HomeMy WebLinkAboutP.R. 25199 CONTRACT FOR THE INSTALLATION OF A SOIL VAPOR EXTRACTION SYSTEM. Ir City of N ort rtutir www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: October 12, 2026 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Jessie Dehn,P.E., Public Works Director RE: P.R.25199—Authorizing the City Manager to contract with SCS Engineers of Houston, Texas,for the installation of a soil vapor extraction system. Introduction: The intent of this Agenda Item is to seek the City Council's authorization for the City Manager to contract with SCS Engineers of Houston,Texas,to install a Soil Vapor Extraction System for the remediation of methane exceedances in gas probe 9 (GMP-9) and prepare a remediation plan in the amount of $128,000.00. Background: SCS Engineers recently completed a quarterly gas monitoring event and recorded elevated methane levels in GMP-9. As a result, SCS will submit a Permit Modification to the Texas Commission on Environmental Quality (TCEQ) and implement a remediation plan in accordance with our Gas Management Plan. Budget Impact: Funds are available from Account No. 403-50-320-5420-00-00-000. Recommendation: It is recommended that the City of Port Arthur's City Council approve PR 25199, authorizing the City Manager to contract with SCS Engineers in the amount of$128,000.00. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 PR 25199 10/06/2026 JAM Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO CONTRACT WITH SCS ENGINEERS OF HOUSTON, TEXAS FOR THE INSTALLATION OF A SOIL EXTRACTION VAPOR SYSTEM FOR THE REMEDIATION OF METHANE EXCEEDANCES IN GAS PROBE GP-9 AND PREPARE REMEDIATION PLAN IN THE AMOUNT OF$128,000.00. FUNDS ARE AVAILABLE IN THE PUBLIC WORKS DEPARTMENT LANDFILL DIVISION — PROFESSIONAL SERVICES ACCOUNT NUMBER 403-50-320-5420-00-00-000. WHEREAS, the City of Port Arthur Landfill is required to monitor the landfill gas quarterly according to the Texas Commission on Environmental Quality(TCEQ); and, WHEREAS, elevated levels of methane were detected in the most recent quarterly monitoring event; and, WHEREAS, SCS will install a soil vapor extraction system to remediate the methane exceedances in gas probe GP-9 and prepare a remediation plan; and, WHEREAS, this procurement for professional services is authorized pursuant to Section 252.022(4) of the Local Government Code; and, WHEREAS, SCS Engineers of Houston, Texas, has performed these services in the past for the City and can perform these services for a total amount of$128,000.00 (attached hereto as Exhibit A); NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT,the facts and opinions in the preamble are true and correct; and, THAT,the City Manager of the City of Port Arthur is hereby authorized to contract with SCS Engineers of Houston, Texas in the amount of$128,000.00, as delineated in Exhibit "A"; and, THAT, funding for this purchase is available in the Public Works Department Landfill Division Professional Services Account Number 403-50-320-5420-00-00-000; and, PR 25199 10/06/2026 JAM Page 2 of 3 THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2026 at a meeting of the City of Port Arthur, Texas,by the following vote: Ayes: Mayor: Councilmembers: Noes: Charlotte M. Moses Mayor ATTEST: Christe Whitley Ned, TRMC City Secretary PR 25199 10/06/2026 JAM Page 3 of 3 APPROVED AS TO FORM: Roxann Pais Cotroneo, Esq. City Attorney APPROVED FOR ADMINISTRATION: Ronald Burton, CPM City Manager Jessie Dehn, P.E. Director of Public Works APPROVED AS TO THE AVAILABILITY OF FUNDS: ynd oswell, PhD, ICMA-CM Director of Finance Clifton . Williams, Jr., CPPB Purchasing Manager P. R. 25199 Exhibit A SCS ENGINEERS Environmental Consultants & Contractors October 2, 2026 Mr.Jorge Morales Sent via email Environmental Operations Manager City of Port Arthur Landfill 4732 Texas 73 Port Arthur,Texas 77705 Subject: Proposal to Install Soil Vapor Extraction System City of Port Arthur Landfill Port Arthur,Jefferson County,Texas Dear Jorge: SCS Engineers(SCS) is presenting this scope of services to install a Soil Vapor Extraction (SVE)at the above-referenced