HomeMy WebLinkAboutP.R. 25170 INTERLOCAL AGREEMENT WITH LAMAR UNIVERSITY FOR FLOOD MONITORING SENSORS. Col of
u,-r rthu�
Texas
www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
Date: October 15, 2026
To: The Honorable Mayor and City Council
Through: Ronald Burton, City Manager
From: Jessie Dehn, P.E., Director of Public Works '
RE: P.R. 25170—Authorizing an Interlocal Agreement with Lamar University for
flood monitoring sensors
Introduction:
The intent of this agenda item is to authorize the City Manager to execute an Interlocal
Agreement with Lamar University for cost-sharing for the installation, access, upkeep, and
maintenance of flood monitoring sensors located within the City of Port Arthur.
Background:
The City of Port Arthur and Lamar University desire to enter into an Interlocal Agreement
pursuant to Chapter 791 of the Texas Government Code for the mutual benefit of the citizens
they serve. The agreement establishes the parties' respective responsibilities for flood
monitoring sensor sites. Lamar University will be responsible for the technical performance and
integrity of the sensor systems, including installation, configuration, calibration, technical
maintenance, data quality assurance and quality control, network monitoring, website
maintenance, and data transmission. The City will provide routine grounds and access
maintenance, site security, access, and permissions necessary to preserve the operability, safety,
and visibility of the flood monitoring instrumentation. The agreement has an initial term of one
year and automatically renews for successive one-year terms, subject to the availability and
annual appropriation of funds approved by City Council,unless either party provides at least 90
days' written notice of its intent to withdraw.
Budget Impact:
"Remember,we are here to serve the Citizens of Port Arthur"
444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
w
There will be a budgetary impact of$2,500.00 per sensor site for maintenance and operational
support. Costs for the sensor sites for Fiscal Year 2026-2027 are not to exceed $15,000. Any
costs for new sensor site installations will be established in writing and approved before
procurement and installation. Funding is available in the Public Works Drainage Division —
Professional Services Account, Account Number 001-21-055-5420-00-70-000.
Recommendation:
It is recommended that the City Council approve P.R. 25170, authorizing the City Manager to
execute an Interlocal Agreement with Lamar University for cost-sharing for the installation,
access, upkeep, and maintenance of flood monitoring sensors located within the City of Port
Arthur.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
P.R.25170
10/15/2026 JD
Page 1 of 4
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE
AN INTERLOCAL AGREEMENT WITH LAMAR UNIVERSITY FOR
COST-SHARING FOR THE INSTALLATION, ACCESS, UPKEEP, AND
MAINTENANCE OF FLOOD MONITORING SENSORS LOCATED
WITHIN THE CITY OF PORT ARTHUR, WITH AN ANNUAL
MAINTENANCE COST OF$2,500.00 PER SENSOR SITE,IN AN AMOUNT
NOT TO EXCEED $15,000. FUNDING IS AVAILABLE IN THE PUBLIC
WORKS DRAINAGE DIVISION—PROFESSIONAL SERVICES ACCOUNT,
ACCOUNT NUMBER 001-21-055-5420-00-70-000.
WHEREAS,the City of Port Arthur and Lamar University desire to enter into an Interlocal
Agreement,pursuant to Chapter 791 of the Texas Government Code, for the mutual benefit of the
citizens they serve; and,
WHEREAS,the Interlocal Agreement establishes the parties'respective responsibilities for
cost-sharing for the installation, access, upkeep, and maintenance of flood monitoring sensor sites
located within their respective jurisdictions; and,
WHEREAS, Lamar University will be responsible for the technical performance and
integrity of the sensor systems, including installation, configuration, calibration, technical
maintenance,data quality assurance and quality control,network monitoring,website maintenance,
and data transmission; and,
WHEREAS, the City will provide routine grounds and access maintenance, site security,
access,easements,and permissions necessary to preserve the operability,safety,and visibility of the
flood monitoring instrumentation; and,
WHEREAS, under Attachment A to the Interlocal Agreement, the City will pay Lamar
University$2,500.00 per sensor site annually for maintenance and operational support,and any costs
P.R.25170
10/15/2026 JD
Page 2 of 4
for new sensor site installations will be established in writing and approved before procurement and
installation; and,
WHEREAS,costs for the sensor sites during Fiscal Year 2026-2027 to not exceed$15,000;
and,
WHEREAS,the term of the agreement is for one(1)year from the date of execution and will
automatically renew for a period of one(1)year,subject to the availability and annual appropriation
of funds approved by City Council or unless the party gives at least 90 days written notice of that
parry's intent to withdraw from it; and,
WHEREAS, the Interlocal Agreement will have an initial term of one year and will
automatically renew for successive one-year terms, subject to the availability and annual
appropriation of funds approved by City Council, unless either party provides at least 90 days'
written notice of its intent to withdraw.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR,TEXAS:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT, the City Council hereby authorizes the City Manager to execute an Interlocal
Agreement with Lamar University for cost-sharing for the installation, access, upkeep, and
maintenance of flood monitoring sensors located within the City of Port Arthur; and,
THAT,the City will pay Lamar University an annual maintenance and operational support
fee of$2,500.00 per sensor site,costs for Fiscal Year 2026-2027 not to exceed$15,000,and any new
installation costs must be established in writing and approved before procurement and installation;
and,
P.R.25170
10/15/2026 JD
Page 3 of 4
THAT, the term of the agreement is for one (1) year from the date of execution and will
automatically renew for a period of one(1)year,subject to the availability and annual appropriation
of funds approved by City Council or unless the party gives at least 90 days written notice of that
parry's intent to withdraw from it, and;
THAT,funding is available in the Public Works Drainage Division—Professional Services
Account Number 001-21-055-5420-00-70-000; and,
THAT, a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ,ADOPTED,AND APPROVED,this day of ,2026 AD,
at a regular meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor:
Councilmembers:
NOES:
Charlotte M. Moses
Mayor
ATTEST:
Christe Whitley Ned, TRMC
City Secretary
10/15/2026 JD
Page 4 of 4
APPROVED AS TO FORM:
Roxann Pais Cotroneo, Esq.
