Loading...
HomeMy WebLinkAboutPR 25059 EASEMENT AGREEMENT KINDER MORGAN PIPELINE COMPANY FOR THE HWY 365 FORCE MAIN REPLACEMENT PROJECT Croy of witort rthu�r Texas INTEROFFICE MEMORANDUM Date: July 31, 2026 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: P.R.No.25059—Executing an Easement Agreement Kinder Morgan Pipeline Company,LLC,for the Hwy 365 Force Main Replacement Project. Introduction: The intent of this agenda item is to request the City Council's approval to authorize the City Manager to execute an easement agreement with Kinder Morgan Pipeline Company,LLC for the City of Port Arthur to acquire a 20-foot-wide permanent easement and a temporary workspace over the same easement area, for the purpose of constructing, installing,maintaining and operating a sanitary sewer force main along FM 365, for the total acquisition cost of$26,173.00. The temporary workspace shall be for a period of twelve(12)months. Background: Pursuant to Resolution 25-050,the City entered into a contract with ALLCO,LLC for the Highway 365 Sanitary Sewer Force Main Replacement Project along FM 365,which involves replacing the existing 8- inch force main with a new 16-inch line to convey flows from the Highway 365 Lift Station to the manhole beyond West Port Arthur Road,spanning approximately 9,300 linear feet to address the critical conditions that caused multiple overflows and TCEQ violations from 2020. The City needs to acquire a twenty-foot(20') wide permanent easement and temporary workspace over the same easement area from Kinder Morgan Texas Pipeline,LLC,on portion of lands described as Lots 6 and 7,Block 13,Range M,Port Arthur Land Company Subdivision,Jefferson County,Texas in order to continue with the sewer main replacement work along FM 365. Kinder Morgan Texas Pipeline, LLC has agreed to grant the City said permanent easement and a temporary workspace over a portion of its property to construct, install,maintain and operate a sanitary sewer force main,for the total acquisition cost of$26,173.00. Budget Impact: The total projected budgetary impact is $26,173.00 and is available in CIP Account No. 405-40-000- 8516-00-00-000,Project No.WS0012.CON. Recommendation: It is recommended that the City Council approve Proposed Resolution No. 25059, authorizing the City Manager to acquire the Permanent Easement and a Temporary Workspace as discussed/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" PR No.25059 07/23/26 ht RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN EASEMENT AGREEMENT WITH KINDER MORGAN PIPELINE COMPANY,LLC,FOR THE CITY OF PORT ARTHUR TO ACQUIRE A 20- , FOOT-WIDE PERMANENT EASEMENT AND A TEMPORARY WORKSPACE ACROSS THE SAME EASEMENT AREA OF APPROXIMATELY 2.20 ACRES OF LAND, MORE OR LESS, BEING PART OF LOTS 6 AND 7, BLOCK 13, RANGE M, PORT ARTHUR LAND COMPANY SUBDIVISION, JEFFERSON COUNTY, TEXAS, LOCATED ALONG FM 365, FOR THE PURPOSE OF CONSTRUCTING, INSTALLING,OPERATING,MAINTAINING,REPAIRING,REPLACING, AND ACCESSING A SANITARY SEWER FORCE MAIN, FOR THE TOTAL AMOUNT OF $26,173.00. FUNDING IS AVAILABLE IN CIP ACCOUNT NO. 405-40-000-8516-00-00-000,PROJECT NO.WS0012.CON WHEREAS,pursuant to Resolution 25-050,the City entered into a contract with ALLCO, LLC for the Highway 365 Sanitary Sewer Force Main Replacement Project along FM 365,which involves replacing the existing 8-inch force main with a new 16-inch line to convey flows from the FM 365 Lift Station to the manhole beyond West Port Arthur Road, spanning approximately 9,300 linear feet to address the critical conditions that caused multiple overflows and TCEQ violations from 2020; and WHEREAS, the City needs to acquire a twenty-foot (20') wide permanent easement and a temporary workspace over the same easement area from Kinder Morgan Texas Pipeline, LLC, depicted in Exhibit"1" and more particularly described in Exhibit"2", across a portion of Lots 6 and 7,Block 13, Range M, Port Arthur Land Company Subdivision,Jefferson County,Texas, for the construction, installation, maintenance, and operation of a sanitary sewer force main in connection with the sewer main replacement work along FM 365; and WHEREAS, Kinder Morgan Texas Pipeline, LLC has agreed to grant the City said permanent easement and a temporary workspace(for a twelve(12)month period) across the same area, for a total cost of$26,173.00; and WHEREAS, the approval and acquisition of the permanent easement and a temporary workspace is hereby deemed an appropriate course of action in order to continue the sewer main replacement project. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: PR No.25059 07/23/26 ht SECTION 1. That the facts and recitals in the preamble are true and correct; and SECTION 2. That the City Council hereby authorizes the City Manager to execute the Easement Agreement with Kinder Morgan Pipeline, LLC, for the City of Port Arthur to acquire a twenty-foot (20') wide permanent easement, together with temporary workspace (for a period of twelve(12)months),over portions of Lots 6 and 7,Block 13,Range M,Port Arthur Land Company Subdivision, Jefferson County, Texas, in substantially the same form attached hereto as Exhibit "2"; and SECTION 3.That the funding for the permanent easement and temporary workspace area in the amount of Twenty-Six Thousand One Hundred Seventy-Three Dollars and No Cents ($26,173.00), is available in Account No. 405-40-000-8516-00-00-000, Project No. WS0012.CON; and SECTION 4. That said Easement Agreement, upon execution by both parties, shall be filed and recorded in the Office of the County Clerk of Jefferson County,Texas; and SECTION 5. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2026 at a meeting of the City of Port Arthur, Texas, by the following vote: Ayes: Mayor: Councilmembers: Noes: CITY OF PORT ATHUR: Charlotte M. Moses Mayor ATTEST: Christe Whitley Ned,TRMC City Secretary PR No.25059 07/23/26 ht APPROVED AS TO FORM: Roxann Pais Cotroneo City Attorney APPROVED FOR ADMINISTRATION: 47k#K Ronald Burton, City Manager Suhail Kanwar, P.E. Director of Public Services Calvin Matthews, P.E. Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: Ly (Lyn oswell, MA ICMA-CM Finance Director (6//0LClifton Williams Jr., CPPB Purchasing Manager ii PR No.24764 01/20/2026 ht/cm Exhibit "1" (Aerial/Survey) , i • - �: ` �� �•` `` ,•. '#filly,,, ., ` %. i jy •,_. .40''',::- ', ' '.- \\ .et: •,.. , ,,,,',.r Stei , ,. ,� k �F t �. ,.4.1 ,Jar .A .i•ti;`� er�- ` ` s�. �"tt3.Er,t i�% .fi ,.' �` y. ,q; Q 6 S11 ,4, Vk 1, b, 3 ..,..... k. ...A.,. � r t. , !�l�E ? , \ \ 4 `. ... \ r; . , • ,,ft,,'•-`• 1 . . "� ; • m ,' a t uek 1 + 7 . F es' 'S'•, VA- t. a . �,i /•f`r', a� - �/t h ,�r r ii;\ � �•``i, \ •` t•. ' r ' SI 1 ;' • ,r. j. .•W II k 4 .4,,, q:::, ., • t h fi�rr,, , 'i v • 1 a� 't ,til ., & .., f , #? . , , f ,.,./... ; . \ A „,, /411 .- .1 / t•\`, . '• •,. \',.. a. 73 •- 'i., '. .- . t , , - *O. . / .0 -4'• . 11(4' , . ,,,•. ...‘• . - g,. : «: N' off • �O e f y l 2,' ,3. . ... ,„ - --#.11-..1"' . ir L-r_,__ _, •s i J r • "i n Ni -, . ..., ...,_ -- .a..: vr. �•e•, ; v` , e r t y t� �. Z 4.'�.k . CD !.s p'4 Y r 1T. p• ccess`S J Commercial•Residential•Industrial Surveyors, L1C Firm No.10136400 EXHIBIT"A" CENTERLINE DESCRIPTION Proposed Sanitary Sewer Pipeline Easement Port Arthur Land Company Jefferson County,Texas BEING a 431.87 linear ft.Sanitary Sewer Pipeline Easement,lying in Lots 6&7,Block 13,Range "M",Port Arthur Land Company,in Jefferson County,Texas,part of a 2.2 acre tract described in an instrument to United Gas Pipe Line Company recorded in Volume 837,Page 338,Deed Records of Jefferson County,Texas(DRJCT),now owned by Kinder Morgan Texas Pipeline(per Jefferson County Appraisal District),the centerline of which being more particularly described as follows: Note:All bearings and coordinates are based on the Texas Coordinate System of 1983(NAD83), South Central Zone. BEGINNING at a point in the south line of said 2.2 acre tract and a northerly line of F.M.Highway 365 (a variable width public road right-of-way),from which the calculated southwest