HomeMy WebLinkAboutP.R. NO. 25129 CONTRACT WITH THE BOWMAN GROUP TO PROVIDE SPECIALIZED SERVICES TO THE POLICE DEPARTMENT. it.
7;a 114
nrt rfh«
7,nnA
www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
OFFICE OF THE CITY MANAGER
Date: September 11,2026
To: The Honorable Mayor and City Council
Through: Ron Burton,CPM, City Manager
From: Dr.Albert Thigpen,Assistant City Manager-Administration
Re: P.R.25129—A Resolution Authorizing the City Manager to Execute a Contract with The Bowman Group to
Provide Specialized Services to the Police Department
COMMENT
Recommendation:
It is recommended the City Council of the City of Port Arthur adopt Proposed Resolution No. 25129 which authorizes
the City Manager to execute a contract with The Bowman Group to provide specialized services for the Police
Department.
Background:
The City of Port Arthur's Police Department(PAPD) is actively engaged in the protection of the public's safety twenty-
four hours each day of the year. This protection runs the full gamut of traffic control, crime prevention, and emergency
management.Additionally,the department is charged to provide complex assistance to, and collaboration with, state and
federal law enforcement agencies.Moreover,the department is responsible for being fully integrated with the community
which it serves.
This places a substantial responsibility on the leadership of the Police Department as it seeks to provide fair,just, and
responsive service to the citizens in an efficient and effective manner. As identified in the City of Port Arthur's 2025-
2030 Strategic Plan—"Organizational Excellence"—, always a concern of administration, is also a key concern of the
City Council and the citizens of Port Arthur.
The City Manager, administration, and the Chief of Police, are setting forth a process, which uniquely addresses the
operational, legal, functional, and community aspects of the department. This process will allow the Chief of Police to
review, fully analyze, and address (e.g., revise, modernize, etc.) key operational processes and procedures. This
engagement also provides for assessment, as well as supporting capacity development, of the senior department
management staff.
An important result of this engagement will be a documented review of Police Department key operational processes and
procedures with the focus of retaining those which are operating effectively and efficiently; improving, revamping, or
discontinuing processes and procedures which no longer meet departmental goals.
"Remember,we are here to serve the Citizens of Port Arthur"
444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
Additionally, there will be a distinct focus on the assessment, development, and increase of the managerial capacity of
the department's senior staff. Given the broad and far-reaching responsibilities of the department, including the critical
area of emergency management(which is a year around concern extending beyond hurricane season, and includes other
weather-related events, petro-chemical and related concerns,major events [e.g. Mardi Gras,Holiday Parade,etc.]).
Police departments require formalized structure, internal integrity,and community connection to be the most effective in
fulfilling their responsibilities regarding protecting the public. The City Manager and the Chief of Police note that the
Police Department is an integral part of the City organization, and its effective operation is key to overall achievement
of Organizational Excellence. The proposed contract will allow the department to improve, and optimize, these key
attributes.
This engagement will set a blueprint for similar departmental organizational review in alignment with the City's strategic
plan.
Budgetary:
Funding in the not to exceed amount of$30,000.00 is available in account 001-01-005-5470-00-10-000.
Staffing/Employee Effect:
No immediate impact on staffing levels is anticipated.
Summary:
It is recommended the City Council of the City of Port Arthur adopt Proposed Resolution No. 25129 which authorizes
the City Manager to execute a contract with The Bowman Group to provide specialized services for the Police
Department.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
•
P.R.No. 25129
09/07/26 ATT
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A
PROFESSIONAL SERVICES CONTRACT BETWEEN THE CITY OF PORT ARTHUR
AND THE BOWMAN GROUP, FOR THE PURPOSE OF PROVIDING SPECIALIZED
MANAGEMENT AND OPERATIONAL DEVELOPMENT SERVICES FOR THE CITY OF
PORT ARTHUR POLICE DEPARTMENT FOR A PERIOD OF 180 DAYS IN AN
AMOUNT NOT TO EXCEED $30,000.00. FUNDING AVAILABLE IN ACCOUNT: 001-01-
005-5470-00-10-000
WHEREAS, the City of Port Arthur 2025-2030 Strategic Plan adopted by th City'Council sets
forth Organizational Excellence as a Strategic Priority; and,
WHEREAS, the City of Port Arthur 2025-2030 Strategic Plan has a key objective in the pursuit
of Organizational Excellence "...Improve leadership performance using performance metrics,
professional development, and leadership competency enhancements."; and,
WHEREAS, the City Manager desires to move the City organization forward toward the
objectives of Organizational Excellence by implementing programming directed at improving operational
efficiency, management competencies, executive leadership capacities, community connection and
integration; and,
WHEREAS, the Port Arthur Police Department operates 24/7/365 in the protection of the public
safety, administration of emergency management,maintaining order and crime prevention; and,
WHEREAS, the City Manager and the Chief of Police desire to implement the specialized
programming and controls necessary to achieve the aforementioned goals above and the noted police
operations as detailed in Attachment"A"hereto.
