Loading...
HomeMy WebLinkAboutPR 25055: CHANGE ORDER NO. 10 OF MAIN WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT u-ice city of caY..: V"?.t rthu� Texas www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: July 22,2026 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews,P.E.,Water Utilities Director RE: PR 25055—Approve Change Order No. 10 of Main Wastewater Treatment Plant(WWTP) Improvement Project Introduction: This agenda item seeks the Council's approval to execute Change Order No. 10 with ALLCO, LLC for the Main Wastewater Treatment Plant (WWTP) Improvement Project, increasing the contract amount by$57,268.43 to $70,923,709.27. Background: Resolution No. 22-147 awarded the Main Wastewater Treatment Plant (WWTP) Improvement Project to ALLCO, LLC of Beaumont, Texas, for the total amount of $73,643,227.00. Freese&Nichols, Inc.,manages the construction phase. On August 2, 2022, Resolution No. 22-329 approved Change Order No. 1 for value engineering performed by Freese &Nichols, Inc., ALLCO, LLC, Golden Triangle Consulting Engineers, and the City of Port Arthur staff in the deduction amount of$6,234,049.00 for a new contract amount of$67,409,178.00. On December 20, 2022, Resolution No. 22-586, approved Change Order No. 2 including, Primary Clarifiers subgrade stabilization, Drying Beds demo, Demo and Remove CSS, Helical Piles, and Brentwood PVC TF Media price increase and reduction for the removal of VE Lighting Package, use of bank sand for pipe bedding, and remove Admin Building improvements in the deduction amount of $73,564.57 and 75-day time extension for a new contract amount of$67,335,613.43. On December 19, 2023, Resolution No. 23-556 approved Change Order No. 3 for an increased amount of$114,851.00 to replace 4 Trickling Filter Effluent Butterfly Valves with Slide Gates and add an expansion joint to the Aeration Basin Buttress Wall for a new contract amount of$67,450,464.43. On June 4, 2024, Resolution No. 24-246, approved Change Order No. 4 for an emergency repair to prevent the complete failure of the 30"force main from the lift station for an increased contract amount of$389,801.00 for additional piping to reach the existing 30" force main and to reroute the discharge piping of the existing 10"pump at the Main Outfall Lift Station to the existing 36" force main. In addition, to install a line stop at the 36" DI influent pipe to reroute the flow through 440 LF of 24"HDPE for a new contract amount of$67,840,265.43. On June 18,2024,Resolution No.24-268,Change Order No. 5,was approved to provide and install Envirodyne Grit Removal Equipment, budgeted in the Capital Budget, as a cost-saving alternative manufacturer for $889,500.00. It also included $215,896.00 for replacing the 30" pipe connection at the new Headworks Facility with a 42"pipe for connection for the new 42" sewer force main being installed under a separate contract and a proposal to install VFD's to add variable speed control to the existing overhead crane at the Main Outfall Lift Station and crane certification which Crane Tech,Inc.will do with support by Allco for$13,195.00.The total cost of this change order increased by $1,118,591.00, to a new total contract amount of $68,958,856.43. On April 8, 2025, Resolution No. 25-140, Change Order No. 6, was approved for the cost associated with bypass pumping at the Main Outfall Lift Station (MOLS). The original plans called for the current pumps at the MOLS to remain operational during the transition to the new pump installation. However, the current pumps have not been functional, necessitating reconfiguration of the bypass pump. Furthermore, during construction, additional bypass measures were required at the Wet Well of the MOLS because the existing gates were not functional, necessitating the installation of new gates and knife gate valves. The cost associated with the reconfigured bypass pumping is for$805,251.12,bringing the total contract amount to $69,764,107.55. Change Order No. 6 also extended the contract time by 180 days. On August 12, 2025, Resolution No. 25-355 approved Change Order No. 7 for the chemical building door and wall rehabilitation, crane repairs, 8-inch water line and valve, crane hoist, Entergy pull box, debris removal at wet well, installing CSS at Main Outfall Lift Station, and includes deductions for pressure testing at the dewatering building, as well as, deduction for the use of stabilized sand at FRP joints instead of concrete. The cost associated with Change Order No. 7 was $357,699.02, bringing the total contract amount to $70,121,806.57. It also extended the contract time by 45 days. On December 16th, 2025, Resolution No. 25-548 approved Change Order No. 8 for Main Outfall Lift Station (MOLS) construction changes to meet new Entergy requirements, six (6) months of bypass pumping due to delays for such changes,and extension of the Chlorine Contact Basin weir height.The total cost associated with Change Order No. 8 was$458,175.02,bringing the total contract amount to $70,579,981.59 and extending the contract time by 90 days. On February 24,2026,Resolution No.26-082 approved Change Order No. 9 for the purchase of 2000-amp Standalone Disconnects required at the Main Outfall Lift Station and the Wastewater Treatment Plant as per Entergy requirements. The total cost associated with Change Order No. 9 is $286,459.25,bringing the total contract amount to $70,866,440.84. The Change Order will not extend the contract time; the total contract time remains 1,970 days. Freese and Nichols is proposing Change Order No. 10 for cellular grout at the primary clarifiers, MOLS fence repairs, debris removal at the MOLS wet well, generator repair at the MOLS, and aeration basin bulkhead inspection. The total cost associated with Change Order No.9 is$57,268.48,which includes a credit for the trickling filter effluent junction box,bringing the total contract amount to $70,923,709.27.The Change Order will extend the contract time by 10 days,bringing the total contract time to 1,980 days. Budget Impact: The original contract price is $73,643,227.00 Change Order No. 1 decreased the contract amount by$6,234,049.00, decreasing the change order percentage allowed by-8.5%. Change Order No. 2 decreased the contract amount by$73,564.57, decreasing the change order percentage allowed by-0.1%. Change Order No. 3 increased the contract amount by$114,851.00, increasing the change order percentage allowed by 0.2%. Change Order No. 4 increased the contract amount by$389,801.00, increasing the change order percentage allowed by 1.5%. Change Order No. 5 increased the contract amount by$1,118,591.00, increasing the change order percentage allowed by 1.5%. Change Order No. 6 increased the contract amount by$805,251.12, increasing the change order percentage allowed by 1.1%. Change Order No. 7 increased the contract amount by$357,699.02, increasing the change order percentage allowed by 0.5%. { Change Order No. 8 increased the contract amount by$458,175.02, increasing the change order percentage allowed by 0.62%. Order No. 9 will increase the contract amount by$286,459.25, increasing the change order percentage allowed by 0.39%. Proposed Change Order No. 10 will increase the contract amount by$57,268.43, increasing the new total contract amount to $70,923,709.27 and increasing the change order percentage allowed by 0.08%to a total -3.69% from the original contract price. The funding is available in Capital Improvement Projects (CIP) Account No. 405-40-000- 8516-00-00-000, Project No. WS0023. Recommendation: Recommend the City Council approve PR No. 25055 to authorize the City Manager to approve Change Order No. 10 as described/outlined above. PR No. 25055 7/22/26 cm Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 10 FOR THE MAIN WASTEWATER TREATMENT PLANT (WWTP) IMPROVEMENT PROJECT WITH ALLCO, LLC OF BEAUMONT, TEXAS, FOR AN INCREASED COST OF $57,268.43 FOR VARIOUS CHANGE PROPOSALS, RESULTING IN A NEW TOTAL CONTRACT AMOUNT OF $70,923,709.27, AND A 10 DAY EXTENSION OF THE CONTRACT TIME; FUNDING FROM CIP ACCOUNT NO. 405-40-000-8516-00-00-000, PROJECT