HomeMy WebLinkAboutPR 24891: AUTHORIZING THE CITY MANAGER TO ACCEPT CLOSE OUT DOCUMENTS SUBMITTED BY MIKE BARNETT CONSTRUCTION AND APPROVE THE RELEASE OF RETAINAGE OF $20,762.50 FOR PHASE IV REPAIRS AND RENOVATIONS TO POMPEIIAN VILLA P.R.No. 24891 04/06/2026 AJS-TNR Memorandum City of Port Arthur, Texas Robert A. "Bob"Bowers Civic Center To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Adam J Saunders, Civic Center Dir RE: Proposed Resolution No. 24891 ANALYSIS/CONSIDERATION: The City Council previously approved Resolution No. 24-365 in November 2024 authorizing a contract with LaBiche Architectural Group for architectural plans, drawings, and documentation required for approval by the Texas Historical Commission, together with oversight of the restoration and repair work for Pompeiian Villa. The Purchasing Division subsequently advertised for bids for Phase IV Repairs and Renovations to Pompeiian Villa in The Port Arthur News on April 12, 2025, and April 19, 2025. Two bids were received, and Mike Barnett Construction of Port Neches, Texas, was determined to be the lowest responsible bidder with a bid amount of$415,250.00. In June 2025, City Council approved Resolution No. 25-267 awarding the construction contract to Mike Barnett Construction for Phase IV repairs and renovations to Pompeiian Villa. City Council later approved Resolution No. 25-519 for Change Order No. 1, extending the contract by thirty-six (36) calendar days, and Resolution No. 26-013 for Change Order No. 2, extending the contract by an additional ninety-eight (98) calendar days, resulting in a final completion date of April 6, 2026. Mike Barnett Construction has now completed the Phase IV work and submitted all required project close-out documentation, including: • Certificate of Substantial Completion dated March 30, 2026 • Contractor's Certificate of Debts Paid • Contractor's Certificate of Warranty • Contractor's Certificate of Guarantee • Contractor's Certificate and Release • Release of Retainage Certificate The completed work has been inspected by City staff and LaBiche Architectural Group and has been determined to be complete and satisfactory in accordance with the contract documents. RECOMMENDATION Staff recommends approval of the resolution authorizing acceptance of the project close-out documents and release of retainage to Mike Barnett Construction of Port Neches, Texas, in the amount of$20,762.50. Funding is available in Account No. 307-00-000-2050-00-00-000-, Project No. BU0015. P.R. No. 24891 04/06/2026 AJS- TNR RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT CLOSE OUT DOCUMENTS SUBMITTED BY MIKE BARNETT CONSTRUCTION OF PORT NECHES,TEXAS AND APPROVE THE RELEASE OF RETAINAGE OF$20,762.50 FOR PHASE IV REPAIRS AND RENOVATIONS TO POMPEIIAN VILLA. FUNDING IS AVAILABLE IN ACCOUNT No. 307-00-000-2050-00-00-000-, Project No. BU0015. WHEREAS, pursuant to Resolution No. 24-365, the City Council of the City of Port Arthur approved a contract with LaBiche Architectural Group for the preparation of architectural plans, drawings, and related documentation necessary for approval by the Texas Historical Commission, together with professional oversight for the proper restoration and repair of Pompeiian Villa; and WHEREAS, the City of Port Arthur Purchasing Division duly advertised for bids for Phase IV Repairs and Renovations to Pompeiian Villa in The Port Arthur News on April 12, 2025, and April 19, 2025; and WHEREAS, two (2) bids were received in response to the solicitation, and after review and evaluation, Mike Barnett Construction of Port Neches, Texas, was determined to be the lowest responsible bid, submitting a bid in the amount of$415,250.00; and WHEREAS, pursuant to Resolution No. 25-267, adopted in June 2025, the City Council awarded a construction contract to Mike Barnett Construction for Phase IV Repairs and Renovations to Pompeiian Villa in the amount of$415,250.00; and WHEREAS, pursuant to Resolution No. 25-519, the City Council approved Change Order No. 1, extending the contract time by thirty-six (36) calendar days; and pursuant to Resolution No. 26-013, the City Council approved Change Order No. 2, extending the contract time by an additional