Loading...
HomeMy WebLinkAboutP.R. 25227 CLOSE-OUT DOCUMENTS AND RELEASE OF RETAINAGE TO PAVECON, LTD. FOR THE 25TH STREET BRIDGE. City of ort rthu ^ 7�cis www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: October 15, 2026 To: The Honorable Mayor and City Council Members Through: Ron Burton, CPM, City Manager From: Suhail Kanwar, P.E., M.S., CFM,Director of Public Services/City Engineer RE: PR No. 25227: Authorizing the City Manager to Accept the Close-Out Documents and Release of Retainage to PaveCon,Ltd. of Houston,Texas,for the 25th Brid ge g e over the drainage ditch-Phase 2.Funding available in the Account No. 307-00-000-2050-00- 00-000 Project No. BR0002.CON. Introduction: The purpose of this memorandum is to recommend approval of a Resolution authorizing the City Manager to accept the close-out documents and release retainage in the amount of$3,647.47 to PaveCon, Ltd. of Houston, Texas, through BuyBoard Cooperative Contract No. 800-26, for Phase 2 of the 25th Street Bridge Repair Project. Background: The Texas Department of Transportation ("TxDOT") conducts periodic inspections of off-system bridges maintained by local governmental jurisdictions. TxDOT's 2023 inspection identified several City-maintained bridges requiring repairs, including the 9th Avenue Bridge spanning the Pear Ridge Main Canal and the 25th Street Bridge over the drainage ditch. Based upon its review of the inspection findings,the City's Engineering Department determined that the 25th Street Bridge presented the most critical repair needs and developed a scope of work to address the identified deficiencies. Certain TxDOT inspection materials and photographs are not being included with the public agenda materials due to restrictions concerning the dissemination of infrastructure-related information for homeland security purposes. The absence of such materials from the public agenda packet does not affect the City's ability to proceed with the repair project or the Council's consideration of the proposed contract. The City elected to undertake the necessary improvements in phases based upon project planning, the scope and sequencing of the work, and available funding. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Phase 1: For Phase 1 of the project, PaveCon, Ltd. submitted a BuyBoard-compliant proposal in the amount of $24,923.00 for the removal and replacement of guardrails and grouting at the 25th Street Bridge. That work was previously authorized and executed under Contract No. 3000582. Phase 2: Pursuant to Resolution No. 26-374, approved by City Council, Phase 2 constituted additional repair work necessary to continue addressing the deficiencies identified at the bridge. PaveCon,Ltd.submitted a BuyBoard-compliant proposal in the amount of$72,949.46 for Phase 2 of the 25th Street Bridge Repair Project. Close-Out: Public Works-Engineering has received Close Out Documents from PaveCon, Ltd., of Houston, Texas, that includes the Certificate of Substantial Completion establishing completion as of September 29, 2026, the Contractor's Certificate and Release, the Contractor's Certificate of Warranty, the Contractor's Certificate of Guarantee, and the Contractor's Affidavit of All Debts Paid. Additionally, PaveCon, of Houston,Texas, is asking for release of retainage in the amount of$3,647.47. Budget Impact: Funding is available in the Account No. 307-00-000-2050-00-00-000 Project No. BR0002.CON. Chapter 271 Subchapter D of the Texas Local Government Code authorizes municipalities to participate in cooperative purchasing programs through a resolution adopted by their governing bodies, including programs such as(BuyBoard), as an alternative to the formal bidding process. The City is authorized to participate in the BuyBoard Cooperative Purchasing Program.PaveCon,Ltd.is an eligible vendor under BuyBoard Cooperative Contract No. 800-26. Recommendation: It is recommended that the City of Port Arthur's City Council approve PR No. 25227 authorizing the City Manager to accept the Close-out documents and release the retainage in the amount of $3,647.47 to PaveCon, Ltd., of Houston, Texas, through BuyBoard Cooperative Contract No. 800-26, for the 25th Street Bridge Repair Project—Phase 2. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 PR No. 25227 10/15/2026 RLD Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT THE CLOSE-OUT DOCUMENTATION SUBMITTED BY PAVECON, LTD., OF HOUSTON, TEXAS, BUYBOARD COOPERATIVE CONTRACT NO. 800-26, FOR THE 25TH STREET BRIDGE REPAIR PROJECT — PHASE 2 AND AUTHORIZING THE CITY MANAGER TO RELEASE THE RETAINAGE IN THE AMOUNT OF $3,647.47. FUNDS ARE AVAILABLE IN ACCOUNT NO. 307- 00-000-2050-00-00-000. PROJECT NO. BR0002.CON. WHEREAS, the Texas Department of Transportation ("TxDOT") conducts periodic inspections of off-system bridges, including bridges maintained by local governmental jurisdictions; and WHEREAS, TxDOT's 2023 inspection identified several City-maintained bridges requiring repairs, including the 9th Avenue Bridge spanning the Pear Ridge Main Canal and the 25th Street Bridge over the drainage ditch,both of which were identified as requiring immediate attention; and WHEREAS, due to the nature of the information contained in the TxDOT inspection report, certain inspection materials and photographs are not included with or publicly disseminated with this Resolution for homeland security purposes; and WHEREAS, the City's Engineering Department evaluated the condition of the identified bridges and determined that the 25th Street Bridge over the drainage ditch was the most critical and required priority repairs; and WHEREAS, the Engineering Department developed a scope of work for the necessary repairs and solicited cost proposals from qualified contractors through the BuyBoard Cooperative Purchasing Program; and WHEREAS, City staff from the Engineering Department reviewed PaveCon, Ltd.'s proposal and determined that the proposed pricing is competitive with pricing for similar projects recently procured by the City; and WHEREAS, PaveCon, Ltd., of Houston, Texas, submitted a BuyBoard-compliant proposal in the amount of$24,923.00 for Phase 1 of the 25th Street Bridge repair project, consisting of the removal and replacement of guardrails and grouting, which was previously authorized and executed as Contract No. 3000582; and WHEREAS, the City determined that the 25th Street Bridge repair project should be undertaken in phases based upon available funding, project planning, and the scope and sequencing of the necessary improvements; and PR No. 25227 10/15/2026 RLD Page 2 of 4 WHEREAS, pursuant to resolution 26-374, PaveCon, Ltd. submitted a BuyBoard-compliant proposal in the amount of$72,949.46 for Phase 2 of the 25th Street Bridge Repair Project; and WHEREAS, Chapter 271 of the Texas Local Government Code authorizes municipalities to participate in cooperative purchasing programs through an interlocal agreement and governing-body authorization, including cooperative purchasing programs such as BuyBoard, as an alternative procurement method when authorized by law; and WHEREAS, PaveCon, Ltd., of Houston, Texas, has submitted the Certificate of Substantial Completion dated September 29, 2026 and the work to which the Certificate applies has been inspected, authorized, and declared to be complete in accordance with the contract documents and made a part hereof as (Exhibit A); together