NO.WS0023. WHEREAS, the City Council approved Resolution No. 22-147, awarding the Main Wastewater Treatment Plant Rehabilitation project to ALLCO, LLC of Beaumont, Texas, for the total amount of$73,643,227.00; and, WHEREAS,on August 2,2022,Resolution No. 22-329, approved Change Order No. 1 to reduce the contract amount by $6,234,049.00 for Value Engineering performed by Freese & Nichols, Inc., ALLCO, LLC, Golden Triangle Consulting Engineers, and the City of Port Arthur staff for a new contract amount of$67,409,178.00; and, WHEREAS,on December 20,2022,Resolution No. 22-586, approved Change Order No. 2 for a decreased amount of $73,564.57 including, Primary Clarifiers subgrade stabilization, Drying Beds demo, Demo and Remove CSS, Helical Piles, and Brentwood PVC TF Media price increase and reduction for the removal of VE Lighting Package,use of bank sand for pipe bedding, and remove Admin Building improvements to a new contract amount of$67,335,613.43 and add 75-day time extension with a final project end date of December 17, 2026; and, WHEREAS,on December 19,2023, Resolution No.23-556, approved Change Order No. 3 for an increased amount of$114,851.00 to replace 4 Trickling Filter Effluent Butterfly Valves with Slide Gates and add an expansion joint to Aeration Basin Buttress Wall, to a new contract amount of$67,450,464.43; and, WHEREAS, on June 4, 2024, Resolution No. 24-246, approved Change Order No. 4 ratifying the emergency repair on the 30" force main for an increased amount of$389,801.00 by installing additional piping with a 10"pump to reroute the force main, 36" Line Stop, and HDPE Bypass piping, to a new contract amount of$67,840,265.43; and, WHEREAS,on June 18,2024,Resolution No.24-268,Change Order No. 5 was approved for providing and installing Envirodyne Grit Removal Equipment, replacing the 30" pipe at the PR No. 25055 7/22/26 cm Page 2 of 4 Headworks Facility with a 42"pipe for connection to the new 42"sewer force main from the Main Outfall Lift Station (MOLS)which is being installed under a separate contract, and proposal to install VFD's to add variable speed control to the existing MOLS overhead crane and get crane certified for an increase of$1,118,591.00,to a new total contract amount of$68,958,856.43; and, WHEREAS, on April 8,2025,Resolution No. 25-140, approved Change Order No. 6 for an as-needed basis with a not to exceed increase amount of$805,251.12 for the costs associated with the reconfigured bypass pumping required for the installation of the new pumps, gates, and knife gate valves at the Main Outfall Lift Station since the existing equipment was not operational as proposed in the original plans, bringing the new total contract amount to $69,764,107.55 and extend the contract time by 180 days due to the reconfigured bypass pumping; and, WHEREAS, on August 12, 2025, Resolution No. 25-355 approved Change Order No. 7 for an increase amount of$357,699.02 for the chemical building door and wall rehabilitation,crane repairs, 8-inch water line and valve, crane hoist, Entergy pull box, debris removal at wet well, installing CSS at Main Outfall Lift Station, and includes deductions for pressure testing at the dewatering building and deduction for the use of stabilized sand at FRP joints instead of concrete, bringing the new total contract amount to$70,121,806.57 and extend the contract time by 45 days; and, WHEREAS, on December 16, 2025, Resolution No. 25-548 approved Change Order No. 8 for an increase amount of$458,175.02 for Main Outfall Lift Station construction changes needed to meet new Entergy requirements, six (6) months of bypass pumping due to delays for such changes, and extension of the Chlorine Contact Basin weir height,bringing the new total contract amount to $70,579,981.59 and extending the contract time by 90 days; and, WHEREAS,on February 24,2026,Resolution No.26-082 approved Change Order No. 9 for an increased amount of $286,459.25 for the purchase of three (3) 2000-amp Standalone Disconnects required at the Main Outfall Lift Station and the Wastewater Treatment Plant as per Entergy requirements,bringing the new total contract amount to$70,866,440.84 with no extension of the contract time; and, WHEREAS, Freese and Nichols, Inc. is proposing Change Order No. 10 for an increase amount of$57,268.48 for cellular grout at primary clarifiers, MOLS fence repairs, debris removal at MOLS wet well, generator repair at MOLS, and aeration basin bulkhead and inspection,which includes a credit for the trickling filter effluent junction box,bringing the new total contract amount PR No. 25055 7/22/26 cm Page 3 of 4 to $70,923,709.27 with a 10-day extension of the contract time bringing the total contract time to 1,980 days; and, WHEREAS, the cumulative amount of all approved Change Orders, including proposed Change Order No. 10, does not exceed (25%) of the original contract amount, as authorized by Section 252.048(d) of the Texas Local Government Code(see Exhibit"B"). NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and recitals in the preamble are true and correct; and, THAT, That the City Council hereby approves the City Manager's execution of Change Order No. 10 (Attachment "A") to the contract with ALLCO, LLC, of Beaumont, Texas, for the Main Wastewater Treatment Plant (Main WWTP) Improvements Project, increasing the contract amount by 57,268.43,from$70,866,440.84 to a new total contract amount of$70,923,709.27,and extending the contract time by ten(10) calendar days,for a revised total contract time of one 1,980 calendar days; and THAT,funding is available in CIP Account No.405-40-000-8516-00-00-000,Project No. WS0023, THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the Meeting of the City Council. READ, ADOPTED, AND APPROVED this day of , 2026 at a Regular Meeting of the City Council of the City of Port Arthur,Texas by the following vote: AYES: Mayor Councilmembers: NOES: • Charlotte M.Moses,Mayor ATTEST: Christe Whitley Ned,TRMC City Secretary PR No.25055 7/22/26 cm Page 5 of 5 APPROVED AS TO FORM: Roxann Pais Cotroneo City Attorney APPROVED FOR ADMINISTRATION: Ronald Burton City Mana t Suhail Kanwar,P.E. Director of Public Services „MA Calvin Matthews,P.E. Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: kqe„. 6-,„,eeLynda(Lswell,MA ICMA-C Finance Director Clifton . Williams r., CPPB Purchasing Manager Exhibit "A" (Change Order No. 10) FR E E S E Innovative approaches "1'5-NICHOLS Practical results Outstandingservice 10497 Town and Country Way,Suite 500 + Houston,Texas 77024 + 713-600-6800 + FAX 817-735-7491 www.freese.com June 26,2026 Calvin Matthews,PE Director of Water Utilities City of Port Arthur Texas 444 4th Street Port Arthur,TX 77640 Re:Project No.R15056 Port Arthur Main WWTP Improvements:Change Order No.010 Dear Mr.Matthews: Included with this letter is Change Order No. 010 for the above-referenced project. This letter is to serve as a narrative along with the supporting documentation attached.All the items included in this change order will be funded by the City of Port Arthur's CIP Account No.405-40-000-8516-00-00-000,No.WS0023. Item No.1:CP-27—Credit for Trickling Filter Effluent Junction Box This change is a credit proposal to reuse the existing trickling filter effluent junction box in lieu of building a new structure. Cost:($123,360.00) Additional Days:0 Calendar Days Item No.2:CP-30:Cellular Grout at Primary Clarifiers This change proposal is to provide access for operations to maintain and clean the primary clarifier effluent weirs. Cost:$65,742.05 Additional Days:0 Calendar Days Item No.3:CP-31:Main Outfall Lift Station Fence Repairs This change proposal is fencing repairs at the Main Outfall Lift Station to maintain regulatory compliance. Cost:$29,194.88 Additional Days:0 Calendar Days Item No.4:CP-32:Debris Removal at Main Outfall Lift Station Wet Well This change proposal is for debris removal at the Main Outfall Lift Station to improve pump performance. Cost:$19,550.00 Additional Days:0 Calendar Days Item No.5:CP-33:Generator Repairs at Main Outfall Lift Station This change proposal is for generator repairs at the Main Outfall