ninety-eight (98) calendar days, resulting in a final contract completion date of April 6, 2026; and WHEREAS, Mike Barnett Construction has completed the Phase IV Repairs and Renovations project in accordance with the contract documents and has submitted all required close-out documentation, including the Certificate of Substantial Completion dated March 30, 2026, together with the, Contractor's Certificate of Debts Paid, Contractor's Certificate of Warranty, Contractor's Certificate of Guarantee, Contractor's Certificate and Release, Release of Retainage Certificate attached hereto respectively as Exhibits "A"through"F"; and WHEREAS, the work associated with the project has been inspected by City staff and LaBiche Architectural Group and has been determined to be complete and satisfactory in accordance with the contract documents; and WHEREAS, the contract retainage for the project, representing five percent (5%) of the completed work, has been requested for release by Mike Barnett Construction in the amount of $20,762.50, as reflected in Exhibit"F"; and P.R. No. 24891 04/06/2026 AJS- TNR WHEREAS, funding for the release of retainage is available in Account No. 307-00- 000-2050-00-00-000, Project No. BU0015; and WHEREAS, the City Council finds that acceptance of the project close-out documents and authorization of the release of retainage constitute proper municipal purposes and are in the best interest of the City of Port Arthur. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT,the facts and opinions in the preamble are true and correct. THAT, the City Manager is hereby authorized to accept the project close-out documents submitted by Mike Barnett Construction of Port Neches, Texas, for Phase IV Repairs and Renovations to Pompeiian Villa; attached hereto as the Certificate of Substantial Completion dated March 30, 2026 (Exhibit A), Contractor's Certificate of Debts Paid (Exhibit B), Contractor' s Certificate of Warranty (Exhibit C), Contractor's Certificate of Guarantee (Exhibit D), Contractor's Certificate and Release (Exhibit E), and the Release of Retainage Certificate (Exhibit F); and, THAT, the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a Certificate of Acceptance for the completion of Phase IV repairs to Pompeiian Villa; and, THAT, the City Manager is further authorized to release retainage in the amount of $20,762.50 to Mike Barnett Construction, with funding available in Account No. 307-00-000- 2050-00-00-000, Project No. BU0015; (Exhibit F); and. THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED, this day of 2026 AD, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote: AYES: Mayor: Councilmembers: • NOES: Charlotte Moses, Mayor ATTEST: Christie Whitley Ned, City Secretary f1{O P.R. No. 24891 04/06/2026 AJS- TNR APPROVED AS Roxann Pais Cotroneo, City Attorney APPROVED ISTRATION: Ronald Burton, CP anager APPR ERAS TO FUND AVAILABILITY:60/. /1 -716a) Lynda Bos Tell, M.A., ICMA-CM Director of Finance Clifton Wi liams, CPPB, Purchasing Manager P.R. No. 24891 04/06/2026 AJS- TNR EXHIBIT "A" CERTIFICATE OF SUBSTANTIAL COMPLETION Purchase Order No.: #25-267 Project Name: Pompeiian Villa Phase 4-"Foundation Leveling and MEP Upgrades" Contractor: Mike Barnett Construction Description of Work: Foundation Leveling/Spray foam Insulation/Electrical Upgrades /New IIVAC/Fire Alarm System The work performed under this contract has been reviewed and found to be substantially complete.The date of substantial completion is hereby established as 01/06/26 KNOW ALL MEN BY THESE PRESENTS: 1.) The stage of construction where, in the opinion of the City of Port Arthur,all items of the work necessary to enable the assets to be utilized without restrictions for the purpose for which the asset was constructed have been completed;and 2.) All pay items are complete and all necessary testing as required by the Laws and Regulations and/or Contract Documents have all been completed. Punch List All list of items to be completed or corrected,prepared by the CONTRACTOR and verified and amended by the ENGINEER, is attached hereto.The failure to include any items on such list does not alter the responsibility of the CONTRACTOR to complete all work