HomeMy WebLinkAboutPR 25077: CHANGE ORDER NO. 5 FOR THE STONEGATE DRAINAGE IMPROVEMENT PROJECT \ //. 4 City of : J1II c, A) 10 ort rthu� Texas " www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: July 23,2026 To: The Honorable Mayor and City Council Through: Ron Burton, CPM, City Manager From: Suhail Kanwar,P.E.,M.S., CFM, ENV SP, Director of Public Services/City Engineer RE: PR. No. 25077— Stonegate Drainage Improvement Project. Change Order No. 5 from Brystar Contracting, Inc. of Beaumont, Texas: Drainage improvements, increasing the contract by $55,996.00, to a new contract amount of $18,033,616.15. Project No. DR1PO4.CON.FEF Account No. 154-00-000-8515-00-10-000. Introduction: The intent of this agenda item is to seek City Council's approval for the City Manager to execute Change Order No. 5 with Brystar Contracting, Inc., (Brystar) of Beaumont,Texas, for drainage improvements, increasing the contract by $55,996.00, to a new contract amount of $18,033,616.15. Project No. DR1PO4.CON.FEF Account No. 154-00-000-8515-00-10-000. Background: Pursuant to Resolution No. 18-231, the City of Port Arthur adopted the 2018 Disaster Recovery and Resiliency Plan (DRRP) for recovery activities following Hurricane Harvey. The City of Port Arthur, as part of the DRRP recovery activities, identified flood and drainage problems within the community of Stonegate. Pursuant to Resolution No. 20-021, Stuart Consulting Group, of Houston, Texas, was approved to provide design specifications and a final bid package for the Stonegate Drainage Improvement Project. Pursuant to Resolution No. 23-561, the City of Port Arthur's City Council approved awarding the Stonegate Drainage Improvement Project to Brystar for the amount of$18,672,548.00. Pursuant to Resolution No. 24-060, the City of Port Arthur's City Council gave approval for the City Manager to enter into a professional engineering services contract for construction management and value engineering with Chica&Associates,Inc.,(Chica)of Beaumont,Texas for the Stonegate Project. "Remember,we are here to serve the Citizens of Port Arthur" 4114th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 S:\EngineeringTUBLIC WORKS NM-ENGINEERING\C.I.P.PROJECTS\Year2023\DRAINAGE PROJECTS1Stonegate\Change Orders\Change Order 51AgendaMemo CO 5 Stonegate.docx Change Order No. 1 Pursuant to Resolution No. 24-187, approved by Port Arthur City's Council for Change Order No. 1 that addressed City staff, Chica, and Brystar performing value engineering on the project saving a total amount of$1,638,750.00. An additional amount of$686,859.00 was added to the contract for lowering the culvert boxes by one foot(1')at the golf course due to pipeline conflicts and also $101,201.10 was added to the contract for a reinforced concrete liner at the bottom of the ditch due to water table issues. The original contract amount of$18,672,548.00 was reduced by the net of$850,689.90, to the new contract amount of $17,821,858.10. Change Order No. 2 A Field Order was issued for Oakmont Drive to build a conflict box to avoid conflict with Entergy's underground electrical line. An emergency letter dated November 14, 2024,to the City Manager outlined the additional scope of work needed. It was approved and signed with the understanding that a resolution regarding the Field Order would be presented to City Council thereafter. Pursuant to Resolution No. 24-510, approved by Council, Change Order No. 2 was submitted by Brystar Contracting, Inc. (Brystar) of Beaumont,Texas, to resolve an electrical conflict on Oakmont Drive, install an irrigation weir at Pond 3 on the golf course,reroute an existing irrigation line,add HDPE pipe(180 LF), install valves on existing transit lines, paving median to convert to a turning lane, and added 154 calendar days to the original contract completion date of December 24,2025,to the new contract completion date of May 27, 2026. Also, to include the additional amount of $315,047.10, modifying the existing contract amount of$17,821,858.10,to the new contract amount of$18,136,905.20. Change Order No. 3 A Field Order,dated May 9,2025, approved and signed by the City Manager,was issued for the immediate installation of two line stops in the existing main feed water line to prevent a major water outage in the surrounding area for the additional cost of$67,813.00. It was discovered that the selected locations of the line stops were not part of the looped system, resulting in loss of water for the residents of Green Pointe Estates. A line stop was removed and a 6"temporary bypass was installed to supply water to the residents. This resulted in a fourteen-day(14)delay and the additional cost of$18,203.00. A change order addressing this action would be presented to City Council as follow up to the Field