Lift Station. Cost:$8,400.00 Additional Days:0 Calendar Days Item No.6:CP-34:Aeration Basin Bulkhead Installation and Air System Inspection This change proposal is to isolate a channel at the Aeration Basin so that an inspection can be conducted on the air system. Cost:$57,741.50 Additional Days:10 Calendar Days PTR22379 T:\4.0 CONSTRUCTION\4.40 Contract Mod\4.43 Chg Orders\Change Order No.10 1TM To summarize,this Change Order has an overall cost increase of$57,268.43 and 10 additional calendar days to the contract time. I hope the above narrative,along with the supporting documentation included,provides adequate information to be able to process this Change Order in a timely manner.Please don't hesitate to reach out to me if you need any further explanation or backup documentation. Sincerely, Kyle Jones,PE,DBIA,CCM Construction Manager CC: Jess Liao Hani Tohme Christian Martinez Murali Erat Matt Cartwright PTR22379 T:\4.0 CONSTRUCTION\4.40 Contract Mod\4.43 Chg Orders\Change Order No.10 Project _ _ Port_Arthur Main_WWTP Improvements _ _ - Project Number Owner City of Port Arthur PR22416 Contractor Allco,LLC TX 870 Construction Manager Kyle Jones,PE,DBIA,CCM PTR22379 Design Professional Murali Erat,P.E. PTR22379 CoPA Account No. 405-40-000-8516-00-00-000 CoPA Project No. WS0023 Change Order No. 010 _ _ _ _ Date 6/29/2026 y Item Description Additional Days Change Amount _1 Change Proposal#27-Credit for Trickling Filter Effluent Junction Box __ 0__ $ _ (123,360.00) _ 2 __,Change Proposal#30-Cellular Grout at Primary Clarifiers _ 0 _ $_ _ 65,742.05 3 Change Proposal#31-MOIS Fence Repairs _ 0_ $ 29,194.88 4 Change Proposal#32-Debris Removal at MOLS Wet Well 0 $ 19,550.00 5 Change Proposal#33-Generator Repair at MOLS 0 $ 8,400.00 6 Change Proposal#34-Aeration Basin Bulkhead and Inspection 10 $ 57,741.50 Net Change in Contract Price this Change Order $ _ 57,268.43 Net Change in Contract Time this Change Order 10 Days The compensation in this Change Order is the full,complete,and final compensation for all costs Contractor may incur because of or relating to this change whether said costs are known, unknown,foreseen, or unforeseen at this time,including without limitation,any cost for delay,extended overhead,ripple or impact cost,or any other effect on changed or unchanged Work because of this Change Order.The changes in Contract Times are the complete and final adjustments for impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled.All terms and provisions of the Contract Documents remain in effect except as specifically modified by this Change Order. Original Contract Amount: $ 73,643,227.00 Net from Previous Change Orders: $ (2,776,786.16) Total Amount of This Change Order: $ 57,268.43 Percent Change in Contract Amount of this Change Order: 0.08% Total Percent Change in Contract Amount to Date: -3.69% New Contract Amount: $ 70,923,709.27 Original Contract Duration: 1,580 Calendar Days Additional Contract Days per Previous Change Orders: 390 Calendar Days Additional Contract per This Change Order: 10 Calendar Days Revised Contract Time: 1,980 Calendar Days Original Previous Revised Substantial Completion Date 7/5/2026 7/30/2027 8/9/2027 Final Completion Date 10/3/2026 10/28/2027 11/7/2027 Change Order No.10 } Recommended by Design Professional: Recommended by Construction Manager: 1'`�"r'►". 7/3/26 Murali Erat,PE Date Kyle Jones, , BIA,CCM Date (Freese and Nichols,Inc.) (Freese and Nichols,Inc.) st Approved by Contractor: Approved by Owner: — te/50/2- Brandon Harrison Date Calvin Matthews,PE Date ;F Vice-President Director of Water Utilities Allco,LLC City of Port Arthur Approved by City Manager: Ronald Burton, CPM Date City Manager City of Port Arthur Change Order No.10 _ _ _ _ :A 1- Design Build. ( Construction Management General Contractors P.O.Box 3684,Beaumont,Texas 77704 Phone:409-860-4459 Fax:409-860-3857 Email:allco@allco.com• January 30,2026 Freese&Nichols 10497 Town&Country Way,Suite 500 Houston,TX 77024 Attn: Richard Provolt Re: City of Port Arthur WWTP Improvements Project Change Proposal—Trickling Filter Effluent Junction Box Deduct Dear Mr.Provolt: Allco proposes the following deductive change order in the amount of$123,360.00 to utilize the existing Junction Box in lieu of replacing with a new Trickling Filter Junction Box: DESCRIPTION/COST SUMMARY Allco proposes to utilize the existing trickling filter effluent junction box in lieu of replacing with a new junction box. The existing box is similar in size,depth,and capacity. The deduct does not include the material costs for the helical piles and handrails as those have already been purchased and are on the jobsite. The additive portion is to core drill the openings for the pipe connections at the box that were not in the original scope ;f ITEM QTY UNIT UNIT PRICE TOTAL r � Deduct-Proposed Junction Box (1) LS $154,350.00 ($154,350.00) Foundation/Walls Deduct-Helical Piles(Labor Only) (1) LS $5,964.00 ($5,964.00) Deduct-Handrails(Labor Only) (1) LS $2,200.00 ($2,200.00) Add-Core Drills(See attached) 1 LS $27,326.00 $27,326.00 Add-Concrete Collar @ 54"Pipe 1 LS $11,828.00 $11,828.00 TOTAL-DEDUCT ($123,360.00) Please contact the undersigned if you have questions or issues regarding this matter. Respectfully, Allco, LLC Brandon Harrison FREESE NICHOLS Request For Information Project Main WWTP Improvements Project Number Owner City of Port Arthur PTR22379 Builder Allco, LLC TX 875 Designer Freese and Nichols, Inc. PTR22379 _ CM Richard Provolt RFI No. RFI-108 Builder Submittal No. Specification N/A _ Drawing/Detail Builder Requests: Information for the items described below or in the attached material referenced below: The plans show to demo the existing Trickling Filter Junction Box; however,the existing structure appears to be in good condition. Builder's Proposed Solution: We recommend leaving the existing junction box. Attachment Requested By Brittany Stutes Date 08/29/2025 Response:Information for the items described above or in the attached material referenced: Reuse of the existing junction box is acceptable.We will have to demolish a wall section of the existing junction box that includes existing pipes to be removed and cast a new wall on the exterior side to reinforce the new pipe penetration for the 54" line.Structural details for the new exterior wall section and penetration details will be provided via field order. Status Filed as Received Action Final Distribution Attachments Response By Kyle Jones Date 11/20/2025 NICHOLS Field Order ra Project Main WWTP Improvements Project Number Owner City of Port Arthur PTR22379 Builder Allco, LLC TX 875 Designer Freese and Nichols, Inc. PTR22379 CM Richard Provolt FO No. FO-008 FO Description Trickling Filter Splitter Box Modifications Specification Drawing/Detail TJB-S3,TJB-S4 Make the following modifications to the Contract Documents as set forth in this Field Order pursuant to the General Conditions of the Contract Documents.It is the Construction Manager's and Engineer's opinion that this Field Order does not alter the Contract Price or the Contract Time. Notify the Construction Manager prior to commencing the Work and submit a Change Proposal if the Builder does not agree with the Construction Manager's and Engineer's opinion. Detailed Desc. Allco proposed reusing the existing Trickling Filter Splitter Box in lieu of demolishing and replacing the structure.The splitter was drained and inspected on October 24, 2025.Attached is revised Drawing TJB-S3 and TJB-S4 modifying the existing structure to accommodate a new 54"pipe. Please prepare a credit proposal for the deleted scope of work. Attachments FO-008-Trickling Filter Splitter Box Modifications-Kyle Jones-Pending.pdf Status Filed as Received Action Final Distribution Submitted By Kyle Jones Date 01/22/2026 Field Order 008 Project Main WWTP Improvements Project Number Owner City of Port Arthur PTR22379 Contractor Allco, LLC TX 875 Construction Manager Freese and Nichols,Inc. Design Professional Freese and Nichols,Inc. Field Order No. 008 Date 1/22/2026 Contractor is directed to make the changes in the Work described in this Field Order. OPT has determined that this change in the Work can be accomplished without a change in the Contract Price or Contract Times.Submit a Change Proposal if Contractor believes that this Field Order justifies an adjustment in the Contract Price or Contract Times before proceeding with the Work described below: Allco proposed reusing the existing Trickling Filter Splitter Box in lieu of demolishing and replacing the structure. The splitter was drained and inspected on October 24,2025. Attached is revised Drawing TJB-S3 and TJB-54 modifying the existing structure to accommodate a new 54"pipe. Please prepare a credit proposal for the deleted scope of work. • Approved by Design Professional Issued by Construction Manager See attached signed drawing Kyle Jones 1/22/2026 Name Date Name Date Field Order 008 Page 1 of 1 '� �„v....,.m N011035 aNd Ndid °"•! "• X09 NOI ONflf S231lId 9NI1N71 Nl JNlISIX3 wWm.nT „ ....I "m �.rnl. M ' ��;. : ,...