in accordance with the contract documents.The CONTRACTOR shall complete or correct the work on the list of items attached hereto within in 60 days from the above date of substantial completion.The responsibilities shall be as set out in the Contract Documents or on the attached isresponsible If not specified in and an attachment or in the Contract Documents the CONTRACTOR for maintenance, utilities and insurance. Mike Barnett Construction �T^ 01/06/26 CONTRACTOR NAME S19/sIATI)RE • DATE • RECOMMENDED FOR ACCEPTANCE a , �� 3 3° x rt�NEEt NA�4 I? SIG t1,;1��fj? ATE cr The City of Port Arthur accepts the work as Substantially Complete. City of Port Arthur,Department of Public Works. PROJECT MANAGER SIGNATURE DATE CITY ENGINEER SIGNATURE DATE PUBLIC WORKS DIRECTOR SIGNATURE DATE CERTIFICATE OF SUBSTANTIAL COMPLETION PROJECT: Pompeii Villa Phase IV ARCHITECT:The LaBiche Architectural Group, Inc PROJECT NO.: 22033 OWNER: City of Port Arthur CONTRACTOR: Mike Barnett Construction 3401 Culture Ctr Dr Port Arthur,Texas 77642 CONTRACT FOR: Historic Restoration DATE OF ISSUANCE:January 6, 2026 CONTRACT DATE: December 3,2024 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: ALL WORK The Work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby established as January 6, 2026 which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below. DEFINITION OF DATE OF SUBSTANTIAL COMPLETION The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect when construction is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents. A list of items to be completed or corrected, prepared by the Contractor and verified and amended by the Architect is attached hereto. The failure QED qq to include any items on such list does not alter the responsibility of the cor'H. Laecti Contractor to complete all Work in accordance with the Contract o y Documents. The date of commencement of warranties for items on the m y attached list will be the date of final payment nless otherwise agreed to in ., co writing. ;' 9T 11592 OF1 The LaBiche Architectural Group, Inc 00A p ARCHITECT The Contractor will complete or correct the Work on the list of items attached hereto within fifteen (15) days from the Date of Substantial Completion Mike Barnett Construction ' / ;�� 1/7/26 _ CONTRACTOR BY DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof at :00 . on January 7, 2026. City of Port Arthur OWNER BY DATE The responsibilities of e Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: Owner will assume responsibility for maintenance, security, and damage to the Work on the Date of Substantial Completion except for damage done by Contractor or Subcontractors during final completion. Owner assumes responsibility for insurance of the Project on January 7, 2026. The Contractor will submit to the Owner the executed warranties, maintenance agreements, inspection certificates, record documentation, maintenance manuals, tools, spare parts, keys and similar operational items by February 6,2026. crn of ort rthu � reran www.PortArthurTx.gov CERTIFICATE OF COMPLETION Date: 4/7/2026 Project: Phase IV repairs and renovations to Pompeiian Villa; Release of Retainage. To: All Concerned I HEREBY CERTIFY THAT this project was completed on March 30, 2026 and that the work was under periodic inspection during construction by LaBiche Architectural Group and myself and City Inspectors. That to the best of my knowledge, the project was constructed substantially in accordance with the plans and specifications. Submitted by: -2410,1 Adam J S unders Civic Center Director 3401 Cultural Center Drive—Port Arthur,TX 77642—409-985-8801 P.R. No. 24891 04/06/2026 AJS- TNR EXHIBIT "B" CONTRACTOR'S CERTIFICATE AND RELEASE FROM: MIKE BARNET CONSTRUCTION Name of Contractor) TO: CITY OF PORT ARTHUR POMPEII VILLA PARSE 4-1953 LAKESHORE DR.PORT ARTHUR,TX (Owner) REFERENCE CONTRACT NO.: 25-267 CONTRACT ENTERED INTO THE 21ST DAY OF MAY BETWEEN THE CITY OF PORT ARTHUR AND MR LANCE BARNETT OF MIKE BARNETT CONSTRUCTION FOR THE PROJECT POMPEHAN VILLA PHASE 4-CITY OF PORT ARTHUR KNOW ALL MEN BY THESE PRESENTS: 1.) The undersigned hereby certifies that there is due from,and payable by,the Owner to the Contractor under the contract