with the Contractor's Certificate and Release (Exhibit B), the Contractor's Certificate of Warranty (Exhibit C), the Contractor's Certificate of Guarantee (Exhibit D); and the Contractor's Affidavit of Debts Paid (Exhibit E); and, WHEREAS, the retainage for the project is 5% of the work completed and billed, the Release of Retainage has been submitted by PaveCon, Ltd. of Houston, Texas, for the amount of$3,647.47, see (Exhibit G); and, WHEREAS, PaveCon, Ltd. of Houston, Texas, has completed the contracted project to the satisfaction of the City Engineer and the City Engineering staff, see(Exhibit F); and, WHEREAS, approval of PR 25227 and acceptance of the Close Out Documents and Release of Retainage is herein deemed an appropriate action. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT, the facts and opinions in the preamble are true and correct. THAT, the City Council hereby authorizes the City Manager to hereby accept the Certificate of Substantial Completion dated September 29, 2026 and the work to which the Certificate applies has been inspected, authorized, and declared to be complete in accordance with the contract documents and made a part hereof as (Exhibit A); together with the Contractor's Certificate and Release (Exhibit B), the Contractor's Certificate of Warranty (Exhibit C), the Contractor's Certificate of Guarantee (Exhibit D), the Contractor's Affidavit of Debts Paid (Exhibit E), and the Engineer's Certificate of Completion (Exhibit F); and, THAT, the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a Certificate of Acceptance (Exhibit H), for the completion of Phase 2 of the 25th Street Bridge Repair Project; and, PR No. 25227 10/15/2026 RLD Page 3 of 4 THAT, the release of retainage be paid to PaveCon, Ltd., of Houston, Texas, for the retainage account number 307-00-000-2050-00-00-000 in the amount of $3,647.47, Project No. BR0002.CON (Exhibit G); and, THAT, inspection reports, photographs, or other materials that are restricted from public dissemination for homeland security purposes shall not be attached to or incorporated into the public record of this Resolution except to the extent permitted or required by applicable law; and, THAT, a copy of the Resolution shall be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the _ day of , A.D., 2026, at a of the City Council of the City of Port Arthur, Texas, by the following vote: Ayes: ^ Mayor: Councilmembers: Noes: Charlotte M. Moses Mayor ATTEST: Christe Whitley Ned, TRMC City Secretary PR No. 25227 10/15/2026 RLD Page 4 of 4 APPROVED AS TO FORM: APPROVED ADMINIS RATION: Roxann Pais Cotroneo, Esquire Ronald Burton M City Attorney City Manag APPROVED AS FOR AVAILABILITY OF FUNDS: / 44/, behex, Lyn " yn"Boswell, , ICMA- M Clifto Williams, CPPB Director of Finance 07/' Purchasing Manager Suhail Kanwar, PE, Director of Public Services/City Engineer EXHIBIT A CERTIFICATE OF SUBSTANTIAL COMPLETION Purchase Order No.: Z(g-32y-1 Project Name: 2.5 S�, 'Br, e. ?e,.apA✓ Contractor: Vpvvoc or 2,TI) Description of Work: i�¢Te, 9247e2ty The work performed under this contract has been reviewed and found to be substantially complete.The date of substantial completion is hereby established as 9/2.9/26l KNOW ALL MEN BY THESE PRESENTS: 1.) The stage of construction where, in the opinion of the City of Port Arthur,all items of the work necessary to enable the assets to be utilized without restrictions for the purpose for which the asset was constructed have been completed; and 2.) All pay items are complete and all necessary testing as required by the Laws and Regulations and/or Contract Documents have all been completed. Punch List All list of items to be completed or corrected, prepared