° ": ;aaesi�; ws�u�.`;'7ww lvdwntus MYr .. 4 " "° ® m r. ;` y yIp� I SJN3W3AO dWl d1MMIfH12V1�Od anrsowo � a;,p;,,, rasutia 3533Hd 5tlX31'A1NfO3NOSU3Ant•tinU.W111OdKUM d,, ME y.31..1y4yaol i9AI «�C A•.i .9-.8 A-.i 124 /\ { i I F 1 / W .f Cs 3 ., 1 . 1 " " •i_ —�—.—v- , s-- t F. « W ~ z .,,LIV Y IE. ^� 1g s* 8- E11111!3•1.•M11.1111� F, <o F, z I' r_-17 T 111fe -=_ o �:1== 1 = zWaz �_r. i�1tI► 71:51 - W x I■wHIII. :Nun W • - -- noun ; 6 .cs O o \�N tf . 2 ~ 1�nu{ ;ga x I. 1 I.■ 1k ■y y a o i- — — — — — $ I��HIIII. '�� ' 1u 5 3 E� z zo o i RIglaL AP = m=o G u i101a;;;;► i\illi = =llz"m- o1 " F. X I ' J a- • LLg e8 * � • 1 - .•u p•.. >'EiWs -- q —z I - — z 9V Eo • CI Is ~IW 0 j .9•.OT .9•.8 E= I! I 44 i r it 5 t` « I c n �^ o v1 `� /---- moo.=, zo �z� ICE o h aH ;� x 1 I 0 lit& W5 z. \i �., z I ., x tfl C a .n_.T w ,� - U m Y I_•t b `\1I1 ` X � 1 �/�_�\�\�z -- —'1 I I s,a—+----- (: ado. ml n « Y u !! •n Qo I'U 0 aw ./IEagl o a l S " 'a a s SNOIIJ3S wsc"u.,assu,"-a �m'">la' v '1a"1 R' X09 NOI1JNflf SM311Id DNIlNJI/LL 9N!ISIX3 """ ®"°' .,.",..I "'""°"°'°;,m"'" "rn"'"'" \J T`T`iT u i.• SjN3A9A0M0fl d1MM HfIH1ad1MOd "" ®"'°° 3533!!d Svx3i'AWNnODNOSIGii31 InU.LUviaodAOA11D I I Td1a -JUIYmWNm+sv.� O o _ pp W vF 0 g3 SW N .a a s rig I. I ~ 03 o ` _ o G — ��oo WI 0 3 < I I �i N 0 I W3 .o. e•.T o��� e3a38 West; 0 2 0 U & = I Es ?i Lp V'er L. �,oz doga ow , ae � igx A z," ( ocP ) a :34 u i 1 w n o zs s - I 1 o6 ~I C 2 W< 3 s o ¢.. „ goo g — 2d FA OR s � Nia iaa� s�a oi zis Ti<sF �acI� < a .Ga . z seo .6 0E nE zaamm 3m o� B.-pa¢ a2Ea i_ .. W i c ,uGWs EN o _aa zad°o13o"a 1 s oc m "_ 8 Piia3C�o 5No ° a3aCoiaaooin : g As tErE vogolfoQogo= ,g 6. ,-r3 ?` o �'— a <P,W < 2ESsGoG malq,46.; oma " c s . ..atez o Z Wuaimo a• > W3- Zoo.,,2o-61 'A e3 E.: K '"'^ia '^ o"o m o Gfz Gd od l'E Q �oio.oPA.T. oo a3G oioW�.g„, z, .,fi g ml U !.'7 zo. zz OE zla2010.023on"aoid W ?W 3 i o I ri" 93zdooPFoi M.1 p bU2g '�E01gELI�< '° ... u '^Q� .ga W�Wai <'"-'a'� a a8�i'.'ria'd 12 3 VW g d di 1 th - a' 0 <oe;m',Si y. zyG` i.... o9gu ' I'm N8 G 0 a . H < 41 �z o 1eo 8 2o Wso zo 0 32C=toogERF.6- .g.. ...GBs._. 4 ... :N3 : u33 .I 0&.! �I GWt a W>G_F GE?Gst'"J . .. a`a ..a� 'z "o "s �' a1 osu WI "=. s3 .1h5 N A'ABEuf3....o.,iu3z 'O'IM'o a.oiva S19 u.. 4 n o N e n m a 2 0 0 o 0 0 o o o 0 0 a In m ,,, ' o 0 0 0 N o c N O N ep n 'co N Co to en —Ai CO n N CI n .n to n .ti .-1 n C N n gi eD N R en N�xW[ .O r R w N a . h TO IA w ww w www ., w CAV - - .°� O.2 2 c v a. a n a a.a 2 .fl O z .2 2 _ _a y p z t '2 -I Ti a a z t a — F N H a o 0 0 0 i w oa`� o 0 0 o `o - « �o a`_ 1D o0 0 H t 8 h° t a` .n `o t°- C.voi R3 1- @ E g �n `a 1 Q. - eV e. - C -. ` a m 9 e ° e pp c at ;W it U C O w U ww N www' y°j N 8 O— a v° us O E ' c n F' a a 0 c U v to w w L. - -.-• } ` 0 0 I 1 1 CI1 0 0 0 U �a a N a 0E r .—h. 1-1 0 0 N 0 os, .a a-c o co j aa: '> >.7 w IA N W a C eL W IL'Q C co 2 U F In tn. w In w in l 2 2a — 0 0 s x C° To 0 0 ' •0 3 ID au o 0 0 o a a. U a r .r 0'^ N C a ¢ a 'r_ mrj^ N t u o c G Na. =•CC 42 Lt. tto o ° o 000 0 ° v `.. ~ o J o o y a ti • o a L «F c u < m\ a� c a c cmN el E o A'c°r m o °¢ .0o m f0 c 0 :2,,2 O 0 yH N c .� �ww 3W �2 W a Nr Q6..- — .�o 3 z E .o N EL u O mS d:c Q 7 oo a 2 2 - LJJ 1- s a _ _ ei aZ f0 0 0 0 C.0 0 0 0 0 0 O z `o . : v .. — o o . 9 00 0 00 00 c ' C N c c TO N 00 0 00 .n ui W 0 N Or. U. U- N N ''8 N IOp COO M1OY ON tD n O. [l W .r rl ei i- .-IN V C O Z a` O E o a w < ma o Z `o 341 a U U 0 m Li u a w w www -V CA CA wUf w w LA CO ;w — o . v. o E o 0 N ? o` „� -° . > > LL „o 0 p O S — w = O 4n a-u o U «am o « 1,51 a r E uc c O y nr U- o 2 ,2 o � 10 W V o n u V.r 3 2 0 03 h d c xc E o Wo 8v c 0 t r E ¢ E m L 3� u 8 '` O u iii "Z. z x o _ PI.s0 0 js o O 0 Z G t 0)J g i5 ° a d u z L. 2.: o en U n -2v00 ILL - m.. En 0 Y Y H F 0 _ — ii — n co a 0 a OOO 3a = _ `o � 2 1- 0�? arm ¢¢¢ a= c� Aaa�` E Y, ya ¢O� a0 00 voLEgd Lo`o� ' ` c O m 7 3 .U U w d . aa m age U ��¢ .. _ aaer ° 3 5 5 N n W 7 7 114 m N w tg III a O LL S O i as 0 U U 0 .n 0 0`� t-.. m io n CO 0 2 Gulf Coast Grouting Inc. PO Box 1149 Huffman, TX 77336-1149 Phone 281-225-4684 Fax 281-225-4686 March 11, 2026 Brittany Stutes Allco P.O. Box 3684 Beaumont,TX 704 Phone:409-860-4459 Email:bstutes@)allco.com Ref: Port Arthur Main WWTP-primary clarifiers Port Arthur,TX Ma'am, Gulf Coast Grouting Inc.would like to submit the following prices for the backfill grouting on your project located in Port Arthur,TX. As I understand you have two effluent troughs for the primary clarifiers (121'O.D./126'I.D.) needing three feet filled with cellular grout. Approximately 220 cubic yards. The proposed backfill grout will have a density of 50 P.C.F. + or-5 P.C.F. and a compressive strength of 10o psi job average. Grout will be placed in one lift. Gulf Coast Grouting Inc.has the ability to blend and mix the cellular grout at the job site and pump up to 4 yards per minute,still remaining portable. With these abilities, Gulf Coast Grouting Inc. can save you time and materials on your projects. If I can be of further assistance, please feel free to contact me at(832) 858-1185 Thank you. David Holt SCOPE Gulf Coast Grouting Inc.will furnish mixing, and injection of the backfill grout only. Grout will be injected directly into trough at different positions to ensure proper levels. Grout will be placed in one lift.All work will be done under our standard insurance. PROVISIONS BY THE CUSTOMER FOR GULF COAST GROUTING INC. TO PERFORM THE SERVICES LISTED IN THIS PROPOSAL, IT WILL BE NECESSARY FOR THE CUSTOMER TO PROVIDE THE FOLLOWING AT NO EXPENSE TO GULF COAST GROUTING INC. 1. Free all-weather access to the jobsite. 2.Traffic controls and barricades as needed. 3.Safe and secure overnight storage area for mixing and pumping equipment as needed. 4. Mixing and cleanup water at the mixing and injection sites. 300 GPM minimum flow rate required,potable water only,with 2-inch water meter. 5. Suitable wash-up area for the mixing and pumping equipment at the mixing and injection site.Any excess grout mixed that cannot be pumped will also need a suitable dumpsite at the jobsite.Clean up of any grout leaked from pipe and/or bulkhead. 6. Customer representative on site to sign daily job logs and to make on the spot decisions, should the need to do so arise. 7.Testing of compressive strength. 8.All permits and permissions needed. 