and duly approve Change Orders and modification the balance of $ 20,762.50 2.) The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: a. b. NONE c. d. (Itemize claims and amounts due,if none,so state) 3.) The undersigned further certifies that all work required under this contract, including work required under Change Order(s)numbered ,has been performed in accordance with the terms thereof,and that there are no unpaid claims for materials,supplies,or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract,and that the wage rates paid by the contractor were in conformity with the contract provisions relating to said wage rates. 4.) Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above-mentioned contract or any modifications or changes thereof. 5.) That in consideration of the payment of the amount stated in Paragraph 1 hereof,the undersigned does hereby release the Owner and Operator from any all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the owner, provided however,that if any reason the Owner does not pay the full amount stated in Paragraph 1 hereof,said deduction shall not affect the validity of this release,but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof.The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of an amount which may be deducted from Paragraph 1 hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of paid contract modification thereof,and will execute such further releases or assurances of the Owner and Operator may request. 1 IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 2nd day of JUNE ,2024 LANCE BARNETT-MIKE BARNETT CONST. {SEAL} (Contractor) BY: ignature) L4#1ci ,CAIErr /& s4- bwnrE,e (Printed Name/Title of Officer) LANCE BARNETT , being first duly sworn on oath,deposes and says,First,that,he/she is the (Affiant) GM/OWNER of MIKE BARNETT CONSTRUCTION (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as GM/OWNER (Title) of MIKE BARNETT CONSTRUCTION (Name of Company) Affiant further states that the matters and things stated herein are true. 41111PAP— Subscribed and sworn to before me this /�2.+d � day of c.j w�E ,2026 My commission expires two1...Q1 NOTARY �������Pin,, KENNADI SPACEK �o��""'�a��;Notary Public,Stata of:faFas i ,'y= Comm.Expires 09 01 (59 'i,;�o �` Notary ID 1355"uc 2 SUBCONTRACTOR'S AFFIDAVID OF RELEASE OF LIEN STATE OF Texas COUNTY OF Jefferson KNOW BY ALL MEN BY THESE PRESENTS: f'itit Aovrill being first duly sworn,deposes and ays: 1. That he is the subcontractor (or the ,r-t-St d�''t'l of l ars1►4'`� ( on r / supplier) who supplied, installed, and /or erected ttfe work described below, and that he is duly authorized to make this Affidavit and Subcontractor Release:Y PROJECT: 7344P€4t IJ& WORK PERFORMED: t sit.r t i-pGdv- OWNER: ad _J di- por A'lnur SPECIFICATION: c 7 ARCHITECT: a)(fit, ( JLrt.- AMOUNT PAID: $ / !� / °C) 2. That all work required under the subject subcontractor of the subject construction project has been performed in accordance with its terms thereof, that all material men, sub-subcontractors, mechanics, and laborers have been paid and satisfied in full and that there are no outstanding claims of any character arising out of the performance of said subcontractor which have not been paid and satisfied in full. 3. That to the best of his I her knowledge and belief, there are no unsatisfied claims for damages resulting from injury or death to any employees, sub-subcontractors, or the public at large arising out of the performance of said sub-contractors, or ant sits or claims for any other damages of any kind, nature or description which might constitute a lien upon the property of the owner. 