Loading...
HomeMy WebLinkAboutPR 15634: CONSTRUCTION/RENOVATION OF TRANSIT FACILITIESMemo To: Steve Fitzgibbons, City Manager and City Council From: Colleen Russell, Planning Department Date: 12/10/2009 Re: P.R. 15634 -Construction/renovation-of Transit Facilities RECOMMENDATION:. The City of Port Arthur Transit Division is requesting the City Council to authorize. advertising a Request for Qualifications for an Architectural/Engineering (A/E) firm for the design phase of the renovations of the existing Transit Terminal and Transit Service Center, located at 300 Procter Street and 320 Dallas Avenue respectively. BACKGROUND: The Transit Terminal has not been upgraded since it was built in 1986 and is in need of various exterior and interior repairs in addition to replacement landscaping. The Transit. Service Center was last renovated in 1995 and is in need of considerable- interior and exterior repairs in addition to modifications to the building structure to accommodate an automated Transit equipment washer.. Funding for these approved projects is provided by The Federal Transit Administration (F.T.A.) within two (2) Capital Grants that provide for Transit Facilities Renovations. Consequently, in order to obligate these Federal Funds a Professional Service Contract with an A/E Firm is needed to provide the design, blue prints, specifications, documents, contracts, contractor and project over site. • Page 1 BUDGETARY/FISCAL EFFECT: Funding for these A/E Professional Services are provided by the F.T.A. at 80% reimbursement through Capital Grant #TX-90-X859 in conjunction with City matching funds at 20%. This expense will be charged to 401-1509-561-55-00. Funding for future Transit facility expansion and any demolition will provided the F.T.A. at 100% reimbursement through "ARRA" Grants (TX-96-X040 and proposed TX- 96-X042). STAFFING/EMPLOYEE EFFECT: None SUMMARY: The City of Port Arthur Transit Division is requesting the City Council to. authorize advertising a Request for Qualifications for an Architectural/Engineering (A/E) firm for the design phase of the renovations of the existing Transit Terminal and Transit Service Center, located at 300 Procter Street and 320 Dallas Avenue respectively. This expense will be charged to 401-1509-561-55-00, Capital Grant #Tx-90-X859. Respectfully, C. Russell, Planning. Director • Page 2 P.R No.15634 12/09/2009 CWR RESOLUTION N0. A RESOLUTION AUTHORIZING THE CITY TO ADVERTISE FOR A REQUEST FOR QUALIFICATIONS (RFQ) FOR AN ARCHITECTURAL/ENGINEERING (A/E) FIRM ` FOR THE DESIGN PHASE OF THE RENOVATIONS OF THE .CITY OF PORT ARTHUR'S EXISTING TRANSIT TERMINAL AND TRANSIT SERVICE CENTER (LOCATED AT 300 PROCTER STREET AND 320 DALLAS AVENUE RESPECTIVELY) WITH THE USE OF `GRANTS TX-90-X859, TX-96-X040 AND PROPOSED TX-96-X042 WHEREAS, the Federal Transit Administration (FTA) will allow and pay for 80% of the design phase of the renovations and administrative cost in conjunction with City matching funds at 20% to be charged to 401-1509-561-55-00; while 100% of the costfoi• demolition and construction will be paid by the ARRA Grants mentioned. Therefore, the City Transit Division is requesting that the City Council allow for a RFQ to be submitted; and WHEREAS, the Purchasing Division will oversee the advertising in the Port Arthur News and a schedule will beset for the RFQ acceptance; and WHEREAS, the City Codes and ordinances in addition the State, Federal and FTA Regulations for RFQ-shall be complied with in line with detailed criteria set for 300 Procter Street and 320 Dallas Avenue respectively; therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR THAT this approval shall allow for a RFQ to be submitted for advertisement. P.R No.15634 , 12/09/2009 CWR THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this _ day of December, A.D. 2009, at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: MAYOR COUNCILMEMBERS: NOES: Mayor ATTEST: City Secretary P.R No. 15634 APPROVED AS TO FORM: P.R No.15634 12/09/20D9 CWR APPROVED FOR ADMINISTRATION: -City Manager of /v Finance Director -> i Shawna Tubbs, Purchasing Manager Director 9f'~l ning • Page 5