9. De-watering of trough. PROJECT PRICING PROPOSAL BASED ON THE FOLLOWING CHARGES: MOBILIZATION/DEMOBILIZATION $ 2,800.00 (per occurrence) BACKFILL GROUT Effluent trough fill $ 217.00 (per yard mixed) STAND-BY RATES Should Gulf Coast Grouting Inc.for any reason be unable to perform grouting operations due to conditions beyond Gulf Coast Grouting Inc.'s control, a stand-by rate of$625.0o per hour will be charged for Gulf Coast Grouting Inc.to remain on the project. NET 3o DAYS/NO RETENTION PRICE GOOD FOR 6o DAYS FROM RECEIPT fFREESE Request For Information NICHOLS Project Main WWTP Improvements Project Number Owner City of Port Arthur PTR22379 Builder Allco, LLC TX 875 Designer Freese and Nichols, Inc. PTR22379 CM Richard Provolt RFI No. RFI-106 Builder Submittal No. Specification N/A Drawing/Detail Builder Requests: Information for the items described below or in the attached material referenced below: The current elevation for the trough at the clarifiers is higher than the weir at the trickling filter splitter box.This will cause 3 ft of standing water in the trough. Please see attached and advise. Builder's Proposed Solution: Attachment RFI-106-Elevation at Clarifiers to Splitter Box-Brittany Stutes-Pending.pdf Requested By Brittany Stutes Date 07/02/2025 Response: Information for the items described above or in the attached material referenced: Install cellular grout at the effluent troughs. Status Filed as Received Action Final Distribution Attachments RFI-106-Elevation at Clarifiers to Splitter Box-Brittany Stutes-Pending.pdf Response By Kyle Jones Date 06/22/2026 i1V • _ 521313 ' Ig'„0. NVld V3 � RIV1JAa t/WRId a,, n ,w"N ""�L°"" l'ir�r�@ :t O sI 1V INtl133w553Jona ,,,,o - . S1N33A01d1 d1 1f11d110d sneina A y a .. : I^" S M'� aSYX31'A1Nn03NOSn3a33r'nnRllNlnoajouq mg a ..'' 1 zzoz09 4SO NO NauanalSNa3 E04 a3nssl I § zi co ~Is ,, '- o ti 'i I i I i i� I � 4 I 1 v A ' r', LL �,11 _: ,y4 6V a . \ :it 1 d, A ,,/ II •i .4 / 'Ilk a 0 , q . J �` j/ . i_ .. Y F. (.1-3xos) 1 17 bbn,P4mm,m1.-� I_ I g a II IT ,_ i Iiih, J '6� DPI —l _ i - �''� t i o r Oa-33,11v) 82 . iff '''' E _0,. — __Iii oi i ,' 1 , ' )54 \\ ! v� 14,4 o I�I�I All - N O rJ4t,` �I i ` Al fu //) 1 I a I 1 . a � I. II d t a I i s R a ,3 no:wo:,ecws wasvn smrrtlo[:wwzan WerJAsat ares.Antaifntwolo-ola IIWrmtinr3xw M nj$xvo Inan, nverun t:In am `1 ILO_ (8 d0 E)31HOad Sf103Nt/ll3JSiW '"°'°°"°"""' ",.....""'"' pganwN' N 1 +s..,.9.,, nei lmlu �Mque WNwo9.N 31Y]s L1(Y3A •r_ of •`i, mu-95,IO l>wa 1p� rvsac®it •a v ���0865oi S��S u[[['+rrs'+""s"L`A"'°°°r<[ 1IN7 eeM m N """'"" SICH]utlt� S1N3W3A021dWIdlMManHlav1110d oPIO `ue y; p StlX3!'AlNf107 NO5H3133(Nf1Hiuviuoa i0Al17 11/111.�M 9,=„.41 a a "'" ,,, g.' °a I ZZOZISLISO NO NOLLO(RiLSNOO?IOd DADSSI I a+ g- m- < •6 � • � �I �d �� o�"= ���> c. ag 11 s gr. s o 00'b+n313 6 M I I 01,138.S9 `21 I 1818.611.5 I I I I I ar9+n313 / r i I ! 385 ON9 e: - I 58'FL•61N5. -i w• 1 _.1._ • arb+13 I I G� j z bs99•a VIS \ I I 9S0-.41313 CW9i-L9) i I ; 1 _ i SEL9.8'OS I . OMB.9 _ 1 i[ - OP9+li 1 F3 6ZZ9.8%us I o IIc I I 1, 1 1 I I I I 1 ti ai eO9-•n313 i I 8 T 3 e l 0N38!S9 I I E 5880.E VS I 1 I I I. yZ-'. g 9L'E-•n313 1 I !l 00'Hli rt (10-3]d•L9) r J/ II,1 o 5828.9 VLS 1 1 9L'9 A:113 I I 3 ON38:S9 '//// '•W I IE9L.9 VJS f a 1 - 2 , ,- < L. •SZ.E•A373 n 10-swat C' 1 _ fa-• LL 1n>.'.. SVELMVIS I O,W / z "I `oil 1 f I g 109119E'iSK3 I 1 I I.( II gI Oo'9-+li SSZBKVLS�' i 11 I I - 1a I - , -.FQ e :69'O=n313 I 1 i i O8'9+11 _�e j g 10'9Z90.S5VVsS I :. I ONS¢ 1� I el_ . W Ind i •O - EL'IWS 1T 1 ./ -_. _ . _i.E-jidN o2„-• 1 I1 W2W- • SL'Z+nT3 1 I �j O S ine o 1 1 , 8619WbV,15 1 I it 1 I I ,�7 ti tt i h - - ` aAf 1 _ a 1-' I I •5['Z+li g .5-,M-tl1S \ I (6 W aN s 8 .6fi'9M➢V18_-. _ tt I I i I I.: It I I' u Wf I I-; . -y ' C > I SEE-ell i8 t o i `1 v i a ;Fj 1 ; ; t— " SCE-•li IL--------- i 1 I �,•E.,� i i 1 _I I 8 331.PSX.MIC.95 1 i � I SL E-•li" Y LI. zO88 1 VIS i 1 1 s O.o i O - I -- I - .1 - t se,,,, F N I WEn313 1 g I mite:sr I I I.I. g OE'9B 0Vi5 I J—r__ SZ£ n713 1 I '^ SCE-11.i ON 8.S9 I I I. I I T EEEL'O VA \ I I I I I J I = 1 / J E i o0. mr . e1[LO>WD>Ws V11n15Lb[hs/SIO>•RIu1 b ruLt-tla.1MN\Nz,s Yala^++G.M61l8:ws.rN Iz2uo,....., NOII33S """•""„`ry we '' p I 0 1 ^ ^,"�:.w'1 � ^..s.OM X08 2131111dS S213111d DNI1HJl211 "mom.,°') """'°."".,..""` 31105 "'9 m ,� ••^I oou xiimi oaeMIL Yl4.1.oe MINVH73w 5S37oaa •a g; g.; " S!N3W3AOHd1NI d1MM 1If1HIIIV 1110d ms a4R 1 ` V ^ i,i,3.;:" S101DIN: ''a;, ,;: 3S3311dE syx3y••uNno3NOS1M33r'anHlluV laoa doMD `0.`�' d "" aW...*1 w..,w,`.o,a I ZZOZFJNSO NO NOLLOONISNOO NO4 O3nSSI ,l'-••• le- nt� „II WW as l o. 1 'I ° \ P P L. d lo aF, G —< n. —3 OF g I�s'.� \� .. •.. I I m I 1 ' d W LL A.I // 1 Z LU• 3 Fes-m r i IL o „ 11: /1 1 a . ri „ 1 I I g lil Rio ,,.„ > 311 WW W L. IIIE 9 fig >t 1g Wo -W H 111 r'd Lf I— tx Z W O� Q U. >O -JOa WI—N a ii 6. T. a 5 i W)CP sigma 1danionals 6,16...0 °"'"I'''''N' I MSS VIM' .1-..Nd S3ldlatllD AaVWlad atom : ills Q o 6:T.V.3ua61.1ua °.,A Q 1V INVHJ39 9nm /C • q-.40S1N3W3AOadWIdJ ManHlatllaOd ��':�:i %1 i u.O a al 1.. "".I.,"'a",..�"' 1 ZZOL/9140 NO NOLLONaLSNO3 ZIO1 aanssi J gg Li Z ilL 4444 \\ —E i slh W ri a i.I - 4E18PWO 1 c W hb gn H TT =mtari•w la . I— _, Xi Z-4 WW =zoi I J z aL p:D ,. gl Nod io .i/EP _.. IL H 6Q'. mi, 'Cg ” DI h., E = W- fg 3 11 W rn . u N. 3 W 12 - ::::::::" \ • Q 13 7• 11 • ® Eag-ldild 1 ° 0 3 m� _� I 3a 3 h r. 1---,,, _ 1111;_161 Ge I 1 0 ao'l / r. V n H O ?m 13 h i. Pit.qa 0 w ``� D T.goy a Z O \ Co a '.. . W,-000 il 3: \ wm— - 1a lir / • '1. : \ I'6 (LIZ ..„ 1 1 atc. , lit< c 5 g a J & 1.9 `a s T.S \ r. 2 ry a ...9"6°.51CP...6 114 Silt LCOIMOS P..RA.1 1.PI1.1..0.+••=61 (°..1ST16.1411.10f]V 0 0 0 0 0 0 0 0 C Into O 0 0 0 0 0 0 0 0 to N 0 o 0v an a]0 N InC In d - n o., IS N d p an f .n to .. an O1 In 01 to 1-u., .N N n n O1 N N .1 .5 Q1 e w to w ton N t�Da . 111 ei N ri- I. 0� N .N•1 .4 z o. to tfl to v>V)VI .n to to to Vf Yf U) » U —. 9 41 j O m h . N _ 1 n C M n N . O Z O Z Ya J J 2 I II N A t N O 0 0 O O '^ .0.. O O O O - O N yn, y0„ O a 0 G S is N N O No t°- C ._ �• [1 .-i N mIN C Z ;e 5 « a U tci ` m C W O C :O to C1_ .n.n on. anVl N V .13 0 000 Wa.. C U TN0 n(1t c 0 n Ua > N0 terH h VN E 8 000 O O N 10 L d N N UI N . . . 0 . 0 N N v E E r. ai to 0,� act F F � m m 40 yr m w �c, n j o o .-i 1.4 G S C C W cr A A O .. 0.n Vf An.N 0,N V)K O i mam0 m 0 0 .'3 - ;U: 00, E V ,0 In N h O t o N N 0 To C m C V 10 .i0 tit C v o N(,7 is m `p Ot0 O 2-p Q C O = O o00> ~ N C0 am .- O O t ip U. — 0 Q N a a Ca 'LC. N N 1-a '8 O V (� fnO'O L U.0 _ O « o 7 aO eti i GFN_ O at U >> e o Q — a e o w ti FO. 2 N O Y - m is 0 MI IL Q t>a g m O d o-o t9 L o 0 0 III o 0 0 0 0 0 0 0 CC z o c 0 c '� m Q o 0 0 0 0 0 0 0 0 0 0 m-0 = � -0-0 ° 0..0. ..A to oe-i too 'm to ten 001 ton 0 C n,Wy a m N V in N N tr R n N N Q O O m W O a". n 2 2 N G ✓ 2 I- N to i t!f N a0 ttf NZ m S m m m 20oct E E m N I c o n e ro ro .2 8 o U V 0 m t0i' at. ,i 3.6 . VY V) Y to N to Of Vf IA .n vi N at O o 0 0 0 i pN N ini QO R O i ........ G = In. N c — •a a u o o u :°'0 A o 0 gt O ul N 7 l-L a0.. 0 ~ ♦. N L o = > j O N io C p E U :C c N O ~ n Fyc, cci u m `o `0 5 a a::: 3 trot �a w to .V2.H E Y • Y O h O 03 a a, F. c x 0 L c m L V Y o V Z Y 0 I o 0 3 v ` se, _oJ r s o y - .. ON 0a q - 'co , uS c z.- ra i C. 0 d U V Q Y ti C O W Q 3. 0 O E O U. U in 0 .. = WO 6 Z N IW- o f_� f0 Q Y c O 0 u u I- to W C! 3 a t 8 g /Nc� ~W¢= W ... W U Q c .. d u G W h o a 1- V Q U aL U n s m a d E o u ccw a0� p¢w �0 <Q ' - a may =_ Z� .. t 2a. 02 OvYtao VOM = Ck o c E E't t 0 .. y La t..01, aamN Ca W > °'' Es 0 3 0 O .. W W W v e ei Lt.,. 9 N Q 1§K o O u n O 0.0 V U 7 U S Q f m u u n m .. r Ntrld t/3atf "aa°'�'°m°"° .............0I a `I's`� M=Mrma NOI1d1SLilllldjlflONNW „a, ""M°m"""°" '"xM°a'" I ti:0 H ratnsm+wanwu x., tuanl ;KO rOMMI CM I ml 5 psi ml �R^ TAD om o> e o-J am 0 'y,ri41 �,, S1N3W3AOadWI dlMM aflHl iv.LHOd _ram ma _g "tiy��,=� SVX31'AINnoJ NO5tl3ii3r'NnHLWlaoa jo AID vvv, a ="' I zromiso NO NOuoniusNoa ma a3nssl I r J Q a a o li a!I x CIE§gg ` d J°ilt. : '" �diO Y < / r ( .7 V Q i Milli o � yt,/ z '- I ' it A Rod ` • a WI ` Y _ " ' 2- les.'''. ' ; 1'1. .:r.t. — #„ , t-V 9 Lt k J a f I o i �W —s W 71 oo I m § -- o - 2 a=s g oWgo ERg ( ' I N� andgi tszC 0 Gf 2 - I. ' f .a „ al5 Wb F6 OOU xi isz� gg's ! ? —— — �$ .3 d.o =3 W6a 1. <� �� 1±_ < n c x RA2 g Lid ?o m.o Na. H o=Na. 0. o'CaF5- 2Eg L.. lil F ov agpr WoolnC•. I� loo Wo< 0 ead Y ? ,? b Wps6W. oa _`ds s iiiVi Y 5 � FF 3 i pi Nu oQ V i a* , 2U Li n In tiiu E'3 11oo 1 ` /` m y W r>: A s x g2'41 .gW Wgg Wo F o ha g ! Wa41 I i. LI to . 3 sa ` _ b AY, d Si li 1 a .1' F I I xtoswaaaw.s VIVtrOttCOTAIM Snxl fwaaNm[n.rarn c ___________________ y. O V T.'C� N.n r ^t - :#4 A t, i ngp}�.• 5� t 1 • s Y o , . 4 � Aam kr� .;��fia� ��E� m r " a a) . r .f lk i t1?``' r � 4 a `� ?t '-i Z ,,,,, ii .,,; :71 .� r;�i 7 K, A $ tr�F W i5:,..,...;!1-,!,,,,,:.,....r,,. ii. I.), „ , • ,.4'� `L • 1 LL e w `N..,. W I•• F 5(S A 2 �) rt • c .t.41 1 •`' Zvi ; , t • �*,4'i, mac U 1 s.'• �it . -Z/� i I..