corner of said 2.2 acre tract bears North 52°49'O1"West,6.00 feet,a concrete monument found in the south line of said 2.2 acre tract for the northwest corner of a 1.425 acre tract described in an instrument to MROAD Investments,LLC,recorded in Clerk's File No. 2008009385 of the Official Public Records of Jefferson County,Texas(OPRJCT),bears South 52°49'01"East,6.13 feet,and from said concrete monument,a'''A"rod found for the southeast corner of said 2.2 acre tract bears South 52°49'01"East,207.33 feet,said POINT OF BEGINNING having a state plane coordinate value of N: 13,919,061.98,E:3,548,575.47; THENCE North 37°05'22"East,crossing said 2.2 acre tract parallel with and 6.00 feet from the west line of said 2.2 acre tract,a distance of 431.87 feet to the POINT OF TERMINATION,in the north line of said 2.2 acre tract and the south line of a 2.406 acre tract of land described in an instrument to Jefferson County Drainage District No. 7,recorded in Volume 2125 on Page 184 (DRJCT),from which the calculated northwest corner of said 2.2 acre tract bears North 70°07'53" West, 6.28 feet, and a '''A"rod found for the northeast corner of said 2.2 acre tract bears South 70°07'53"East, 224.12 feet, said POINT OF TERMINATION having a state plane coordinate value of N: 13,919,406.49,E: 3,548,835.92, and said easement being 431.87 linear feet with a width to be determined by the size of pipe to be installed; An easement plat(Exhibit`B')accompanies this description. •. hP��G`STFgF .ate SCOTT N BRACKIN 6650 v;' .900DI Scott N.Brackin, PLS 6650 1174 ..FSESSIO�P•URV�.' Access Surveyors ,. Project No.2023838 Surveyed:October 13,2023 Revised:June 23,2026 Page 1 of 1 11025 Old Voth Road,Beaumont,Texas 77713 Office:(409)838-6322 Fax:(409)838-6122 Email:rpIs5163@aol.com Web:www.access-surveyors.com File:2023838 Ex A SSE Description Line Table EXHIBIT Br VICINITY L1 N 52'49'O1" W 12.13' 0 Easement Plat MAP deed o• L2 S 70'0753"E 6.28' not to scale o o, 'S%' h 90 `y- 2.408 RJCf ^�y 3 V�'�5� P j64, c oo.s of'o _ 5 ��230,0 ' ---_--__--c' k,12� " Rod and Ec 2.2 Pa' NWC 2.2 Ac. N s.28' P.O.T. N: 13919406.49 Y°' E 73548835.92 •U >7 I Ion j Cipco Pipelines Notes: x P_ 1\. (1) All bearings are grid, based on il.' � the Texas Coordinate System of I1983 (NAD83), South Central Zone. ■ ■ ■ ■ • IMM ' ■ ■ ■ ■ ■ 41 I (2) A Centerline Description 0' 50' too' ^ (Exhibit A) accompanies this plot. Scale: 1" = 50' m f I Sheet: 8.5"X 14" al13 o i I e\`�6 l Q• ,Q �.C5 Po`c ock eiil LEGEND e I o(63 be GO •ell FaJ ■ = Concrete Monument Cr) a 0 7- 66 G6'016 Q9 J N' with Brass Disk (found) fi I I W ' $,5�t Qee • = Point for Corner I V N .4o\eGJ it lgn - I I N U.G.C. = Underground Cable 4 lI 1 f ^I M —R.— = Pipeline (assumed location) I. Z —«= Chain Link Fence 3E' = Light Pole °1 f of Proposed Saniary .0- = Power Pole r Sewer Pipeline Easement ci I 431.87 L.F. P.O.B. = Point of Beginning o Easement Width to be Determined ~o a, by Size of Pipe Installed P.O.T. = Point of Termination ti 6.0 I li West Line of 2.2 Ac. PLAT SHOWING THE P.O.B. CENTERLINE OF A Kinder Morgan Pipelines E 3548575.478 PROPOSED SANITARY SEWER -Pt. - p` Found 1/2" Rod- PIPELINE EASEMENT ---Pl--PL SEC 2.2 Ac. TO THE CITY OF PORT ARTHUR, TEXAS 6.00' 6.13' 207.33' SWC 2.2 Ac. I <> S 5749'01"E ACROSS THE ----ft---Pt.--1 FLU KINDER MORGAN TEXAS PIPELINE MROAD investmen Acts, LLC CALLED 2.2 ACRE TRACT �_� ————2008009385, OPRJCT PART OF I P4 LOTS 6&7,BLOCK 13,RANGE'M' w+4CC8SS . PORT ARTHUR LAND COMPANY F JEWbRSON COUNTY, TEXAS _. I PQ``G, 9:�'79cn Surveyors LLC : = surveyed: October 13, 2023 Commercial-Industrial-Residential SCOTT N BRACKIN Plat Revised: June 23, 2026 11025 Old Voth Road - Beaumont, Texas 77713 ,� .3. 