HomeMy WebLinkAboutPR 24970: EXECUTE CHANGE ORDERS NOS. 6, 7, AND 8 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND CONSTRUCTION MANAGERS OF SOUTHEAST TEXAS, LLC. FOR PHASE II AND PHASE III ROADWAY AND DRAINAGE RECONSTRUCTION AT THE H.O. MILLS MAINTENANCE FACILITY City of Port Arthur Transit Department Memorandum To: Ronald Burton,City Manager From: Ivan Mitchell,Transit-Fleet Director Date: May 25,2026 Re: P.R.24970—A resolution authorizing the City Manager to execute change orders No.6,7, and 8 for Phase II and Phase III reconstruction and drainage repairs at the H.O.Mills Maintenance Facility NATURE OF REQUEST: Authorize the City Manager to execute change orders No. 6, 7, and 8 in the amount of$38,486.25 to Construction Managers of Southeast Texas,LLC,for Phase II and Phase III reconstruction and drainage repairs at the H.O. Mills Maintenance Facility. BACKGROUND: Pursuant to Resolution No. 25-446, the City Council awarded a construction contract to Construction Managers of Southeast Texas, LLC, in the amount of$1,114,939.19 for roadway reconstruction and drainage improvements at the H.O. Mills Maintenance Facility. During construction, several unforeseen site conditions and field adjustments were encountered, requiring modifications to the original construction contract. City Council previously approved Change Orders Nos. 1 through 5 to address conditions discovered during construction and to facilitate continued progress on the project. As construction has continued, additional unforeseen conditions have been identified, necessitating changes to complete the project in accordance with the approved engineering design and applicable construction standards. ANALYSIS: The proposed change orders address conditions encountered during construction that could not reasonably have been identified during the design phase and are necessary to ensure the long-term functionality, durability, and safety of the completed roadway and drainage infrastructure. Change Order No. 6 provides for the removal, transportation, and proper disposal of additional contaminated soil encountered during excavation activities. Removal of the contaminated material is necessary to allow construction to proceed safely and in compliance with applicable environmental requirements. Change Order No. 7 provides for the installation of additional dowel bars and limestone stabilization resulting from field adjustments to roadway grades necessary to improve pavement support and drainage performance. These improvements will strengthen the roadway structure and reduce the likelihood of premature pavement failure. Change Order No. 8 provides for the installation of larger drainage inlets to improve stormwater collection capacity and reduce the potential for future structural cracking and maintenance issues associated with the drainage system. Collectively, these changes represent prudent construction modifications that address unforeseen field conditions while enhancing the long-term performance of the completed improvements. Completing this work during construction is significantly more cost-effective than undertaking corrective work after project completion and minimizing the City's future maintenance obligations. RECOMMENDATION: The cumulative cost of Change Orders Nos. 6, 7, and 8 is $38,486.25, increasing the contract amount to $1,313,094.56. Considering the overall scope of the roadway and drainage reconstruction project, the requested increase is reasonable and necessary to ensure the project is completed in accordance with accepted engineering standards and the City's operational needs. BUDGETARY/FISCAL EFFECT: Funding to pay for the construction services is available in Account Funds 307-13-037-8525-00-10-000. P.R. No. 24970 7/7/2026 IM-TNR RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS NOS. 6, 7, AND 8 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND CONSTRUCTION MANAGERS OF SOUTHEAST TEXAS, LLC, OF BEAUMONT, TEXAS, FOR PHASE II AND PHASE III ROADWAY AND DRAINAGE RECONSTRUCTION AT THE H.O. MILLS MAINTENANCE FACILITY LOCATED AT 101 H.O. MILLS BOULEVARD, INCREASING THE CONTRACT AMOUNT BY $38,486.25 FOR A NEW TOTAL CONTRACT AMOUNT OF$1,313,094.56; FUNDING IS AVAILABLE IN ACCOUNT NO. 307-13-037-8525-00-10-000. WHEREAS, pursuant to Resolution No. 25-446, the City Council authorized the City Manager to execute a contract with Construction Managers of Southeast Texas, LLC, of Beaumont, Texas, for Phase II and Phase III roadway reconstruction and drainage improvements at the H.O. Mills Maintenance Facility in the amount of$1,114,939.19; and WHEREAS, pursuant to Resolution No. 26-102, the City Council approved Change Orders Nos. 1 and 2, increasing the contract by $67,002.50, for a revised contract amount of $1,181,941.69; and WHEREAS, pursuant to Resolution No. 26-192, the City Council approved Change Orders Nos. 3, 4, and 5, increasing the contract by $61,330.37, for a revised contract amount of $1,274,608.31; and WHEREAS, during the continued construction of the project, additional field conditions were encountered that could not reasonably have been identified prior to construction and required modifications to the work in order to complete the project in accordance with engineering standards and project specifications; and WHEREAS, Change Order No. 6, in the amount of $11,000.00, provides for the removal, transportation, and lawful disposal of additional contaminated soil encountered during excavation activities, which is necessary to allow construction to proceed safely and in compliance with applicable environmental requirements, as reflected in Exhibit "A"; and WHEREAS, Change Order No. 7, in the amount of $20,336.25, provides for the installation of additional dowel bars and limestone stabilization resulting from grade adjustments necessary to improve roadway integrity and drainage performance, as reflected in Exhibit "B"; and WHEREAS, Change Order No. 8, in the amount of $7,150.00, provides for the installation of larger drainage inlets to improve stormwater conveyance and reduce the potential for future inlet deterioration and structural cracking, as reflected in Exhibit "C"; and P.R. No. 24970 7/7/2026 IM-TNR WHEREAS, the Public Works Department has determined that the work encompassed within Change Orders Nos. 6, 7, and 8 is necessary for the proper completion of the project, is directly related to unforeseen site conditions and field adjustments encountered during construction, and is in the best interest of the City to ensure the long-term performance and durability of the reconstructed roadway and drainage infrastructure; and WHEREAS, the cumulative amount of Change Orders Nos. 6, 7, and 8 is $38,486.25, increasing the contract amount from$1,274,608.31 to $1,313,094.56. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT, the facts and opinions in the preamble are true and correct. THAT,the City Manager is hereby authorized to execute Change Orders Nos. 6, 7, and 8 to the contract with Construction Managers of Southeast Texas, LLC, in the cumulative amount of$38,486.25, increasing the total contract amount to $1,313,094.56, substantially in the form attached hereto as Exhibits "A," "B," and "C." THAT, funding for the additional work is available in Account No. 307-13-037-8525-00- 10-000. THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED,AND APPROVED this day of A.D. 2026 at a Regular Meeting of the City of Port Arthur, Texas by the following vote: AYES: Mayor: Councilmembers: • NOES: Charlotte M. Moses, Mayor ATTEST: Christe Whitley Ned, City Secretary P.R. No. 24970 7/7/2026 IM-TNR APPROVED AS TOFORM: Roxann Pais Cotroneo, City Attorney APPROVED FOR ADMINISTRATION: APPROVED AS 0 AVAILABILITY OF FUN S: Ronald Burton, CP Lyn sw 11 City Manager Di ctor of ' ance gil/tavt beilae Clifton Williams, CP PB Ivan ell Purchasing Manager Transit-Fleet Director P.R. No. 24970 7/7/2026 IM-TNR Exhibit "A" Construction Managers of Southeast Texas. LLC 5520 GORMAN ROAD—BEAUMONT,TEXAS 77705—PHONE(409) 736—9010 May 22,2026 CHANGE ORDER#6- CITY OF PORT ARTHUR—HO MILLS PHASES 2&3 Please find below the cost associated with the Changes Requested and the Additional Work that has arisen due to unforeseen existing conditions of the worksite. ITEM DESCRIPTION QUAN UNIT UNIT PRICE EXT PRICE I Contaminated Material Handling_ - Day Rate 11 DAY $1,000.00 $1 1,000.00 Total: $11,000.00 Excavation,Disposal,and Haul of Contaminated Soils. • 375 CY of Contaminated soils are to be placed in Republic Services Containers and hauled to their Labell Facility. • Took a total of 20 Days to get all contaminated materials out of the project due to limitations set by Republic Services. o Of 20 days 5 were originally agreed upon during Change Order 5. o Of the remaining 15 days,only 11 Days are billable as 4 were Rain Days. 0 If you have any questions,please feel free to give me a call. Sincerely, Construction Managers of Southeast Texas,LLC uan He r, andez—Sr. Project Manager Page 1 of 1 P.R. No. 24970 7/7/2026 IM-TNR Exhibit "B" 6. Construction Managers of Southeast Texas, LLC 5520 GORMAN ROAD—BEAUMONT,TEXAS 77705—PHONE(409) 736—9010 May 22,2026 CHANGE ORDER#7-CITY OF PORT ARTHUR—HO MILLS PHASES 2&3 Please find below the cost associated with the Changes Requested and the Additional Work that has arisen due to unforeseen existing conditions of the worksite. ITEM DESCRIPTION QUAN UNIT UNIT PRICE EXT PRICE 1 Construction Joint-Dowel Bars 205 LF $41.95 $8,599.75 2 Additional Limestone for Grade Adjustments 30 TON $253.15 $7,594.50 3 Additional Demo&Paving of Drive for Storm Water 218 SF $19.00 $4,142.00 Total: $20,336.25 3 Additional Calendar Days to Contract due to Additions. • Grade Elevations were adjusted by Engineer due to poor drainage of previous elevations.Additional Limestone Base is needed for adjustments made to grade. • Construction Joint was missing from the Drawing. o This required additional Dowel Bars to be placed on the Existing Concrete. • Demo and Replacement of Concrete Pavement on Drive between Inlets#4&#5. o Was going to overrun quantities during phase but due to increase in contract amount is now included in this change order. o Work needed to accomplish installation of New RCP that was to be connected to existing inlet leading to both New Inlets#4&#5. If you have any questions,please feel free to give me a call. Sincerely, Construction Managers of Southeast Texas,LLC uan He r, andez—Sr. Project Manager Page 1 of 1 P.R. No. 24970 7/7/2026 IM-TNR Exhibit "C" Construction Managers of Southeast Texas, LLC 5520 GORMAN ROAD—BEAUMONT,TEXAS 77705—PHONE(409) 736—9010 June 10,2026 CHANGE ORDER#8- CITY OF PORT ARTHUR—HO MILLS PHASES 2&3 Please find below the cost associated with the Changes Requested and the Additional Work that has arisen due to unforeseen existing conditions of the worksite. ITEM DESCRIPTION QUAN UNIT UNIT PRICE EXT PRICE 1 Inlet Type A Replacement(Houston Gate) 1 LSU $1,950.00 S1,950.00 2 Inlet Top Replacements w/Square Grate 4 EA $1,300.00 S5,200.00 Total: $7,150.00 • Demo Inlet Top and Rise at Houston Gate. Replace with Type A with Square Grate. HES Ready Mix to be used for this task. o Pricing is for Material Only. (Grate,Riser,and Ready Mix). o This pricing is assuming the top and riser can be removed without damaging the surrounding concrete. Subcontractor to focus on demo with minimal contact to existing concrete. o An Addition of$1,900.00 will apply is surrounding concrete will require sawcut and pour back. • Replace all inlet tops for remainder of project with tops that accommodate Square Grates. o Manufacturer will not buy back