- ' ! � l '> t i e n }, 1 cm to3 c C a w \' 1}(t rkI LL 27 Mry co c N C L a R •X O O)m c c m O. m enO) C •o, O. N 8 a o o `05rno N >m m o m E E n a)" 3 y E c a > co d C o 2'N O C CO Q_' O m e E.O•.o fx c m c o � C d l A'- vC C C �rrF a• � 3,R' ;4 '• , ft' m�r,.; � y�- ' ,, i'� < � W J R � •, Z$i..r 'i! ,I.74,.. 44r W a �^' r,t y 6 y 1` F .•,,. t ^_ �1 ','-, i,i 'ice 4 -a,. . i v• L.,1 .0 `L'L4._ , ', ' ',.. , ' _= r, - - —•.,—ram ,.i:,f._�u --f•� �• y, - _ �-� : `fir. 1, r` h pA:.�y L- n 3 r;,r m 1"; .� 7 I j _ m= C. �4 .,Ytiy a ". ❑ d ,F CC O �C�71 -' � .._ t5. :° tea_ 42:1' `' ' 'z a) N c9 C t tz • •o o m CD a CD <� �a r:; C ,p, t • a .x l F sk } :rt.;,; }� fi a. > `o a s° o , Ob E5m.oN . a. r tt p • ii,u ., y , -t-1•4 • z 4 t. 4 C 4 t.4! 47.)' ' ;Vl - 3Sv:%ti71 ♦ q SS j'6' '� ram``.l\ ' 4, r • "� �k „. i ;tr., yF t '-y. �i. I ,,e n, .gip. ^� x. ^'i-7?• i•i.:.�� as-...,iP ,� �. c. �_ • 18C1"di lit.' 1 A-1 Maida Fence Company Estimate 4790 Washington Blvd. Date Estimate# Beaumont,TX 77707 5/4/2026 6893 (409)861-1144 Name/Address Ship To Allco MOLS PO Box 3684 5436 Practer St Beaumont,TX 77704 Port Arthur,TX P.O.No. Rep JW Item Description Total New Construct 151ft of 6+1 9 gauge chain link 10,997.00 1-3 inch tie in 1-3 inch terminal post Remove existing fence 1-40ft double drive gate 2 inch frame 2-8 5/8 gate post 1-21ft double drive gate 2-4 inch ss40 gate post If we replace an„hish i,.,total of 6MR price is$22 997 00„hick incl„des gates Back fence removed by Allco THANK YOU, Jason Wood Subtotal $10,997.00 Sales Tax (8.25%) so.00 Total 810,997.00 ll CO Design Build. Construction Management General Contractors P.O.Box 3684,Beaumont,Texas 77704 Phone:409-860-4459 Fax:409-860-3857 Email:allco@allco.com June 10,2026 Freese&Nichols 10497 Town&Country Way,Suite 500 Houston,TX 77024 Attn: Kyle Jones Re: City of Port Arthur WWTP Improvements Project Change Proposal—Debris Removal @ MOLS Wet Well Dear Mr.Jones: Allco proposes the following change order in the amount of$19,550.00 to remove and dispose of debris from the Main Outfall Lift Station Wet Well: DESCRIPTION/COST SUMMARY Debris buildup in the wet well is causing issues with the pumps.It is recommended the debris be removed to ensure proper operation. The scope includes removal of debris with a vacuum truck and disposal.If larger debris is encountered it could make removal difficult and pricing may need to be adjusted accordingly Allco will load the debris into a dumpster and haul off to WWTP;if any special permitting or fees are required then that will be an additional cost Time Extension—TBD ITEM LABOR MATERIALS EQUIPMENT SUBCONTRACTOR MARKUP/OH TOTAL Debris Removal @ $9,750.00 $0.00 $7,250.00 $0.00 $2,550.00 $19,550.00 MOLS Wet Well Please contact the undersigned if you have questions or issues regarding this matter. Respectfully, Allco, LLC Brandon Harrison 0 0 0 0 0 0 0 0 0 t!n� [nn I o so i Of N N N$voi n y uu'i Ill N U1"1 N ei f.i F 1 x y •ei .0 F- • vs.vs NNN vs. NN VI. N N y , 0 N N a In a E' Cf c z t '4 LL c 0 Vw o 0 0 0 0 „ 0 ~ _ ~ V.a a` o 0 0 0 `o 6 o `w•g a c c u u 3 oac auusIsc O W u NNN N NN VIN U O 0 O N E • O O�ten I= u a a ,> E U O' O" W in vs vsW 0 0 0 .0 lU c P « au E _a _n= m o N 0a W W ToA O • Fvs ifs vs vs.N vs. vs an CI - I I D G o m c _ a c T., Y n N C oCI 7 al 0 O GL N 2NN a�a n I` Y. o f a e o o • N F T. r 0 J 4 No o m am u ,U aL h c_ u « aN m t j o ~ m m o u Vl m 0 a o _ m 7 u In O cc Y da ' ul 03 a a� 2 O an z a, Q z `o2 F. 00 0 00 0 ' 00 00 c c c a' o o ei . . 00 0 0 0 00 y,J '�a O in O N N N W O m O In In In O In N `n pl•- — U N In In N I, N O M In V a« d_0 2 P. F u1 tO j0 ra Mf cri r: N a Z o E m Q a`a m m E '� a N = • l e-o o c 3 3 �n U '� «`m_ E ot_i o V O m C Vf N N N Vf Y N N N N vs.vs. N N o Eats 1 o0 01 `o .; A 1 N N T O G C O O Cc IL O x N N x C _ n aaiu 0o u ?a o `o .« Inol - n o d 1- 12 TB" > > a-2 «F c.. O o—` O c om S S E c I CI E o u o co 3 voi 3 2 Ea .'n-I g; E - - 3 3 a 0 4 a, v as O C E t al c H E a t C. _c u Y u Z Y OIs «a O 3. v' It O'2, aI C 3 '0 G4. 'n - a ▪ o a al 0e0'a ' ,`u O `u ri¢ Yli • m it: a, - E Q 0 laQ g 0 u C _ U H 0 t e E d x >Y Y = UI -- t C 00 0 Y 3 v f.. 8 .7...2 c` U W� Wa�a1 _ - v E 0 re LLz2u au v e n E Yi .. E « m'n> >>Ox 0 E E r E d ' m ` c 1°mac 00 - U " c da Er ;aOu U0 u • -.44m Lo 0lo cs aam.. L_ _ .. , ,,._.�-.. _. _ __. _ 0 ' o . 6o o ' o .m n Z. '9 0 0 0 0 O N 0 O I-W N m 6 16 to ,n N NIAN N N V — — 'O O 2 0 0 C7 6 O C h 0. a Q a 0. °o. z° v — — ° U F° t; ° O o . 3 , o i V. N E. :° :9 v°i t°i ° 1° -_ `o F I- C Ld `o `m 2'i a a o o m a ` S o 3 m c w "aI ,o u c O W S an. NN y N Ij 0. a a8 w • w o ' • 0 0 E E 0 0 0 0 o p o o o E . P`= oo w o6 a O.C N 0 N 00 a GO E 9 9°, 6 6 m W w w u V O 0 N tn..0. ?In 2 a — — s o - o L N m - G O C u m - '-° t w G 0 o 2ses .-.to N p[ N o f 2 o - o "O co. N N V O A 10 E G ° NO G N F a., O 1- O ...Ia..- .O rt1 r.� au-. .O..E re.1.- ..a. — u w Q rn ^I L.', 0" c o c c vi i F E p _ Q ulna u 9 - - .nX a a �:° n- �� —� _ 2 2g �2wa �g• o > E W m , d-,0CI ° z ° a. n o Lt E — — z 5a ca - o UJ o o o a_„ m m o0 0 0 ZQ ,a-E u `rn . E `o a _ 'm vI o v `c o `3 m U 0 .O-.N G y u a .u O m t. y t/f VI,N -leN.N N.N.N N. t0 N r ,--.— E 01 2 o ° °1 p K O 3 R T T Q O ti W O S _ E LL G O O . y 0 S ,S N o- N -. o u — — o v 1O v - a `o m S II o v 19 r m S "S a t 1°- c E m U S 2 W O g W N C p vI ,. 1-- E a ou E G co O 6- .2.I_ u- S O• O m w H:0u E ..le x 3 3 •a U s a o o ISO jE `_ o N ' 7, C G i ' t u Y U ZY O v� 0 3 '^ gu 3 o s .o.a 3° oa `o a a¢ `o `. _ ' A �'� ofa '�.° a "m il 2'v¢ Y c G 8' 0 Z _ E UI 'a n E — `m - o - m m y `3� G G 0 N a _Tsi o S n-^-u r n n o 0O v cV ° eo ° au a ,I-v5cE t g a ` EEL E- m` no and I.-. m „. o E` d o a 0` u uo t7 1..nm m0nmm.. aura Ammer STEWHHT STFVEIIS®11' Rol ls-Roycee Date: 4/1/2026 Quote No: GG26-0401-ALLCO-SVC-1 Customer: ALLCO Jobsite: City of Port Arthur P 0 Box 3684 Brandon Harrison Beaumoont,TX 77704 5440 Procter ST Port Arthur,TX 77640 409-860-4459 I bharrison@allco.com Subject: MTU ONSITE ENERGY 574RSL5082 900 kW Generator,Serial Number WA-579413-0911 Stewart&Stevenson Power Products,LLC is pleased to provide the following service proposal for the emergency equipment located at the address noted above. Scope of Work: Travel from S&S Houston to jobsite(address in header)and assist with making the necessary connections from customers new control panel to the existing MTU gen set controller.We propose two(2)days at a daily rate of $4,000.00 per day.The day rate includes round trip mileage from our location to jobsite,travel time and nine(9) hours labor to install and connect relays,create programming and test.Please note mileage and travel time may be replaced with perdiem should the tech choose to stay overnight. Item Description Qty Total Price T&L Travel and Labor 1 $7,697.00 S&E Shop&Environmental Fee 1 $303.00 Total Price,Plus Applicable Taxes: $8,000.00 > Payment Terms:Net 30 with prior credit approval. > A credit application will accompany this proposal. > If you have an MSA please provide. > The proposed amounts do not include State and Local taxes.If you are exempt from these taxes, please provide a copy of your exemption certificate. > All prices are subject to change without prior notice due to unprecedented steel surcharges,trucking prices and/or unforeseen economic circumstances. All sales are subject to Terms and Conditions of Sale,which can be found at link below and which are incorporated by reference into this document as if fully set forth herein. https://www.stewartandstevenson.com/terms-of-sale/ We appreciate the opportunity to be of service to you. Should you have any questions concerning the above,or require further information,please do not hesitate contacting us. Sincerely, �albe 6rn7_,vl'laln Power Generation Service Sales Stewart&Stevenson Power Products, LLC Cell:(832)690-9037 Email:gabe.guzman@ssss.com Acceptance of Quoted approved by: Date: Purchase Order#: 8631 East Freeway I Houston,TX 77029 I (832)690-9037 Page 1 Brittany Stutes From: Brandon Harrison Sent: Wednesday,June 10,2026 1:22 PM To: Brittany Stutes Subject: Fw: Re: Port Arthur WWTP-Main Outfall Generator Attachments: GG26-0401-ALLCO-SVC-1.pdf Thank You, euudo t q4't cd ut Vice-President Division Manager—Heavy/Civil ALSO P.O. Box 3684 Beaumont, Texas 77704 Ph: (409)860-4459 Fax: (409)860-3857 Email: bharrison(a)allco.com Forwarded Message From "Gabe Guzman" <Gabe.Guzman@kirbycorp.com> To "Scott Giovannini" <Scott.Giovannini@kirbycorp.com>; "Brandon Harrison" <bharrison@allco.com> Cc "Jeffrey Hixon" <J.HixonPkirbycorp.com>; "Kim Standifer" <K.Standifer@ kirbycorp.com> Date 4/1/2026 9:16:35 AM Subject Re: Port Arthur VWVTP-Main Outfall Generator Good morning Scott-Brandon, I spoke with Jeff this morning about what is needed at the City of Port Arthur WWTP.Jeff has spoken with your onsight electrical tech about what you are needing in order to complete the installation.Jeff advised your tech that a various relays need to be installed and wired up to your new system,as well as creating logic to make the parameters that you are going to monitor function.The parts(relays)required are on Jeff's truck.We can get you the part numbers once were on sight.I apologize for the simplistic overview but the easiest way for me to explain what needs to be done.If approved,please sign and return our proposal as well as a payment method.I have attached a credit card authorization form as well as a link to apply for an account with us in the event you choose to do so as I am not sure whether you have an account with us.Do not hesitate to reach out to us if there are questions or concerns,and I will be glad to assist. Jeff,is available tomorrow and Friday if you are interested in getting him out there ASAP. Be advised that Jeff is on vacation all next week per our scheduler. 1 https---na2.fisgetpaid.com-ngetpaid-#-cmapp-createCreditApplication-x=84&f=52&c=1- solutionlnstanceGuid=kirby Regards, Gabe Guzman Power Generation Service Sales Stewart&Stevenson Power Products,LLC 8631 East Freeway Houston,TX 77029 Cell:832-690-9037 email:gabe.guzman@kirbycorp.com If o r AM NI STEIUMITCS7EVEMIT From:Scott Giovannini<Scott.Giovannini@kirbycorp.com> Sent:Tuesday,March 31,2026 4:26 PM To:Kim Standifer<K.Standifer@kirbycorp.com> Cc:Jeffrey Nixon<1.Hixon@kirbycorp.com>;Gabe Guzman<Gabe.Guzman@kirbycorp.com> Subject:Fw:Port Arthur WWTP-Main Outfall Generator Good Afternoon, I was directed to reach out to you in regard to having some new Relays installed on this existing Generator in Port Arthur. They have already been in contact with Jeff and Gabe, but the GC just called me asking for someone to go out to the field or hop on a call to get everything installed. Are you able to help with this?The contact for the GC is below. Best Regards, Scott Giovannini 4 /469ff Application Engineer I Stewart&Stevenson STE(IIBRTSTEVEI1SOIT P: (214)776-6046 I E:Scott.Giovannini@kirbycorp.com 1631 Chalk Hill Rd, Dallas,TX 75212 2 Commercial&Residential Stock Generator Sets Available From:Brandon Harrison<bharrison@allco.com> Sent:Tuesday,March 31,2026 3:40 PM To:Scott Giovannini<Scott.Giovannini@kirbycorp.com>; Daniel Nunez<Daniel_Nunez@w-industries.com>; Bryan M. Hernandez<Bryan_MHernandez@w-industries.com> Cc:Brittany Stutes<bstutes@allco.com> Subject:Port Arthur WWTP-Main Outfall Generator Scott, Just starting this email so we can coordinate together. It may be beneficial if we all got on a call to discuss what we have in the field and what we know is missing. W-Industries can talk more specifically on this matter. Let us know what works for you. Thank You, etagdoa ` evor flocs Vice-President Division Manager—Heavy/Civil ALSO P.O. Box 3684 Beaumont, Texas 77704 Ph: (409)860-4459 Fax: (409)860-3857 Email: bharrison@allco.com Links contained in this email have been replaced. If you click on a link in the email above,the link will be analyzed for known threats. If a known threat is found,you will not be able to proceed to the destination. If suspicious content is detected,you will see a warning. 3 Brittany Stutes From: Brandon Harrison Sent: Wednesday,June 10,2026 1:24 PM To: Brittany Stutes Subject: Fw:Re: Port Arthur WWTP-Main Outfall Generator Attachments: 1000008940 jpg; 1000008939 jpg; 1000008942 jpg See below and attached. Also attach the picture w/change order. Thank You, Sn'4tdel atni400t Vice-President Division Manager—Heavy/Civil ALSO P.O. Box 3684 Beaumont, Texas 77704 Ph: (409)860-4459 Fax: (409)860-3857 Email: bharrison(cr�allco.com Forwarded Message From "Jeffrey Hixon" <J.Hixon@kirbycorp.com> To "Bryan M. Hernandez" <Bryan MHernandez@w-industries.com>; "Brandon Harrison" <bharrison@allco.com>; "Gabe Guzman" <Gabe.Guzman@kirbycorp.com>; "Kim Standifer" <K.Standifer@kirbycorp.com>; "Scott Giovannini" <Scott.Giovannini@kirbycorp.com> Cc "Aaron Gauthier" <aaron gauthier@w-industries.com>; "Daniel Nunez" <Daniel Nunez@w- industries.com> Date 4/15/2026 2:18:56 PM Subject Re: Port Arthur WWTP-Main Outfall Generator Update on engine not starting found that the fuel supply hose was cracked and dry rotted had to go and get a new hose I also installed a check valve on the fuel supply.The hose being cracked made it lose its prime and when it was trying to start it was sucking air into the fuel system, I primed the fuel system ran the engine for 15 min and took the fuel psi reading from the engine ECU and everything looked good no error codes on engine ECU please see the pictures Stewart and Stevenson Field Service tech III Jeff Hixon 713-874-7648 1 n -",F,-7-"-7 ..-7..-.,. .., , ...'--- .....-,r .... ,,. ..,,, " .- \. 3t,-, cf.,.ki; ',:-.'' -74.17':%f-,.._,.. , 1.,-- • • ,.. .- - -,:,--,...,.- . -, ... . ,,,,,,,,.., •- ,z, , .., -,),- • • ,.$. 1 --.-; • - :-fe-r- is;.': r..• ' -/!t''- s' ..1', ' " .1,01k.f:, • .. , , '' ,r.'1.:,'..--•,.: . •• ,-, .,. ':'II - ''' .'' ' - ' • .1...-0'---.'`1"'.,..0.,"‘\"4"•,-..•L,-,1,,•,, . . -...„' . ---,.. ' ' t .„ ,. - . r-.,. •-,._.,!,..--.,.A- i...,.._ ? ..-, ... ' ' 1- .''. i'.--'cie.,,-1/44',. f'•f,, -.. ....., ,_,:,......,,.... •,,, - -.4 '. ' '.'' ' ''''i.f-LC-ii' ' ,-. -- --, -__ • ' .:',. ..1".":,:.til._,, ..,,,,,,,,AL*, 1 ' •'',, . , ...'';..: * . i ,„ -1...i'd...') '\,',,' ,,,,, ' • " - . , - ----,-..,---- \ '-'4,7``L.r,v,',.51N-W-,?, ''' 4* ;:ii;' * * -' ' ''.1''.':,--i.•"Atet.4kft.i,. '''''1*#41•-..":"'-'.7.'''' --.,- •• •ii:••#',. ,, .i„.*..-.....,VEici,,:.7• , ' ..,; ,_ ,-..".P'7,-,421-. ''' ,.. .. . , . •.. • ' ,,..• IIISC'L*- :- '''• . . • ,,,,..10.,,-- . s .- .. *-•., .- -•?+•*-ai.....--,--•'-n--' m - . . 4'- •',.1/4' - . ' t•-••7't - ''' ''• „ ,••", (.'...",-t.•;.•• i '-`,,i, • '21411 4,,... .:,3.s, ''..i, , ',.-.." •„,.. .. .- ..,, .._.... .• ., . ,:. „ '../t14:'• :.....'.'' .,,_.', . t'• It_. 1.....1116‘*.'. " ••'.... •,,,,,.,•',,,, .L..v,, ,s..•"- '•-•. ,..„. ... • A.:-, ,,„..- ,z41,,, ,••-,..„, '-. „:' , *. -- ., .. 454* 4, -...--:•-•-, 4,,c..* 4.-- ' ' . -tti, 4?A,,,, • ,..,.. __—. .,. - -- -_.. --..-_•,,,,4,t:4;1*-4 .....,,,•-. -. . . -• H., irk (,• • --,---,,,,,,,,,-.„),.. • -. ,K''''' '-., ,,,,,.... .vi.- „... _. . - • lk ' !...,,'.."YN'-l''k ili'. 1,,•,•;. .,,,g-,-,.% *,,..;,,,,104...,,, , --•• ., ' •-,. i .. ''' ''.-7-'," 7t,____'•int-1-•.-..\ c. .., ,.•-•' ''''• - - •.--,-- '.':,....-4.,,-..•---...=.. ..._„,--i.b.,•••• ',. _ '*--' __,, •;., .2 fr • . i:'••••"• ..',..• •),),.). . ""•- ,.....Q...1 ,-- -- ... -'• '- . . '-k---2- •,4,.... -='-". '-,,•.''..) i„.-4 e.i..., -..1.• :- .. ....,„. 41. ..,, .....,•••,,, _. - ..... --;,. .,,,k .i-i'..j. ,....-k.A.,,t,,,' I tvit,., . ry,..,-.4,,,. :',.. -.!., ' -.... . • C i .4,....t ,L . .% •. -T'--.,....F.e.4 c , _„ '':•,... , '.,•:,.,- ?.:-.•,',.. ' -Q..i,.., ..'.' . , . :' -k,.!:.'•... ....4"' * 4110S4 ' -41-4141P- ' °. - --''''' '-,- 2,•'".,....-•••4.'.•'-: -..- .. •- 4.k. • k_1.•••• ;..'' :r'•'P:-•1--"-11•... .-t-'' . ...,. :;•:-.• •'''•'••'4- _ -.. • ,.. ki',..„•,',.i• , .... 1.•..,-•..-,Ah„,-..,4P-..,, . '-'-'• •- -Y-• ....;-':`. ,i '•";,...„".i,i-';•-'''-'-':i.---). - : ;i.;•--•:-...-, ...4'...;..-- ' '.' --:,•-- .....,..0„ ,- .._.- -,..,,,,,,,,,I, , - -',-;.., A-t;. . ,, : .,,z,.;.•--- ;,#;;12.,--.;.‘3iiiii-...,'...?: .........i.,-*.:,, ..-...... ; ' -:. i Jac 4,,t4-*-P'''''ir-;-''•'N'-'•`'.."-??`..."':.-- ' . .•1 ',..;.:...-•,. --•' .•,`;.- .4.- ..