HomeMy WebLinkAboutPR 25047: AMENDING RESOLUTION NO. 26-286 TO CORRECT THE FUNDING ACCOUNT FOR THE RELEASE OF CONTRACTUAL RETAINAGE RELATED TO THE CLOSEOUT OF THE PORT ARTHUR TRANSIT ALLEYWAY, ROAD RECONSTRUCTION, AND DRAINAGE REPAIRS OF SAN ANTONIO AVENUE City of Port Arthur
Transit Department
Memorandum
To: Ronald Burton,City Manager
From: Ivan Mitchell,Transit Director f"l
Date: May 27,2026
Re: P.R.25047—a resolution amending resolution no.26-286 to correct the funding account
for the release of contractual retainage related to the closeout of the Port Arthur transit
alleyway,road reconstruction, and drainage repairs of San Antonio Avenue performed
by Texas Materials,Inc. of Beaumont,Texas.
Nature of Request: A resolution amending Resolution No. 26-286 to correct the funding account for
the release of contractual retainage related to the closeout of the Port Arthur Transit alleyway, road
reconstruction, and drainage repairs of San Antonio avenue performed by Texas Materials, Inc. Of
Beaumont, Texas; accepting the project as complete; authorizing the city manager to release the
contractual retainage in the amount of$27,616.07;providing that funds are available in Account No.
401-00-000-2050-00-00-000,PROJECT DR1P06
Background: On April 1, 2025, pursuant to Resolution No. 25-111, the City Council authorized the
City Manager to enter into a construction contract with Texas Materials, Inc. of Beaumont, Texas, for
the Port Arthur Transit Alleyway,Road Reconstruction, and Drainage Repairs of San Antonio Avenue
in an amount not to exceed$562,099.50.
The project has been completed in accordance with the contract documents and has been inspected
by the project engineer and Port Arthur Transit staff. The contractor has satisfactorily completed
all required work, and the staff has determined that the project is acceptable for final close-out.
In accordance with the construction contract, the City has received all required project closeout
documentation, including:
• Engineer's Certificate of Completion;
• Contractor's Certificate of Substantial Completion;
• Contractor's Warranty of Construction;
• Contractor's Certificate of Guarantee;
• Contractor's Affidavit of Payment of Debts and Claims (Affidavit of All Bills Paid);
• Contractor's Certificate and Release; and
• Release of Retainage Certificate.
Recommendation: It is recommended that the City Council approve proposed P.R. 245047. This
resolution would authorize the City Manager to execute on behalf of PAT the release of retainage
in the amount of$27,616.07.
Budgetary/Fiscal Effect: Funding to pay for this capital project is budgeted in PAT's capital budget.
Funds available in account 401-00-000-2050-00-00-000,DR1P06 which is the revised account.
P.R. No. 25047
7/22/2026 TNR
RESOLUTION NO.
A RESOLUTION AMENDING RESOLUTION NO. 26-286 TO CORRECT
THE FUNDING ACCOUNT FOR THE RELEASE OF CONTRACTUAL
RETAINAGE RELATED TO THE CLOSEOUT OF THE PORT ARTHUR
TRANSIT ALLEYWAY, ROAD RECONSTRUCTION, AND DRAINAGE
REPAIRS OF SAN ANTONIO AVENUE PERFORMED BY TEXAS
MATERIALS, INC. OF BEAUMONT, TEXAS; ACCEPTING THE
PROJECT AS COMPLETE; AUTHORIZING THE CITY MANAGER TO
RELEASE THE CONTRACTUAL RETAINAGE IN THE AMOUNT OF
$27,616.07; PROVIDING THAT FUNDS ARE AVAILABLE IN ACCOUNT
NO. 401-00-000-2050-00-00-000, PROJECT DR1P06
WHEREAS, pursuant to Resolution No. 25-111, the City Council authorized the City
Manager to execute a contract with Texas Materials, Inc., of Beaumont, Texas, for the Port
Arthur Transit Alleyway, Road Reconstruction, and Drainage Repairs of San Antonio Avenue in
an amount not to exceed $562,099.50; and
WHEREAS, by Resolution No. 26-286, the City Council accepted the completed
project, approved the closeout documents, and authorized the release of the contractual retainage
in the amount of$27,616.07, attached hereto as Exhibit"A"; and
WHEREAS, Resolution No. 26-286 inadvertently identified the incorrect funding
account for the release of the contractual retainage by referencing Account No. 401-70-530-
8525-00-60-000, Project DR1P06; and
WHEREAS, the Finance Department has determined that the contractual retainage
should be released from Account No. 401-00-000-2050-00-00-000, Project DR1P06, and that
Resolution No. 26-286 should be amended solely to correct the funding account; and
WHEREAS, all other provisions, findings, authorizations, and actions approved in
Resolution No. 26-286 remain unchanged and in full force and effect.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR,TEXAS:
THAT, the facts and opinions in the preamble are true and correct.
