Loading...
HomeMy WebLinkAboutP.R. NO. 25160 CHANGE ORDER NO. 2 HIGHWAY 365 SEWER FORCE MAIN REPLACEMNENT PROJECT. City of ti cam_ _ rrrt rtlrur www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: September 11, 2026 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Calvin Matthews,P.E., Water Utilities Director RE: PR No. 25160—Change Order No. 2 Highway 365 Sewer Force Main Replacement Project(Project No. WS0012-CON) Introduction: This agenda item is to seek the City Council's authorization for the City Manager to execute Change Order No. 2 for the Highway 365 Sewer Force Main Replacement Project(Project No. WS0012-CON)with Allco,LLC of Beaumont,Texas,extending the time of the contract by 210 consecutive calendar days to a new contract time of 683 days. Background: Resolution No. 25-050 approved a contract with Allco, LLC, of Beaumont, Texas, for the Highway 365 Sewer Force Main Replacement Project. The project will replace approximately 9,300 linear feet of force main as part of the City's Texas Commission on Environmental Quality Supplemental Environmental Project requirement addressing the critical conditions that contributed to multiple sanitary sewer overflow violations. Before the contract was approved, City staff and the project engineer anticipated difficulty in obtaining the easements and temporary workspace necessary for construction. The project crosses numerous properties and rights-of-way and is located near multiple existing pipelines and utility facilities. On July 15,2025,Resolution No.25-310 approved acceptance of a utility easement from Labelle Properties, Ltd., for a portion of the project near Highway 365, West Port Arthur Road, and Riley Street. A portion of this easement is located within an existing utility corridor shared by multiple pipeline operators, including Colonial Pipeline Company, Enterprise Pipeline, and Cameron Highway Oil Pipeline Company,LLC,also known as Genesis Pipeline. Encroachment agreements with the applicable pipeline operators were required before construction could proceed in those areas. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 Cite of ort rtItur www.PortArthurTx.gov Negotiations with Genesis Pipeline and Colonial Pipeline Company took longer than anticipated. Communication with both companies was difficult because they did not consistently respond to City communications. While negotiating the necessary encroachment agreements, the City also contacted Angel Mid Jeff County, J.V. ("Angel Mid Jeff') to obtain a temporary workspace easement for another portion of the project area. Negotiations with Angel Mid Jeff were also delayed because the landowner did not respond in a timely manner. On February 24, 2026, pursuant to Resolution No. 26-068, the City approved a temporary workspace easement with Angel Mid Jeff. Subsequently, however, Angel Mid Jeff denied the City access to the temporary workspace area. As a result, the project design had to be modified to avoid the temporary easement area. The design modification required additional permits and revisions from the Texas Department of Transportation and Drainage District No. 7. On March 24,2026,Resolution No.26-114 approved an encroachment agreement with Cameron Highway Oil Pipeline Company, LLC (Genesis Pipeline). Due to the delays associated with securing the required encroachment agreements and easements,Resolution No. 26-248, approved on June 16,2026, authorized Change Order No. 1. Change Order No. 1 increased the contract time by 108 days, from 365 days to 473 consecutive calendar days. On July 14, 2026, pursuant to Resolution No. 26-303, the City approved and executed an encroachment agreement with Colonial Pipeline Company for the portion of the project along Highway 365, West Port Arthur Road, and Riley Street. The City also determined, through review of survey descriptions, that Kinder Morgan Texas Pipeline's property line extended beyond the standard right-of-way area along Highway 365. Accordingly, the City was required to obtain a permanent easement and temporary workspace access from Kinder Morgan Texas Pipeline. Resolution No. 26-345, approved on August 11, 2026, authorized the City to resolve those property-access issues. While the City was working to resolve the Kinder Morgan easement and access issues, Allco, LLC requested a second suspension of work beginning July 27, 2026, with an anticipated resumption date of September 26, 2026. The suspension delayed construction activities and required the City to seek an extension of the Union Pacific Railroad permit and reschedule railroad flagging services for the drilling operations. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 \ City of ort rthu� � www.PortArthurTx.gov SPI Engineering and City staff recommend approval of Change Order No. 2 for the Highway 365 Sewer Force Main Replacement Project. Change Order No. 2 would increase the contract time by an additional 210 consecutive calendar days,from 473 days to 683 consecutive calendar days, and extend the contract completion date from September 18, 2026,to April 16, 2027. The 210-day extension includes time associated with the work suspension, the Union Pacific Railroad permit extension and flagging rescheduling,Kinder Morgan easement and underground access issues, and construction-scope changes. Those scope changes include revisions to the TxDOT permit to relocate the force main within the State Highway 365 right-of-way. Budtet Impact: There is no budgetary impact associated with Change Order No. 2. The contract amount will remain$2,709,931.50. Recommendation: It is recommended that the City Council approve Proposed Resolution No. 25160, authorizing the City Manager to approve Change Order No. 2 for the Hwy 365 Sewer Force Main Replacement Project with Allco, LLC of Beaumont, Texas, as described/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P.R.No. 25160 9/11/2026 cm Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 2 TO THE HIGHWAY 365 SEWER FORCE MAIN REPLACEMENT PROJECT (PROJECT NO. WS0012- CON) WITH ALLCO, LLC. OF BEAUMONT, TEXAS, EXTENDING THE CONTRACT TIME BY 210 DAYS TO THE NEW TOTAL CONTRACT TIME OF 683 DAYS, THEREBY SHIFTING THE COMPLETION DATE TO APRIL 16, 2027; PROVIDING THAT CHANGE ORDER NO.2 HAS NO BUDGETARY IMPACT. WHEREAS,pursuant to Resolution No. 25-050, City Council approved the contract with Allco, LLC (Contractor) of Beaumont, Texas for the Highway 365 Sewer Force Main Replacement Project to replace 9,300 linear feet of force main,with a projected budgetary impact of$2,709,931.50; and WHEREAS, before the contract was approved, City staff and the project engineer anticipated difficulty in obtaining the easements and temporary workspace necessary for construction. The project crosses numerous properties and rights-of-way and is located near multiple existing pipelines and utility facilities; and WHEREAS, on July 15, 2025, Resolution No. 25-310 approved acceptance of a utility easement from Labelle Properties, Ltd., for a portion of the project near Highway 365, West Port Arthur Road, and Riley Street. A portion of this easement is located within an existing utility corridor shared by multiple pipeline operators,including Colonial Pipeline Company,Enterprise Pipeline,and Cameron Highway Oil Pipeline Company, LLC, also known as Genesis Pipeline. Encroachment agreements with the applicable pipeline operators were required before construction could proceed in those areas; and WHEREAS, on November 21, 2025, due to the time required to obtain the easements and encroachment agreements, Allco, LLC requested a suspension of contract time to resume on March 9, 2026 and as a result of the 108-day suspension the completion date shifted from June 2,2026,to September 18, 2026; and WHEREAS negotiations with Genesis Pipeline and Colonial Pipeline Company took longer than anticipated. Communication with both companies was difficult because they did not consistently respond to City communications.; and WHEREAS, while negotiating the necessary encroachment agreements, the City also contacted Angel Mid Jeff County, J.V. ("Angel Mid Jeff') to obtain a temporary workspace easement for another portion of the project area. Negotiations with Angel Mid Jeff were also delayed because the landowner did not respond in a timely manner; and P.R.No. 25160 9/11/2026 cm Page 2 of 3 WHEREAS, On February 24, 2026, pursuant to Resolution No. 26-068, the City approved a temporary workspace easement with Angel Mid Jeff. Subsequently, however, Angel Mid Jeff denied the City access to the temporary workspace area. As a result, the project design had to be modified to avoid the temporary easement area. The design modification required additional permits and revisions from the Texas Department of Transportation and Drainage District No. 7; and WHEREAS, On March 24, 2026, Resolution No. 26-114 approved an encroachment agreement with Cameron Highway Oil Pipeline Company, LLC (Genesis Pipeline); and WHEREAS, due to the delays associated with securing the required encroachment agreements and easements, Resolution No. 26-248, approved on June 16, 2026, authorized Change Order No. 1. Change Order No. 1 increased the contract time by 108 days, from 365 days to 473 consecutive calendar days; and WHEREAS,on July 14,2026,pursuant to Resolution No.26-303,the City approved and executed an encroachment agreement with Colonial Pipeline Company for the portion of the project along Highway 365, West Port Arthur Road, and Riley Street; and WHEREAS,the City also determined,through review of survey descriptions,that Kinder Morgan Texas Pipeline's property line extended beyond the standard right-of-way area along Highway 365. Accordingly,the City was required to obtain a permanent easement and temporary workspace access from Kinder Morgan Texas Pipeline.Resolution No. 26-345,approved on August 11,2026,authorized the City to resolve those property-access issues; and WHEREAS, while the City was working to resolve the Kinder Morgan easement and access issues, Allco, LLC requested a second suspension of work beginning July 27, 2026, with an anticipated resumption date of September 26, 2026. The suspension delayed construction activities and required the City to seek an extension of the Union Pacific Railroad permit and reschedule railroad flagging services for the drilling operations; and WHEREAS, SPI Engineering and City staff recommend approval of Change Order No. 2 for the Highway 365 Sewer Force Main Replacement Project. Change Order No. 2 would increase the contract time by an