‘-2t-- .- '• -'.. : Vi- .;,•,..-A.-.0.---...:.q.,•=-,„.,,-4,,,..f_, ._,4 , .1....,1 - .••'.1... .r.tf• '''''- ,."7-c,-- .4.2 ...!•tt.'... ..."4? - - -•'?F4.7----.•,-.' ..-..• '''''''.4. --kk •--,;.--_, \f,!, -T'•'.r-'-*---; '4w.,.'..- " ''.''---.Z" .., ‘• .":1!t•."-.-.; ...:P-....,.. ' ..• =-11404iiii„- •.,. .. , •14)?..J!" " .f.'1 4.4.4 `:?, I."- -',-; ‘' se•ti.3,, .-',----• .-• ;-•:. 4.-•-‘-‘4,,;-„.÷ ••• V . -1.,* .... . .- .:. ,,A',4. ., ', ' .'' .. '1,44 'I, 1. . ' -4 '4 'I, 1.,b...-‘.--•..7." \i, ,.,..,''At' ./..1, '.: ..,:4, ,• ,... t'i--.. .- ..„.• , • , Ilik ,,,,, , 14- 1 '--.'-•*'.... • 1-. ''' — .1.'• ,'", ',VIA&:- ..-,,-.'••'.-' ; 7. 4 ",,,-,". '.,••s4.4 1,_,,r'-'s .••'' -.-' ., ,: -4....., .,.. •'*".:--;-,-,,,.'•, -.*P.: ...h,„ , ......„*. WX''. --,;/• '.• -..' . ..: r- :VA-s.:_L ; ;,...:,- , ".;-, , -, ..-, - ,11-..t:.. • .. • , ..- ,,-, Lr 4 T„. =4'.frel t''''.;.': . -- ''' . - s.' Vy • 1 . *,:'I --• ' ....,...•-- ' .'''''. -',,,•4 *N /‘, . '.: :.. . '- ' 7,' ' •''' ,. ','.' 4' :' ';-' . •'e...r- -,-. --''. ...' • %-'3 ,.. ,, .. . \iet:W*I••• 11\, ' , : .. tiii4,,,,-•,,,•••j,..., . . . ,., . ... 4,, 14' • , 't' g-' • ;.' e' 0. • . - ,.. . ''' , .4."-."1,0' • i'-,., .', "-....; , .." • ..,- , - fci.-• f . ',. . --NT`,ir• * ;:• ., ,o, - t,-;,. i'' 4,.." ,4,k,:'• , : W ,..t. 44: -:.-1 y , . .1.,, ,..,•••• ,. , . 'i• If'' - ,,•:., ,r ,-,.#:-. , b '-,),t. ', ;...,..r..7.., \ - ,-,• • ,•-',,e. - ., ... -.., :•'.1/4''s-' .41$ v -' . " 4....?..,:4-••"•• '...,!;'• ."-",;..21t. • ' -44.4.,„,,...-.4. •4.- - .. --.A'--- • l•-• A-,, '.',"-,;, '''.:•, -•-4.., -f. .• ., ..? . ,,,.-„,,,,,, • ,,,•if J,--,' , ii , ' •••• •..A, x ,.. , . -•••. .• -•- ,g,•,. 7 " .'•-Al.'-'.* -....1,'.:.'*'''' ,'' *r:.. • . . ., . IQ k., -b'*.-''''t.-,.A..-.4.11,..,,,4.:,,1!;4•4•1.•,:•4,.9.)_.4-'''.';••-,••',.."V14:.1c oi.f'0 r,..'4 o;.t1'.,c,s".k.'.4-,-••-4,:,,,•;.,;,r;'.,.',1s-'.,, 1.i:..,4,.1,•:.'r.:N,-.-.,z e,4'.4'k..";',',,,,,,,,,,i4,.,,-;i'-'t,•.'.:...,.''.,-Q-•''4.'4',V,...1=-V•,•...4'.. ' ,e . 1, 14 ” r E„'''-,'"',,N'''.'-,;-`:,.-.1,4,i.,',.,,,,.',.'•,'.:-'',-.,:7_•„.,4.:1,-‘'-,.\'_4'•l04,r,,'.i,l Fi.,,:.!'.',',..'7,l-,•.i4t•;- 1•'4s, •.1e5,7.i A,,•-.•-•,,,, , ,, --7 . - ,,..,. ..••:. . ..., .,. "-•,. ,,''''. 4..,.C.,0 *..E,.•-,,A.•..•...•4,,,,',-,r-_. .r...' ,..-..'.,.-.9;,4-.''.1„.I,r',,,•:*4,P,,,--.,."i4,'4".i 1.ti0.....t,.%;,..:-I:'N\,',.‘,-N1,d'1,i‘,:„,.k.1,.,0,..,.',..*,•''.I...Y..4,-z=,.,.•;,-_?0:.).;,•LA:.4.•-,,:,_A,,;':iM;l..'‘..,'N.lt,,C''".'„..•.•.-...$,.7tv`,‘"-4-'.t..',f-,V.,v,•." :_'t'.,,-.'•-', A•,‘.m.-,,'‘.."'',,7`.'4.4,1A.:'-•,.,,‘'',`-.',',il:-yO,il,,,'t...a:•.,1.-:‘-..-..'..,..;,',>,--,*.-'..„,a'.,,:,`,tN,3,!•*.s..'''-/.-',-',•.,.-.4•.,•,.•,A-,t.i7:•.`",•7.O".,`,.c.„;4..;'',,V,4z4.,.,...4,tr.,.v.,;,7...-..e;',NcP!..,t.f4,,,':s h,',.•,.1.te.,•4.'.*_*.".-,..,•,.--..*'i:..:k.:.t.,'-•-',k-•-,N.".,t-i0:1'.,:.:..) ,, . - 4 -k Ak .....::.:-!%.....11'3-•,i.t%•.w.L2 ;*-•!.—,; .,.;-.',,•;1•;0•,..'.,•4.:' • ' Sif(P1 t�;y r Ird * a / ,----- '4411141,..., ....4* • •W a 4r \ "ice .M` `j z. 4 S .., 0 7 A& PI h k\., - ter ' • e r • A. a, r ;pf'q x � �i3 tF$ 2FK .�1g ,( • • ,'! • ..G� �: t ,fix / j N • I ,„. fit ' T q+ it 1, ., • ` t YJ yC f • - p �� '`- rr. T_ \1 of ... 1 ap, #� i S • si' • V;L i b 3 . } w al l S , 4 40."--, .,_.,--,...,-=',A _ s + .� 1- n. V y s R • ♦ £y, .... \ . . 2.. fit.. f rC 8 88 SSo8$ 8 S o o $ O 66 8 C O O Ci O o O 43 a ` $ .4 QI •^ mi n.p-1 m m.too N O o 1� m m n O N r ~G m C7 Ol . m N m . t . 0 N mX N NN NNNNN N I N Vf N N- N N N 8 — — _ .O 0 1.y 0. E. i a .. e z j .� m m N o z " zta — — — — fo LL ° 08 a to oa — oS p0 0 1O .o is Ti $ to- O .a`•,N U ........ R N f L� .`. „, d« r 00 of N N Q. O C 6 m • •o W U m..." N InNN m m u 0 0 0 o. E N m $ F la .N N or cr 0 0 O n K . . . o • coo - E E E F E n. a m m 2m . m O' 0 A A ,_ ,� p F.. N N N N N N c 00000 O v cu Tir 0 0 0 0 0 oaoo•o 0 Fo- a 3 C o s— Vv m C N = m — mi O u $ to :; ; @ '" n a It -8 `a. .i. NNNNN N NN O O — m E.- 5`o c oo,00 o .'n� N Q 0 gn pot'm a v+-• 00000 U a r c U« m\y o.n n•n as o— m;a .c o d a am 11 r= .min m •n > r_ �N Ce to fro g fro•Z 22 C NNNNN _.N _ W N ti F 12 0l W 00000 _.— 3 y �'.v .ti.-ioomri .*a O vn V ' al„i; e2 IV — a 01 O oi' � ��, — !d a3 0 0o 8 $ $to $o 88 $ o 0 m• i us p O nI D qF 1-I at 0coO V'an N N In n Q « O m ill [Y . • mNh1NNT-1 mO a nIaaa EE .V im.'oo m n«d_ C O U0mg y N N N N N N idN N NNNN N N E0U . m o o 8 a 3 a O p o U- Q C = N N N = C - a U p O — O 8 ,-. — 'O' O C ; R N 0 ? m= O F ` U = = N j ill0 d •a CO O E o o n F u u 0 3 3 la d o c E `o `o u Y. C C V1 E P. I.T. O < O O r m Y U U lh0il = Z a 3 e v<i z cmo G w¢ G r - u ."m. w n a t c .y a V Q c 0 1' w Z a V o o E 45 . U n.n. Y u z z W z -- .. W V a _0 3 0 < .n o• f _ N << 2 z f O N Y w mq < F"w �o-- H < = < < v �, C C O u w m N < N m 0 - r @� �z �gamo z @� Z�au 0 z @i 75 gear: u II _,5 7o.w-. cacm nv<iv<i� am o a 0m. E`o E ?; c `t>' o u .O 3 C Er 6G U N 6 2 .r...m“.0 m o... f""--WM Y9,HM$mw R�PmuD.PHQ ,.—nos 1,MA e•1 ep GG..a.uLN..�W c tax-{Pit_`4 :,, .EEt1.N,VN..1 21313 W StlM St1H ,a„TIMM 311Y1 E'ON WWN300Y 1 C ^if 6OE6t I AS oar non1.4EE."w..tt 11/7INVH73INSS33011d Ham ..,, m ':,;i.3 1.000I 35913 � S1N3W3n02ldWld1MM2lf1H121tl1210d u,1ro W� 'Oi.""'1>;_ SYX31 W.NHo3 NO5N3333f'U0H1NV 1NOd 30 AM 11m wmn. u.a 1 u my a.n Si. Gu. "' „:0' ";"'""' I ZZOZHLISO NO NOI1OINII.SNO0 2101 CIMISSI I " c. --^—ONE----ONE----ONE----ONE----ONE--- -OHE— --ONE—---ONE----OHE— x x x x x z x z z x z z x IO•1WVz 10-1W-K ICI-1W->L I I � j II I I i 'AC12).— H ,,„ . I �I11 . / 1 D g I p u WI D i. g ii - z a 3 I ICI g 0_ t7 ... U [i II - cc a t G z 11 ; E�� I11 ,� 8 D 2 (21 I . i 1 1 IIII W s I D ab 3� l i �I � I 3 II'Iillill I p rq> 7...: - I uL.H ou (j r "3 j is e c 1USW L1 �� ,t rr III 11"i { — --- --I-3 — - tJ ' m (IO-31111) I I I • Z o Et 1 E�Q�) 1 • I as m/ •\\\........›............ I 5. 1 5 I g1 4 i 5- D o l gN 1 CT:. , 1 . D FW < u ro.�, E, 1 I . �D ]—— — Ct1.3]dQ> ——— -I [y 111111111I Ertl . I a 1. RWWOANW.E n,EFILlWVWi13H+R. Ewp'3d1d'1dSYE-,E1WW1W3imllwozl�.vlv Aeration Basin-Seat Off Gate&Pump Down Basin See drawing below for your reference. We will first need to build a berm on the backside of the aeration basin to set up the long stick track hoe. Allco will then seal off the effluent gate by installing a'h"steel plate w/2"foam board with our crane. We will then use the long stick to install approximately 1,200 sandbags behind the steel plate to ensure the gate is properly sealed off. Next,we will set up a 6"pump to remove the water in the basin. No sludge or grit removal is included. At this time,we can perform an inspection of the diffusers and air piping to determine scope of repairs. We will remove the sandbags, plate, etc.at the City's direction. Existing Slide Gate-Does the City want us to attempt repairs on the gate while the basin is drained? Do we want to include a contingency amount to address the gate repairs or replace if necessary? It is possible one of the ide gates not used at the Main Outfall could be installed here. We will not know for ce in until we pump down the basin. This proposal is for installation of the bulkhead and preparation for inspection of equipment in the channel. Repairs will be included in a 10' separate change proposal. 2IN FOAM 1/2IN STEEL PLATE ,. ... . ... ... ... . 48IN SLIDE GATE • koolietd SAND BAGS Exhibit "B" (Contract Status) Contract Status Contract Name: Main WWTP Improvement Contractor: ALLCO Contract#: 24-021 Original Contract Amount: $ 73,643,227.00 Statutory Range: $ 18,410,806.75 Pursuant to 252.048(d)(+/-) Amount Percentage of Percentage Original Contract to Date Original Contract $ 73,643,227.00 Change Order 1 $ (6,234,049.00) -8.5% -8.5% Change Order 2 $ (73,564.57) -0.1% -8.6% Change Order 3 $ 114,851.00 0.2% -8.4% Change Order 4 $ 389,801.00 0.5% -7.9% Change Order 5 $ 1,118,591.00 1.5% -6.4% Change Order 6 $ 805,251.12 1.1% -5.3% Change Order 7 $ 357,699.02 0.5% -4.8% ?Change Order 8 $ 458,175.02 0.6% -4.2% Change Order 9 $ 286,459.25 0.4% -3.8% Change Order 10(proposed) $ 57,268.43 0.1% -3.7% y Y Total Change Orders to Date $ (2,719,517.73) -3.69% New Total Contract Amount $ 70,923,709.27