HomeMy WebLinkAboutPR 25114 AUTHORIZING THE CITY MANAGER TO EXECUTE SETTLEMENT OF A PHYSICAL DAMAGEw
City of
o r t rth rrY�
liwas
INTEROFFICE MEMORANDUM
Office of Safety & Risk Management
Date: August 20, 2026
To: Ronald Burton, CPM, City Manager
From: Trameka Williams, CPM, Assistant Director of Human Resold 3j)
RE: A Resolution Approving a Property Damage Settlement in the Amount of$22,928.20 Less
the $5,000.00 Deductible for Water Damage to City of Port Arthur Annex Building — First
Floor Making the Final Settlement Offer $17,928.20
Nature of the request: On June 8, 2026, a pipe burst in the first-floor bathroom in the
annex building causing significant damage to the annex first floor area.
Staff Analysis, Considerations: As a result of the damage a claim was filed with Texas
Municipal League Intergovernmental Risk Pool (TMLIRP). Texas Municipal League
Intergovernmental Risk Pool has offered the City a settlement of $22,928.20 (Exhibit "A"
attached) less the $5,000.00 deductible per occurrence making the final settlement amount
$17,928.20.
Recommendation: I recommend approval of Proposed Resolution No. 25114 authorizing the
property damage settlement against Texas Municipal League Intergovernmental Risk Pool
(TMLIRP) for water damage sustained to the first-floor annex building of City Hall. Texas
Municipal League Intergovernmental Risk Pool has offered to settle the claim for $22,928.20
less the $5,000.00 deductible per occurrence making the final settlement amount $17,928.20.
This is considered a fair and reasonable settlement.
Budget Considerations: The funds received will be deposited in HINGF.
"Remember we are here to serve the Citizens of Port Arthur."
P.R. No. 25114
08/20/2026 taw
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE SETTLEMENT OF A PHYSICAL DAMAGE CLAIM IN
THE AMOUNT OF $22,928.20 LESS THE DEDUCTIBLE
($5,000.00). THE CLAIM IS MADE AGAINST TEXAS MUNICIPAL
LEAGUE INTERGOVERNMENTAL RISK POOL (TMLIRP). THE
CLAIM IS A RESULT OF PROPERTY DAMAGE TO THE CITY HALL
ANNEX, FIRST FLOOR, MAKING FINAL SETTLEMENT
$17,928.20.
WHEREAS, on June 8, 2026, water damage occurred in the City Hall annex building
due to a damaged pipe in the restroom; and,
WHEREAS, as a result of the damage, a claim was filed with Texas Municipal
League Intergovernmental Risk Pool (TMLIRP); and,
WHEREAS, Texas Municipal League Intergovernmental Risk Pool (TMLIRP) has
offered to settle the claim for $22,928.20, less the $5,000.00 deductible per occurrence,
resulting in a final settlement amount of $17,928.20, which is considered a fair and
reasonable settlement.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PORT ARTHUR, TEXAS:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That, the City Manager is hereby authorized to execute a settlement in
the amount of $22,928.20, less the $5,000.00 deductible per occurrence, making the final
settlement amount $17,928.20, for the claim against Texas Municipal League
Intergovernmental Risk Pool (TMLIRP) in substantially the same form as delineated in
Exhibit "A".
Section 3. That, a copy of this Resolution be spread upon the minutes of the City
Council.
READ, ADOPTED, AND APPROVED this day of , AD, 2026, at a
Meeting of the City Council of the City of Port Arthur, Texas, by the following
vote: AYES: Mayor , Councilmembers
NOES:
Charlotte M. Moses, Mayor
ATTEST:
Christe Whitley-Ned, City Secretary
APPROVED AS TO FORM:
---s
Roxann Cotroneo, City Attorney
APPROVED FOR ADMINISTRAT •
Ronald Burton, CP , City Manager
J!.
EXHIBIT " A "
Mission Risk Consulting Group,LLC
MRCG,LLC
1601 Westheimer Road
Houston,Texas 77006
Insured: City of Port Arthur
Property: 444 4th Street
Port Arthur,TX 77640
Claim Rep.: Mike Myers Billing: PO Box 149194
Austin,TX 78714-9194
Position: Senior Claims Specialist Business: (512)491-2464
Company: TML-IRP E-mail: mike.myers@tmlirp.org
Estimator: Paul Tierce Business: (713)956-5255
Position: President E-mail: ptierce@missiongrp.com
Company: MRCG,LLC
Business: 1601 Westheimer Rd
Houston,TX 77006
Claim Number: TX264474 Policy Number: 7587 Type of Loss: Water Damage
Date Contacted: 6/8/2026 5:46 PM
Date of Loss: 6/8/2026 8:00 AM Date Received: 6/8/2026 5:14 PM
Date Inspected: 6/12/2026 10:00 AM Date Entered: 6/12/2026 8:00 AM
Price List: TXBM8X_JUN26
Restoration/Service/Remodel
Estimate: 2026-06-24-0800
This is an estimate only. This estimate in present format is based on information that has been made available to me and
collected by me at this time. Should additional information be presented or discovered,I reserve the right to determine the
impact of any new information on my opinions and conclusions. I also reserve the right to revise my opinions and conclusions if
necessary or warranted by the discovery or review of any additional new information.