City Attorney
APPROVED FOR ADMINISTRATION:
V.rfsce
City Mae ._er
l � �
Jessie Dehn, P.E.
Director of Public Works
APPROVED AS TO THE AVAILABILITY OF FUNDS:
y o well, PhD, CMA-CM
Finance Director
I ,, (Ajlek:
Clifton . Williams, Jr., CPPB
Purchasing Manager
EXHIBIT A
Igr
STATE OF TEXAS § INTERLOCAL AGREEMENT
CITY OF PORT ARTHUR §
WHEREAS, the City of Port Arthur (Agency) authorized by Chapter 791 of the Government
Code, desire to enter into this Interlocal Agreement with Lamar University(Lamar) (Parties) for
the mutual benefit of the citizens they serve, desire to enter into an agreement to be individually
bound by the covenants and responsibilities regarding the cost-sharing for installation, access,
upkeeping and maintenance of flood monitoring sensors (sites)described herein below and which
are located within the jurisdiction of the respective parties.
1. Definitions
A. Sensor site
The location of the installed sensors and assemblies (e.g., pressure transducer) Camera,
solar/power system, mounting, conduit/cabling, antennas, enclosure (node) and related
appurtenances, including the immediate grounds required for safe access and operation.
B. Ancillary Area
A practical work and access area extending a typical radius of approximately 20 feet around
the site(or as otherwise agreed)plus the route necessary for vehicle and or foot access.
C. High-Flow Event
A storm, flood or other event likely to deposit debris/sediment or obstruct access within
72 hours of the event.
D. Preventative Maintenance (PM)
Routine activities required to reduce the risk of outages or damage (vegetation control,
pest mitigation, sediment/debris cleaning and/or minor housekeeping.)
2. Roles and Responsibilities of Counties and Cities
I. Site Upkeep,Access and Security
The Agency shall perform routine grounds and access maintenance to preserve operability,
safety and visibility of the instrumentation and camera imagery which include:
• Mowing and/or trimming to maintain grass/vegetation at or below 8 inches within
a 3-5-foot radius around enclosures, solar panels, camera masts, staff gauges and
cabling. Do not remove or open instrument enclosures unless instructed by Lamar.
• Weed whack and clear brush to keep the camera field of view unobstructed and to
prevent shading of the solar panels, camera masts, staff gauges and cabling and
remove and debris or loose material which become wind/flood-borne hazards.
• Remove vines/overgrowth from poles, conduits and enclosures and avoid cutting
or pulling on cables.
• Use herbicides judiciously and only those appropriate for proximity to waterways
and avoid overspray on the equipment.
• After high flow events and during routine inspections,remove trash,woody debris
and any other debris which accumulates around the pressure transducer, stilling
well intake(if applicable),mounting structures and staff gauge,check for damaged
conduits, vandalism, for damaged or missing components and report damages to
Lamar.
• Clear sediment deposits that may obstruct or interfere with the approach to the
sensing or redirect flow such that measurements are not compromised without
materially altering the channel hydraulics.
• Keep culvert inlets/outlets and immediate approach areas clear of any obstructions
which might affect the instrument readings.
• Do not modify or relocate sensor elements and immediately report any damage or
misalignment/obstruction to Lamar for technical action.
• Report to Lamar within 24 hours of discovering damaged or non-operational
equipment or missing signage and provide photos with date and time,wide shot of
site and camera FOV, sensor area and any noted issues.
• Keep camera lenses and solar panels free of debris/dirt.
II. Pest& Wildlife Control:
• Implement Preventative measures against insects (fire ants, wasps) wildlife
(rodents,birds)that may damage cables, enter nodes or obscure cameras and solar
panels.
• Treat ant mounds near pads or poles, remove active wasp/hornet nests from
equipment, camera mounts. (Use rodent-safe conduit and bait boxes where
appropriate.)
• Install or maintain deterrents such as mesh screen, cable glands and anti-perch
spikes, as agreed.
III. Access, Easements and Permissions
• Maintain year-round access to sites, including keys for any gates or locks.
• Obtain and maintain all rights of entry and permissions for sites on private property
and coordinate with landowners to ensure that Lamar has timely access for routine
and corrective maintenance.
• Coordinate with right-of-way owners with respect to roadway, drainage or utility
authorities in the event traffic control or lane closures are require.
• Notify Lamar within 24 hours of any damaged or nonfunctional equipment.
3. Roles and Responsibilities of Lamar University
I. Technical Systems
Lamar will be responsible for technical performance and integrity of the sensor systems,
including:
• Installation, configuration, calibration and routine technical maintenance of the
pressure transducers, cameras, telemetry and routine maintenance of the pressure
transducers, cameras, enclosures, antennae, enclosures, solar/power systems and
firmware/software.
• Data quality assurance/quality control (QA/QC), network monitoring and
troubleshooting.
• Replacement/repair of sensors and electronic components due to normal
wear/failure and management of spares.
• Scheduled service windows as communicated to the Counties and coordination for
temporary takedown/replacement of damaged parts.
• Provide for a help desk or designated contact channel for outage reports and
coordination for access.
• Maintenance of the website and data transmission.
• Maintenance and calibration records,outage logs and data QA/QC notes and share
the status summary quarterly.
4. Shared Responsibilities
I. The Agency will designate,and keep current,primary and secondary Points of Contact
(name, title, phone and email) and meet at least annually to review performance and
share lessons learned.
II. Maintain and share an up-to-date inventory of site locations by GPS coordinates,
address/landmarks,parcel ROW information, access points and gate codes.
III. Routine maintenance(stipulated in Sections 2 and 3)with at least 7 days advance notice
and provide for urgent access, when necessary.
IV. Compliance with all applicable laws, environmental regulations, safety standards and
ROW access, when necessary per the ROW owner's standards.
V. Strive to maintain sensor data availability at 75% and camera imagery availability,
excluding force majeure.
VI. Major/extraordinary repairs that must be performed by a third party will be scoped and
mutually approved before work is done.
VII. The Agency will cooperate to establish an annual budget for performance of routine
services per this agreement.
5. Term,Amendment, and Termination
I. This agreement will extend for a period of one (1) year(s) from the date of execution
and will automatically renew for a period of one(1)year, subject to the availability and
annual appropriation of funds approved by City Council or unless the party gives at
least 90 days written notice of that party's intent to withdraw from it.
II. The Agency will remit annual payment within 60 days of September 1 St of each year
for maintenance services rendered per the schedule of costs established in Attachment
A.
III. Lamar will invoice payment for equipment and services rendered for new site
installations per the schedule of costs established in Attachment A.
IV. Removal/Relocation of Sensor Sites
Any participating agency may request the removal of an existing sensor site. Upon
such request:
a. Lamar will coordinate the safe decommissioning and removal of the
equipment.
b. The inventory will be updated to reflect the removal, and any adjustments to
annual maintenance fees will take effect in the next fiscal year.
c. Any new sensor sites requested by an agency will fall under the New
Installation category described in Attachment A.
d. If an existing site is to be relocated(moved from one position to another),this
will also be considered a new installation,particularly if additional
infrastructure(e.g.,mounting, cabling,power systems)is required to
accommodate the relocation.
V. The Agency shall maintain customary liability insurance or self-insurance as permitted
by law.
VI. The Agency will indemnify the other parties from negligence or willful misconduct to
the extent allowed by law.
VII. Nothing herein shall operate to waive any governmental or statutory protections.
6. Force Majeure
I. The Agency will not be liable for delays or failures due to events beyond reasonable
control, such as severe storms, floods, acts of God, labor disputes or utility outages,
provided reasonable measures are taken to mitigate damages and to restore service.
7. Stipulations:
I. The Agency agrees, pursuant to Sec. 791.015, Texas Government Code, that any
dispute regarding the terms of the Agreement will be submitted to an agreed upon
mediator for resolution.Nothing in this Section is intended to waive either party's right
to seek civil relief in a Court of proper jurisdiction.