Order. Pursuant to Resolution No. 25-223, Change Order No. 3 was submitted by Brystar for the 9th Avenue improvements behind the houses of the Greenway Pointe Estates Subdivision that addresses the Field Order's installation of the two 16"water main line stops. It also defined work that will remove and replace an existing sidewalk, install a manhole, install an inlet, install piping, modify an existing conflict box, and install overflow pipes at Ponds#5 and#6. Change Order No. 3 also increased the contract amount of $18,136,905.20 by $253,077.00 to the new contract amount of $18,389,982.20; also, the addition of eighty-nine (89) calendar days, changing the contract completion date of May 27,2026 to the new date of August 24,2026. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 Change Order No. 4 Pursuant to Resolution No. 25-526, Change Order No. 4 was submitted by Brystar Contracting,Inc., of Beaumont, Texas, decreasing the contract in the amount of$412,362.05. The deductions were related to quantities not utilized, as listed. These additions provided access roads to the two pump stations that are essential for operating the retention ponds, repaired golf cart paths damaged during construction, replaced 130LF water line to accommodate the installation of boxes on 9th Avenue,and the removal and replacement of box culverts between the ponds as per the original design. Change Order No.4 decreases the contract amount of$18,389,982.20 by$412,362.05,to the new contract amount of$17,977,620.15. Change Order No. 5 Change Order No. 5 is submitted by Brystar Contracting, Inc.to reconcile final quantities and costs for work performed under the project, including adjustments to bid items previously modified by prior change orders. During construction, certain estimated quantities were either underutilized or exceeded due to field conditions encountered, resulting in both cost reductions and increases. Change Order No. 5 provides for the necessary balancing of these line items to accurately reflect the actual quantities installed and work completed, thereby ensuring that the contract amount corresponds with the final project costs. Additionally, Change Order No. 5 includes the ratification of emergency expenditures previously authorized by an emergency memorandum for the rental of temporary pumps to mitigate and manage significant rainfall events in May 2024. The emergency pump rentals were necessary to maintain drainage operations, protect public infrastructure, and reduce the risk of flooding impacts to residents and public property during periods of excessive precipitation. The total cost associated with the emergency pump rentals is $43,366.00. As referenced above, Change Order No. 5 addresses the quantity reconciliations and emergency expenditures. Change Order No. 5 increases the original contract amount of $17,977,620.15 by $55,996.00,resulting in a revised contract amount of$18,033,616.15. Budget Impact: The original contract price was$18,672,548.00 Change Order No. 1 decreased the contract amount by$850,689.90. Change Order No.2 increased the contract amount by$315,047.10. Change Order No. 3 increased the contract amount by$253,077.00. Change Order No.4 decreased the contract amount by$412,362.05. Proposed change order No.5 will increase the contract amount by$55,996.00,to the new contract amount of 18,033,616.15,with a total contract change order percentage of-3.54%. Funds are available in Account No.: 154-00-000-8515-00-10-000.Project No.DR1PO4.CON.FEF Recommendation: It is recommended that the City of Port Arthur's City Council approve PR No. 25077 authorizing the City Manager to accept Change Order No. 5 from Brystar Contracting Inc., of Beaumont, Texas, increasing the contract by $55,996.00, to a new contract amount of$18,033,616.15. Project No. DR1PO4.CON.FEF Account No. 154-00-000-8515-00-10-000. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 PR No.25077 07/23/2027 RLD Page 1 of 7 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 5 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND BRYSTAR CONTRACTING, INC., OF BEAUMONT, TEXAS, FOR THE STONEGATE DRAINAGE IMPROVEMENT PROJECT. INCREASING THE CONTRACT AMOUNT BY$55,996.00,TO A NEW CONTRACT AMOUNT OF$18,033,616.15.ACCOUNT 154-00-000-8515-00-10-000. PROJECT NO. DR1PO4.CON.FEF WHEREAS,pursuant to Resolution No. 18-231, the City of Port Arthur adopted the 2018 Disaster Recovery and Resiliency Plan(DRRP)for recovery activities following Hurricane Harvey; and, WHEREAS, the DRRP included mitigation planning and investment in infrastructure to rebuild/repair streets,utilities,public facilities,water,sewer,and drainage in addition to identifying areas in the 100-year flood zone frequently flooded during previous storms or significant rain events; and, WHEREAS, the