additional 210 consecutive calendar days, from 473 days to 683 consecutive calendar days, and extend the contract completion date from September 18, 2026,to April 16, 2027; and WHEREAS,the 210-day extension includes time associated with the work suspension,the Union Pacific Railroad permit extension and flagging rescheduling, Kinder Morgan easement and underground access issues, and construction-scope changes. Those scope changes include revisions to the TxDOT permit to relocate the force main within the State Highway 365 right-of-way. P.R.No. 25160 9/11/2026 cm Page 3 of 3 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Council hereby approves Change Order No. 2 (EXHIBIT "B") extending the contract time by 210 days to the new total contract time of 683 consecutive calendar days,thereby shifting the completion date to April 16, 2027; and, THAT,there is no budgetary impact for Change Order No. 2; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ,ADOPTED AND APPROVED THIS day of , 2026 at a Regular Meeting of the City Council of the City of Port Arthur, Texas,by the following vote: AYES: Mayor Councilmembers: NOES: Charlotte M. Moses Mayor ATTEST: Christie Whitley Ned City Secretary P.R.No. 25160 9/11/2026 cm Page 4 of 3 APPROVED AS TO FORM: Roxann Pais Cotroneo City Attorney APPROVED FOR ADMINISTRATION: Ronald B PM City Man /(e Suhail Kanwar, P.E. Director of Public Services Calvin Matthews, P. . Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: Lynda(Lynda) Boswell, MA CGFO Finance Director 'I)) [, ,ja44.. Clifton E. Williams Jr. CPPB Purchasing Manage EXHIBIT A (Suspension of Contract Request) ALICO Build Construction Management General Contactor Corporate Office—P.O.Box 3684,Beaumont,TX 77704 Phone 409.860.4459 Fax 409.860.3857 Central Texas—P.O.Box 11807,College Station,TX 77842 Phone 979.260.1000 Fax 979-450-7310 Houston Office—5065 Westheimer,Ste.1150,Houston,TX 77056 Phone 713.222.1331 Fax 713.936.4858 September 9, 2026 Schaumburg&Polk 8865 College Street Beaumont, TX 77707 ATTN: Jeff Beaver, P.E. RE: City of Port Arthur—Hwy. 365 Force Main Dear Mr. Beaver; Please let this letter serve as our request for a time extension for the above referenced project. This request for extension is due to delays from the Union Pacific railroad permit having expired, lack of easement from Kinder Morgan to access their property, and revision to the TXDOT permit on Highway 365. As of today, Kinder Morgan says they have not received their payment for the easement. Until payment is received,we cannot access their property. We request 210 calendar days due to delays on the project. Please contact me if you have any questions or comments. Sincerely, ALLCO LLC Euvreee Keith Burrell EXHIBIT B (Change Order No. 2) APPROVAL OF CONTRACT CHANGE CHANGE ORDER No.Two(2) DATE: September 10,2026 PROJECT: City of Port Athur Highway 365 Force Main Improvements P25-050 OWNER: City of Port Athur,Texas 444 4t Street Port Arthur,Texas 77640 CONTRACTOR: Allco,LLC P.O.Box 3684 Beaumont,Texas 77704 TO THE OWNER: Approval of the following contract change is requested. Reason for Change: -To adjust the contract time due to delay from the Union Pacific railroad permit having expired,delay from Kinder Morgan easement access, and revisions to the TxDOT permit to move force main location within the SH365 right-of-way. ORIGINAL CONTRACT AMOUNT: $ 2,709,931.50 TOTAL AMOUNT OF THIS CHANGE ORDER: $ 0.00 TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: $ 2,709,931.50 CONTRACT TIME Revised Contract Time per prior Change Order No.1 473 calendar days Additional time per this Change Order No.2 210 calendar days Revised Contract Time per this Change Order No.2 683 calendar days CONDITION OF CHANGE: "Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Change Order represents full compensation for all increases and decreases in the cost of,and the time required to perform the entire work under the Contract arising directly or indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change Order represents an all inclusive,mutually agreed upon adjustment to the Contract,and that Contractor will waive all rights to file a claim on this Change Order after it is properly executed." Recommended by: Approved by: Accepted by: c u g k,I c. City of Port Arthur Allco,LLC gineer Owner Contractor Date: 7 //"- 2cet Date: Date: ! ,z4 Page 1 of 1 1.! Design Build Construction Management General Contactor Corporate Office—P.O.Box 3684,Beaumont,TX 77704 Phone 409.860.4459 Fax 409.860.3857 Central Texas—P.O.Box 11807,College Station,TX 77842 Phone 979.260.1000 Fax 979-450-7310 Houston Office—5065 Westheimer,Ste.1150,Houston,TX 77056 Phone 713.222.1331 Fax 713.936.4858 September 11, 2026 Schaumburg& Polk 8865 College Street Beaumont, TX 77707 ATTN: Jeff Beaver, P.E. RE: City of Port Arthur—Hwy. 365 Force Main Dear Mr. Beaver; Please let this letter serve as our request for a suspension of time for the above referenced project. We ask for this suspension from July 27, 2026, due to delays from the expiration if the Union Pacific railroad crossing permit, lack of Kinder Morgan easement and TXDOT permit extension. Due to these delays, we have been unable to work. Please contact me if you have any questions or comments. Sincerely, ALLCO LLC Keith Burrell