6650 ° t '•.9a �aP'2 Telephone (409) 838-6322 Facsimile 838-6122 19i17'Ffssk1:? y0 I www.access-surveyors.com § rpls5163@aoLcom -,�SURV ' Scott N. Brackin File:2023838 BCH a(Rev. 6-23-26)Finn No.. 1013640 Registered Professional Land Surveyor No. 6650 PR No.25059 07/23/26 ht Exhibit WI 99 (Easement Agreement) _ - EASEMENT AGREEMENT This EASEMENT AGREEMENT (this "Agreement"), dated 2026, is between KINDER MORGAN TEXAS PIPELINE LLC, a Delaware limited liability company, with offices at 1001 Louisiana Street, Suite 1000, Houston,Texas 77002 (hereinafter referred to as"Grantor",whether one or more), and CITY OF PORT ARTHUR,TEXAS whose mailing address is 444 4Tg Street,Port Arthur,Texas 77640,and its successors and assigns (such entity and its successors and assigns are collectively referred to as the"Grantee"). Grantor and Grantee may be referred to herein individually as a"Party" and collectively as the "Parties". For the consideration of TEN AND No/100 Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Grantor hereby grants, sells and conveys unto Grantee a permanent and temporary easement, for the purpose, as Grantee may elect,to establish, lay,construct, install,replace, operate, maintain,inspect,protect,use,and remove,from time to time,one force main pipeline(the"Pipeline")not to exceed twenty inches(20")in nominal diameter for the purpose of transporting waste water,as more particularly described and depicted in EXHIBIT A,attached hereto and made a part hereof,in,over,through,across,under,upon,and along the following described property("Grantor's Lands") situated in Jefferson County,Texas,described as follows: Being 2.20 acres more or less in Lot 6 and Lot 7 Block 13 Range M T&NO RR CO.Survey, Abstract No.239,Jefferson County,Texas.Being the same tract of land conveyed by Anna Elizabeth Edwards a femme sole to United Gas Pipe Line Company by Deed Dated October 23, 1951 Deed Records Jefferson County,Texas Grantor hereby conveys a non-exclusive twenty inch (20") wide permanent easement for the above-described purposes,more or less,for the location and construction of the Pipeline(the"Permanent Easement"),is more generally depicted on EXHIBIT A and EXHIBIT B. Notwithstanding anything herein to the contrary,there shall be no above- ground improvements of Grantee on the Permanent Easement.Grantee shall bury the Pipeline a minimum of twenty- five feet(25')below the surface of the ground. Grantor further conveys a temporary workspace easement for the above-described purposes, being an area of land comprising approximately 0.129 acres,more or less(the"Temporary Workspace Easement"),which is more generally depicted on EXHIBIT A and EXHIBIT B. The duration of the Temporary Workspace Easement shall be for a period not extending twelve (12) months from the date of initial construction commencement of the Pipeline. Upon completion of the initial construction of the Pipeline,Grantee shall restore the Temporary Workspace Easement to the extent practicable to its original condition following the completion of such initial construction. Upon completion of such restoration, the Temporary Workspace Easement shall revert to Grantor and the grant of the Temporary Workspace Easement shall terminate. Thereafter,as required for the replacement or removal of the Pipeline(in whole or in part)or as required for excavation(to occur entirely within the Permanent Easements),Grantee shall be granted such Temporary Workspace Easement upon providing requisite notice as required by this Agreement and written approval of Grantor,which shall not be unreasonably withheld,provided,however,that Grantor reserves the right to change the size and parameters of such subsequent Temporary Workspace Easement as is reasonably necessary to ensure Grantor's safe and undisturbed use and operations on Grantor's lands. Upon completion of such replacement or removal of the Pipeline or excavation, Grantee shall restore said area in compliance with the covenants aforesaid and said Temporary Workspace Easement shall revert and terminate same. All rights,duties and/or obligations arising by or under this Agreement shall only apply to the Temporary Workspace Easement while same is in effect. The Temporary Workspace Easement,and Permanent Easement are collectively referred to as the"Easements." It is further agreed as follows: 1. The right to use these Easements shall belong to the Grantee and its agents, employees, designees, contractors, guests,invitees,successors and assigns,and all those acting by or on behalf of it for the purposes established herein. 2. During initial construction of the Pipeline, and thereafter as required for replacement, removal, or excavation, Grantee shall limit ingress and egress and the exercise of its rights under this Agreement to the Permanent Easements. Grantee shall conduct all activities in a manner that avoids interference with Grantor's use and operation of Grantor's Lands and shall not block,obstruct,or otherwise materially interfere with Grantor's roads,driveways,gates,entrances, exits,or access routes.At no time shall Grantee prevent vehicular access to Grantor's Lands. 3. Grantee shall not excavate on the Easements for any purpose(including the initial construction of the Pipeline), and Grantee shall not conduct any excavation outside the presence of a designated Grantor representative. No work as approved herein, including digging,shall be performed within twenty-five feet(25')of any of Grantor's pipeline facilities on Grantor's Lands without a designated Grantor representative being on-site.All digging and excavation shall be conducted solely by a Grantor-approved soft-digging method or as otherwise agreed upon in writing by Grantor taking place within the currently existing fenced area on Grantor's Land.All digging and excavation within eighteen inches (18") of Grantor's pipeline facilities shall be conducted solely by a Grantor-approved hand-digging or soft-digging method. In the event that contact is made with Grantor's pipeline facilities, said contact shall be reported immediately to Grantor's representative. No material,fill,spoil,pipe or other material shall be stored on the Easements. The existing grade and/or ground cover on the Easements shall not be altered or reduced without Grantor's written consent, and if it is altered or reduced, upon completion of construction of the Pipeline, Grantee agrees to restore all disturbed areas on the Easements as nearly as practicable to their original condition at Grantee's sole cost and expense. 4. Grantee shall employ or contract only licensed professionals in compliance with all required certifications and standards required by applicable statutes, ordinances and regulations of any governmental entity having jurisdiction to construct,replace or remove the Pipeline. Grantee shall be responsible for procuring and maintaining all necessary federal, state, county, and municipal permits, licenses, variances, signoffs, or other documentation required to construct,maintain,operate,repair,replace and remove the Pipeline. 5. Grantee will restore the ground disturbed by the Grantee's use and operations on the Easements(including initial construction of the Pipeline)and will take reasonable measures,as necessary,to prevent soil erosion resulting solely from operations of Grantee hereunder. Grantee shall leave the surface as nearly as reasonably possible as it was prior to the construction of the Pipeline and will restore all fences as nearly as possible to as good, or better,condition as they were prior to the construction of the Pipeline. 6. After the construction of the Pipeline,should the Pipeline cease to be used for the transmission of waste water for a continuous period of twenty-four(24)months or more or if Grantee shall at any time expressly abandon the Pipeline for the use of the rights herein granted,the Pipeline shall be considered abandoned and all rights enjoyed by Grantee herein terminated. Upon termination,Grantee agrees that it will promptly remove the Pipeline from the Permanent Easements in accordance with this Agreement,industry standards,and in a good and workmanlike manner and restore the surface of the Easements as near as reasonably practicable to the conditions existing prior to the construction of the Pipeline within 180 days of termination. After removal of the Pipeline,the Easements shall revert to Grantor. 7. Grantor shall retain all the oil,gas,and other minerals in,on and under the Easements. 8.Neither Party shall be liable hereunder for indirect,special,speculative,remote,consequential or punitive damages (including lost profits or savings)even if it has been advised of their possible existence,except that the foregoing shall not restrict a Party's ability to recover actual damages for breach of this Agreement. 9.Grantee maintains liability coverage through the Texas Municipal League Intergovernmental Risk Pool(TMLIRP), a governmental risk pool established pursuant to Texas law. Grantee shall maintain such coverage throughout the construction of the Pipeline and for so long as the Easements remain in effect.Upon request,the Grantee shall provide the Grantor with a current TMLIRP Certificate of Coverage as evidence of such coverage.The Grantee's coverage is subject to the terms,conditions,exclusions,and limits of the applicable TMLIRP Coverage Documents. 10. This Agreement shall not be assigned in whole or in part without the written consent of Grantor, which consent shall not be unreasonably withheld, delayed or conditioned. However, Grantee is specifically granted the right to assign this Agreement without the necessity of obtaining such consent should Grantee desire to assign this Agreement to any affiliate or subsidiary company of Grantee. 11. This Agreement shall be interpreted in accordance with the laws of Texas and all applicable federal laws. — -. 12. If any provision herein is held to be partially or completely contrary to law and/or unenforceable, then this Agreement shall survive and be deemed to be amended to delete the unenforceable provision or portion thereof. 13. This Agreement may be signed in counterparts and all such counterparts shall be deemed as originals and binding upon each party executing any counterpart and upon their respective heirs, representatives, successors and assigns. Facsimile signatures shall be deemed as an original signature by the enforcing party. 14. This Agreement contains the entire agreement between the parties and there are not any other representations or statements,verbal or written that have been made modifying,adding to,or changing the terms of this Agreement. [Signatures and Acknowledgements on the Following Pages.] EXECUTED this day of 2026. GRANTOR: GRANTEE: KINDER MORGAN TEXAS PIPELINE LLC CITY OF PORT ARTHUR,TEXAS Name:Tony Sala Jr. Name:Ron Burton,CPM Title:Vice President Right-of-Way Title:City Manager ACKNOWLEDGMENT STATE OF TEXAS § COUNTY OF HARRIS § This instrument was acknowledged before me on ,2026,by Tony Sala Jr., Vice President Right-of-Way of KINDER MORGAN TEXAS PIPELINE LLC a Delaware limited liability company, on behalf of said limited liability company. Notary Public in and for the State of Texas ACKNOWLEDGMENT STATE OF TEXAS § COUNTY OF JEFFERSON § The foregoing instrument was acknowledged before me this ,2026,by Ron Burton, CPM,City Manager of the CITY OF PORT ARTHUR,TEXAS,a municipal corporation,on behalf of the company. Notary Public in and for the State of Texas cressCommercial•Residential•Industrial Surveyors, LLC Firm No.10136400 EXHIBIT"A" CENTERLINE DESCRIPTION Proposed Sanitary Sewer Pipeline Easement Port Arthur Land Company Jefferson County,Texas BEING a 431.87 linear ft.Sanitary Sewer Pipeline Easement,lying in Lots 6&7,Block 13,Range "M",.Port Arthur Land Company,in Jefferson County,Texas,part of a 2.2 acre tract described in an instrument to United Gas Pipe Line Company recorded in Volume 837,Page 338,Deed Records of Jefferson County,Texas(DRJCT),now owned by Kinder Morgan Texas Pipeline(per Jefferson County Appraisal District),the centerline of which being more particularly described as follows: Note:All bearings and coordinates are based on the Texas Coordinate System of 1983(NAD83), South Central Zone. BEGINNING at a point in the south line of said 2.2 acre tract and a northerly line of F.M.Highway 365 (a variable width public road right-of-way),from