community of Stonegate was selected as an area that has experienced significant flooding due to rain events, flash flooding and drainage related issues; and, WHEREAS, pursuant to Resolution No. 20-021, Stuart Consulting Group of Houston, Texas, was approved to provide design specifications and a final bid package for the Stonegate area; and, WHEREAS, the Stonegate Drainage Improvement Project was let for bidding under Bid Number P23-069 on September 9, 2023 and September 16, 2023,by the Purchasing Department; and, WHEREAS, three (3) bids were received from Allco, LLC, of Beaumont, Texas; BDS Constructors, LLC, of Vidor,Texas; and Brystar Contracting, Inc., of Beaumont,Texas; and, PR No.25077 07/23/2027 RLD Page 2 of 7 WHEREAS,bids were opened, and evaluated by the Purchasing Department, the Public Works staff, and Stuart Consulting Group, on Wednesday, October 11, 2023, with Brystar Contracting, Inc., of Beaumont,Texas being the lowest qualified bidder for$18,672,548.00; and, WHEREAS,pursuant to Resolution No. 23-561,the Port Arthur City Council authorized the City Manager to enter into an agreement with Brystar Contracting,Inc.,(Brystar)of Beaumont, Texas, for$18,672,548.00 for the Stonegate Drainage Improvement Project; and, WHEREAS,pursuant to Resolution No. 24-060, the Port Arthur City Council authorized the City Manager to enter into a professional engineering services contract for construction management and value engineering with Chica & Associates, Inc., of Beaumont, Texas for the Stonegate Project; and, WHEREAS, pursuant to Resolution No. 24-187, City Council approved Change Order No. 1 where City staff, Chica, and Brystar performed value engineering on the project, saving a total amount of$1,638,750.00.An additional amount of$686,859.00 was added to the contract for lowering the culvert boxes by one foot (1') at the golf course due to pipeline conflicts and also $101,201.10 was added for a reinforced concrete liner at the bottom of the ditch due to water table issues; and, WHEREAS, Change Order No. 1 reduced the original contract amount of$18,672,548.00 by the net of$850,689.90,to the new contract amount of$17,821,858.10; and, WHEREAS,a Field Order was issued for Oakmont Drive that built a conflict box to avoid conflict with Entergy's underground electrical line and an emergency letter dated November 14, 2024,was sent to the City Manager outlining the additional scope of work needed; and, WHEREAS,pursuant to Resolution No.24-510, approved by Council,Change Order No. 2 was submitted by Brystar Contracting, Inc. of Beaumont,Texas,to resolve an electrical conflict PR No.25077 07/23/2027 RLD Page 3 of 7 on Oakmont Drive, install an irrigation weir at Pond 3 on the golf course, reroute an existing irrigation line, add HDPE pipe(180 LF), install valves on existing transit lines,paving median to convert to a turning lane, and added 154 calendar days to the original contract completion date of December 24, 2025, to the new contract completion date of May 27, 2026; and, WHEREAS, Change Order No. 2 also modified the existing contract amount of $17,821,858.10 by$315,047.10,to the new contract amount of$18,136,905.20; and, WHEREAS,the emergency letter was approved and signed by the City Manager with the understanding that a resolution regarding the Field Order would be presented to City Council thereafter; and, WHEREAS,a Field Order,dated May 9,2025,approved and signed by the City Manager, was issued for the immediate installation of two line stops in the existing main feed water line to prevent a major water outage in the surrounding area for the additional cost of$67,813.00. It was also discovered that the selected locations of the line stops were not part of the looped system, resulting in the loss of water for the residents of Green Pointe Estates.A line stop was removed and a 6" temporary bypass was installed to supply water to the residents, resulting in a fourteen-day (14) delay and the additional cost of$18,203.00; and, WHEREAS,pursuant to Resolution No. 25-223 for Change Order No. 3, approved by the City of Port Arthur's Council, was submitted by Brystar for 9th Avenue improvements behind the houses of the Greenway Pointe Estates Subdivision that addresses the Field Order's installation of the two 16" water main line stops and defined work to remove and replace an existing sidewalk, install a manhole,install an inlet,install piping,modify an existing conflict box,and install overflow pipes at Ponds#5 and#6; and, PR No.25077 07/23/2027 RLD Page 4 of 7 WHEREAS, Change Order No. 3 also increased the contract amount of$18,136,905.20 by$253,077.00 to the new contract amount of$18,389,982.20 and the addition of eighty-nine(89) calendar days, changing the contract completion date of May 27,.2026 to the new