P.R No.25129
09/07/26 ATT
Page 2
Now, Therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR,TEXAS:
Section 1.That,the facts,and opinions in the preamble are true and correct.
Section 2. That,the City Council of the City of Port Arthur hereby authorizes the City Manager to
enter into a contract with the Bowman Group for operational and leadership improvement specialized
services as detailed in Attachment"A"hereto.
Section 3. That funding is available in account number 001-01-005-5470-00-10-000 in the not to
exceed amount of thirty thousand($30,000.00)and zero one hundredths dollars.
Section 4. That, a copy of this Resolution be spread upon the Minutes of the City Council.
READ,ADOPTED,AND APPROVED this day of ,AD, 2026, at a Regular Meeting
of the City Council of the City of Port Arthur, Texas, by the following vote: AYES:
Mayor
Councilmembers
NOES:
Hon. Charlotte M. Moses
Mayor
ATTEST:
Christe Whitley-Ned, TRMC,City Secretary
P.R.No.25129
09/07/26 ATT
Page 3
APPROVED AS TO FORM:
Roxann Pais Cotroneo,Esq.
City Attorney
APPROVED FOR ADMINISTRATION:
bit125t 141.
Clifton Williams,CPPO
Purchasing Manager
Ly da Bosw , FO
Director of F nance
Wier
Ronald Burton 'rM
City Man. -r
•
EXHIBIT
«A„
THE BOWMAN GROUP PORT ARTHUR
TEXAS
ENGAGEMENT CHARTER
OPERATIONAL AND LEADERSHIP IMPROVEMENT
PORT ARTHUR POLICE DEPARTMENT LEADERSHIP ASSURANCE ENGAGEMENT
October 8, 2026
This Engagement Charter is made as of October 8,2026, by and between the City of Port Arthur,Texas(the"CITY"),and Theron
L. Bowman, Inc., DBA The Bowman Group("TBG").It supplements the parties'governing agreement or written authorization.
This project is ordinary government business.The governing agreement controls in a conflict.
1. Purpose.TBG will assess and improve PAPD operational controls,executive leadership capacity,organizational
execution,employee communication, labor-management processes,and implementation discipline.The work is
designed to produce measurable corrective actions, reliable controls,and sustained organizational improvement.
2. Current Authorization.The City Manager is the executive sponsor and authorizes project Phases 1-5 as described
below.TBG may conduct operational review, BOLSTER."assessment,decision and remediation design,
implementation facilitation,and assurance reviews. BOLSTER'culture assessment and a formal BOLSTER"
Executive Leadership Scorecard remain optional and require separate written authorization unless later added by
amendment.
AUTHORIZED SCOPE OF SERVICES
Phase 1 — Sex-Offender Registry and Operational Controls I Weeks 1-4
• Reconcile PAPD information with available court, probation,and state registry data to identify overdue,
attempted,incomplete,or unverified registrations.
• Review call and voicemail handling, published contact information,walk-in processes,response time,ownership,
supervisory review, staffing,workload,technology,procedures,and backup coverage.
• Implement a two-person coverage model,escalation thresholds,callback standards,weekly exception reporting,
and monthly supervisory certification,subject to CITY approval.
• Immediately escalate apparent current noncompliance or public-safety exposure to designated CITY officials.
Phase 2 — BOLSTER"' Executive Leadership Assessment I Weeks 2-4
TBG will evaluate observable executive behavior and organizational results across six domains: Executive Character,
Executive Leadership, Executive Management, Executive Communication,Executive Relationships,and Executive
Organizational Stewardship. Evidence may include executive and command interviews,supervisor and employee input,
documents, policy, metrics, decision analysis,system testing, meeting observations, prior corrective actions,and
appropriate stakeholder interviews.