which the calculated southwest corner of said 2.2 acre tract bears North 52°49'O1"West,6.00 feet,a concrete monument found in the south line of said 2.2 acre tract for the northwest corner of a 1.425 acre tract described in an instrument to MROAD Investments,LLC,recorded in Clerk's File No. 2008009385 of the Official Public Records of Jefferson County,Texas(OPRJCT),bears South 52°49'01"East,6.13 feet,and from said concrete monument,a''A"rod found for the southeast corner of said 2.2 acre tract bears South 52°49'O1"East,207.33 feet,said POINT OF BEGINNING having a state plane coordinate value of N: 13,919,061.98,E:3,548,575.47; THENCE North 37°05'22"East,crossing said 2.2 acre tract parallel with and 6.00 feet from the west line of said 2.2 acre tract,a distance of 431.87 feet to the POINT OF TERMINATION,in the north line of said 2.2 acre tract and the south line of a 2.406 acre tract of land described in an instrument to Jefferson County Drainage District No. 7,recorded in Volume 2125 on Page 184 (DRJCT),from which the calculated northwest corner of said 2.2 acre tract bears North 70°07'53" West, 6.28 feet, and a'/:"rod found for the northeast corner of said 2.2 acre tract bears South 70°07'53"East,224.12 feet, said POINT OF TERMINATION having a state plane coordinate value of N: 13,919,406.49, E: 3,548,835.92, and said easement being 431.87 linear feet with a width to be determined by the size of pipe to be installed; An easement plat(Exhibit`B')accompanies this description. . ,OF Ay?: ,%sTegF.i9 Iyi Q * SCOTT N BRACKIN e:q 6650 Scott N.Brackin, PLS 6650 Access Surveyors , Project No.2023838 Surveyed:October 13,2023 Revised:June 23,2026 Page 1 of 1 11025 Old Voth Road,Beaumont,Texas 77713 Office:(409)838-6322 Fax:(409)838-6122 Email:rp1s5163@aol.com Web:www.access-surveyors.com File:2023838_Ex A SSE Description - _._ ._ . Line Table EXHIBIT "B" VICINTTy N• . Lt N 52'49.01" W 12.13' 0 Easement Plat MAP ee o cr 1 L2 S 70'07'53'E 6.28' not to scale N. '5 I 60% 40 e, moo, °• 2.40 Drcr gbh 03 j0007p 164• 0s'V2125 a E �i • pi53 c;.x S 1p 40 23p212 2• Rd -- nN22 C. —_ _— four . NWC 2.2 Ac. t s.28' P.O.T. N: 13919406.49 Lc• 3548835.92 E .l U> O�� •,------- � I I Cipco f Notes: Pipelines ` . R 411 rt : (1) All bearings ore grid, based on � �' " 'a the Texas Coordinate System of 1983 (NAD83), South Central Zone. ■ ■ ■ ■ ■ ad (2) A Centerline Description 0' 50' too' (Exhibit A) accompanies this plat. Scale: 1" = 50' m• f Sheet: 8.5"X 14" °I ci 2 c5 • Oa cA9 io �"c tz'•p ve-1&l LEGEND e co o<9a ti bea'58• VD J • = Concrete Monument C� 0 a6 CP085-qcY,& °' with Brass Disk (found) �o e rT 1 W � b��t�g • = Point for Corner L' l a I a ,o\Jiten °v` c� kG U.G.C. = Underground Cable 4 1 1 o II1'. —R.— = Pipeline (assumed location) M I f Z —«—= Chain Link Fence ' = Light Pole f of Proposed Sarliary = Power Pole I" Sewer Pipeline Easement 0 431.87 L.F. P.O.B. = Point of Beginning Q: Easement Width to be Determined v. by Size of Pipe Installed P.O.T. = Point of Termination o S�J 0 ti • ,1 6.0 IWest Line of 2.2 Ac. PLAT SHOWING THE P.O.B. CENTERLINE OF A Kinder Morgan n I N: 13919061.98 Pipelines E: 3548575.47 PROPOSED SANITARY SEWER --p` Found 1/2" Rod PIPELINE EASEMENT —P—p a SEC 2.2 Ac. TO THE CITY OF PORT ARTHUR, TEXAS 6.00' 6.13' 207.33' • I S 52'49'01"E ACROSS THE • SWC 2.2 Ac. o 0 KINDER MORGAN TEXAS PIPELINE -- N.—p..-1----P111- MROAD Investments, LLC CALLED 2.2 ACRE TRACT . Qrt. d 1.425 Ac I ————2008009385, OPRJCT PART OF D4 LOTS 6&7,BLOCK 13,RANGE'M' wE cress PORT ARTHUR LAND COMPANY SJ �'P"C.�°'' •F+' JEI~FERSON COUNTY, TEXAS I Q5- *�Se 96>k Surveyed: October 13, 2023 Surveyors, LLC I ' Plat Revised: June 23, 2026 • Commercial-Industrial-Residential SCOTT N BRACKIN • 1 11025 Old both Road - Beaumont, Texas 77713 1 ...°qo 6650.r:c. Telephone (409) 838-6322 Facsimile 838-6122 1"9.1;••• Ess1S.y0 I www.access-surveyors.com § rpls5163@aol.com .`J Stj ' ,. Scott N. Brackin File:2023838 e:H B(Rev. 6-23-26)Firm No.. 1013640 • Registered Professional Land Surveyor No. 6650