date of August 24, 2026; and, WHEREAS,pursuant to Resolution No.25-526 for Change Order No. 4, approved by the City of Port Arthur's Council, was submitted by Brystar decreasing the contract in the amount of $412,362.05.The deductions are related to quantities not utilized and the additions provided access roads to the two pump stations that are essential for operating the retention ponds,repaired golf cart paths damaged during construction, replaced 130LF water line to accommodate the installation of boxes on 9th Avenue, and the removal and replacement of box culverts between the ponds as per the original design; and, WHEREAS, Change Order No. 5 is being submitted by Brystar Contracting, Inc. to reconcile final quantities and costs for work performed under the project,including adjustments to bid items previously modified by prior change orders. During construction, certain estimated quantities were either underutilized or exceeded due to field conditions encountered, resulting in both cost reductions and increases. Change Order No. 5 provides for the necessary balancing of these line items to accurately reflect the actual quantities installed and work completed, thereby ensuring that the contract amount corresponds with the final project costs, see Exhibit A; and, WHEREAS, additionally, Change Order No. 5 includes the ratification of emergency expenditures previously authorized by an emergency memorandum for the rental of temporary pumps to mitigate and manage significant rainfall events in May 2024.The emergency pump rentals were necessary to maintain drainage operations, protect public infrastructure, and reduce the risk PR No.25077 07/23/2027 RLD Page 5 of 7 of flooding impacts to residents and public property during periods of excessive precipitation. The total cost associated with the emergency pump rentals is $43,366.00, and, WHEREAS,as a result of these quantity reconciliations and emergency expenditures,the original contract amount of$17,977,620.15 increased by$55,996.00,resulting in a revised contract amount of$18,033,616.15. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct; and, THAT,the City Manager of the City of Port Arthur is hereby authorized to execute Change Order No. 5 with Brystar Contracting, Inc. of Beaumont, Texas, for line-item adjustments from previous change orders, that resulted in both price reductions and increasements. The contract amount of $17,977,620.15 was increased by $55,996.00 to the new contract amount of $18,033,615.15, available in Account No. 154-00-000-8515-00-10-000, Project No. DRIP 04.CON.FEF.; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D., 2026, at a of the City Council of the City of Port Arthur, Texas, by the following vote: Ayes:_ Mayor: Councilmembers: ._-- c-- - PR No.25077 07/23/2027 RLD Page 6 of 7 Noes: Charlotte M. Moses Mayor ATTEST: Christe Whitley Ned,TRMC City Secretary PR No.25077 07/23/2027 RLD Page 7 of 7 APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: attoi•-- Roxann Pais Cotroneo, Esquire Ron Burto -• City Attorney City w. ager APPROVED AS TO AVALIABILITY OF FUNDS: ia 46,0, yn a "Lyn" Boswell, M.A., ICMA-CM Director of Finance Suhail Kanwar, PE Director of Public Services/City Engineer I 1f4 Clifton Williams, CPPB Purchasing Manager EXHIBIT A CFFY OF PORT ARTHUR PuHIe Wade:EalleeerlaE DATE:APRIL6,2026 PROTECT:STOYEGATE MANAGE DWROYESIENT PROTECT OWNER: CITY OF PORE ARTHUR CONTRACTOR: IBRYSIAR CONTRACTING.INC. TIIE FOLLOWLVG CHANGES CV TILE PLANS A.`IIYOR5PECIFICATIONS ARE HEREBY MADE:QLANGE ORDER NO,6 Ad3mt:be ExlmstedQmuRhs to reflect Our Acmni Qto:Wt4s wed bt ,pktka of the project: Item Ha. 'Et06606VAdyatedp9r ItemEluealptka LI& (MOW Qu+atltp Dull Erin Ocl1(nalAmount Mut Quantity NSW MM.! $(16s0:o1 OR Updated ClaamRrlpee Pnelpn CO.) $Addfilant FroatC04/R.vomduo 90 earectimeCoetpra: REMOVE EREPULCE CONC(SIDEWALK ORRAMPI S( 303 430.9D •$9.000.O3 166 d6.230.00 S4A20.60 Replsa uvhemcted cem &1pv 90 Co,MOo0 REMOVE EREPLACE COW ISIOEWAIX OR RAMP) SY 30 S170.00 $5L00000 166 S2i,220.00 LS22,Td0.00J RamC034/Rmmmdmb 17D mrrcnmmepdaledq atilt' CONCCWEE3$E) (P 9,003 •510D0 -59400000 5.193 413900DD 53TA2000 Replace aid:oractei item L<lar 170 Conschal CONCCORD DYII IF 5,561 510E0 558.610D0 5493 $51,1m44 (S6,630.00J Ad.1 Emer6em.P..Rmtal&Sawke LS 1 S43,366.03 543.366.00 S 0.1019LS S10,610.m S66.60400 S13036.00 UPDATED coNrRACTAMOUNT ADD TO CONTRACT NEW CONTRACT AMOUNT CO,6 Si S 17977,6ID.1S 553996.00 S ILa33F34ss ORIGLVAL CONTRACT ASIOUN,5 I5,67Z5103C VET FROM PREVIOUS CHANGE ORDERS:S 179T1.620.13 TOTAL ASIOLTT OF THIS CHANGE ORDER NOS:S 53,19400 PERCENT OF THIS CHANGE ORDER V0.5: 0.31% TOTAL PERCENT CHANGE ORDERS NO S: 431% FLV,IL CONTRACT:MOUND S 11,033,616.15 L LIM Y- Ammon, - •� JA55. 3E.monAmaratis LAIi JVJ AwRot'm4r btu G,m,tuty Ct7ltnpr i