4. That he I she has received full payment of all sums due him/ her for materials furnished and services rendered by the undersigned in connection with the performance of the said subcontractor and has and does hereby release their Owner and the Architect and his consultants and the Contractor from any and all claims of any character arising out of or in any way connected with the performance of said subcontract. ATTEST (If Corporation) r\lor Wafers-pro Name of Subcontractor/ Supplier UFA. PVAA-4`\-- CY_Lcii t-etZbfiA2 By Title THE STATE OF Texas COUNTY OF Jefferson 09-0,2 Sworn to and subscribed before me on this i day f tiq ..28z-3-- (Seal) �' (i.,:ii;;,..,'' �� MICHEILE NElZL � /� "::1 "otary ro ,zsa;5�,g lli : Notary Pu li na ure ty - • 1 P.R. No. 24891 04/06/2026 AJS- TNR EXHIBIT "C" CONTRACTOR'S CERTIFICATE OF WARRANTY FROM: Mike Barnett Construction (Name of Contractor) TO: The City of Port Arthur Pompeii Villa Phase IV 1953 Lakeshore Dr.Port Arthur.Tx 77640 (Owner) REFERENCE CONTRACT NO.: 25-267 CONTRACT ENTERED INTO THE a 1 DAY OF Mek BETWEEN THE CITY OF PORT ARTHUR AND Mike Barnett Construction OF FOR THE PROJECT Pompeii Villa Phase IV City Of Port Arthur KNOW ALL MEN BY THESE PRESENTS: 1.) Lance Barnett does hereby guarantee all of the work done under the (Name of Contractor) above referenced contract to be free from faulty materials in every particular,and free from improper workmanship,and against injury from proper and usual wear;and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect,and to make good all damage caused to other work or materials due to such required replacement or re-execution. 2.) This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this contract by Owner,as evidenced by the Contractor's Certificate of Completion. 3.) This Certificate is given in connection with the final payment under the contract between the Owner and Lance Barnett,and with the knowledge that it will be relied upon in (Name of Contractor) Making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 3 day of g00('OA ,2026. Lance Barnett (SEAL) (Contractor) BIC:4-X-------- (Signature) Lance & net-t &M tDWneX (Printed Name/Title of Officer) 1-Warranty L O'Y\C ' ' oxr * r ,being first duly sworn on oath,deposes and says,First,that,he/she is the (Affiant) GM/Owner Of Mike Barnett Construction, (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as RA 'ot ne ws (Title) Of Mike Barnett Construction. (Name of Company) Affiant further states that the matters and things stated herein are true. ( II Subscribed and sworn to before me this a day of VI OW CP ,2026. My commission expires °1 — 3- 20% I "'" KENNADI SPACEK NOTARY �r � Notary Public,State of Texas j %H,,; Q Comm.Expires 09-03-2029 i ',';,,,,,` Notary ID 135526869 I 4 2-Warranty P.R. No. 24891 04/06/2026 AJS- TNR EXHIBIT "D" CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: Mike Barnett Construction TO: City of Port Arthur FOR: Rehabilitation on Pompeiian Villa Phase IV - Foundation MEP Upgrades REFERENCE CONTRACT NO. #22033 ENTERED INTO THE 3rd DAY OF June , 2025,BETWEEN THE CITY OF PORT ARTHUR AND Mike Barnett Construction (CONTRACTOR) OF Port Neches, TX (CITY/STATE) FOR: Rehabilitation on Pompeiian Villa Phase IV - Foundation MEP Upgrades (PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. Lance Barnett does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such require replacement or re-execution. 2. This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this Contract, as evidenced by the Engineer's Certificate of Completion. IN WITNESS THEREOF,the undersigned has signed and sealed this instrument this the .Z.Y)()k day of Pr?Y l \ , 2026. COMPANY SEAL Mike Barnett Construction (COMPANY NAME) C_..�" 4rte (OWNER, TURE/TITL Gnu/ E) Lance Barnett (PRINT) SUBSCRIBED AND SWORN to before me this 2 y d day of Avy 1 1 . 20* My commission expires ( r ) — 2029 `�� (DATE) 0',I�,,, KENNADI SPACEK o� "4e�':Notary Public,State of Texas '" Comm.Expires 09-03-2029 CaL-I14 t '''1,*, � Notary ID 135526869 nm++ Y "" (NOTARY P ) NOTARY SEAL P.R. No. 24891 04/06/2026 AJS-TNR EXHIBIT "E" CONTRACTOR'S CERTIFICATE AND RELEASE FROM: MIKE BARNET CONSTRUCTION (Nwne of Contractor) TO: CITY OF PORT ARTHIJR POMPEII VILLA PAHSE 4-1953 LAKESHORE DRPORT ARTHUR,TX (Owner) REFERENCE CONTRACT NO.: 25-267 CONTRACT ENTERED INTO THE 21ST DAY OF MAY BETWEEN THE CITY OF PORT ARTHUR AND MR.LANCE BARNETT OF MIKE BARNETT CONSTRUCTION FOR THE PROJECT POMPEIIAN VILLA PHASE 4-CITY OF PORT ARTHUR KNOW ALL MEN BY THESE PRESENTS: 1.) The undersigned hereby certifies that there is due from,and payable by,the Owner to the Contractor under the contract and duly approve Change Orders and modification the balance of $ 20,762.50 2.) The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: a. b. NONE c. d. (Itemize claims and amounts due,if none,so state) 3.) The undersigned further certifies that all work required under this contract,including work required under Change Order(s)numbered ,has been performed in accordance with the terms thereof,and that there are no unpaid claims for materials,supplies,or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract,and that the wage rates paid by the contractor were in conformity with the contract provisions relating to said wage rates. 