This estimate is subject to the review and approval of TML-IRP.
Date Submitted to TMLIRP:07/28/2026 03:45 PM
Mission Risk Consulting Group,LLC
MRCG,LLC
1601 Westheimer Road
Houston,Texas 77006
2026-06-24-0800
ID 20-City Hall Annex
Main Level
1---8 2'-I Women's Room Height: 9'
6„
351.00 SF Walls 90.00 SF Ceiling
, 441.00 SF Walls&Ceiling 90.00 SF Floor
Women's Room"
- 10.00 SY Flooring 39.00 LF Floor Perimeter
39.00 LF Ceil.Perimeter
DESCRIPTION QUANTITY UNIT PRICE TAX RCV DEPREC. ACV
Remove Toilet partition(plastic laminate or baked 1.00 EA 174.22 0.00 174.22 (0.00) 174.22
enamel steel)
Replace Toilet partition(plastic laminate or baked 1.00 EA 780.90 0.00 780.90 (224.00) 556.90
enamel steel)
Totals: Women's Room 0.00 955.12 224.00 731.12
Total: Main Level 0.00 955.12 224.00 731.12
Painting
DESCRIPTION QUANTITY UNIT PRICE TAX RCV DEPREC. ACV
Painter-per hour 12.00 BR 85.33 0.00 1,023.96 (0.00) 1,023.96
Miscellaneous painting
Seal and paint various effected areas
PAINTING 1.00 EA 225.00 0.00 225.00 (0.00) 225.00
Miscellaneous paint materials
Totals: Painting 0.00 1,248.96 0.00 1,248.96
Millwork
DESCRIPTION QUANTITY UNIT PRICE TAX RCV DEPREC. ACV
Install Finish Carpenter-per hour 16.00 HR 77.15 0.00 1,234.40 (0.00) 1,234.40
Remove/reinstall doors
Repairs as necessary
Totals: Millwork 0.00 1,234.40 0.00 1,234.40
2026-06-24-0800 7/28/2026 Page:2
Date Submitted to TMLIRP:07/28/2026 03:45 PM
Mission Risk Consulting Group,LLC
MRCG,LLC
1601 Westheimer Road
Houston,Texas 77006
Debris Removal
DESCRIPTION QUANTITY UNIT PRICE TAX RCV DEPREC. ACV
Tandem axle dump trailer-per load-including dump 1.00 EA 223.89 0.00 223.89 (0.00) 223.89
fees
Totals: Debris Removal 0.00 223.89 0.00 223.89
Mitigation
DESCRIPTION QUANTITY UNIT PRICE TAX RCV DEPREC. ACV
WATER EXTRACTION&REMEDIATION 1.00 EA 19,265.83 0.00 19,265.83 (0.00) 19,265.83
Water extraction and drying services
Action Restoration
Totals: Mitigation 0.00 19,265.83 0.00 19,265.83
Total: ID 20-City Hall Annex 0.00 22,928.20 224.00 22,704.20
Line Item Totals: 2026-06-24-0800 0.00 22,928.20 224.00 22,704.20
Grand Total Areas:
351.00 SF Walls 90.00 SF Ceiling 441.00 SF Walls and Ceiling
90.00 SF Floor 10.00 SY Flooring 39.00 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 39.00 LF Ceil.Perimeter
90.00 Floor Area 103.44 Total Area 351.00 Interior Wall Area
416.67 Exterior Wall Area 41.67 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
2026-06-24-0800 7/28/2026 Page: 3
Date Submitted to TMLIRP:07/28/2026 03:45 PM
Mission Risk Consulting Group, LLC
MRCG,LLC
1601 Westheimer Road
Houston,Texas 77006
Summary for Structure
Line Item Total 22,928.20
Replacement Cost Value $22,928.20
Less Depreciation (224.00)
Actual Cash Value $22,704.20
Less Deductible (5,000.00)
Net Claim $17,704.20
Total Recoverable Depreciation 224.00
Net Claim if Depreciation is Recovered $17,928.20
Paul Tierce
President
2026-06-24-0800 7/28/2026 Page:4
Date Submitted to TMLIRP:07/28/2026 03:45 PM