by the CONTRACTOR and verified and amended by the ENGINEER, is attached hereto.The failure to include any items on such list does not alter the responsibility of the CONTRACTOR to complete all work in accordance with the contract documents. The CONTRACTOR shall complete or correct the work on the list of items attached hereto within in 60 days from the above date of substantial completion.The responsibilities shall be as set out in the Contract Documents or on the attached hereto. If not specified in and an attachment or in the Contract Documents the CONTRACTOR is responsible for maintenance, utilities and insurance. Pal i4 ��p —� /PM&� CONTRACTOR NAME SIGNATURE DATE RECOMMENDED FOR ACCEPTANCE Si ,}1ai 1 Y..Gc n.war feel u-t ENGINEER NAME SIGNATURE DA'I ' The City of Port Arthur accepts the work as Substantially Complete. City of Port Arthur, Department of Public Services. /O-/5-216 PROJECT MANAGER AT / DATE a�t �lGtt 1 Q4v /44lo/4�iY /a -/f-Z' CITY ENGINEER SIGNATURE DATE EXHIBIT B CONTRACTOR'S CERTIFICATE AND RELEASE FROM: gItesov, G.TD cc (Name of Contractor) TO: Cloy o3 ?A Af if (Owner) REFERENCE CONTRACT NO.: CONTRACT ENTERED INTO THE 31 DAY OF 4 ugJr BETWEEN THE CITY OF PORT ARTHUR AND Pavuov, Lj2T J OF 144Imi FOR THE PROJECT 2.54L. 13Y;dje Rep► ✓ KNOW ALL MEN BY THESE PRESENTS: 1.) The undersigned hereby certifies that there is due from, and payable by,the Owner to the Contractor under the contract and duly approve Change Orders and modification the balance of 2.) The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: a. b. c. d. (Itemize claims and amounts due,if none,so state) 3.) The undersigned further certifies that all work required under this contract, including work required under Change Order(s)numbered , has been performed in accordance with the terms thereof,and that there are no unpaid claims for materials,supplies,or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract,and that the wage rates paid by the contractor were in conformity with the contract provisions relating to said wage rates. 4.) Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above-mentioned contract or any modifications or changes thereof. 5.) That in consideration of the payment of the amount stated in Paragraph 1 hereof,the undersigned does hereby release the Owner and Operator from any all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the owner, provided however,that if any reason the Owner does not pay the full amount stated in Paragraph I hereof, said deduction shall not affect the validity of this release,but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof.The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of an amount which may be deducted from Paragraph 1 hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of paid contract modification thereof,and will execute such further releases or assurances of the Owner and Operator may request. 1 IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this pi day of tt, r , 2026. aLtt.ov. LTP (SEAL) (Contractor) BY: (Signature) r vCY;IN (Printed Name/Title of Officer) " r s -;tzf C.r, ,being first duly sworn on oath, deposes and says, First,that,he/she is the (Affiant) Jti+.16v 1?