4.) Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above-mentioned contract or any modifications or changes thereof. 5.) That in consideration of the payment of the amount stated in Paragraph 1 hereof,the undersigned does hereby release the Owner and Operator from any all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the owner, provided however,that if any reason the Owner does not pay the full amount stated in Paragraph 1 hereof,said deduction shall not affect the validity of this release,but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof.The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of an amount which may be deducted from Paragraph 1 hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of paid contract modification thereof,and will execute such further releases or assurances of the Owner and Operator may request. 1 IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 2nd day of JUNE ,20260 LANCE BARNETT-MIKE BARNETT CONST. {SEAL} (Contractor) BY: ignature) Z4.4ci &t irT r /a0A- vwrrEi2 (Printed Name/Title of Officer) LANCE BARNETT , being first duly sworn on oath,deposes and says,First,that,he/she is the (Affiant) GM/OWNER of MIKE BARNETT CONSTRUCTION (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as GM/OWNER (Title) of MIKE BARNETT CONSTRUCTION (Name of Company) Affiant further states that the matters and things stated herein are true. Cant) Subscribed and sworn to before me this ...S day of cj w�E ,2026 My commission expires 1 1 ao201 NOTARY a u?'014 KENNADI SPACEK ;', Pre;2.Notary Public,State of"texas �I�oya Comm.Expires cg +e� 135,—,.:6c`69 4'';Fci";�o� Notary ID 2 P.R. No. 24891 04/06/2026 AJS- TNR EXHIBIT "F" The LaBiche ARCHITECTURAL GROUP,INC. Dohn H.LaBiche,FAIA March 30, 2026 Principal Greg Wall,AIA Principal Mr. Ron Burton, City Manager 7999 Gladys,Suite 101 City of Port Arthur Beaumont Texas 77706 3401 Culture Ctr, Dr (40197 Fax:(409) 60- Port Arthur, Texas 77642 Fax 860-0198 www.labiche.com RE: COPA—Pompeii Villa—Phase IV Dear Mr. Burton, Enclosed herewith is the Contractor's Application and Certificate for Payment No. 7 retainage, in the amount of$20,762.50. This application has been reviewed, and is recommended for payment. ti9,E D AAC Sincerely, , C.3" o s..m 11592 Dohn H. LaBiche, FAIA DHL/bo Enclosure CC: Mike Barnett Project#: 22033 ARCHITECTURE PROJECT CONSULTING PLANNING INTERIOR DESIGN 1 i �.,tiai°F",% KENNADI SPACEK a•'' =Notary Public,State of Texas )14 `y' Comm.Expires 09-03-2029 4;°' w +utter Notary ID 135526869 6 i APPLICATION AND CERTIFICATION FOR PAYMENT AIA DOCUMENT G702 PAGE ONE OF TWOPJWEn TO OWNER: PROJECT:#22033 APPLICATION NO:7 Retainage Distnbuttaa to: City of Pon Arbor Texas Poonpeiiau Villa-Plume 4 ®OWNER P.O.Hox 1089 1953 Iakeshore Dr. no ARCHITECT Port Arthur,Texas 77641 Port Arthur,Tx 77641 PERIOD TO: 3/27/26 MICONIRACTOR FROM CONTRACTOR: VIA ARCHITECT:Doha Labiche (♦ Mike Barnett Construction The I.aBiche Architectural Group,Inc. - 1701 Pat Neches Ave. 7999 Gladys Avenue,Suite 101 Pat Neches,Texas 77651 Batunout,Tow 77706 CONTRACT FOR:General Construction CONTRACT DATE. 05/21J25 CONTRACTORS APPLICATION FOR PAYMENT The undnegoedConrMta certifies that to the beet of the Contractor's knowledge, Appliutiw u mad.foe payment,as shown below,in connection with the Contract information rui belief the Work coveted by this Application for Payment has been Conararation Shoot,AIA Document 0703,is enaohod completed in ancrederce with the Contract Documents,that all amounts have bean paid by the Connector fa Work for which previous Certificates for Payment weft woof Arad paymemu received from the Owner,and oast current peyrmcnt shown herein is now Ate 1.ORIGINAL CONTRACT SUM S 415.250 W 2.Net change by Change Orden S 0IN CONTRACIOR: MIKE BARNE T CUNSTRUCISON 3.CONTRACT SLIM TO DATE(Line 1 t•2) S 415 250.W • 4.TOTAL COMPLETED R STORED TO $ 415,,5660 DATE (Column G on 0703) fey. /// - — D 3/27/26 S.RETAINAt3E. i� !.. — uey re VAS�S�^ a. S %of Completed Work S OW Sum of. 1 ` F I✓1„y' C,w i of.f. ..dorm G7 aRtrsoe D+E no 03) Subsoibod end to, nto benne mcU trsJ of Ja b 5 %or Stored Man n& $ 0 Notary Public. 