facility. This SVE system is recommended in response to confirmed landfill gas exceedances associated with gas probe GP-9. In May of 2025 twenty (20) passive vents (PVs) were installed to address the exceedance in GMP-9. Following the installation of the PVs, GP-9 achieved compliance in early 2026. Compliance with the regulatory level of 5% methane had been achieved for several months. However, during the second May 2026 quarterly monitoring event GP-9 the methane concentration exceeded the regulatory limits and continues to exceed. On May 14, 2026, SCS Engineers completed a quarterly landfill gas monitoring event at the City of Port Arthur Landfill. During this event,a methane level of 62.3%by volume was detected in landfill gas monitoring probe GP-9 located on the southern boundary of the landfill approximately 1,000 feet east of the landfill entrance. The methane gas detection equipment was recalibrated according to manufacturer's recommended procedures and the gas probe was again sampled with a methane level of 61.4% by volume. SCS personnel immediately informed the landfill manager, Mr.Justin Thomas,of the results.SCS and Mr.Thomas determined that there were no buildings or structures within 1,000 feet of GP-9 and that there were no nearby buildings or structures that were at risk and no evacuations of buildings or structures were warranted. On May 15, 2026, SCS again recalibrated the gas detection equipment according to manufacturer's recommended procedures and the gas probe was again sampled with a recorded methane level of 48.8% by volume. In accordance with Section 4.1.1.2 Permit Boundary of Part III, Attachment 14, Landfill Gas Management Plan, the landfill is required to notify the Executive Director through the regional office, local and county officials, emergency officials, and the public. On May 14, 2026, SCS Engineers notified the following entities: 12651 Briar Forest Drive, Ste. 205, Houston, TX 77077 1817-358-61621 Fax 281-293-7878 to, Mr. Jorge Morales October 2, 2026 Page 2 • TCEQ MSW Permits Section, Austin (via mailed copy to Megan Henson and to MSWPER@tceq.texas.gov); • TCEQ Region 10, Beaumont(via telephone and mailed copy to Kathryn Sauceda); • Port Arthur Police Department(via telephone and mailed copy); and • Port Arthur Fire Department(via telephone and mailed copy) Since there were no structures within 1,000 feet of GP-9, no notifications to members of the public were made. In accordance with 30 TAC §330.371(c) 3 and Section 5 Remediation Plan of Part III,Attachment 14, Landfill Gas Management Plan, SCS Engineers investigated the cause of the methane levels at the area of concern. A remediation plan was prepared and implemented on July 13, 202026. A copy of the remediation plan was placed in the operating record and provided to the executive director with a notification that the plan has been implemented. On July 2, 2026, SCS conducted a methane delineation around GP-9 and found methane levels ranging from 8.4 to 72.9 percent by volume. SCS also conducted a vacuum study on MPV 7, near GP- 9. This vacuum study indicated a reduction of methane concentration at GP-9. As a result of the soil vapor study and vacuum study, it was determined to install a Soil Vapor Extraction (SVE) System on MPV 6, 7 and 8. This system would be installed with an infrastructure that allows additional SVE points to be added in the future as necessary. On July 15, 2026, SCS submitted a July 2026 Remediation Plan to the TCEQ. On August 10, 2026, a Notice of Deficiency (NOD) regarding the July 2026 Remediation Plan was received from the TCEQ. On September 4, 2026, SCS submitted response to the August 10, 2026 NOD including an updated July 2026, Remediation Plan, Revised September 2026. On September 22, 2026, the TCEQ issued an approval of the July 2026, Remediation Plan, Revised September 2026. Per the July 2026, Remediation Plan, Revised September 2026, existing MVPs (MVP 6, 7, and 8) will be incorporated into a new SVE System. This system would be installed with an infrastructure that allows additional SVE points to be added