• Identify executive strengths, leadership vulnerabilities,organizational barriers,and corrective actions necessary
for stabilization and long-term improvement.
• Assess judgment,accountability,strategic direction,execution, communication,trust building, labor relations,
succession, resilience, risk management,and future readiness.
• Determine which competencies may reasonably improve through coaching and structured performance
management and which may indicate fundamental capacity limitations.
1
THE BOWMAN GROUP PORT ARTHUR
\\// TEXAS
Phase 3 — Decision Support and Remediation Design I Weeks 4-5
• Present evidence-based options for retain-and-support,formal performance improvement,or leadership
- transition; final personnel decisions remain with authorized CITY officials.
• Create measurable 30-, 60-,and 90-day expectations,owners,deadlines,controls, dependencies, and
performance indicators.
• Design operational remediation,communications,supervisory accountability,and labor-management protocols.
Phase 4— Implementation and Labor-Management Reset I Weeks 6-12
• Facilitate monthly Chief—Association meetings with agendas,decision logs,owners,and due dates; restore
supervisor forums with attendance and escalation rules.
• Establish annual goals and quarterly measures for crime response,training,staffing,community engagement,
and high-risk administrative functions.
• Develop service standards for training requests,temporary assignments,interview boards,disciplinary status,
case closure,and unresolved labor-management matters.
• Support dashboards, implementation cadence,coaching,and quarterly review of disciplinary consistency and
processing time using appropriately anonymized data.
Phase 5 — 90-and 180-Day Assurance Reviews
At each checkpoint,TBG will validate evidence of completion rather than accept self-reported status;identify completed
actions,overdue items,repeated control failures,retaliation indicators,employee-confidence trends,and decisions
requiring City Manager intervention.
THE BOWMAN GROUP PORT ARTHUR
TEXAS
GOVERNANCE, MEASURES,AND WORK PLAN
4. Executive Direction.The City Manager sets priorities,authorizes material changes, receives project reporting,and
retains final authority for policy,personnel,discipline,budget, and operations.TBG controls assessment methods
and provides independent professional recommendations. PAPD leadership maintains day-to-day command and
implements authorized actions.
5. Evidence Discipline. Leadership conclusions will be based on corroborated behavioral and operational evidence,not
popularity or isolated opinion.TBG will identify sources, limitations,competing evidence,and the organizational
effect of observed conduct or systems.CITY factual review may correct errors but may not require unsupported
conclusions.
Activity City Mgr. City Atty. PAPD/HR TBG Association
Approve project scope/priorities A/R C C R I
Produce operational information A C R C 1
Registry/process review A C R A/R
BOLSTER"'assessment I C C A/R I
Personnel decisions A/R C R I I
Implement corrective actions A C R C I
Labor-management facilitation A C R R C
Assurance validation I C C A/R I
Performance Measures
Measure family Illustrative indicators
Registry controls Backlog,callback compliance,backup coverage,exceptions,supervisory certification.
Leadership execution Action items completed on time,recurring unresolved items,command accountability.
Communication Meeting cadence,documented decisions,employee understanding,follow-through.
Training and discipline Request and case aging,closure,rationale,comparator consistency,timely notice.
Workplace climate Confidence in reporting,fear of retaliation,perceived fairness,supervisor confidence.
Target Work Plan
Phase Timing Primary output
1—Registry and process controls Weeks 1-4 Backlog reconciliation;call-handling review;interim controls;
control-gap memorandum.
2—BOLSTER leadership assessment Weeks 2-4 Leadership-capacity assessment;evidence themes;capability
determination.
•
Decision options;90-day corrective-action plan;performance
3—Decision/remediation design Weeks 4-5 dashboard.
4—Implementation/trust reset Weeks 6 12 Implementation kickoff;meeting cadence;supervisory forums;
labor-management protocol.
1
THE BOWMAN GROUP PORT ARTHUR
TEXAS
\/#4
Phase Timing Primary output
5—Assurance reviews Days 90 and 180 Independent progress validation;risk exceptions;
sustainability recommendations.
DELIVERABLES AND COMMERCIAL TERMS
Deliverables
• Registry control-gap and remediation memorandum,including reconciliation status and interim controls.
• BOLSTER'executive leadership-capacity and organizational assessment.