�►rj��N1aL+ltr of auvCcov% (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as ;0i ProjecoV (Title) of 9:mo (Name of Company) Affiant further states that the matters and things stated herein are true. (Affiant) Subscribed and sworn to before me this \ day of 0 Q. 1 ,2026. My commission expires ON:A NtitidS1114, 010/10 NOTARY <tRY' ANNETTE STEPHENS it..j��►� Notary ID#2579980 '�t�* My Commission Expires 4 't•ice December 21,2026 2 EXHIBIT C CONTRACTOR'S CERTIFICATE OF WARRANTY FROM: 'R..GeAv% LTD pp # (Name of Contractor) TO: Cil, trt )y4 1"II''N� ✓ (Owner) REFERENCE CONTRACT NO.: 1-(9-'3 i-1 CONTRACT ENTERED INTO THE 31 DAY OF AIVAA} BETWEEN THE CITY OF PORT ARTHUR AND Po co L7p OF 1-,.,,54 Tx FOR THE PROJECT 2 6' l KNOW ALL MEN BY THESE PRESENTS: 1.) PautaN J.19. does hereby guarantee all of the work done under the (Name of Contractor) above referenced contract to be free from faulty materials in every particular,and free from improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials due to such required replacement or re-execution. 2.) This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this contract by Owner,as evidenced by the Contractor's Certificate of Completion. 3.) This Certificate is given in connection with the final payment under the contract between the Owner and &.Gtm.177 ,and with the knowledge that it will be relied upon in (Name of Contractor) Making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 111 day of OdoiX,Y ,2026. avGGo,n 1.Tp {SEAL} (Contractor) BY: (Signature) siah �-rcx:c' (Printed Name/Title of Officer) 1-Warranty �o.�r��Y;. ,being first duly sworn on oath,deposes and says, First,that,he/she is the (Affiant) 5C1.4i0V yo'l ca.ca. Mom& t>r' of ?avua... tTp (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as SCst w 12grajcrA frt le( (Title) of P4+L66Ot4 LTh (Name of Company) Affiant further states that the matters and things stated herein are true. (Affiant) Subscribed and sworn to before me this ILA day of fl)L. \ ,2026. My commission expires --')A40 4 �aY Pue ANNETFE STEPHENS M I Nr� ` WZRAQACD I i .A — Notary ID#2579980 NOTARY °AV4h,C My Commission Expires 4 ''t° December 21, 2026 2-Warranty EXHIBIT D CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: „awGGov. LTD TO: lily ac ?wA Av&K✓ FOR: Z541~ S. SAN5t., ,epavr REFERENCE CONTRACT NO. Vs-3p41-1 ENTERED INTO THE 31 DAY OF Aujts,S , 2014 BETWEEN THE CITY OF PORT ARTHUR AND 17(,�twctpvl �.TO (CONTRACTOR) OF 140v4kovi x (CITY/STATE) FOR: 254%% S6 13ri4 (PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. �Avt c,cv'. L14 does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such require replacement or re-execution. 2. This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this Contract, as evidenced by the Engineer's Certificate of Completion. IN WITNESS THEREOF, the undersigned has signed and sealed this instrument this the /1/ day of l 446( , 2026. gavcco,n LTD (COMPANY NAME) (OWNER,SIGNATURE/TITLE) ah Frut (PRINT) SUBSCRIBED AND SWORN to before me this 14 day of QL- 20 rx My commission expires 11 -1.01(0 (DATE) t; a ANNETTE STEPHENS *"' i Notary ID#2579980 M 11VOLith 1 G'J ,1 (� My Commission Expires M (NOTARY PUBLIC) 4 'Foss December 21,2026 EXHIBIT E CONTRACTOR'S AFFIDAVIT OF ALL BILLS PAID Project: 25th St Bridge Repair Project Location: Port Arthur, Texas Owner: City of Port Arthur County of Jefferson State of Texas The undersigned hereby certifies that, except as listed below, all previous progress payments received on account of the Work, have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. Exceptions: NONE Signature:`s Print: / a+.N 1'rQY i Date: /0/peZG Sworn to and subscribed to me, a Notary Public,this day of OCT , 2026. bdli1t . iw (Notary Public) My Commission Expires: `� �t ' � , �04 "0e ANNETTE STEPHENS r°%,1► Notary ID#2579980 My Commission Expires "11•737:64 December 21,2026 EXHIBIT F ENGINEER'S CERTIFICATE OF COMPLETION Project: Z.5'` St ' b'c7CG 141)O►i' Date of Issuance: El 31 /2(7 Owner(s): City of Port Arthur Owner's Project Number: Z(y- S34- 1 Engineer: Contractor: RWc(41,1 LTD. This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To: City of Port Arthur (OWNER) And To: (ENGINEER) The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the Contract Documents on /Zi DATE OF COMPLETION Executed by Engineer on /Cer,v►i.,/a e /00 I Z AP (info, JOCELYN MONTEZ _:: e.S.Notary Public,State of Texas r, a"II Comm.Expires 09-14-2027 �! . 