in the future as necessary. SCOPE OF WORK Task 1 -Soil Vapor Extraction System Installation The proposed gas remediation includes conversion of existing gas probes PV-6,-7,and -8 to soil vapor extraction (SVEs) and the installation of a Soil Vapor Extraction System designed to apply vacuum to the SVEs.The system would be connected to the existing landfill electrical grid. This remediation plan Mr. Jorge Morales October 2, 2026 Page 3 has been developed based on the results of past investigation and monthly monitoring. No air permitting will be required. To support gas transport to the new SVE skid location, 4-inch HDPE header piping will be installed. This includes connection to the existing PVs. The approximate locations of both the skid and the new header are shown in Figure 1 attached to this proposal. Vacuum will be applied through a 3HP Soil Vapor Extraction with the following features: • 3 HP regenerative blower,XP motor • Moisture separator with automatic level controls • Integrated particulate inlet filter • Automatic condensate transfer pump • Vapor-phase granular activated carbon treatment vessel • Manual dilution air valve with filter/silencer • Vacuum monitoring and blower protection instrumentation • Vapor sampling ports • NEMA 4 industrial control panel with HOA controls and alarms All above equipment will be mounted and plumed on a 40"X 48" powder coated steel skid. To provide power for operation of the skid and SVE system electrical service will be extended from the existing office building to the skid location. Scope includes trenching and installation of a new underground electrical feeder,conduit,conductors, required terminations, backfilling,and restoration of disturbed areas. All electrical work will be completed in accordance with applicable codes and project requirements. Task 2 —SVE Maintenance, Evaluation and Maintenance SCS proposes to monitor, evaluation and maintenance of the SVE system for 8 months. It is anticipated that the filters on the SVE system will last several years but monthly evaluation is necessary. If additional monitoring is necessary, SCS will contact the City prior to the additional activities for approval of additional funds. SCHEDULE SCS proposes to initiate work immediately upon receipt of notice to proceed from the City. FEES SCS proposes to conduct the Task 1, Soil Vapor Extraction Systeme Installation for $117,000 and Task 2,SVE Monitoring, Evaluation and Maintenance for$11,000 on a lump sum basis and for a total of$128,000. As with other recent projects for the City, receipt of a Purchase Order will suffice for our notice to proceed. Any additional Services that the City may request with regards to this project or other tasks, will constitute a change order for additional services, or prepared as additional task orders. Mr. Jorge Morales October 2, 2026 Page 4 CLOSING We appreciate the opportunity to assist the City with this very important project and look forward to working with the City Staff to ensure the project's success. If you have any questions related to this proposal, please feel free to contact J. Roy Murray at (817) 358-6156 or Gil Gabaldon at (817) 358- 6162. Sincerely, 1 Gil Gabaldon, P.G. J. R y Murray, P.E. Sr. Project Professional Vice President/Houston Office Director SCS ENGINEERS SCS ENGINEERS TBPE Registration No. F-3407 FIGURE 1:SVE Extraction System Location .�* SVE-7_ r . +6 SVE- 4� lik, ," ,40, 00 / , 3HP Soil Vapor " e Extraction Skid y ` ° with a Vapor Phase jilt Carbon Filter �= t 407 D � s .r. r5 n t> ` � ,.. - Note:Perform an open-cut N �`•` < installation across the road A `" to lay electrical conduit,with rehabilitation road repairs. o 2 f, r m eC t O A o •A C r d' a I m, GP-9 j_j Permit Boundary Note: r Tentative Skid Location ill- Proposed Proposed SVE's For Proposal Purposes Only 1=1 Entrance Road Approx.Electrical 0 1 80 Approx.4"HDPE Header 1' Feet Port Arthur Landfill ___— _ PORT ARTHUR GP-9 REMEDIATION Approx.SVE System Location ENVI AL APPROX.SVE SKID SYSTEM Jefferson County,TX Map Revised 08/21/2026 I Protect Number L-I I-I$40 I GIS Anal,st TJW