• City Manager decision-options memorandum and measurable 90-day corrective-action plan.
• Performance dashboard,implementation cadence,and labor-management operating protocol.
• Implementation kickoff and facilitation support during Weeks 6-12.
• Independent 90-and 180-day assurance reviews with completion evidence,overdue actions,risk exceptions,
and sustainability recommendations.
6. Optional Services.The BOLSTER'Organizational Culture Assessment may measure employee perspectives across
executive credibility,trust, psychological safety,accountability,communication,development,support,innovation,
community orientation,and future readiness.A formal BOLSTER' Executive Leadership Scorecard may rate
competencies with behavioral observations,supporting evidence,organizational impact, risks,recommendations,
and ratings. Neither option is included unless separately authorized in writing.
7. Acceptance.A deliverable is acceptable when it covers the authorized scope, uses corroborated evidence reasonably
available,identifies limitations and competing information,distinguishes assessment from legal and personnel
decisions,provides usable corrective actions where appropriate,and receives TBG factual-quality review.
8. Compensation and Invoicing.The blended rate is$175 per hour for all TBG personnel. Based on the source proposal,
planning assumes up to 166 TBG hours across Phases 1-5,estimated at$29,050.This is a planning estimate, not a
guarantee or not-to-exceed cap unless the CITY separately establishes one in writing.TBG invoices actual
authorized hours monthly; payment is due net 30.Approved travel and extraordinary expenses are billed at cost.
Authorized phase Estimated hours Rate Planning estimate
1—Registry and process controls 40 $175/hour $7,000
2—BOLSTER"'leadership assessment 60 $175/hour $10,500
3—Decision/remediation design 30 $175/hour $7,500
4—Implementation/trust reset 24 $175/hour $5,250
5—Assurance reviews 12 $175/hour $2,100
Project total 166 $175/hour $29,050
1
THE BOWMAN GROUP PORT ARTHUR
TEXAS
SAFEGUARDS AND CONTROLLING PROVISIONS
9. CITY Responsibilities.The CITY will provide timely access to personnel,records,systems,policies,agreements,
facilities, and authorized data;designate decision-makers and implementation owners; communicate expectations;
address safety,retaliation,and operational risks; and make policy,budget,labor,and personnel decisions.
10. Records and Transparency.TBG will use reasonable safeguards,version control,and authorized access. Project
materials may constitute public records.The CITY determines retention, release,redaction,confidentiality,and
public-information responses.TBG will not promise nondisclosure or independently make legal determinations.
11. Change Control. Material scope expansion,optional BOLSTER'"'Cultural Assessment or scorecard services,third-
party costs, or additional implementation support requires written authorization from the City Manager or another
official with contracting authority. Routine sequencing within the authorized phases may be adjusted through
written direction.
12. Escalation and Non-Retaliation.Apparent criminal conduct,imminent harm,evidence tampering,material
retaliation,mandatory reporting,or significant current public-safety exposure will be escalated promptly to the City
Manager and City Attorney. Participation will follow CITY-directed representation,confidentiality,and non-
retaliation protocols.
13. Independent Contractor and No Outcome Guarantee.TBG is an independent contractor and controls its professional
methods subject to authorized scope, law,CITY security requirements,and operational coordination.TBG does not
guarantee a particular leadership,employment,labor,cultural, public-confidence,or operational outcome.
14. Term and Controlling Documents.This Charter becomes effective when signed or when TBG first performs
authorized services,whichever occurs first,and continues until completed, replaced,suspended, or terminated
under the governing agreement or written direction.The governing agreement controls in a conflict. Records,
payment,security,confidentiality,and integrity obligations survive closeout. Electronic signatures and counterparts
may be used.
THE BOWMAN GROUP PORT ARTHUR
\o/e
TEXAS
ACKNOWLEDGMENT AND AUTHORIZATION
The undersigned acknowledge that they have reviewed this Engagement Charter,are authorized to act for their
respective entities,approve the project scope and operating controls,and authorize TBG to perform the services
described herein at$175 per hour.
CITY OF PORT ARTHUR THERON L.BOWMAN,INC.
DBA THE BOWMAN GROUP
By: By:
Ron Burton Theron L. Bowman,PhD
City Manager Founder I CEO I Principal Expert
Date: Date:
Reviewed as to form,if required:
City Attorney: Date: