Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P.R. NO. 25145 CONTRACT FOR THE ROOF REPLACEMENT AT FLEET'S MAINTENANCE BUILDING LOCATED AT 101 H.O. MILLS.
City of Port Arthur Transit Department Memorandum To: Ron Burton,City Manager From: Ivan Mitchell,Transit-Fleet Director t(,C Date: September 23,2026 Re: P.R.25145—101 & 103 H.O.Mills Maintenance Building Roof Replacement Nature of Request: Authorize the City Manager to execute a contract with Centurion Industries, Inc., D/B/A A-Lert Roof Systems of New Braunfels, Texas, through TIPS cooperative contract NO. 24060401, for the roof replacement at 101 H.O. Mills Boulevard, in an amount not to exceed $240,180.00 and at 103 H.O. Mills Boulevard,in an amount not to exceed$407,955.00. Background: Fleet's maintenance building at 101 H.O. Mills and 103 H.O. Mills allows the department to maintain the City's vehicles and equipment. Additionally, the city's Police department utilizes the building to maintain their vehicles. This project is essential to the preservation of the City's fleet and equipment. Replacing the deteriorated roof will ensure Port Arthur's vehicles and equipment remain safe, dependable, and in a state of good repair, while also maintaining the functional and professional appearance of this critical maintenance facility. Recommendation: It is recommended that the City Council approve P.R. No. 25145, authorizing the City Manager to execute a contract with Centurion Industries, Inc., D/B/A A-Lert Roof Systems of New Braunfels, Texas,through TIPS cooperative contract NO. 24060401, for the roof replacement at 101 H.O. Mills Boulevard,in an amount not to exceed$240,180.00 and at 103 H.O. Mills Boulevard, in an amount not to exceed $407,955.00. Budgetary/Fiscal Effect: Funding to pay for the roof replacement is available in Account Fund 307- 13-037-8525-00-10-000. P.R. No. 25145 9/23/2026 IM-TNR RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH CENTURION INDUSTRIES, INC., DB/A A-LERT ROOF SYSTEMS OF NEW BRAUNFELS, TEXAS, THROUGH TIPS COOPERATIVE CONTRACT NO. 24060401 FOR THE ROOF REPLACEMENT AT FLEET'S MAINTENANCE BUILDING LOCATED AT 101 H.O. MILLS BOULEVARD, IN AN AMOUNT NOT TO EXCEED $240,180.00, AND 103 H.O. MILLS BOULEVARD IN AN AMOUNT NOT TO EXCEED $407,955.00; FUNDING IS AVAILABLE IN PROJECT ES0001.CON WITHIN ACCOUNT NO 307-13-037-8525-00-10-000. FOR A TOTAL OF $ 648,135.00. WHEREAS the Fleet Department has determined tha t the roofs at 101 and 103 H.O. Mills Boulevard, Port Arthur, Texas, have exceeded their useful service life and require replacement to preserve the structural integrity of the buildings and maintain the safety, functionality, and operational readiness of the Fleet Maintenance Facility; and WHEREAS, Chapter 271, Subchapter F, of the Texas Local Government Code authorizes local governments to participate in cooperative purchasing programs to procure goods and services in accordance with applicable law; and WHEREAS, The Interlocal Purchasing System (TIPS) is a cooperative purchasing program through which the City may procure eligible goods and services under an applicable cooperative contract, subject to the terms of the contract and applicable law; and WHEREAS, the City Council finds that procuring the roof replacement services through TIPS Cooperative Contract No. 24060401 serves the City's best interests by providing a cooperative procurement method for the necessary improvements to the Fleet Maintenance Facility; and WHEREAS, Centurion Industries, Inc., D/B/A A-Lert Roof Systems of New Braunfels, Texas, has submitted a proposal under TIPS Cooperative Contract No. 24060401 to replace the roof at 101 H.O. Mills Boulevard for a lump-sum amount of $243,835.00 and the roof at 103 H.O. Mills Boulevard for a lump-sum amount of$414,165.00, as reflected in Exhibit "A" and " B"; and WHEREAS, the contractor has offered a discount of$3,655.00 for the roof replacement at 101 H.O. Mills Boulevard if both contracts are executed together and the projects are performed consecutively, reducing the contract amount for that location to $240,180.00; and WHEREAS, the contractor has offered a discount of$6,210.00 for the roof replacement at 103 H.O. Mills Boulevard if both contracts are executed together and the projects are performed consecutively, reducing the contract amount for that location to $407,955.00; and WHEREAS, the combined discounted contract amount for both roof replacement projects is $648,135.00, and the Fleet Department recommends approval of P.R. No. 25145 to P.R. No. 25145 9/23/2026 IM-TNR authorize the City Manager to execute the contract documents with Centurion Industries, Inc., D/B/A A-Lert Roof Systems, subject to the terms and conditions set forth in the applicable contract documents and proposal attached as Exhibit"A" and "B"; and WHEREAS, funding for the roof replacement projects is available in Project ES0001.CON within Account No. 307-13-037-8525-00-10-000. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT, the facts and opinions in the preamble are true and correct. THAT, the City Manager is hereby authorized to execute the contract documents with Centurion Industries, Inc., D/B/A A-Lert Roof Systems of New Braunfels, Texas, through TIPS Cooperative Contract No. 24060401, for the replacement of the roof at 101 H.O. Mills Boulevard in an amount not to exceed $240,180.00 and the roof at 103 H.O. Mills Boulevard in an amount not to exceed $407,955.00, for a combined amount not to exceed $648,135.00, attached as Exhibit"A" and "B". THAT, funding for the foregoing expenditures shall be provided from Project ES0001.CON within Account No. 307-13-037-8525-00-10-000. THAT, a copy of the caption of this Resolution be spread upon the minutes of the City Council. READ, ADOPTED AND APPROVED this day of 2026 at a Regular meeting of the City of Port Arthur, Texas by the following vote: AYES: Mayor: Councilmembers: ;NOES: Charlotte M. Moses, Mayor ATTEST: Christe Whitley Ned, City Secretary P.R. No. 25145 9/23/2026 IM-TNR APPROVED AS TO F Roxann Pais Cotroneo, City Attorney APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: 307-1 - 37-8525-00-10-000 61112 Ronald Bu , PM n Boswell / LV City Manager Director of Finance P• ,a. AO,,,_..A.., aiSildtv-71 2•-oe+ Cli on Williams, CPPB Ivan Mitchell Purchasing Manager Transit-Fleet Director P.R. No. 25145 9/23/2026 IM-TNR Exhibit "A" Centurion Industries, Inc. -- A-Lert Roof System Division Centurion 2065 FM 1102 New Braunfels, TX 78132 P (80o) 344-0609*F (83o) 643-1912 September 23, 2026 Ivan Mitchell City of Port Arthur Transit Director Dear Mr. Mitchell: We respectfully submit the following proposal to manufacture and install an A-Lert Standing Seam Roof System on the 101 HO Mills building, located in Port Arthur, TX. Scope of work: Manufacture and install a standing seam roof system with new wall panel, flashing, gutter, downspouts and trim as required. Roof panels will have a Galvalume finish and be continuous in length from eave to ridge eliminating panel end laps. Includes the following items. Material Specifications: 1. Roof Panel — 24 gauge steel with a Galvalume finish. A-Lert "SSR" panel, 16" wide with a 2" high major rib corrugation. Roof pitch to be 1/2":12". Concealed fasteners. UL-90. 2. Purlins and Verticals — per A-Lea's engineers design requirements. Members to be red oxide primer and labor to install. 3. Wall Panel —24 gauge "SSR" panel with a Fluropon 70% PVDF finish and labor to install. 4. Gutter—6" x 6" x 24 gauge with a prefinished Fluropon 70% PVDF finish and labor to install. 5. Downspouts— 3-1/2" x 4" prefinished to match gutters and labor to install. 6. Trim and other flashing —24 gauge with a Fluropon 70% PVDF finish and labor to install. Trims and flashings; including Rake, J-Trim, Eave, and Ridge Cap (Ridge Cap to be a Galvalume finish). 7. Roof jacks and labor to install. 8. Roof Curb — 1/8" Aluminum sheets and labor to install. 9. Extend ductwork to exhaust fans on the new roof. 10. Installation of temporary roof to dry-in the building at the conclusion of the asbestos abatement. This includes sweeping the existing deck of loose gravel and materials, priming the concrete deck with asphalt primer, and installing Polyglass self-adhered base sheet over the entire roof deck. 11. Performance Bond. 12. Building Permit. 13. WPI-8 windstorm certification as required. 14.TIPS Cooperative Contract Number 24060401. 15. A-Lert's 20 year Watertight, Materials, and Workmanship Warranty. The following are excluded items and material: 1. Any work not directly related to new standing seam metal roofing as shown per A-Lert's proposal drawing. 2. Any work with PEMB. 3. Any type of demolition. 4. Sales Tax. 5. Prevailing Wages. 6. Cash Allowance or Contingencies. 7. Architectural Fees. 8. Any work with the existing framing structure, decking, or sheathing and labor to install. 9. Any work to the existing flat roofs, metal roofs, shingle roofs, wall panels or soffit panels. 10. Concrete or Masonry work, HVAC, Mechanical, Gas, Electrical, and Plumbing. 11. Any work involved with the existing fascia mounted lighting, cameras, satellite, sensors, electrical boxes, conduit, antennas, or wiring. 12. Disconnecting, reconnecting, lowering or raising of any weatherheads, HVAC units, power vents, antennas, satellites, or wiring. 13. Any work with louvers. 14. Roof insulation, curb insulation, or vapor barriers and labor to install. 15. Downspout boots or splash blocks and labor to install. 16. Soffit panels and labor to install. 17. Any work with painting. 18. Wood blocking and labor to install. 19. Landscaping, tree or bush trimming, or removal and haul-off from job-site. 20. Snow guards and labor to install. 21. Any work with signage, letters, or plaques. 22. Any work with doors, windows, canopies, awnings, or skylights. 23. Any work with Asbestos, LEAD, mold, or mildew. 24. Firewall, fire barrier, fire partitions, smoke barriers, smoke partitions and draft stops. The above described work on the 101 HO Mills building can be done for a lump sum total of: Two Hundred Forty-Three Thousand Eight Hundred Thirty-Five and No/100 Dollars $243,835.00 If the contracts for 101 HO Mills and 103 HO Mills are signed together, they can be done back to back and 101 HO Mills will receive a discount of$3,655.00 *"The eHlstIng roof area viltlaln the deslgna ted utfo;rh score shall have all asI©estos- eontalr ing materials properly abated fully abated and the area rutty cleared pr rr to A-LeG s Elrr1lvet on-Mite and the commencement cud any rre-Vosfing ectivitlee. A- ert Boor c irate vulth rrrrofiecct subcontractors, h ckidh the t mporrarrny dry-ln rroc ling lnstalterr as ervell es the City of Port Arthur's asbestos abatement subcontractor.*** Terms- Monthly draws during construction and balance upon completion. Proposal good thirty days. Tax is excluded from bid. Customer must provide proper proof of tax exemption to avoid sales tax. `HlS PROPOSAL lS BASED UPOM HO REQUIRED . ODIFlC TtO 9S TO THE ENlSTIMG SUB-STRUCTURE. CUSTOMER RESPONISBLE FOR REUOVA L AHD OilSPOS A L OF ANY ASBESTOS MATERIALS OR AH u' OTHER HARMFUL SUBS d V,ICES THAT I'M of ENCOU TERED AT THE JJOEStTE. Due to the volatility of the steel market, this proposal is only valid for 30 days from proposed date. This document summarizes a project A-Lert Roof Systems proposes to perform for you. It will automatically be withdrawn 30 days after the date on the face of this project summary. The parties shall endeavor to promptly enter into written contract after execution of this document summary under terms(which may differ from those presented in the document summary)agreeable to both parties. In no event shall A-Lert Roof Systems be bound by this project summary if A-Lert Roof Systems determines that its customer credit worthiness standards have not been met. If we can be of any further assistance or if you have any questions, please don't hesitate to call me at 1-210-842-8913. Respectfully submitted, Brandon Ginn Regional Account Representative Centurion Industries, Inc. A-Lert Roof Systems Division ACCEPTANCE You are hereby authorized to complete the work described in the above proposal, for which I agree to pay the amount mentioned above. Tamil k • :���f,osoa000ee. Depo�itt. °a,00eAoaoe,o,oe,$ DATE: ACCEPTED: (title) Centurion Industries, Inc. _ Centunon A-Lert Roof System Division 2065 FM 1102 New Braunfels, TX 78132 P (800) 344-0609 * F (830) 643-1912 September 24, 2026 Ivan Mitchell City of Port Arthur Transit Director Dear Mr. Mitchell: We respectfully submit the following proposal to manufacture and install an A-Lert Standing Seam Roof System on the 103 HO Mills building, located in Port Arthur, TX. Scope of work: Manufacture and install a standing seam roof system with new wall panel, flashing, gutter, downspouts and trim as required. Roof panels will have a Galvalume finish and be continuous in length from eave to ridge eliminating panel end laps. Includes the following items. Material Specifications: 1. Roof Panel — 24 gauge steel with a Galvalume finish. A-Lert "SSR" panel, 16" wide with a 2" high major rib corrugation. Roof pitch to be 1/2":12". Concealed fasteners. UL-90. 2. Purlins and Verticals— per A-Lert's engineers design requirements. Members to be red oxide primer and labor to install. 3. Wall Panel —24 gauge "SSR" panel with a Fluropon 70% PVDF finish and labor to install. 4. Gutter—6" x 6" x 24 gauge with a prefinished Fluropon 70% PVDF finish and labor to install. 5. Downspouts — 3-1/2" x 4" prefinished to match gutters and labor to install. 6. Trim and other flashing —24 gauge with a Fluropon 70% PVDF finish and labor to install. Trims and flashings; including Rake, Valley, J-Trim, Eave, and Ridge Cap (Valley and Ridge Cap to be a Galvalume finish). 7. Roof jacks and labor to install. 8. Roof Curb — 1/8" Aluminum sheets and labor to install. 9. Extend ductwork to exhaust fans on the new roof. 10. Performance Bond. 11. Building Permit. 12.WPI-8 windstorm certification as required. 13. TIPS Cooperative Contract Number 24060401. 14. A-Lert's 20 year Watertight, Materials, and Workmanship Warranty. The following are excluded items and material: 1. Any work not directly related to new standing seam metal roofing as shown per A-Lert's proposal drawing. 2. Any work with PEMB. 3. Any type of demolition. 4. Sales Tax. CONTRACT BETWEEN THE CITY OF PORT AND CENTURION INDUSTRIES, INC DBA A-LERT ROOF STSTEMS THIS AGREEMENT, made this day 2026, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY," and Centurion Industries, Inc., DBA A-Lert Roof Systems, of New Braunfels, Texas, hereinafter called "CONTRACTOR" WITNESSETH: That for and in consideration of the payment terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The term of this Contract shall be for one year from the date of the issuance of the Notice to Proceed. The City can terminate this contract at its convenience, which includes, but is not limited to, funding not being available in any budget cycle, with thirty(30) days' written notice. 2. The Contractor will perform work as stated in the proposal documents. The Contractor will provide Port Arthur Equipment Service with a Manufacture and install an A-Lert Standing Seam Roof System for 101 HO Mills. 3. During the term of this Contract, the Contractor will furnish at his own expense all the materials, supplies, tools, equipment, labor, and other services necessary to connection therewith, excepting those supplies specifically not required of the Contractor in the Specifications. 