THAT, Resolution No. 26-286 is hereby amended solely to correct the funding
account from which the contractual retainage shall be released.
P.R.No. 25047
7/22/2026 TNR
THAT, the City Council authorizes the City Manager to release the contractual
retainage to Texas Materials, Inc., in the amount of $27,616.07 from Account No. 401-00-
000-2050-00-00-000, Project DR1P06.
THAT, except as expressly amended herein, Resolution No. 26-286 shall remain
unchanged and shall continue in full force and effect.
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
READ, ADOPTED AND APPROVED this day of A.D. 2026
at a Regular Meeting of the City of Port Arthur, Texas by the following vote: AYES:
Mayor:
Councilmembers:
•
NOES:
Charlotte M. Moses, Mayor
ATTEST:
Christe Whitley Ned, City Secretary
APPROVED A •
Roxann Pais Cotroneo, City Attorney
APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY
OFF S:
6411-"e
Ronald Burton, CPM nda oswell
City Manager Director of Finance
• Lv Ciafr/VtJ s1 \
Clifton ' illiams, CPPB Ivan Mitc
Purchasing Manager Transit-Fleet Director
P.R. No. 25047
7/22/2026 TNR
Exhibit "A"
P.R.No. 24799
e //�� 7/2/2026 IM-TNR
RESOLUTION NO. Al -
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT THE
PROJECT CLOSEOUT DOCUMENTS FOR THE PORT ARTHUR TRANSIT
ALLEYWAY, ROAD RECONSTRUCTION, AND DRAINAGE REPAIRS OF SAN
ANTONIO AVENUE PERFORMED BY TEXAS MATERIALS, INC. OF BEAUMONT,
TEXAS; ACCEPTING THE PROJECT AS COMPLETE; AUTHORIZING THE
RELEASE OF CONTRACT RETAINAGE IN THE AMOUNT OF $27,616.07; FUNDS
AVAILABLE IN ACCOUNT 401-70-530-8525-00-60-000, DR1P06.
WHEREAS, pursuant to Resolution No. 25-111, the City Council authorized the City
Manager to execute a contract with Texas Materials, Inc. of Beaumont, Texas, for the Port
Arthur Transit alleyway, road reconstruction, and drainage repairs of San Antonio Avenue in an
amount not to exceed$562,099.50; and
WHEREAS, Texas Materials, Inc. has completed the project in accordance with the
plans, specifications, and contract documents, and the work has been inspected and accepted by
Port Arthur Transit and the project engineer; and
WHEREAS,the City has received all required project closeout documents, including:
• Engineer's Certificate of Completion;
• Contractor's Certificate of Substantial Completion;
• Contractor's Warranty of Construction;
• Contractor's Certificate of Guarantee;
• Contractor's Affidavit of Payment of Debts and Claims (Affidavit of All Bills Paid);
• Contractor's Certificate and Release; and
• Release of Retainage Certificate,
all of which are attached collectively as Exhibit "A-G" and incorporated herein by reference; and
WHEREAS, in accordance with the contract, the remaining contract retainage in the
amount of $27,616.07, representing the final five percent (5%) retainage withheld during
construction, is now due and payable to Texas Materials, Inc., as reflected in Exhibit "G"; and
WHEREAS, funds are available for the release of retainage in Port Arthur Transit
Capital Project Account No. 401-70-530-8525-00-60-000, Project DR1P06.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR,TEXAS:
THAT,the facts and opinions in the preamble are true and correct.