II. The Agency further agrees that, during the performance of the work, no agent, servant
or employee of a party will be an agent, servant or employee of the other.
7. Entire Agreement
I. This Agreement and any and all Exhibits attached hereto constitute the sole and only
agreement between the Parties and supersede any prior or contemporaneous
understandings, written agreements, or oral agreements between the Parties with
respect to the subject matter of this Agreement.
8. Governing Law and Exclusive Venue
I. The laws of the State of Texas shall govern this Agreement, and the exclusive venue
for any legal action concerning this Agreement shall be in a District Court with
appropriate jurisdiction in Jefferson County, Texas. The Parties agree to submit to the
personal and subject matter jurisdiction of said court.
9. Authorization
Each Party represents that it has full capacity and authority to grant all rights and
assume all obligations granted and assumed under this Agreement.
10. Severability
In the event any one or more of the provisions contained in this Agreement shall for
any reason be held to be invalid, illegal, or unenforceable in any respect by a court of
competent jurisdiction, such invalidity, illegality or unenforceability shall not affect
any other provision in this Agreement,and this Agreement shall be construed as if such
invalid,illegal,or unenforceable provision had never been contained in this Agreement.
11. Indemnification
To the extent authorized by the Constitution and laws of the State of Texas, each Party
shall be responsible for the negligent acts or omissions and other wrongful conduct of
its own officers, employees, agents, contractors, and representatives acting within the
course and scope of their duties or authorized activities under this Agreement. Each
Party shall be responsible for bodily injury, death, or damage to or loss of property to
the extent caused by the negligent acts or omissions or other wrongful conduct of that
Party or its officers, employees, agents, contractors, or representatives in connection
with the installation,operation,access,inspection,upkeep,or maintenance of the flood-
monitoring sensor sites and associated equipment.
II. Nothing in this Agreement shall be construed to require either Party to indemnify,
defend, or hold harmless the other Party for the other Party's negligence or wrongful
conduct,or to the extent such obligation is prohibited by the Constitution or laws of the
State of Texas. Nothing in this Agreement shall be construed as a waiver of sovereign
immunity, governmental immunity, or any other rights, defenses, or immunities
available to either Party under Texas law.
III. III.The responsibilities established under this Section shall apply to claims arising from
acts or omissions occurring during the term of this Agreement. This Section shall
survive the expiration or termination of this Agreement solely with respect to such
claims, to the extent permitted by applicable law.
lir
Points of Contact for Agency
Primary Contact
Name:
Phone number:
Email address:
Secondary Contact
Name:
Phone number:
Email:
For Lamar:
Primary Contact
Name:Nicholas Brake
Phone number: (409) 880 - 8765
Email: nbrake@lamar.edu
For Lamar:
Secondary Contact
Name: Ryan Lee
Phone number: (409) 880 -2272
Email: rlee17@lamar.edu
Approved by:
City of Port Arthur
Date:
Ron Burton, CPM,City Manager
Lamar University
Date: 10/15/2026
Gene Theodori,Associate Provost for Academic and Research Administration
ATTACHMENT A
SENSOR NETWORK SCHEDULE OF COSTS
1. Cost for Existing Sensor Sites
Each participating agency agrees to pay$2,500 per sensor site annually for maintenance and operational
support provided by Lamar University.This cost includes:
• Weekly monitoring and diagnostics
• Quarterly uarterl site visits and routine maintenance
• Sensor calibration and firmware updates
• Data quality assurance and reporting
• Website and data transmission maintenance
• Coordination and communication with agency contacts
This flat rate is intended to streamline budgeting and ensure consistent service across all sites.
2. Additional Costs for New Site Installations
For any new sensor site installations requested by an agency, costs will be determined on a case-by-case
basis and invoiced as follows:
• Equipment: Based on the published pricing from the sensor equipment manufacturer at the time
of procurement.
• University Overhead: A standard overhead rate applied by Lamar University to cover
administrative and indirect costs, set at 35%as of the time of this agreement.This rate is subject
to change following periodical negotiations with the cognizant federal agency.
• Permitting and Engineering Services: Any costs incurred for site-specific permitting,
engineering design,or third-party services required for installation.
• Installation: Based on the proposed sensor location(s)and the Party providing installation
services may or may not apply.
The total cost for new site installations will be established and communicated in writing to the requesting
agency in advance and must be approved prior to procurement and installation.
3. Cost Variability
The Parties acknowledge that the cost of sensor equipment may vary depending on market conditions and
manufacturer pricing. As such, Lamar University will provide updated quotes for equipment, labor, and
installation upon request or as part of the annual budget planning process.
4. Incorporation into Agreement
This Attachment shall be incorporated into and made part of the Interlocal Agreement.All other terms and
conditions of the Agreement remain in full force and effect unless expressly modified herein.