Loading...
HomeMy WebLinkAboutP.R. 25170 INTERLOCAL AGREEMENT WITH LAMAR UNIVERSITY FOR FLOOD MONITORING SENSORS. Col of u,-r rthu� Texas www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: October 15, 2026 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Jessie Dehn, P.E., Director of Public Works ' RE: P.R. 25170—Authorizing an Interlocal Agreement with Lamar University for flood monitoring sensors Introduction: The intent of this agenda item is to authorize the City Manager to execute an Interlocal Agreement with Lamar University for cost-sharing for the installation, access, upkeep, and maintenance of flood monitoring sensors located within the City of Port Arthur. Background: The City of Port Arthur and Lamar University desire to enter into an Interlocal Agreement pursuant to Chapter 791 of the Texas Government Code for the mutual benefit of the citizens they serve. The agreement establishes the parties' respective responsibilities for flood monitoring sensor sites. Lamar University will be responsible for the technical performance and integrity of the sensor systems, including installation, configuration, calibration, technical maintenance, data quality assurance and quality control, network monitoring, website maintenance, and data transmission. The City will provide routine grounds and access maintenance, site security, access, and permissions necessary to preserve the operability, safety, and visibility of the flood monitoring instrumentation. The agreement has an initial term of one year and automatically renews for successive one-year terms, subject to the availability and annual appropriation of funds approved by City Council,unless either party provides at least 90 days' written notice of its intent to withdraw. Budget Impact: "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 w There will be a budgetary impact of$2,500.00 per sensor site for maintenance and operational support. Costs for the sensor sites for Fiscal Year 2026-2027 are not to exceed $15,000. Any costs for new sensor site installations will be established in writing and approved before procurement and installation. Funding is available in the Public Works Drainage Division — Professional Services Account, Account Number 001-21-055-5420-00-70-000. Recommendation: It is recommended that the City Council approve P.R. 25170, authorizing the City Manager to execute an Interlocal Agreement with Lamar University for cost-sharing for the installation, access, upkeep, and maintenance of flood monitoring sensors located within the City of Port Arthur. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P.R.25170 10/15/2026 JD Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN INTERLOCAL AGREEMENT WITH LAMAR UNIVERSITY FOR COST-SHARING FOR THE INSTALLATION, ACCESS, UPKEEP, AND MAINTENANCE OF FLOOD MONITORING SENSORS LOCATED WITHIN THE CITY OF PORT ARTHUR, WITH AN ANNUAL MAINTENANCE COST OF$2,500.00 PER SENSOR SITE,IN AN AMOUNT NOT TO EXCEED $15,000. FUNDING IS AVAILABLE IN THE PUBLIC WORKS DRAINAGE DIVISION—PROFESSIONAL SERVICES ACCOUNT, ACCOUNT NUMBER 001-21-055-5420-00-70-000. WHEREAS,the City of Port Arthur and Lamar University desire to enter into an Interlocal Agreement,pursuant to Chapter 791 of the Texas Government Code, for the mutual benefit of the citizens they serve; and, WHEREAS,the Interlocal Agreement establishes the parties'respective responsibilities for cost-sharing for the installation, access, upkeep, and maintenance of flood monitoring sensor sites located within their respective jurisdictions; and, WHEREAS, Lamar University will be responsible for the technical performance and integrity of the sensor systems, including installation, configuration, calibration, technical maintenance,data quality assurance and quality control,network monitoring,website maintenance, and data transmission; and, WHEREAS, the City will provide routine grounds and access maintenance, site security, access,easements,and permissions necessary to preserve the operability,safety,and visibility of the flood monitoring instrumentation; and, WHEREAS, under Attachment A to the Interlocal Agreement, the City will pay Lamar University$2,500.00 per sensor site annually for maintenance and operational support,and any costs P.R.25170 10/15/2026 JD Page 2 of 4 for new sensor site installations will be established in writing and approved before procurement and installation; and, WHEREAS,costs for the sensor sites during Fiscal Year 2026-2027 to not exceed$15,000; and, WHEREAS,the term of the agreement is for one(1)year from the date of execution and will automatically renew for a period of one(1)year,subject to the availability and annual appropriation of funds approved by City Council or unless the party gives at least 90 days written notice of that parry's intent to withdraw from it; and, WHEREAS, the Interlocal Agreement will have an initial term of one year and will automatically renew for successive one-year terms, subject to the availability and annual appropriation of funds approved by City Council, unless either party provides at least 90 days' written notice of its intent to withdraw. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Council hereby authorizes the City Manager to execute an Interlocal Agreement with Lamar University for cost-sharing for the installation, access, upkeep, and maintenance of flood monitoring sensors located within the City of Port Arthur; and, THAT,the City will pay Lamar University an annual maintenance and operational support fee of$2,500.00 per sensor site,costs for Fiscal Year 2026-2027 not to exceed$15,000,and any new installation costs must be established in writing and approved before procurement and installation; and, P.R.25170 10/15/2026 JD Page 3 of 4 THAT, the term of the agreement is for one (1) year from the date of execution and will automatically renew for a period of one(1)year,subject to the availability and annual appropriation of funds approved by City Council or unless the party gives at least 90 days written notice of that parry's intent to withdraw from it, and; THAT,funding is available in the Public Works Drainage Division—Professional Services Account Number 001-21-055-5420-00-70-000; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ,ADOPTED,AND APPROVED,this day of ,2026 AD, at a regular meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor: Councilmembers: NOES: Charlotte M. Moses Mayor ATTEST: Christe Whitley Ned, TRMC City Secretary 10/15/2026 JD Page 4 of 4 APPROVED AS TO FORM: Roxann Pais Cotroneo, Esq. City Attorney APPROVED FOR ADMINISTRATION: V.rfsce City Mae ._er l � � Jessie Dehn, P.E. Director of Public Works APPROVED AS TO THE AVAILABILITY OF FUNDS: y o well, PhD, CMA-CM Finance Director I ,, (Ajlek: Clifton . Williams, Jr., CPPB Purchasing Manager EXHIBIT A Igr STATE OF TEXAS § INTERLOCAL AGREEMENT CITY OF PORT ARTHUR § WHEREAS, the City of Port Arthur (Agency) authorized by Chapter 791 of the Government Code, desire to enter into this Interlocal Agreement with Lamar University(Lamar) (Parties) for the mutual benefit of the citizens they serve, desire to enter into an agreement to be individually bound by the covenants and responsibilities regarding the cost-sharing for installation, access, upkeeping and maintenance of flood monitoring sensors (sites)described herein below and which are located within the jurisdiction of the respective parties. 1. Definitions A. Sensor site The location of the installed sensors and assemblies (e.g., pressure transducer) Camera, solar/power system, mounting, conduit/cabling, antennas, enclosure (node) and related appurtenances, including the immediate grounds required for safe access and operation. B. Ancillary Area A practical work and access area extending a typical radius of approximately 20 feet around the site(or as otherwise agreed)plus the route necessary for vehicle and or foot access. C. High-Flow Event A storm, flood or other event likely to deposit debris/sediment or obstruct access within 72 hours of the event. D. Preventative Maintenance (PM) Routine activities required to reduce the risk of outages or damage (vegetation control, pest mitigation, sediment/debris cleaning and/or minor housekeeping.) 2. Roles and Responsibilities of Counties and Cities I. Site Upkeep,Access and Security The Agency shall perform routine grounds and access maintenance to preserve operability, safety and visibility of the instrumentation and camera imagery which include: • Mowing and/or trimming to maintain grass/vegetation at or below 8 inches within a 3-5-foot radius around enclosures, solar panels, camera masts, staff gauges and cabling. Do not remove or open instrument enclosures unless instructed by Lamar. • Weed whack and clear brush to keep the camera field of view unobstructed and to prevent shading of the solar panels, camera masts, staff gauges and cabling and remove and debris or loose material which become wind/flood-borne hazards. • Remove vines/overgrowth from poles, conduits and enclosures and avoid cutting or pulling on cables. • Use herbicides judiciously and only those appropriate for proximity to waterways and avoid overspray on the equipment. • After high flow events and during routine inspections,remove trash,woody debris and any other debris which accumulates around the pressure transducer, stilling well intake(if applicable),mounting structures and staff gauge,check for damaged conduits, vandalism, for damaged or missing components and report damages to Lamar. • Clear sediment deposits that may obstruct or interfere with the approach to the sensing or redirect flow such that measurements are not compromised without materially altering the channel hydraulics. • Keep culvert inlets/outlets and immediate approach areas clear of any obstructions which might affect the instrument readings. • Do not modify or relocate sensor elements and immediately report any damage or misalignment/obstruction to Lamar for technical action. • Report to Lamar within 24 hours of discovering damaged or non-operational equipment or missing signage and provide photos with date and time,wide shot of site and camera FOV, sensor area and any noted issues. • Keep camera lenses and solar panels free of debris/dirt. II. Pest& Wildlife Control: • Implement Preventative measures against insects (fire ants, wasps) wildlife (rodents,birds)that may damage cables, enter nodes or obscure cameras and solar panels. • Treat ant mounds near pads or poles, remove active wasp/hornet nests from equipment, camera mounts. (Use rodent-safe conduit and bait boxes where appropriate.) • Install or maintain deterrents such as mesh screen, cable glands and anti-perch spikes, as agreed. III. Access, Easements and Permissions • Maintain year-round access to sites, including keys for any gates or locks. • Obtain and maintain all rights of entry and permissions for sites on private property and coordinate with landowners to ensure that Lamar has timely access for routine and corrective maintenance. • Coordinate with right-of-way owners with respect to roadway, drainage or utility authorities in the event traffic control or lane closures are require. • Notify Lamar within 24 hours of any damaged or nonfunctional equipment. 3. Roles and Responsibilities of Lamar University I. Technical Systems Lamar will be responsible for technical performance and integrity of the sensor systems, including: • Installation, configuration, calibration and routine technical maintenance of the pressure transducers, cameras, telemetry and routine maintenance of the pressure transducers, cameras, enclosures, antennae, enclosures, solar/power systems and firmware/software. • Data quality assurance/quality control (QA/QC), network monitoring and troubleshooting. • Replacement/repair of sensors and electronic components due to normal wear/failure and management of spares. • Scheduled service windows as communicated to the Counties and coordination for temporary takedown/replacement of damaged parts. • Provide for a help desk or designated contact channel for outage reports and coordination for access. • Maintenance of the website and data transmission. • Maintenance and calibration records,outage logs and data QA/QC notes and share the status summary quarterly. 4. Shared Responsibilities I. The Agency will designate,and keep current,primary and secondary Points of Contact (name, title, phone and email) and meet at least annually to review performance and share lessons learned. II. Maintain and share an up-to-date inventory of site locations by GPS coordinates, address/landmarks,parcel ROW information, access points and gate codes. III. Routine maintenance(stipulated in Sections 2 and 3)with at least 7 days advance notice and provide for urgent access, when necessary. IV. Compliance with all applicable laws, environmental regulations, safety standards and ROW access, when necessary per the ROW owner's standards. V. Strive to maintain sensor data availability at 75% and camera imagery availability, excluding force majeure. VI. Major/extraordinary repairs that must be performed by a third party will be scoped and mutually approved before work is done. VII. The Agency will cooperate to establish an annual budget for performance of routine services per this agreement. 5. Term,Amendment, and Termination I. This agreement will extend for a period of one (1) year(s) from the date of execution and will automatically renew for a period of one(1)year, subject to the availability and annual appropriation of funds approved by City Council or unless the party gives at least 90 days written notice of that party's intent to withdraw from it. II. The Agency will remit annual payment within 60 days of September 1 St of each year for maintenance services rendered per the schedule of costs established in Attachment A. III. Lamar will invoice payment for equipment and services rendered for new site installations per the schedule of costs established in Attachment A. IV. Removal/Relocation of Sensor Sites Any participating agency may request the removal of an existing sensor site. Upon such request: a. Lamar will coordinate the safe decommissioning and removal of the equipment. b. The inventory will be updated to reflect the removal, and any adjustments to annual maintenance fees will take effect in the next fiscal year. c. Any new sensor sites requested by an agency will fall under the New Installation category described in Attachment A. d. If an existing site is to be relocated(moved from one position to another),this will also be considered a new installation,particularly if additional infrastructure(e.g.,mounting, cabling,power systems)is required to accommodate the relocation. V. The Agency shall maintain customary liability insurance or self-insurance as permitted by law. VI. The Agency will indemnify the other parties from negligence or willful misconduct to the extent allowed by law. VII. Nothing herein shall operate to waive any governmental or statutory protections. 6. Force Majeure I. The Agency will not be liable for delays or failures due to events beyond reasonable control, such as severe storms, floods, acts of God, labor disputes or utility outages, provided reasonable measures are taken to mitigate damages and to restore service. 7. Stipulations: I. The Agency agrees, pursuant to Sec. 791.015, Texas Government Code, that any dispute regarding the terms of the Agreement will be submitted to an agreed upon mediator for resolution.Nothing in this Section is intended to waive either party's right to seek civil relief in a Court of proper jurisdiction. II. The Agency further agrees that, during the performance of the work, no agent, servant or employee of a party will be an agent, servant or employee of the other. 7. Entire Agreement I. This Agreement and any and all Exhibits attached hereto constitute the sole and only agreement between the Parties and supersede any prior or contemporaneous understandings, written agreements, or oral agreements between the Parties with respect to the subject matter of this Agreement. 8. Governing Law and Exclusive Venue I. The laws of the State of Texas shall govern this Agreement, and the exclusive venue for any legal action concerning this Agreement shall be in a District Court with appropriate jurisdiction in Jefferson County, Texas. The Parties agree to submit to the personal and subject matter jurisdiction of said court. 9. Authorization Each Party represents that it has full capacity and authority to grant all rights and assume all obligations granted and assumed under this Agreement. 10. Severability In the event any one or more of the provisions contained in this Agreement shall for any reason be held to be invalid, illegal, or unenforceable in any respect by a court of competent jurisdiction, such invalidity, illegality or unenforceability shall not affect any other provision in this Agreement,and this Agreement shall be construed as if such invalid,illegal,or unenforceable provision had never been contained in this Agreement. 11. Indemnification To the extent authorized by the Constitution and laws of the State of Texas, each Party shall be responsible for the negligent acts or omissions and other wrongful conduct of its own officers, employees, agents, contractors, and representatives acting within the course and scope of their duties or authorized activities under this Agreement. Each Party shall be responsible for bodily injury, death, or damage to or loss of property to the extent caused by the negligent acts or omissions or other wrongful conduct of that Party or its officers, employees, agents, contractors, or representatives in connection with the installation,operation,access,inspection,upkeep,or maintenance of the flood- monitoring sensor sites and associated equipment. II. Nothing in this Agreement shall be construed to require either Party to indemnify, defend, or hold harmless the other Party for the other Party's negligence or wrongful conduct,or to the extent such obligation is prohibited by the Constitution or laws of the State of Texas. Nothing in this Agreement shall be construed as a waiver of sovereign immunity, governmental immunity, or any other rights, defenses, or immunities available to either Party under Texas law. III. III.The responsibilities established under this Section shall apply to claims arising from acts or omissions occurring during the term of this Agreement. This Section shall survive the expiration or termination of this Agreement solely with respect to such claims, to the extent permitted by applicable law. lir Points of Contact for Agency Primary Contact Name: Phone number: Email address: Secondary Contact Name: Phone number: Email: For Lamar: Primary Contact Name:Nicholas Brake Phone number: (409) 880 - 8765 Email: nbrake@lamar.edu For Lamar: Secondary Contact Name: Ryan Lee Phone number: (409) 880 -2272 Email: rlee17@lamar.edu Approved by: City of Port Arthur Date: Ron Burton, CPM,City Manager Lamar University Date: 10/15/2026 Gene Theodori,Associate Provost for Academic and Research Administration ATTACHMENT A SENSOR NETWORK SCHEDULE OF COSTS 1. Cost for Existing Sensor Sites Each participating agency agrees to pay$2,500 per sensor site annually for maintenance and operational support provided by Lamar University.This cost includes: • Weekly monitoring and diagnostics • Quarterly uarterl site visits and routine maintenance • Sensor calibration and firmware updates • Data quality assurance and reporting • Website and data transmission maintenance • Coordination and communication with agency contacts This flat rate is intended to streamline budgeting and ensure consistent service across all sites. 2. Additional Costs for New Site Installations For any new sensor site installations requested by an agency, costs will be determined on a case-by-case basis and invoiced as follows: • Equipment: Based on the published pricing from the sensor equipment manufacturer at the time of procurement. • University Overhead: A standard overhead rate applied by Lamar University to cover administrative and indirect costs, set at 35%as of the time of this agreement.This rate is subject to change following periodical negotiations with the cognizant federal agency. • Permitting and Engineering Services: Any costs incurred for site-specific permitting, engineering design,or third-party services required for installation. • Installation: Based on the proposed sensor location(s)and the Party providing installation services may or may not apply. The total cost for new site installations will be established and communicated in writing to the requesting agency in advance and must be approved prior to procurement and installation. 3. Cost Variability The Parties acknowledge that the cost of sensor equipment may vary depending on market conditions and manufacturer pricing. As such, Lamar University will provide updated quotes for equipment, labor, and installation upon request or as part of the annual budget planning process. 4. Incorporation into Agreement This Attachment shall be incorporated into and made part of the Interlocal Agreement.All other terms and conditions of the Agreement remain in full force and effect unless expressly modified herein.