THAT, the City Council hereby accepts the Port Arthur Transit Alleyway, Road
Reconstruction, and Drainage Repairs of San Antonio Avenue project as complete and
authorizes the City Manager to accept the project closeout documents submitted by Texas
Materials, Inc., attached collectively as Exhibit "A- G."
P.R. No. 24799
7/2/2026 IM- TNR
APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY
)7 / c71
atV
Ronald Burton, CPM a Bos
City Manager "Director of F nance
U‘Att...ctA, 4/ait'LL-41tszif
Clifton ' illiams, CPPB Ivan Mit ell
Purchasing Manager Transit-Fleet Director
ENGINEER'S CERTIFICATE OF COMPLETION
PROJECT: San Antonio Ave Rehabilitation and Block Alley Reconstruction
DATE OF ISSUANCE: May 20, 2026
OWNER: CITY OF PORT ARTHUR
OWNER'S CONSTRUCTION CONTRACT IDENTIFICATION: 24-053
TSG PROJECT NO: TSG: 2023-10-1230 - SAN ANTONIO AVE REHABILITATION AND BLOCK
ALLEY RECONSTRUCTION
ENGINEER: THE SOLCO GROUP, LLC
CONTRACTOR: TEXAS MATERIALS GROUP, INC
This Engineer 's Certificate of Completion applies to all WORK under the Contract Documents or to
the following specified parts thereof:
TO: THE CITY OF PORT ARTHUR
Owner
AND TO: TEXAS MATERIALS GROUP, INC
Contractor
The Work to which this Certificate applies has been inspected by authorized representatives of Owner,
Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the
Contract Documents on
)arruary 1. 2-026 March 31, 202
Date of Substantial Completion Date of Completion
,raMONNv
Executed byEngineer on: MAY 20, 2026 �0F
9 'S�P����rfxgs����
.� . -* II
i*•
KELVIN L SOLCO
�� ( 'O 78161 c.
BY:
Kelvin L. Solco, P.E. i SAVZ6
The Solco Group, LLC f
1
CERTIFICATE OF SUBSTANTIAL COMPLETION
Purchase Order No.:
Project Name: San Antonio Ave Rehab& Block Alley Reconstruction 24-053
Contractor:Texas Materials Group, Inc
Description of Work: Mill,Overlay&Road Reconstruction
The work performed under this contract has been review ed and found to be substantially complete.The
date of substantial completion is hereby established as 8/1/2025
KNOW ALL MEN BY THESE PRESENTS:
1.) The stage of construction where, in the opinion of the City of Port Arthur, all items of the work necessary
to enable the assets to be utilized without restrictions for the purpose for which the asset was constructed
have been completed; and
2.) All pay items are complete and all necessary testing as required by the Laws and Regulations and/or
Contract Documents have all been completed.
Punch List
All list of items to be completed or corrected,prepared by the CONTRACTOR and verified and amended by the
ENGINEER,is attached hereto. The failure to include any items on such list does not alter the responsibility of
the CONTRACTOR to complete all work in accordance with the contract documents.The CONTRACTOR shall
complete or correct the work on the list of items attached hereto within in 60 days from the above date of
substantial completion.The responsibilities shall be as set out in the Contract Documents or on the attached
hereto. If not specified in and an attachm or• t e Contract Documents the CONTRACTOR is responsible for
maintenance,utilities and insurance.
Texas Materials Group,Inc
CONTRACTOR NAME GNATURE L DATE
RECOMMENDED FOR ACCEPTANCE
KELVIN L. SOLCO, P.E. JUNE 23, 2026
ENGINEER NAME SIGNATURE DATE
The City of Port Arthur accepts the work as Substantially Complete.City of Port Arthur. Department of Public
Works.
7cvh1ell' -- e aff Of;zb
PROJECT IvYARIAGER , `GNA TE
CITY ENGINEER SIGNATURE DATE
PUBLIC WORKS DIRECTOR SIGNATURE DATE
WARRANTY OF CONSTRUCTION
OWNER: City of Port Arthur
PROJECT: San Antonio Ave -Contract No: 24-053
Texas Materials, A CRH Company ("Contractor") hereby guarantees that all material
furnished by Contractor to, and services performed by Contractor on the above-referenced project
("Project") comply with the applicable contract specifications. If any defect develops during the
contract guaranty period due to defective materials and/or improper workmanship, Contractor,
upon written notice,shall repair such defective work at no expense to Owner.
Contractor further warrants that all manufacturer warranties on all materials and
equipment furnished by Contractor shall run directly to or be assigned to Owner upon written
request. Owner shall be entitled to enforce a claim against the manufacturer in accordance with the
terms of said warranty.
The guarantee period shall be a period of one (1) year from the date of substantial
completion of the work, 1/30/2026. This warranty does not cover damage to or deterioration of
work or unsatisfactory results resulting from deficient Project specifications, pre-existing
conditions, damages from intervening causes, misuse, or normal wear and tear.
THE EXPRESS WARRANTIES SET FORTH HEREIN, AND THE
OBLIGATIONS AND LIABILITIES HEREUNDER, ARE IN LIEU OF ALL OTHER
WARRANTIES, EXPRESS OR IMPLIED, INCLUDING ANY IMPLIED WARRANTY
OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.
Texas Materials,A CRH Company
'aei
PrMted-Name Leggett
Title: Project Manager
Date: 3/31/2026
Ti &
(Printed Name/Title of Officer)
TJ Brown , being first duly sworn on oath, deposes and says, First, that, he/she is the
(Affiant)
GM/President of Texas Materials Group. Inc.
(Title) (Name of Company)
Second, that he/she has read the foregoing certificate by him/her subscribed as GM/President
(Title)
of Texas Materials Group, Inc_
(Name of Company)
Affiant further states that the matters and things stated herein are true.
(Affiant)
Subscribed and sworn to before me this 2 2 day of J U vv. , 2026.
My commission expires j I ZO 2 9
1 Erin Rachael Scianimanico 1 NOTARY
4Cm
My Commission Expires
I 21612029 II, tNotary 10135501141
I
2-Warranty
CONTRACTOR'S CERTIFICATE OF GUARANTEE
FROM: Texas Materials Group., Inc
TO:City of Port Arthur
FOR:San Antonio Ave Rehab & Block Alley Reconstruction 24-053
REFERENCE CONTRACT NO. San Antonio Ave Rehab &Block Alley Reconstruction 24-
053
ENTERED INTO THE 19 DAY OF March, 2025, BETWEEN THE __CITY OF PORT
ARTHUR
AND Texas Materials Group. Inc
(CONTRACTOR)
OF Port Arthur. Texas
(CITY/STATE)
FOR:San Antonio Ave Rehab & Block Alley Reconstruction 24-053
(PROJECT)
KNOW ALL MEN BY THESE PRESENTS:
1. Texas Materials Group. Inc does hereby guarantee all of the work done under the above
referenced contract to be free from faulty materials in every particular, and free improper
workmanship, and against injury from proper and usual wear; and agrees to replace or re-
execute without cost to the Owner and Operator such work as may be found to be improper
or imperfect, and to make good all damage caused to other work or materials, due to such
require replacement or re-execution.