or provide credit for Tops and Grates already on site.These will become the property of the City. If you have any questions,please feel free to give me a call. Sincerely, Construction Managers of Southeast Texas, LLC 44/ uan He andez—Sr. Project Manager Page 1 of 1 MATERIALS SUBMITTAL HO Mills Facility Driveway Reconstruction Phase II & Ill City of Port Arthur Project No. 25-139 TSG—2025-03-1268 To:CMOS From: Mira Martin PMP CM —The Solco Group CC: Keith Richard-PA Associated Contractor CMOST-CivDiv Submittal Date: 06/10/2026 Submittal Number: 1 Submittal Description: Inlet Tops &Grates TX Contract Item 465 Specification: Reviewed By: Review Date: Submittal Type: ❑ Material Data 0 Shop Drawing ❑Test Reports ❑Sample ❑ 0&M ❑ As Built ❑ Additional Information ❑ Approved ❑Approved With Changes Noted ❑ Revise And Resubmit ❑ Rejected ❑ Other: Submittal was reviewed only for general conformance with the contract documents. This review does not >lieve contractor of responsibility for the full compliance with the contract documents. Comments: TSG Project No. 2025-03-1268 Construction & Municipal Castings : Frame & Grates. ���� CLICK FOR TOC ITEM NO. : 2660-2682 vim A Vv v� ti v ar -„ VV V a. V V Vv V V vtiv v v N V v V M,y, Y�Y. V VyY „v a'4: vV-B V R+ av N r A {-B A 7 j_ ,,...,s, ,z,4.,s,.. . , ,.-,,a..,,,„..4,....,,,..:.,...A...,,,,.z..:...,, ,. B 44,44111Zstib4144,4%, Ali, GRATE''" OPEN AREA 32"X 32" 1 1/16"X 9"-42 Nos. 1 r C E %I riia 11 F D i . ITEM NO SIZE A B C D E �� (IN.) (IN.) (IN.) (IN.) (IN.) (IN.) ` `� r 2660/61/62 32 X 32 32 2 32 '/4 30 1/2 2 3/a � 2670/71/72 34 X 34 34 2 34 '/4 32 '/a 2 % 2680/81/82 38 X 38 38 2 38 1/4 36 1% 2 % Item# 2660 Flow Rate= 10.6 cu. ft./sec. (402 inches2 Open Area) GRATE OPEN AREA Item#2670 Flow Rate= 13.2 Cu. ft./sec. (499 inches2 Open Area) 38"X 38" 1 1/8"X 11" 51 Nos. 34"X 34" 7/8"X 10 1/2"-54 Nos. Item# 2680 Flow Rate= 16.6 cu. ft./sec. (631 inches2 Open Area) Note:Above calculations are based on 6 inch water head, 0.67 orifice coefficient and no clogging factor. DESCRIPTION : FRAME, GRATE & COVER. MATERIAL : Cast Iron,ASTM A48, Class 35B. LOAD RATING : H-20 Load Rating SERAMPORE INDUSTRIES TOLL FREE PHONE : 1-877-921-6111 dba SIP Industries TOLL FREE FAX : 1-877-921-6114 I www.sipindustries.Com E-MAIL :info@sipindustries.com H RATS D L RAID HIGH H RAISED FLUSH C RAISED FLUSH 1.50 T000ac /i i !� v I.=NMI MIME MEM N. la ; . I. a � �;�� 37J'� �� laiI I I IMI. jiB � � 0 =12 r JiL ifig--71/1/7''''/..' . 353 OF ORIGIN SECTION C C TOP VIEW ''11111111.111.11.111.11.111111"1.111111111111111.1111.1.11/1111111.4111W="111.1.1.1111"1"1:11.1"PLIMMilia"....Than".11111- 39.00 SQ. 37.75 ( 11 I 1.501 38.00 SQ. I 1 --� 1----1.25 1 F 1.50 1 1 f 1 t lr/J\ 4.00 s ,,4 .. „-,T n _ ; [ I ( 1 I— 36.00 SQ. �i[���', SECTION B-B l 43.50 SQ. '1 ' SECTION A-A TOTAL OPEN AREA:748.80 IN2(Approx.) FLOW RATE: 19.76 Feet3/Sec.(Approx.) ' ( I f I Note:Above Calculations Are Based On 6-Inch Water Head And No ( 11 1 Clogging Factor. '- I 1 11 1 I A a O a a UNLESS OTHERWISE SPECIFIED: 37.75 X 37.75 Inch Reversible MATERIAL DIMENSIONS ARE IN INCHES Frame&Grate Gray Iron Per ASTM A48 TOLERANCES: SIP Industries/Serampore Class 35B FRACTIONAL:i0.06 DECIMAL:!0.031 2900 Patio Drive FINISH ANGLES:i I' SIP DRAFT ANGLES:z^_I° Houston,TX 77017 UNDIPPED/BARE NAME DATE United States of America PROPRIETARY AND CONFIDENTIAL DRAWN SS 08/19/20 Ph:(713)923-61 l l Fax:(713)923-6114 THE INFORMATION CONTAINED IN MS DRAWING IS THE SOLE PROPERTY OF LOAD RATING: SIZE DWG. NO. REV ITEM# DESCRIPTION SIP INDUSTRIES/SERAMPORE ANY REPRODUCTION M PART OR AS A WHOLE A CUD WITHOUT TUE%BUREN PERMISSION OF 2728 2729 37.75 X 37.75 INCH GRATE ONLY SIP M9UREoIES,SERAMPOREIS Heavy Duty as per AASHTO M 306,40,000 LBS BOTTOM VIEW SHEET 1 OF 1 2730 37.75 X 37.75 INCH REVERSIBLE FRAME ONLY DO NOT SCALE DRAWING and H-20/HS-20 Load Rating SCALE:1:16 5 4 3 2 1