1 V('5 � 7�umeFat G703) My Caoanuu osprro+. 09 ,o Tow Reainagr(Linn 5a*5b or V"I 'W Tow to Column lofG703) S 0.00 ARCHITECTS CERTIFIC TE FOR PAYMENT 6 TOTAL EARNED LESS RETAIN AGE S 415,250.00 In accordance with the Contract Documents,based on on+ate otuervatiau end the data (Line 4 Lem Line 5 Tow) ctmptnets the applisauon,the Architect certain to the Owner that to the boot of the 7.LESS PREVIOUS CERTIFICATES FOR Atsneecte knowledge.4/demean and Wier eke Work hat progrestod at Agitated, PAYMENT(Lim 6from prior Cayoaoan) S 591.4e7.50 Ow moiety 0ferr..Wwa'on+aecw4ata.Iwtth the Cretraat Dt4wsnoto,toot the Crm/rm. 8.CURRENT PAYMENT DUE $ 20,75.2 50 is entitled to payvsera of the AMOUNT CERTIF!?.. 9.BALANCE TO FINISH,INCLUDINGRETAINAOF: S OOO Q (Lint 3 laser Line 6) AMOUNT CERTIFIED .S 411101. !at '° .` CItANCat ORDER RUFfMARY ADDITIONS DEDUCTIONS (Ara>t erphtnonrnetIf a reject.the omens appne/.trammel ullNN efts to,We Tow changes approved Appbconon and ono t chnwrrf tocoekra with the 1evehaef) in preview morel.by Oomcr sin uo S000 ARCltffhCT: Total app»ved ties Month SO p) SA 00 by. Date. TOTALS S0 00 SO 00, 'lbw Cabin... t4a. b. IRWIN)rs payub!a ty to the (.antnaCbr eoeoe payment and acceptance at payment tll without NET CHANGES by Chtunao Litchi stu r pro)umrs to any I. of the Owner or Contractor urd.r thu Contract Aw0IX.>A*HI Ilia).Al*.WA."toot C.titO Att.N NUR t notAtol,hi CUI!t r,ALA.Otass TIC aw,,,c,.o.eoTi,UIL or FIK'ritit.Tn.emehe w TOR%AK..eve.,W04.4eG10100G1eraee0264 Users may obtain validation of dais document by requesting a completed NA Document 0401-Certification of Document's Authenticity from the Licensee. CONTINUATION SHEET AU DOCUMENT G703 PAGE TWO Of I O IIPOtlii AIA Dowmolt G702,APPLICATION AND CERTIFICATION FOR PAYMENT.containing Application Daze 032726 Applicatom06 Cootrxloi'I signed cutification s aftacatd. In tabolaticoa below,unwna are uazeC to Otc oee/cst dollar. PERIOD TO:032726 I sc Colonal l oar COOOY:is wkao vsoaalc Tcminage We line nomx may ap+ly PROJECT NO;22033 A B D I E F G H 1 HEM DEStRO'EDS OF sr UM, "SLEIDULSD WORE L tPLETEb MATERIALS TOTAL 51 IBALANCE RE IALNAI* NO. VALUE PREVIOUS THIS PERIOD PRESENTLY COMPLETED(G-C) TO FINISH VARIABLE APPLICATION STORED AND STORED (C-G) RATE (D+E) (NOT IN TO DATE DORE) (DIEHL) '!v RASE 11U5 1 GENERAL.RIAUIRMENIS S28.500.90 $28300.00 S0.00 $0.00 S28300.00 100% $0.00 $1.425,00 7 SUPERVISION 82.5000.00 S25,000.00 5000 2000 525.000.00 100% S0.00 S1.250.00 3 TEMPORARIIS/SEl'UP/MOB&LZATION S7.000.00 57.000.00 S0.00 S0.00 S7,000.00 100% S0.00 $300.00 4 SITE MAINTENCE/FINAL.CLEANUP S7.000.00 S7.000.00 54.1.00 S0.00 S7.000.00 100% 50.00 S.a50.00 6 CONTINGENCY 830,000.00 530,000.00 S0.00 $0.00 530,000.00 100% $0.00 51.500.00 7 PATCHES/REPAIRS ALLOWANCE $10,000.00 S10,000.00 $0.00 $0.00 S10.000.00 100% S0.00 S500.00 8 FI,YCERICAL _ 9 ELECTRICAL DE O17HON TEMP SETUP S32,00000 532,00000 S000 $0.00 532000.00 100% $0.00 $1.600.00 10 EL.ECT.WJRINGTICIHTS/M1SC MATERIALS S13,400.00 513,400.00 S0.00 $0.00 Si3,400.00 100% $0.00 S670.00 11 ELF-CT.GEAR/PANELS/RISER/SERVICE INST S17,600.00 S17.600.00 S0.00 S000 SI7,600-00 100% $0.00 S880.00 12 WIRING ROUGHING WIRE PULL.-INSTALL $32.000.00 S32.000.00 S0.00 S0.00 $32,000 W 100% $0.00 S1,600.00 13 ELECTRICAL TRIM OUZ 510.000.00+ SI0.000.00 S0.00 $0.00 S10,000.00 100% 50.00 S500.00 14 IITE FD(11JRE RESTORATION $9,000.00 S9.000.00 S0.00 SO.00 59.0 0 00 100% S0.00 S450.00 15 FIRE ALARM'N 16 ROUGH TN WIRING $8,000.00 58.000.00 S0.00 S0.00 58.000.00 100% S0.00 S400.00 17 TOP OUT/PANEL SET/ S2200.00 S2.200.00 50.00 $0.00 57.200.00 100% S0.00 S 110.00 19 TRIM OUT INTTI12OR AND PANEL E L CONNECTR SS000 00 sa.000.00 5000 sO.OS) sat 000 00 10014. S0.00 fa00 00 19 PLUMBING 50.00 20 PLUMBING DEMOLIION O'OL.D PIPING $2,800.00 52800.00 S0.00 50.00 $2..800.00 10094 S0.00 S140.00 REMOVE AND REPLACESEWFLINE S10.000.00 $10,000.00 S0.00 $0.00 $10.000.00 100% $0.00 $500.00 REMOVE AND REPLACE WATER LINE 56.700.00 S6,700 00 SO.00 S0.00 $6,700 00 100% $0.00 $335.00 100MOVEAND REPLACE 2FAUCETS $3300.00 13300.00 SO.00 S0.00 53300.00 100% 50.00 S165.00 REMOVE AND REPLACE WATER HEATER S4,000 00 S4 000 00 S0.00 S0.00 S4.000.00 )00% S0 00 5200.00 11 INSULATION ATTIC INSULATION S3.80000 S3.800.00 S0.00 $0.00 S3.800.00 100% S0.00 $190.00 SPRAY FOAM ON UNDERNEATH SIDE S20250.00 130.250.00 SO.00 S0.00 120250.00 100% SO.50 S1.012_50 12 )IVAC-MECNAACIAL DEMOLITION AC UNFI'ANC DUCT PHASE 1 $2500.00 52500.00 1000 S0.00 S2.500.00 100% S0.00 S125..00 NA COG LAIENl PAP CON I NlWT10N 6ICECT FOIL IOW•11aO EOTON 0*.011E2 RWAMEIaCAN.IYT1TIJTE of ARCNTEGT3,1735 NEW'IOWA 6*5*00'KW.WA9eNGION,P G 20 W421122 070145/92 N P 1 sty 8 p 8 8�jj 8 p 8 3 8 p 8 8 8 8 p 8 8p p 8 8 p g p a p 8 8 8 8 8 -q 5 4 N ry Ory N.pp ryOry 1 Nry1Nry 1ry Npp fry�ry'� I O O N b O P N b O O r N ((( N N N N N N N VI N N N N N N N N N N 1 ZI $ $ $ 8888888 $ 8 $ 88. 8 888 88 i $ c x lG 5{ aaa a liaiaaa ass as a aaa as 2'" �Rv °z ,,� c cgas -8 iiI " " $ flg fi a °L qV 8s88 $ 8888, 8 888 888 $ ss sS ° �F e- 8 § 8 & § 8 § g 8 & 8 $ 8 8 § § 8 0 8 8 8 fi r=' °' eAR� s y 3 3 z4 3 3 V, S a u Gi Add a m a a R 2 6 v $ 8 8 8 $ 8 8 8 8 8 $ 8 8 8 $ 8 8 88 G7 ° } 44aaaaabiai35ifiR asa Sag saa as 1 QQb 0 K Ill go 2 U 8, 8, 8 8 S 8 $ 8 $ e 8 8 8 8 $ 8 S 8 8 8 $ i 8 I 1211111111 Sian ass ill as 11 11..P 8 8 8 8 $ $ $ 8 $ $ $ 8 8 8 8 8 8 8 8 8 8 ?(I: g § f. 8 §. 8 § §. 888 88 g 888 8 i i. g e Itfaauaa2a acid raad ada ua illo VI a ; $ 8 8 8 8 8 8 8 8 $ $ 8 8 8 8 8 8 $ $ $ 8 z > ad s3tadd x aaa QDIa aaa Sa i N N N w ..w 1— il c iiEZili I w nmaVwlw qE r1I- � E � , z s � Q .t o. d 4 .1 � h; PC id{�; ev' pFU p }�s4{(iQg8e YQ g2 ey p t a pF ] rflu p U • CONTINUATION SHEET MA DOCUMENT G703 PACE TWO(*WA,PACFB AIA Document G702,APPLICA EION AND CERTIFICATION FOR PAYMENT,wntaining Applicacnn Date: 0327/26 Applicatian46 Contrac[ot's tried actifia4on is attested In tabulations below.amounts are suited to the neatest dollar. PERIOD TO:03/27/26 Use Colms=Inn Cctotr.cts n6cte•-.r.b1c(ex 4R late linos may apatw. PROJECT NO.22033 A B D L E F G H t st.. iSTP�t..k1 E)) MATETEIALS 'TOTAL % BALANCE RAM(4 NO. VALUE -1 T$00S l�gKS PERIOD PRESENTLY ( IMPIETED(G-Cl TO FINISH VA WART 1 APPLICATION STORED AND STORED (C-G) RATE (0+E) (NOT IN TO DATE D OR El (1E,41 5% SET BLOCKS AND SHIMS PHASE! $2.400 00 $2,400.00 S0.00 SO(X) S2.400.00 100% S0.00 5120.00 PHASE2 DRILL PIERS/SET STEEL CAGES PHASE 2 S5.100.00 S5,100.00 S0.00 S0.00 S5,100.00 100% S0.00 S255.00 POURCONCRTEI'E PIERS PHASE 2 S3.500.00 S3,500.00 S0.00 $0.00 S3,500.00 100% S0.00 S175.00 SET BLOCKS AND SHIMS PHASE 2 S2.400.00 $1400.00 S0.00 S0.00 S2.400 00 100% S0.00 S 120.00 PHASE 3 DRILL PIERS/SET STEEL CAGES PHASE 3 55,100.00 S5(100.00 50.00 $0 00 55,100.00 100% S0.00 S255.00 POUR CONCRTETE PIERS PHASE 3 S3.500.00 53,500.00 S0.00 50.00 $3,500.00 100%. S0.00 5175.00 SET BLOCKS AND SHIMS PHASE 3 S2,400.00 S2.400.00 S0.00 S0.00 S2,400.00 100% S0.00 S120.00 SITE CLEANUP $2.400,00 52,400.00 S0.00 S0.00 S2,400.00 100% S0.00 5120.00 GRAND nrrATS S415,250.00 S415,250.00 S0.00 S0.00 S415250.00 100% S0.00 S20,762.50 Users may obtain validation of this document by requesting of the license a completed AlA Document 0401-Certification of Document's Authenticity NA lw,'MEW G703 oOtmuuATAM SHEET FOR Graz 4102 fO11ION NA.10I0921HEAYE)aCMHrumnTt OF mica recl5,tr.s NEW YORK AVENUE,NW.WACO ON0lOi1.O.0 22036e232 G703-1992 CITY OF PORT ARTHUR, TEXAS CIVIC CENTER DEPARTMENT CERTIFICATE OF ACCEPTANCE FOR... Pompeiian Villa Phase IV To: Mike Barnett Construction This document is to certify that the City of Port Arthur,Texas accepts the completion of the Phase IV repairs and renovations to Pompeiian Villa, on the basis of the recommendation of the City of Port Arthur's Civic Center Department and receipt of the Certificate of Completion, Contractor's Affidavit of All Debts Paid, Contractor's Certificate of Release, Contractor's Certificate of Warranty executed by Mike Barnett Construction. Ron Burton, CPM City Manager Sherri Bellard City Secretary