INTEROFFICE MEMORANDUM
Date: October 5, 2026
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Jessie Dehn, P.E., Director of Public Work
RE: P.R. No. 25197—Authorizing the City Manager to enter into a Contract with
Mike Barnett Construction Inc. for replacement of the wall at the Hotel Sabine.
Introduction:
Proposed Resolution No. 25197 seeks City Council's approval for the City Manager to enter
into a contract with Mike Barnett Construction, Inc. of Port Neches, Texas, under SETX
Purchasing Cooperative Region 5 Contract #20250202/#20250503, for replacement of the
existing wall outside of the Hotel Sabine in the amount of$26,925.97.
Background:
There is an existing wall that was constructed outside of the Hotel Sabine to protect from
unauthorized entry to the building as well as protection of patrons from potential for falling
debris. Following Tropical Storm Edouard, several areas of the wall became damaged,requiring
replacement.Mike Barnett Construction provided a proposal to construct a new 16-foot tall wall,
replacing the existing 8-foot tall wall. The proposal received from Mike Barnett Construction to
complete this work is $26,925.97. After construction, banners advertising the upcoming Mardi
Gras event will be installed along its exterior.
Budget Impact:
This work will have a budgetary impact in the amount of$26,925.97. Funding shall be available
in the Mardi Gras Account#001-01-005-5470-00-10-000, Project Number MG2027.
"Remember,we are here to serve the Citizens of Port Arthur"
444 46 Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
Recommendation:
It is recommended that the City Council authorizes the contract with Mike Barnett
Construction, Inc. of Port Neches,Texas for replacement of the existing wall outside of the
Hotel Sabine in the amount of$26,925.97.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
P.R.25197
10/5/2026 JD-TNR
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AWARDING THE CONTRACT BETWEEN THE CITY OF
PORT ARTHUR AND MIKE BARNETT CONSTRUCTION,INC.OF PORT
NECHES, TEXAS, FOR THE REPLACEMENT OF THE WALL AT THE
HOTEL SABINE, A CITY-OWNED PROPERTY LOCATED AT 600
PROCTER STREET, WITH A BUDGETARY IMPACT OF $26,925.97.
FUNDING SHALL BE AVAILABLE IN THE MARDI GRAS ACCOUNT,001-
01-005-5470-00-10-000,PROJECT NUMBER MG2027.
WHEREAS,the City of Port Arthur owns and maintains a wall adjacent to Hotel Sabine,a
City-owned property located at 600 Procter Street,for the purpose of restricting unauthorized access
to the building and providing a measure of protection to patrons from potential hazards associated
with falling debris; and,
WHEREAS, following Tropical Storm Edouard, portions of the existing wall sustained
damage and required replacement to restore the area to a safe and functional condition; and,
WHEREAS, Mike Barnett Construction, Inc. of Port Neches, Texas, has submitted a
proposal,attached hereto as Exhibit A,to replace the existing eight-foot(8')wall with a new sixteen-
foot(16')wall at the Hotel Sabine; and,
WHEREAS,the proposed work will include the replacement of the damaged wall and will
facilitate the subsequent installation of banners advertising the City's upcoming Mardi Gras event
along the exterior of the wall; and,
WHEREAS, the proposed contract is to be awarded pursuant to the SETX Purchasing
Cooperative Region 5 Contract Nos. 20250202/20250503; and,
WHEREAS,the total cost for the proposed work is$26,925.97,with funding available from
Mardi Gras Account No. 001-01-005-5470-00-10-000, Project No. MG2027; and,
WHEREAS, the City Council finds that approval of the proposed contract is in the best
interest of the City and will facilitate the timely replacement of the damaged wall at the Hotel
Sabine.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR,TEXAS:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT,the City Council hereby awards a contract to Mike Barnett Construction,Inc.of Port
Neches, Texas, pursuant to SETX Purchasing Cooperative Region 5 Contract Nos.
20250202/20250503, for the replacement of the existing wall at the Hotel Sabine, a City-owned
P.R.25197
10/5/2026 JD-TNR
Page 2 of 3
property located at 600 Procter Street, in an amount not to exceed $26,925.97, substantially in
accordance with the proposal attached hereto as Exhibit A; and,
THAT,the City Manager is hereby authorized and directed,for and on behalf of the City of
Port Arthur,to execute the contract with Mike Barnett Construction,Inc.,attached hereto as Exhibit
B;
THAT,funding shall be available in the Mardi Gras Account,001-01-005-5470-00-10-000,
Project Number MG2027; and,
THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the
Council.
READ,ADOPTED,AND APPROVED,this day of ,2026 AD,
at a regular meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor:
Councilmembers:
NOES:
Charlotte M. Moses, Mayor
ATTEST:
Christe Whitley Ned, TRMC, City Secretary
APPROVED AS TO FORM:
Roxann Pais Cotroneo, Esq., City Attorney
P.R.25197
10/5/2026 JD
Page 3 of 3
APPROVED FOR ADMINISTRATION:
Ronald Burt , C'` , City Manager
Jessie Dehn, P.E., Director of Public Works
APPROVED AS TO THE AVAILABILITY OF FUNDS:
ditom.
Clifton . Williams, Jr., CPPB, Purchasing Manager
Lyn e 1, IC A- , , Di ector of Finance
P. R. 25197
Exhibit
A
Alike Barnett Construction
17(11 Port Neches Avenue
Port Neches, TX 77651
The City of Port Arthur Sabine Hotel 10/5/26
Port Arthur,TX 77641
Attn: LaTonya James
Re:Sabine Hotel Temporary Barrier Wall
We at Mike Barnett Construction are offering you this proposal for the" Removal and replacement
of Barrier Containment wall around the Old Sabine Hotel"Our estimate includes all labor and
.materials to perform the scope of work.
Scope of work:
1. To remove and dispose of the existing containment barrier wall around the old Sabine Hotel.
2. To furnish and install a New 16'tall barrier wall approx. 250' long with a double gate for
entry. We will provide a drawing schematic of the Bracing supports we are proposing to build
to support the wall
3. All angle Supports will be anchored into the concrete surfaces as solid surfaces are available.
4. All framing materials will be treated material for the exterior. All Plywood sheeting shall be 3/4"
OSB.
Qualifications:
All lift equipment is included.
• All painting is by others as per the City
• To clean and maintain site daily.
• We exclude permit fees.
• Omissions and errors—Any Additions to the scope of work will be a change may incur
additional charges.
Pricing: exempt.
We are offering this proposal with all labor, material, equipment and required insurance for the total
amount of:Twenty-Six thousand nine hundred and twenty-five dollars and .97 cents: (S26,925.97)
Tax
MIKE BARNETT CONSTRUCTION SETX COOP REGION 5 :#20250202/20250503
This bid is good for 30 days. This bid is subject to change upon on any revisions or changes contrary to
the
scope provided. This bid is also subject to change based upon market increases beyond our control.
Sincer ly,
e�
ussell Bourgeois- ercial Const. Mgr.
P. R. 25197
Exhibit
B
CONTRACT FOR THE REPLACEMENT OF THE
EXISTING WALL AT THE HOTEL SABINE
THIS AGREEMENT,made this day of , 2026,
by and between the City of Port Arthur, a municipal corporation organized under the laws
of the State of Texas,hereinafter called "OWNER" or "CITY" and Mike Barnett
Construction, Inc. of Port Neches,Texas, hereinafter called "CONTRACTOR."
WITNESSETH: That for and in consideration of the payment terms, conditions and
agreements set forth herein, OWNER and CONTRACTOR agree as follows:
1. The term of this contract shall be for 90 days from the date stated on the Notice to
Proceed. The City can terminate this contract at its convenience which includes,but is
not limited to, funding not being available in any budget cycle within thirty(30) days'
written notice.
2. The CONTRACTOR will perform work as stated in the Contract Documents.
3. During the term of this Contract, the CONTRACTOR will furnish at his own expense
all of the materials, supplies, tools, equipment, labor and other services necessary to
connection therewith, excepting those supplies specifically not required of Contractor
in the Specifications.
4. The CONTRACTOR agrees to perform all the work described in the specifications and
contract documents and to comply with the terms therein for the sum of$26,925.97.
5. The term "Contract Documents" means and includes the following:
a) Agreement
b) Quote
c) Notice of Award
d) Notice to Proceed
6. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors, and assigns.
7. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed
by their duly authorized officials,this Agreement in(2 copies), each of which shall be
deemed an original on the date first above written.
B- 1
Signed on the day of 2026
ATTEST CITY OF PORT ARTHUR
BY
CITY SECRETARY CITY MANAGER
Signed on the day of 2026
ATTEST MIKE BARNETT
CONSTRUCTION, INC.
BY
CITY SECRETARY
B- 2