2. This guarantee shall cover a period of one (1)year from the date of acceptance of all work
under this Contract, as evidenced by the Engineer's Certificate of Completion.
� v ..,w_ -""
hR
! 4�.. '+ '1 7 . /1.
4,,- 4, ,„"-". ..`'...--,„,-1 .":'4,,,`. fe. \\ifl-3(4, '.' ' . ' ,. .
r i "
a
•
:T ifY t 'yf.r
v
•
is sa
4
s ,
)
sL
ems.
a
•
•
•
rff
{
•
i x 2-.A.
it , c}
•
C ate'
CONTRACTOR'S AFFIDAVIT OF ALL BILLS PAID
Project: San Antonio Avenue Rehab& Block Alley Reconstruction—24-053
Location: Port Arthur,Texas
Owner: City of Port Arthur
County of Jefferson
State of Texas
The undersigned hereby certifies that, except as listed below, all previous progress payments
received on account of the Work, have been applied on account to discharge Contractor's
legitimate obligations associated with prior Applications for Payment.
Exceptions: NONE _
Signature::
11 �
Print: 'C Y S C. \ GLYu m Ct,a 1 ► CC)
Date: 15 2 S
Sworn to and subscribed to me. a �+
Notary Public,this 2- F) day of ` , 2026.
(Notary Public) .. r Lesli Brown
My Commission Expires
2/10/2029
My Commission Expires: aQ v� a� 1 Notary 10134366236
CONTRACTOR'S CERTIFICATE AND RELEASE
FROM: _ Texas Materials Group, Inc
(Name of Contractor)
TO: City of Port Arthur
(Owner)
REFERENCE CONTRACT NO.: San Antonio Ave Rehab & Block Alley Reconstruction 24-053
CONTRACT ENTERED INTO THE 19 DAY OF MARCH, 2025. BETWEEN THE
CITY OF PORT ARTHUR AND Texas Materials Group, Inc
OF Port Arthur,Texas
FOR THE PROJECT San Antonio Ave Rehab & Block Alley Reconstruction 24-053
KNOW ALL MEN BY THESE PRESENTS:
1.) The undersigned hereby certifies that there is due from, and payable by,the Owner to the Contractor
under the contract and du approve Change Orders and modification the balance of
s 27,616.07
2.) The lindercj .red further certifies that in addition to the amount set forth in Paragraph 1,there are
outstanding and unsettled the following items which he claims are just and due and owing by the Owner
to the Contractor:
a. NONE
b.
c.
d.
(Itemize claims and amounts due,if none,so state)
3.) The undersigned further certifies that all work required under this contract, including work required under
Change Order(s) numbered ,has been performed in accordance with the terms thereof, and that
there are no unpaid claims for materials, supplies, or equipment and no claims of laborers or mechanics
for unpaid wages arising out of the performance of this contract, and that the wage rates paid by the
contractor were in conformity with the contract provisions relating to said wage rates.
4.) Except for the amounts stated under Paragraphs 1 and 2 hereof, the undersigned has received from the
Owner all sums of money payable to the undersigned under, or pursuant to,the above-mentioned contract
or any modifications or changes thereof.
5.) That in consideration of the payment of the amount stated in Paragraph I hereof, the undersigned does
hereby release the Owner and Operator from any all claims arising under or by virtue of this contract,
except the amount listed in Paragraph 2 hereof due from the owner, provided however, that if any reason
the Owner does not pay the full amount stated in Paragraph I hereof, said deduction shall not affect the
validity of this release, but the amount so deducted shall be automatically included under Paragraph 2 as
an amount which the Contractor has not released but will release upon payment thereof.The Contractor
further certifies that upon the payment of the amount listed in Paragraph 2 hereof, and of an amount
which may be deducted from Paragraph 1 hereof, he will release the Owner and Operator from any and
all claims of any trature whatsoever arising out of paid contract modification thereof, and will execute
such further releases or assurances of the Owner and Operator may request.
