Loading...
HomeMy WebLinkAboutP.R. NO. 25197 A CONTRACT WITH MIKE BARNETT CONSTRUCTION INC. FOR REPLACEMENT OF THE WALL AT THE HOTEL SABINE. Ciry of nrr rth �u Texas www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: October 5, 2026 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Jessie Dehn, P.E., Director of Public Work RE: P.R. No. 25197—Authorizing the City Manager to enter into a Contract with Mike Barnett Construction Inc. for replacement of the wall at the Hotel Sabine. Introduction: Proposed Resolution No. 25197 seeks City Council's approval for the City Manager to enter into a contract with Mike Barnett Construction, Inc. of Port Neches, Texas, under SETX Purchasing Cooperative Region 5 Contract #20250202/#20250503, for replacement of the existing wall outside of the Hotel Sabine in the amount of$26,925.97. Background: There is an existing wall that was constructed outside of the Hotel Sabine to protect from unauthorized entry to the building as well as protection of patrons from potential for falling debris. Following Tropical Storm Edouard, several areas of the wall became damaged,requiring replacement.Mike Barnett Construction provided a proposal to construct a new 16-foot tall wall, replacing the existing 8-foot tall wall. The proposal received from Mike Barnett Construction to complete this work is $26,925.97. After construction, banners advertising the upcoming Mardi Gras event will be installed along its exterior. Budget Impact: This work will have a budgetary impact in the amount of$26,925.97. Funding shall be available in the Mardi Gras Account#001-01-005-5470-00-10-000, Project Number MG2027. "Remember,we are here to serve the Citizens of Port Arthur" 444 46 Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Recommendation: It is recommended that the City Council authorizes the contract with Mike Barnett Construction, Inc. of Port Neches,Texas for replacement of the existing wall outside of the Hotel Sabine in the amount of$26,925.97. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P.R.25197 10/5/2026 JD-TNR Page 1 of 3 RESOLUTION NO. A RESOLUTION AWARDING THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND MIKE BARNETT CONSTRUCTION,INC.OF PORT NECHES, TEXAS, FOR THE REPLACEMENT OF THE WALL AT THE HOTEL SABINE, A CITY-OWNED PROPERTY LOCATED AT 600 PROCTER STREET, WITH A BUDGETARY IMPACT OF $26,925.97. FUNDING SHALL BE AVAILABLE IN THE MARDI GRAS ACCOUNT,001- 01-005-5470-00-10-000,PROJECT NUMBER MG2027. WHEREAS,the City of Port Arthur owns and maintains a wall adjacent to Hotel Sabine,a City-owned property located at 600 Procter Street,for the purpose of restricting unauthorized access to the building and providing a measure of protection to patrons from potential hazards associated with falling debris; and, WHEREAS, following Tropical Storm Edouard, portions of the existing wall sustained damage and required replacement to restore the area to a safe and functional condition; and, WHEREAS, Mike Barnett Construction, Inc. of Port Neches, Texas, has submitted a proposal,attached hereto as Exhibit A,to replace the existing eight-foot(8')wall with a new sixteen- foot(16')wall at the Hotel Sabine; and, WHEREAS,the proposed work will include the replacement of the damaged wall and will facilitate the subsequent installation of banners advertising the City's upcoming Mardi Gras event along the exterior of the wall; and, WHEREAS, the proposed contract is to be awarded pursuant to the SETX Purchasing Cooperative Region 5 Contract Nos. 20250202/20250503; and, WHEREAS,the total cost for the proposed work is$26,925.97,with funding available from Mardi Gras Account No. 001-01-005-5470-00-10-000, Project No. MG2027; and, WHEREAS, the City Council finds that approval of the proposed contract is in the best interest of the City and will facilitate the timely replacement of the damaged wall at the Hotel Sabine. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct; and, THAT,the City Council hereby awards a contract to Mike Barnett Construction,Inc.of Port Neches, Texas, pursuant to SETX Purchasing Cooperative Region 5 Contract Nos. 20250202/20250503, for the replacement of the existing wall at the Hotel Sabine, a City-owned P.R.25197 10/5/2026 JD-TNR Page 2 of 3 property located at 600 Procter Street, in an amount not to exceed $26,925.97, substantially in accordance with the proposal attached hereto as Exhibit A; and, THAT,the City Manager is hereby authorized and directed,for and on behalf of the City of Port Arthur,to execute the contract with Mike Barnett Construction,Inc.,attached hereto as Exhibit B; THAT,funding shall be available in the Mardi Gras Account,001-01-005-5470-00-10-000, Project Number MG2027; and, THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the Council. READ,ADOPTED,AND APPROVED,this day of ,2026 AD, at a regular meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor: Councilmembers: NOES: Charlotte M. Moses, Mayor ATTEST: Christe Whitley Ned, TRMC, City Secretary APPROVED AS TO FORM: Roxann Pais Cotroneo, Esq., City Attorney P.R.25197 10/5/2026 JD Page 3 of 3 APPROVED FOR ADMINISTRATION: Ronald Burt , C'` , City Manager Jessie Dehn, P.E., Director of Public Works APPROVED AS TO THE AVAILABILITY OF FUNDS: ditom. Clifton . Williams, Jr., CPPB, Purchasing Manager Lyn e 1, IC A- , , Di ector of Finance P. R. 25197 Exhibit A Alike Barnett Construction 17(11 Port Neches Avenue Port Neches, TX 77651 The City of Port Arthur Sabine Hotel 10/5/26 Port Arthur,TX 77641 Attn: LaTonya James Re:Sabine Hotel Temporary Barrier Wall We at Mike Barnett Construction are offering you this proposal for the" Removal and replacement of Barrier Containment wall around the Old Sabine Hotel"Our estimate includes all labor and .materials to perform the scope of work. Scope of work: 1. To remove and dispose of the existing containment barrier wall around the old Sabine Hotel. 2. To furnish and install a New 16'tall barrier wall approx. 250' long with a double gate for entry. We will provide a drawing schematic of the Bracing supports we are proposing to build to support the wall 3. All angle Supports will be anchored into the concrete surfaces as solid surfaces are available. 4. All framing materials will be treated material for the exterior. All Plywood sheeting shall be 3/4" OSB. Qualifications: All lift equipment is included. • All painting is by others as per the City • To clean and maintain site daily. • We exclude permit fees. • Omissions and errors—Any Additions to the scope of work will be a change may incur additional charges. Pricing: exempt. We are offering this proposal with all labor, material, equipment and required insurance for the total amount of:Twenty-Six thousand nine hundred and twenty-five dollars and .97 cents: (S26,925.97) Tax MIKE BARNETT CONSTRUCTION SETX COOP REGION 5 :#20250202/20250503 This bid is good for 30 days. This bid is subject to change upon on any revisions or changes contrary to the scope provided. This bid is also subject to change based upon market increases beyond our control. Sincer ly, e� ussell Bourgeois- ercial Const. Mgr. P. R. 25197 Exhibit B CONTRACT FOR THE REPLACEMENT OF THE EXISTING WALL AT THE HOTEL SABINE THIS AGREEMENT,made this day of , 2026, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas,hereinafter called "OWNER" or "CITY" and Mike Barnett Construction, Inc. of Port Neches,Texas, hereinafter called "CONTRACTOR." WITNESSETH: That for and in consideration of the payment terms, conditions and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The term of this contract shall be for 90 days from the date stated on the Notice to Proceed. The City can terminate this contract at its convenience which includes,but is not limited to, funding not being available in any budget cycle within thirty(30) days' written notice. 2. The CONTRACTOR will perform work as stated in the Contract Documents. 3. During the term of this Contract, the CONTRACTOR will furnish at his own expense all of the materials, supplies, tools, equipment, labor and other services necessary to connection therewith, excepting those supplies specifically not required of Contractor in the Specifications. 4. The CONTRACTOR agrees to perform all the work described in the specifications and contract documents and to comply with the terms therein for the sum of$26,925.97. 5. The term "Contract Documents" means and includes the following: a) Agreement b) Quote c) Notice of Award d) Notice to Proceed 6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 7. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials,this Agreement in(2 copies), each of which shall be deemed an original on the date first above written. B- 1 Signed on the day of 2026 ATTEST CITY OF PORT ARTHUR BY CITY SECRETARY CITY MANAGER Signed on the day of 2026 ATTEST MIKE BARNETT CONSTRUCTION, INC. BY CITY SECRETARY B- 2