to do the Tie-In to exisiting LS 1.00 53,000.00 53,000.00
lines.
TOTAL DUE:
276,000.00
Terms and Conditions:
Amount in Words(US Dollars):Two Hundred Seventy Five Thousand Only