1
P.R. No. 24799
7/2/2026 IM- TNR
Exhibit "G"
•
ALA Document 0702,APPLICATION AND CERTIFICATION FOR PAYMENT', APPLICATION NO: _ 7
containing Subcontractor's signed eenilication is attached
In tabulations below,amounts are staled to the nearest dollar
Use Column Ion Contracts where variable letatnage lot line Hems may apply
A B C D E P 0 _ H i
WDTt.('fS�v PLE'17:D MATERIALS TOTAL
ITEM DESCRIPTION OF WORE SCI-EDLILED FRIIMPREVXIDS PRESEN'O.5 COMPLETED 4U C) 46,111 RETAINAGE
NO VALUE AtYl.R'AIit N THIS PERIOD STORED AND STORED TO FINISH 11F VARIABLE)
ID«El INC)!IN TO DAIt IC-(I) RATE
D OR E) (D*E'F) Ste'
San Antonio Avenue Rehabilitation n(Base Bid Schedule No 1)
1 _._ .MOB I1..1Z.4lDON S 42200 to S 4220001/ $ $ - $ 42,20000 Ile ow, 5 $ 211000
_- _.__ _._. !3I ILU26 $ 25(1(X)
2 Bamcadcs.Signor.and Traffic Hmadling $ 5000 00 $ 5,WU.W '5
$ $ - $ ,WW )
U 100.00% -
3 _Sawcur.Rc000e and Dispoco(sating Curb 8 Gutter le Inched S 15.1u00 U0 $ 15,000.00 5 - $ _ $ 15,000.00 100 00% $ $ 750 00
4 Saxew,Remo,:and Dispose h sating load Paeemant in`-'a+Inches)Full - _ 13,650.W $ - $ 082 5U
Depth
5 Saucut Reboot.and Dispose Side,sall,Full Depth 5 6,448 W $ n 448 8) $ S $ 100.015'
p I 48 IS) $ - $ - $ 6,448 W IUb.INP,% $ - S 322A0
t Sue cut Re I ant Unsp,rs..Existing Drn...it Full Depth $ 2,343,00 $ 2.14300 '5 - $ • $ 2,343.00.,.. I0000° $ - S 11715
7 Suvcut.kemovc and Usspuse haseng ADA I urn kamp Full Depth $ 1,452.00 $ 1,452.W $ $ $ 1,452 00 1 W o(w,o $ - $ 72 60
aExcavates. .._. __ .... -
x Unclassified Excavates.
and DiapDisposal .. -. $ 9,720.00 $ 9,720.(KI $ - $ - S 9,720 l81 I(H1.004'° $ - $ 486W
9 Eleoiole Base,Tlpe A.Grade 1(8 lnehcsi $ 20 130.00 $ 26,130.0C) $ • S -..$ 26,13200 100005' $ - $ 1,306 50,
l u Fla Mr.A bah Pat await Oxday l2 Rehest CT) D)(Virgin PG 70-22 $ 39,010 00 $ 39,600 OU $ $ • S 39.600 00 $ - $ 1.980.00
s, w g ) IooB(wn
I I 'l esel Twat $ 840 00 $ 840.00 $ - $ • S 840.00 1(10.005-o $ - $ 42 W
$ 295.78
12 1 old Planing Bgsung Asphalt Pavement Surface 0-2 hones) $ 5,915.60 $ 5,915 60 $ $ S 5 415 60 100.00% $
_. 00
U Read-weed
Rsaaced Portland C'emcm w Cante(9 Incises)Il4aa`Pt IRudnay) $ 58,SW W $ 58.500_IX7 S - $ $ 58,500.00 1 W.U09e S $ 2,925.00
14 iteulivud Portland Cement C'oncrete 17htchl:sl(Class P)(Din cagy) $ 19,17000 $ Ici.17000 $ $ _ $ .-. 19,170.W (0U01.3% $ - $ 95850
_.. 15 Itcnlorccd Cahretc Pipe(IX Ludes)(Class IIII Cwnple¢tin Place $ 71,825 W $ 31 525 00 $ - $ - $ 31,825.W 100 MA. $ ' 1,591.25
inReud'otced Convene Pape(18 inches)(Class 1111 Complete in Place at Puw1cr $ - 23,120 00 $ - $ 1,156 00
23.12000 $ 23.1_0,4, $ $ $ IOU OIP.b
Sut❑
17 hilts Conp(at In Flats $ 3y600.00 $ 19,006 sa; $ _7 S in00000 (00001' $ - $ I`950 CO
18 Ranu9(01 Exumtg Sever Manhole Ring and Cosy $ I 000 W S 1,000,ill 5 - $ - _$ I UUU t0I IOU 00% $ - $ 50.00
19 Bud,:gradabk Eto:004 Coated I ogs tInsult)Ot 1rchesl $ 3,550 00 $ i.ias,ti; 5. S $ 3,5 u(R) 100 00 o $ - $ 177.50
d l BConcrete
Cuih Erosion Clnutol Logs(FL:nunc) $ ).55U.W S .SSu ll(' _ $ $ 37,2UU.U0 94.0°u $ -,092 28 S 1,860.89,
21 Concrete Curb and Gutter(Class A)(Tv3x 111(o fiches} $ 18,25U W $ 36.1
22 Cwccrcie Selo,alk(S Inches)(('lass Al Conpletent Place $ 37,20000 $ 37.200 OD $ 5 $ _._..
_- 23 AUA Curb Ramp Ilcpc 5) - $ 12.(8)0 Oti $ 12.00000 5 _ $ _. $ 12,000 00 I00 0l7 0 $ .. - - $ 601i UO
24 :\UA Curb R:unp 11,pk.-221_ _. $ -... 28,t)l1000 $ 28000 Ott $ - 5 - - $ '_8.000 DOIOO.U(P.'u 5 - % L3W UU
:.e 25 Itelle<tond PeicmmiI(stall.I), l Tape 11((00 ts1L)(White) $ 1,032.(5) $ 1,912.IX) $ $ ..-... $ 1,932.W I111.1005' 5 - $ 96.60_.
26 kclkaonz,.d Pasemcm M1larkmgsl"Iplk IIIII)n h1l.11Ycllo(I .. .$ 4,i62.W S 3,36_'.OU S - S - $ 3.362 W IleW°/ $ $ I6810
27 (l an:mid Seal Cracks and limns m Fxn Sting PC Pavement $ 0110)1.00 $ 0.00(1.W $ $. -.. S. 6.((00 00 100 00% "$ $ 300(X)
Bloek Ale,Rounsmad1U11dime Bid Schedule No.2) ..". .. _.__
3 Sati net Ren,uveand Uns(ms:Existing Alley Pat cuina(3 lncM:y(Full Depth) 5 12,810.00 S 12,81000 S $ - S 12,810.00 11)0)00°° $ - S 64 U.50
Remove and Dipole Al welfare uss hems libandnrod(able,Fence Post,Palm $ 75 l8)
4 Free etc 1 $ 1,5W W $ I.SW.W $ .. S - $ I,500.0O •$
_ 8.250.DU ] s -II:'io
v Uttcias'sntn•J Es,°axauar arid Disposal Si 8_511 Inn $ K;"iU tics 5. $ S 8,?50(tt 1011.OlWu S
e Flexible Buse I) M1 Grade 1(7 Inches) $ 15.372 uu...$ o0r,oU fi $' $ 0 t1(1 $ 7,686.1)1 $ t8) 10
7 kcm(owed PoN,d Couteui Concrete(7 Inches)If lass P) $ 49,410 00 $ -1,-110 00 $ - $ - $ 4'1,410.00 ion ui $ S 2,4)0 5t)
Invoice Total $ 562,099.60 $ 552,321,32 S - S - ' °v$ 552,321.32 98.26% $ 55,890.28 $ 27,616.07