4 Notary ID 134555391 %silS ., ..., . 5 - ,.. :IL..,-' F U o U3.4 W ¢ s _!a 5 d `e C y a. c-a t7 u c = a C5 U z c = z 3 d v O a o Q-' O a avi aoi v o l7 t t 3 U c „ 2 o A _L_____ . .. . .... _,. u T., .. . ,,, ,_, ... 6, c., ...._ . 2_g 2 7 ,,, 3 L, .,. . F 0" v ri ` - ❑ c Y of E u m m O Q `' v -S.� aT z C E gE o o A c x a.) m E o- o m u o a C E C 3 C7 mV - % v .0 - .= so O CO L o y i' r F s a a Fs z • . o W a m a aG I E PG o o � a a cY c ° ° 3 . S , W . c > 0 v9 ' Yr- r F d a, - ,a a, 4 a.. c U T 61 c\ •0 s ° U v t U a wi y E.YF it a m O W y o U o LL o o F ai °� N N co Z Ji < .: .-"-E.- 3 W Q<'i ° vc 3 .w- Z a 0 0 ° E 3O U E= - a< = ,a ay O = m O _� Z z F o 3 .3 .ot o �.o'm� o = o= = a EE U c o e Fti C.< p H < vaY z 111H x W '3 F o f >, ac 13 >, c O v l" p,a _i 'a u r c c W cE = EcO j ` F T x .3 T N o U J c o z m C m 7 C ^ < �� � E .i C ,c -' �7 Z m.a[IW- y U u y _ S w Q '3 c u to (� o...• . O s u :� ti a v _o E E, Z a T .�t a 0-0 y a• O a U 7, n ¢ m rC i-- -E oil E. OU m v) ✓l Z2 Q E. E,< £ .sL' < `e< tr FJ n E . o0 -d O SO 0 E` n C X v a o q a e o r co _ E Os 0 N 'Kt7 v O 0 7 0 0 ,S•• Li Z .3 s N r r ,o M U O 6R Q 2 Qr. s s: H < >- 22Z o rr . y 4 F.; 11J ea ea ys s s! •f r o o n Om U P� O O W C. O o QL o Z al LL - a - F cx Z W 3 O Q ` ca` m � �U. , I— Zm Q Z $ a U QU 'O o LL E- c -5 s Z o co Q o = < 2 E Ce O 0 aci V �•- * O N b >- < - W ..er 0 p E J 3N -F � 12 V re V r X > a s o� 0 Y ,m o Q W�a z .c c n O F 2 C7 W M c Z `u 0 v w x U �. n may. o o v vi F U O u CI < i', F h ai E Q a' v ;y O N 3 4 + c..,F < a O u 0 Z .. _ _ a+1•'^ U ,. :7 •v ^44 x o - U `o_ -U GfT z C 0f 3m Z GQ < 0 V a0 0 :. p c o ' < " It cE :o.] _ 3l - s7.§Z v o. ,z v ' 01 < � min rF > 0. O < cx m- f- E em o r c -i cU - W v O - c c J va U¢ aa7 0 •v<- E- A lm 3 s] o m E Q q �c Zc W �� E L > 00 Z - D 10 0 + c 1O c . � a , c e ZO � ° • Q ' F = QEs ' .7 V� o c c J x o ` F"°' v v E °• , 0, • c .. V L� z „ v JvCJO E EC E <Q " Ell a., T :,, a z = a •, Fz 97Eer v > xWe J0. U < - Z m ? .- "PE : ... . p,.V ce o -u 5 -< < < V 00 < � c,, 2a �, < m EZm co ZFPr �E- E- _ •�;A >' Y ..7 m Ti F a. O 0 O O �2 a 1-1 OOLa 0 a < O< o °' B. 0 J] c9 E Q O s U V < U O ZU F = ati a vi E- _J D c i; a E-.5 E-- r Z D HQ -¢ D =5 | _ \\� O : \ co | t — _: '. k2q \\� . = . = 0 . \a ( j=1 „ - ,a 2 zzzz / sl :, (fk) U» `! � - (2 /%; § ;-; <§ f (\ T= - - = - 2\ __ G 3 it k j j !»_ _ &__ \\\\k \ } \ \ \ } \ §± & 47. j %) §- - k/ \ $ _7 % \ !> � k ) 2 13• 5 /f7 ti - ; f it | \ f - §- - - . a | ;_ _ _ : § §/ - �| ( � / - - ( - ■ ! 4| 2 , \ \/ - |11. , E S ;1 < `g ®!_ / § 2] �_� , ,! W ( ) U , | )\ 1 0 )) ) 2 R n §, �! ; - m £ ! ii 2 gill ' k .- O <, ! 4 ) 7 2 / _. =! |« - " G. « Z-4 ■ 1 : ` - ` 2 I! R§ •_ }} } );, \ ' / 2 §! $° - !e J 15a | k � /\ \ � \}k { \ Of) ]§ � � - , ,L. , . � 0 <! ;! !® k k I Z\-5\ � 4 0 y y J y U aS C R C S Q IS , N , . 2 1 , 1 a - ' Q ° a 4 i y ,. > U O a. EXHIBIT G EXHIBIT H CERTIFICATE OF ACCEPTANCE FOR 25TH STREET BRIDGE REPAIR - PHASE 2 PROJECT FOR THE CITY OF PORT ARTHUR To: PaveCon, Ltd. of Houston, Texas This document is to certify that the City of Port Arthur, Texas, accepts the completion of the 25th Street Bridge Repair- Phase 2 Project,based on the Engineer's Certificate of Completion by the City Engineer, Contractor's Affidavit of Bills Paid, the Contractor's Certificate and Release, and Contractor's Certificate of Warranty from PaveCon, Ltd. of Houston,Texas. Ronald Burton, CPM City Manager ATTEST: Christe Whitley Ned, TMRC City Secretary