4. The CONTRACTOR agrees to perform all work described in the specifications and contract documents and to comply with all terms and conditions contained therein for a total cost of $243,835.00, less than $3,655.00, for a final amount not to exceed $240,180.00 for 101 H.O. Mills 5. The term"Contract Documents" means and includes the following: A) Proposal • Specification 6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 8. IN WITNESS WHEREOF, the parties hereto have executed or caused to be executed by their duly authorized officials, this Agreement in(2 copies), each of which shall be deemed an original on the date first above written. Signed on the day of , 2026. ATTEST: CITY OF PORT ARTHUR BY: Christe Whitey Ned, Ronald Burton, CPM City Secretary City Manager Signed on the day of , 2026. WITNESS: CENTURION INDUSTRIES, INC BY: Print Name: Title: P.R. No. 25145 9/23/2026 IM-TNR Exhibit "B" 11, 111 Centurion Industries, Inc. Cen ' A-Lert Roof System Division t= N 2065 FM 1102 New Braunfels,TX 78132 P (800) 344-0609 *F (830) 643-1912 September 24, 2026 Ivan Mitchell City of Port Arthur Transit Director Dear Mr. Mitchell: We respectfully submit the following proposal to manufacture and install an A-Lert Standing Seam Roof System on the 103 HO Mills building, located in Port Arthur, TX. Scope of work: Manufacture and install a standing seam roof system with new wall panel, flashing, gutter, downspouts and trim as required. Roof panels will have a Galvalume finish and be continuous in length from eave to ridge eliminating panel end laps. Includes the following items. Material Specifications: 1. Roof Panel —24 gauge steel with a Galvalume finish. A-Lert "SSR" panel, 16" wide with a 2" high major rib corrugation. Roof pitch to be 1/2":12". Concealed fasteners. UL-90. 2. Purlins and Verticals— per A-Lert's engineers design requirements. Members to be red oxide primer and labor to install. 3. Wall Panel —24 gauge "SSR" panel with a Fluropon 70% PVDF finish and labor to install. 4. Gutter—6" x 6" x 24 gauge with a prefinished Fluropon 70% PVDF finish and labor to install. 5. Downspouts— 3-1/2" x 4" prefinished to match gutters and labor to install. 6. Trim and other flashing —24 gauge with a Fluropon 70% PVDF finish and labor to install. Trims and flashings; including Rake, Valley, J-Trim, Eave, and Ridge Cap (Valley and Ridge Cap to be a Galvalume finish). 7. Roof jacks and labor to install. 8. Roof Curb — 1/8" Aluminum sheets and labor to install. 9. Extend ductwork to exhaust fans on the new roof. 10. Performance Bond. 11. Building Permit. 12.WPI-8 windstorm certification as required. 13.TIPS Cooperative Contract Number 24060401. 14. A-Lert's 20 year Watertight, Materials, and Workmanship Warranty. The following are excluded items and material: 1. Any work not directly related to new standing seam metal roofing as shown per A-Lert's proposal drawing. 2. Any work with PEMB. 3. Any type of demolition. 4. Sales Tax. 5. Prevailing Wages. 6. Cash Allowance or Contingencies. 7. Architectural Fees. 8. Any work with the existing framing structure, decking, or sheathing and labor to install. 9. Any work to the existing flat roofs, metal roofs, shingle roofs, wall panels or soffit panels. 10. Concrete or Masonry work, HVAC, Mechanical, Gas, Electrical, and Plumbing. 11. Any work involved with the existing fascia mounted lighting, cameras, satellite, sensors, electrical boxes, conduit, antennas, or wiring. 12. Disconnecting, reconnecting, lowering or raising of any weatherheads, HVAC units, power vents, antennas, satellites, or wiring. 13. Any work with louvers. 14. Roof insulation, curb insulation, or vapor barriers and labor to install. 15. Downspout boots or splash blocks and labor to install. 16. Soffit panels and labor to install. 17. Any work with painting. 18. Wood blocking and labor to install. 19. Landscaping, tree or bush trimming, or removal and haul-off from job-site. 20. Snow guards and labor to install. 21. Any work with signage, letters, or plaques. 22. Any work with doors, windows, canopies, awnings, or skylights. 23. Any work with Asbestos, LEAD, mold, or mildew. 24. Firewall, fire barrier, fire partitions, smoke barriers, smoke partitions and draft stops. The above described work on the 103 HO Mills building can be done for a lump sum total of: Four Hundred Fourteen Thousand One Hundred Sixty-Five and No/100 Dollars $414,165.00 If the contracts for 101 HO Mills and 103 HO Mills are signed together, they can be done back to back and 103 HO Mills will receive a discount of$6,210.00 Terms- Monthly draws during construction and balance upon completion. Proposal good thirty days. Tax is excluded from bid. Customer must provide proper proof of tax exemption to avoid sales tax. THIS PROP*}SAL IS BASED UP NO REQUIRED MODIFICATIONS T4 THE EXISTING SUt-STRUCTURE. CUSTOMER RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ANY ASE ES T OS MATERIALS OR ANY OTHER HARMFUL SUBSTANCES NCES THAT RIIAY BE ERICOUNTE ;ED AT THE JO SITE, Due to the volatility of the steel market, this proposal is only valid for 30 days from proposed date. This document summarizes a project A-Lert Roof Systems proposes to perform for you. It will automatically be withdrawn 30 days after the date on the face of this project summary. The parties shall endeavor to promptly enter into written contract after execution of this document summary under terms(which may differ from those presented in the document summary)agreeable to both parties. In no event shall A-Lert Roof Systems be bound by this project summary if A-Lert Roof Systems determines that its customer credit worthiness standards have not been met. If we can be of any further assistance or if you have any questions, please don't hesitate to call me at 1-210-842-8913. Respectfully submitted, 07— Brandon Ginn Regional Account Representative Centurion Industries, Inc. A-Lert Roof Systems Division ACCEPTANCE You are hereby authorized to complete the work described in the above proposal, for which I agree to pay the amount mentioned above. Total Amount...........$ Balance......... DATE: ACCEPTED: (title) CONTRACT BETWEEN THE CITY OF PORT AND CENTURION INDUSTRIES, INC DBA A-LERT ROOF STSTEMS THIS AGREEMENT, made this day 20261 by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY" and Centurion Industries, Inc DBA A-Lert Roof Systems, of New Braunfels, Texas hereinafter called "CONTRACTOR" WITNESSETH: That for and in consideration of the payment terms, conditions and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The term of this Contract shall be from one year from date of the issuance of the Notice to Proceed. The City can terminate this contract at its convenience which includes, but is not limited to, funding not being available in any budget cycle with thirty (30) days' written notice. 2. The Contractor will perform work as stated in the proposal documents. The Contractor will provide Port Arthur Equipment Service with a Manufacture and install an A-Lert Standing Seam Roof System for 103 HO Mills. 3. During the term of this Contract, the Contractor will furnish at his own expense all the materials, supplies, tools, equipment, labor, and other services necessary to connection therewith, excepting those supplies specifically not required of Contractor in the Specifications. 4. The CONTRACTOR agrees to perform all work described in the specifications and contract documents and to comply with all terms and conditions contained therein for a total cost of $414,165.00, less than $6,210.00, for a final amount not to exceed $407,955.00 for 103 H.O. Mills 5. The term "Contract Documents" means and includes the following: A) Proposal • Specification 6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 8. IN WITNESS WHEREOF the parties hereto have executed or caused to be executed by their duly authorized officials,this Agreement in(2 copies) each of which shall be deemed an original on the date first above written. Signed on the day of , 2026. ATTEST: CITY OF PORT ARTHUR BY: Christe Whitey Ned, Ronald Burton, CPM City Secretary City Manager Signed on the day of , 2026. WITNESS: CENTURION INDUSTRIES, INC BY: Print Name: Title: