INTEROFFICE MEMORANDUM
Date: June 15, 2026
To: The Honorable Mayor and City Council
Through: Ronald Burton CPM, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR No. 25005—Authorize City Manager to Apply for TWDB Financial
Assistance for Sabine Pass Water System Rehabilitation
Introduction:
This Agenda Item intends to seek the Council's approval to apply to the Texas Water
Development Board's (TWDB) funding opportunity requesting financial assistance for the
Sabine Pass Water System Rehabilitation.
Background:
The City's water distribution system in Sabine Pass needs rehabilitation as there are recurring
water loss due to leaks in the area. As part of House Bill 500 (89th Legislature), there is the
opportunity for one-time 100% grant funding available for water infrastructure and supply
projects. The City is applying for $13,000,000.00 in financial assistance from the TWDB to
provide for the costs of the Sabine Pass Water System Rehabilitation. The City must submit the
complete application to TWDB by July 30, 2026.
Budget Impact:
The project is seeking financial assistance in an amount not to exceed$13,000,000 from TWDB
grant. There is no City funding appropriation required if selected.
Recommendation:
It is recommended that the City Council approve PR No. 25005, authorizing the City Manager
to submit the application for the TWDB funding as discussed and/or outlined above.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
PR No.25005
7/30/2025 cm
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO SUBMIT A GRANT APPLICATION TO THE TEXAS
WATER DEVELOPMENT BOARD (TWDB) FUNDING
OPPORTUNITY AS PART OF THE TEXAS HOUSE BILL
500 (89TH LEGISLATURE) FOR THE POSSIBLE GRANT
FUNDING OF $13,000,000.00 FOR THE SABINE PASS
WATER SYSTEM IMPROVEMENTS PROJECT
WHEREAS, the City of Port Arthur continually seeks funding opportunities to improve
the safety and integrity of its water and sanitary sewer lines,utilities and critical infrastructure for
its citizens; and,
WHEREAS, as part of the Texas House Bill 500 (89th Legislature), one-time 100% grant
funding is available for water infrastructure and supply projects from Texas Water Development
Board(TWDB); and,
WHEREAS,the City's Utilities Department staff,in collaboration with Arceneaux Wilson
& Cole, LLC, has formed a scope, referred to as the Sabine Pass Water System Improvements
project for this TWDB grant opportunity and is seeking financial assistance in an amount not to
exceed$13,000,000.00; and,
WHEREAS,the scope of work includes the replacement of approximately 6,875 liner feet
of existing 8-inch water line from the existing ground storage tank facility on South Gulfway Drive
to the intersection of South Gulfway Drive and Buford Street in Sabine Pass, as well as, the
construction of restrained joints on approximately 11,000 linear feet of existing 16-inch PVC water
line from the intersection of South Gulfway Drive and Buford Street to Keith Lake; and
WHEREAS,this project will address a large area of recurring water loss due to leaks and
also harden the City's existing potable water distribution system for the Sabine Pass area; and
WHEREAS, it is in the best interest of the City to apply for this one-time 100% grant
funding in which the City does not need to secure local matching funds.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR, TEXAS:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT, the City Manager is hereby authorized to submit the required application
documents, in substantially the same form as attached in Exhibit "A", for Texas Water
Development Board's (TWDB) funding opportunity, as per House Bill 500 (89th Legislature) for
PR No.25005
7/30/2025 cm
Page 2 of 3
the Sabine Pass Water System Improvements Project, with an application deadline of July 30,
2026; and
THAT,the City does not need to secure local matching funds if the application is selected
for award for the Sabine Pass Water System Improvements Project; and,
THAT a copy of the caption of this resolution is spread upon the minutes of the City
Council.
READ,ADOPTED,AND APPROVED THIS day of ,2026 at
a Regular Meeting of the City Council of the City of Port Arthur, Texas,by the following vote:
AYES: Mayor
Councilmembers:
•
NOES:
Charlotte M. Moses
Mayor
ATTEST:
Christe Whitley Ned
City Secretary
PR No. 25005
7/30/2025 cm
Page 3 of 3
APPROVED AS TO FORM:
Roxann Pais Cotroneo
City Attorney
APPROVED FOR ADMINISTRATION:
ofi
\Nsip-
Ronald Burton, CP V
City Manager
Suhail Kanwar, P.E.
Director of Public Services
Ca yin Matthews, P.E.
Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS:
y yn) Boswell, FO
Finance Director
efi (1 (A/tbitAA
Clifton . Williams Jr. PPB
Purchasing Manager
EXHIBIT A
6/15/26,1:17 PM Mail-Christian Martinez-Outlook
t Outlook
[NON-CoPA] WSIG (HB 500) Project Summary
From Keith Zotzky<Keith.Zotzky@awceng.com>
Date Mon 6/15/2026 7:46 AM
To JESS LIAO <jess.liao@portarthurtx.gov>;Christian Martinez<christian.martinez@portarthurtx.gov>
Cc Calvin Matthews <calvin.matthews@portarthurtx.gov>; Hani Tohme<tohmehani@yahoo.com>
Good Morning,
Please find below the requested project summary.
House Bill 500, passed during the 89th Legislative Session, appropriated$1.038 billion in funds for water supply
and infrastructure projects to the Texas Water Development Board. This is a one-time opportunity for a limited
number of Texas communities to receive grant funding to implement water supply/water infrastructure projects.
Once this initial appropriation is provided to communities by August 31, 2027,the TWDB will no longer have these
grant funds available to provide financial assistance.
HB 500 from the 89th Texas Legislative Session appropriated$1,038,000,000 from the general revenue fund to
the TWDB but did not specify that the money was appropriated to a specific fund,which resulted as a deposit of
the appropriated money into TWDB's general revenue fund. Additionally,the appropriation language did not
provide authority for the TWDB to transfer that money into another TWDB fund or account. Therefore,the money
must be provided for the stated purposes directly from TWDB's general revenue fund and not through an existing
financial assistance program.
Further, the purpose for the appropriation was stated in the HB 500 legislation as"water infrastructure and supply
projects and grants as determined by the board." As the language is specific to water infrastructure and supply,
the plan excludes wastewater and flood projects. This one-time 100%grant funding opportunity is aimed to
address real or apparent water loss,TCEQ violations,water reuse, or upgrading/replacing water systems.
Complete applications for this program are due by Thursday,July 30th at 11:59pm CST.
The City of Port Arthur has formed a scope, referred to as the"Sabine Pass Water System Improvements"project
for this funding opportunity to include the following: replacement of approximately 6,875 linear foot of existing 8"
water line from the existing ground storage tank facility on South Gulfway Drive to the intersection of South
Gulfway Drive and Buford Street in Sabine Pass. The project will also include the construction of restrained joints
on approximately 11,000 linear foot of existing 16"PVC water line from the intersection of South Gulfway Drive
and Buford Street to Keith Lake. This project will address a large area of recurring water loss due to leaks and
also harden the City's existing potable water distribution system for the Sabine Pass area.
Let me know if you have any questions.
Thank you,
al awn
Keith Zotzky,P.E.(TX,LA),CFM/Vice President
Keith.Zotzky-@awceng.com/281.543.2663
Arceneaux Wilson&Cole LLC
3120 Central Mall Drive
Port Arthur,TX 77642
409.724.7888
awceng.com
https://outlook.cloud.microsoft/mail/inbox/id/AAQkADIzMzZkMTk3LTcOMDEtNDdIZS1 hMTc4LWE3ZWNjMmViZjdhMgAQAGDoWrmSJUkvgfsvkJ6xKQ... 1/1
TWDB-0201
Rev 2/23
Application Affidavit
THE STATE OF TEXAS §
COUNTY OF JEFFERSON §
APPLICANT CITY OF PORT ARTHUR §
BEFORE ME,the undersigned,a Notary Public in and for the State of Texas,on this day
personally appeared RONALD BURTON as the Authorized Representative of the
CITY OF PORT ARTHUR
,who being by me duly sworn,upon oath says that:
1. The decision by the CITY OF PORT ARTHUR (authorit
y,city,county,
corporation,district)to request financial assistance from the Texas Water Development Board("TWDB")was
made in a public meeting held in accordance with the Open Meetings Act(Government Code,§551.001,et seq,)
and after providing such notice as required by such Act as is applicable to the CITY OF PORT ARTHUR(authority
city,county,corporation,district).
2. The information submitted in the application is true and correct according to my best knowledge and
belief.
3. The CITY OF PORT ARTHUR (authori
ty,ty,city,county,corporation,district)has
no litigation or other proceedings pending or threatened against it that would materially adversely affect its
financial condition or ability to issue debt.
4. The CITY OF PORT ARTHUR (authori
ty,ty,city,county,corporation,district) has no
pending,threatened,or outstanding judgments,orders,fines,penalties,taxes,assessment or other enforcement or
compliance issue of any kind or nature by the Environmental Protection Agency,Texas Commission on
Environmental Quality,Texas Comptroller,Texas Secretary of State,or any other federal,state or local government,
except for the following(if no such outstanding compliance issues,write in"none"):
5. The CITY OF PORT ARTHUR (authori
ty,ty,city,county,corporation,district)
warrants compliance with the representations made in the application in the event that the TWDB provides the
financial assistance.
6. The CITY OF PORT ARTHUR (authori
ty,ty,city,county,corporation,district)
is or will become in compliance with all of its material contracts.
7. The CITY OF PORT ARTHUR (authori
ty,ty,city,county,corporation,district)will
comply with all applicable federal laws,rules,and regulations as well as the laws of this state and the rules and
regulations of the TWDB.
Official Representative
Title:
SWORN TO AND SUBSCRIBED BEFORE ME,by
on this day of ,20
(NOTARY'S SEAL)
Notary Public,State of Texas
TWDB-0201A
Rev 11/16
Application Filing and Authorized Representative Resolution
A RESOLUTION by the CITY COUNCIL of the
CITY OF PORT ARTHUR requesting fmancial assistance from the Texas Water
Development Board; authorizing the filing of an application for assistance; and making certain findings in
connection therewith.
BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF PORT ARTHUR
SECTION 1: That an application is hereby approved and authorized to be filed with the Texas Water
Development Board seeking financial assistance in an amount not to exceed $13,000,000.00 to provide
for the costs of SABINE PASS WATER SYSTEM REHABILITATION
SECTION 2: That RONALD BURTON be and is hereby
designated the authorized representative of the CITY OF PORT ARTHUR for purposes
of furnishing such information and executing such documents as may be required in connection with the preparation
and filing of such application for financial assistance and the rules of the Texas Water Development Board.
SECTION 3: That the following firms and individuals are hereby authorized and directed to aid and assist
in the preparation and submission of such application and appear on behalf of and represent the
CITY OF PORT ARTHUR before any hearing held by the Texas Water
Development Board on such application,to wit:
Financial Advisor: HILLTOP SECURITIES.INC.
70 NE LOOP 410,SUITE 750 SAN ANTONIO,TX 78216
Engineer: ARCENEAUX WILSON&COLE LLC
3120 CENTRAL MALL DRIVE PORT ARTHUR,TEXAS 77642
Bond Counsel: HOLLAND&KNIGHT LLP
811 MAIN STREET,SUITE 2500 HOUSTON,TX 77002
PASSED AND APPROVED,this the day of ,20 .
ATTEST: By:
(Seal)
TWDB-0201B
Rev 11/16
Application Resolution - Certificate of Secretary
THE STATE OF TEXAS §
COUNTY OF JEFFERSON §
APPLICANT CITY OF PORT ARTHUR §
I,the undersigned,Secretary of the Texas,
DO HEREBY CERTIFY as follows:
1. That on the 30TH day of J U N E ,20 26 ,a regular/special meeting of the
CITY COUNCIL was held;the duly constituted members of the
CITY COUNCIL being as follows:
all of whom were present at the meeting,except the following:
Among other business considered at the meeting,the attached resolution entitled:
"A RESOLUTION by the CITY COUNCIL of the CITY OF PORT ARTHUR requesting
financial participation from the Texas Water Development Board;authorizing the filing of an application
for financial participation;and making certain findings in connection therewith."
was introduced and submitted to the CITY COUNCIL for passage and adoption. After
presentation and consideration of the resolution,and upon a motion made by and
seconded by ,the resolution was passed and adopted by the
CITY COUNCIL by the following vote:
voted"For" voted"Against" abstained
all as shown in the official minutes of the CITY COUNCIL for this meeting.
2. That the attached resolution is a true and correct copy of the original on file in the official records
of the CITY OF PORT ARTHUR ;the qualified and acting members of the CITY COUNCIL on
the date of this meeting are those persons shown above and,according to the records of my office,advance notice of
the time,place,and purpose of meeting was given to each member of the CITY COUNCIL ;and that the
meeting,and the deliberations of the public business described above,was open to the public and written notice of
the meeting,including the subject of the resolution described above,was posted and given in advance of the meeting
in compliance with the provisions of Chapter 551 of the Texas Government Code.
IN WITNESS WHEREOF,I have signed my name and affixed the seal of
the ,this the day of ,20
Secretary
(SEAL)