HomeMy WebLinkAboutP.R. 25195 ENTER IN TO A CONTRACT WITH SCS FOR GROUNDWATER, LANDFILL GAS AND AIR QUALITY MONITORING. •
City of
L J
www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
Date: October 12,2026
To: The Honorable Mayor and City Council
Through: Ron Burton,City Manager
From: Jessie Dehn,Public Works Director
RE: P.R.No. 25195: Authorizing the City Manager to enter into contract with SCS Engineers
of Houston,Texas for Groundwater,Landfill Gas and Air Quality Monitoring.
Introduction:
This agenda item seeks the City Council's authorization for the City Manager to contract with SCS
Engineers of Houston,Texas for groundwater, landfill gas and air quality monitoring for$190,200.00.
Background:
The City of Port Arthur's Landfill is required by state and federal laws to monitor its groundwater, landfill
gas and air quality. SCS Engineers of Houston,Texas,currently provides the aforementioned services,and
the firm has been instrumental in maintaining the monitoring schedule and compliance.
A new round of monitoring and reporting is required each fiscal year. SCS has proposed continuing to
provide air compliance and groundwater and gas monitoring services from November 2026 through
August 2027 for$190,200.00.
Budget Impact:
Funds are available from Account No.403-50-320-5420-00-00-000.
Recommendation:
It is recommended that the City of Port Arthur's City Council approve PR 25195, authorizing the City
Manager to contract with SCS Engineers of Houston, Texas, for groundwater, landfill gas, and air quality
monitoring for$190,200.00 for the period of November 2026 to August 2027.
"Remember,we are here to serve the Citizens of Port Arthur"
444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
S:\Engineering\PUBLIC WORKS\PW-RESOLUTIONS\PR 25195_GWLFGAQ Monitoring(Landfill)\PR 25195-Agenda Memo.docx
PR 25195
10/5/2025 JAM
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
CONTRACT WITH SCS ENGINEERS OF HOUSTON, TEXAS FOR
GROUNDWATER, LANDFILL GAS AND AIR QUALITY MONITORING
AT THE LANDFILL FROM NOVEMBER 2026 TO AUGUST 2027 FOR
$190,200.00. FUNDS ARE AVAILABLE IN PUBLIC WORKS
DEPARTMENT LANDFILL DIVISION — PROFESSIONAL SERVICES
ACCOUNT NUMBER 403-50-320-5420--00-00-000.
WHEREAS, the Texas Commission on Environmental Quality (TCEQ) requires the
Landfill to monitor and report the groundwater, landfill gas and air quality levels at the Landfill;
and,
WHEREAS, a registered geologist and environmental engineer are required to perform
this task; and,
WHEREAS, this procurement for professional services is authorized pursuant to Section
252.022(4)of the Local Government Code; and,
WHEREAS, SCS Engineers of Houston, Texas, has previously performed these services
for the City and has been instrumental in maintaining the monitoring schedule and compliance;
and,
WHEREAS, SCS Engineers can perform these services for the not-to-exceed amount of
$190,200.00 as shown in Exhibit A.
NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR,TEXAS:
THAT, the facts and opinions in the preamble are true and correct; and,
THAT, the City Council of the City of Port Arthur hereby authorizes the City Manager to
contract with SCS Engineers of Houston, Texas, from November 2026 through August 2027, for
PR 25195
10/5/2025 JAM
Page 2 of 3
groundwater,landfill gas,and air quality monitoring for the not-to-exceed amount of$190,200.00,
as delineated in Exhibit A; and,
THAT, funding is available in Public Works Landfill Professional Services Account
Number 403-50-320-5420-00-00-000; and,
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
READ, ADOPTED AND APPROVED this the _day of
A.D. 2026 at a meeting of the City of Port Arthur, Texas by the following
vote: Ayes: Mayor:
Councilmembers:
Noes:
Charlotte M. Moses
Mayor
Attest:
Christe Whitley Ned, TRMC
City Secretary
PR 25195
10/5/2025 JAM
Page 3 of 3
APPROVED AS TO FORM:
Roxann Pais Cotroneo, Esq.
City Attorney
APPROVED FOR ADMINISTRATION:
,iw 11-)/
Ronald Bu n, CPM
City Manager
APPROVED AS FOR AVAILABILITY OF
FUNDS:
OrliP(44
oswell, PhD, ICMA-CM
Director of Finance
=--/ Z___—,
Jessie Dehn, P.E.
Director of Public Works
. cam ,
Clifton . Williams,Jr., CPPB
Purchasing Manager
P. R. 25195
STATE OF TEXAS § CITY OF PORT ARTHUR,TEXAS
COUNTY OF JEFFERSON § AGREEMENT FOR PROFESSIONAL SERVICES
This Agreement for Professional Services ("Agreement")is made by and between the City
of Port Arthur,Texas,a Texas home-rule municipality located in Jefferson County,Texas("City"),
and SCS ENGINEERS ("Professional")(individually,each a"Party"and collectively,"Parties"),
acting by and through the Parties' authorized representatives.
Recitals:
WHEREAS, the City desires to engage the services of the Professional as an independent
contractor and not as an employee in accordance with the terms and conditions set forth in this
Agreement; and
WHEREAS, Professional desires to render professional services in accordance with the
terms and conditions set forth in this Agreement.
NOW, THEREFORE, in exchange for the mutual covenants set forth herein and other
valuable consideration, the sufficiency and receipt of which is hereby acknowledged, the Parties
agree as follows:
Article I
Employment of a Professional
The professional will perform all services under this Agreement as an independent
contractor, in accordance with the Statutory Standard of Care codified in Tex. Civ. Prac. & Rem.
Code § 130.0021(b)(1).
Article II
Term
2.1 The term of this Agreement shall begin on the last date of execution hereof by all
parties hereto (the"Effective Date") and shall remain in effect from November 2026 until August
2027, including the time necessary to develop the project deliverables, subject to change upon
request or mutual agreement(s).
2.2 The Professional may terminate this Agreement by giving thirty (30) days' prior
written notice to the City. In the event of such termination by Professional, Professional shall be
entitled to compensation for services satisfactorily completed in accordance with this Agreement
prior to the date of such termination.
2.3 City may terminate this Agreement by giving ten (10) days' prior written notice to
Professional. In the event of such termination by City, Professional shall be entitled to
compensation for services satisfactorily completed in accordance with this Agreement prior to the
date of such termination. Upon receipt of such notice from the City, Professional shall
immediately terminate working on, placing orders, or entering into contracts for supplies,
assistance, facilities,or materials in connection with this Agreement and shall proceed to promptly
cancel all existing contracts insofar as they are related to this Agreement.
2.4 Upon notice of termination by Professional or City, Professional shall immediately
surrender all project documents produced by Professional and its subcontractors up to and
including the date on which the termination notice was given.
Article III
Scope of Services
3.1 Professional shall perform the services specifically set forth in Exhibit A, attached
hereto and incorporated herein by reference, entitled "Scope of Services." In the event of any
conflict between the language of Exhibit A and the provisions of this Agreement, the provisions
of this Agreement shall control. Any additional services require the prior approval of the City
Council.
3.2 The Parties acknowledge and agree that any and all opinions provided by
Professional represent the best judgment of Professional, in accordance with the Standard of Care.
Article IV
Schedule of Work
4.1 Professional agrees to commence services upon written direction from City and to
complete the tasks set forth in Exhibit A, Scope of Services, in accordance with a work schedule
established by City(the "Schedule"), which is attached hereto and incorporated as Exhibit A.
4.2 In the event Professional's performance of this Agreement is delayed or interfered
with by acts of City or others, Professional may request an extension of time for the performance
of same as hereinafter provided, and City shall determine whether to authorize any increase in fee
or price, or to authorize damages or additional compensation as a consequence of such delays,
within a reasonable time after receipt of Professional's request.
4.3 No allowance of any extension of time, for any cause whatsoever, shall be claimed
or made by Professional, unless Professional shall have made written request upon City for such
extension not later than thirty (30) business days after the occurrence of the cause serving as the
basis for such extension request, and unless City and Professional have agreed in writing upon the
allowance of such additional time.
Article V
Compensation and Method of Payment
5.1 City shall pay Professional for the services specifically as set forth in Exhibit A and
in accordance with the Rate Schedule in an amount not to exceed $190,200.00 for said services.
5.2 Each month,Professional shall submit to the City an invoice supporting the amount
for which payment is sought. Each invoice shall also state the percentage of work completed on
Page 2 of 11
City of Port Arthur, Texas
Professional Services Agreement
the Project through the end of the then-submitted billing period, the total amount of the current
invoice, and a running total balance for the Project to date.
5.3 Within thirty (30) days of receipt of each such monthly invoice, City shall make
monthly payments in the amount shown by the Professional's approved monthly invoice and other
documentation submitted.
5.4 Professional shall be solely responsible for the payment of all costs and expenses
related to the services provided pursuant to this Agreement, including, but not limited to, travel,
copying and facsimile charges, reproduction charges, and telephone, internet, e-mail, and postage
charges, except as set forth in Exhibit A.
5.5 Nothing contained in this Agreement shall require City to pay for any services that
are unsatisfactory as determined by City or which is not performed in compliance with the terms
of this Agreement, nor shall failure to withhold payment pursuant to the provisions of this section
constitute a waiver of any right, at law or in equity, which City may have if Professional is in
default, including the right to bring legal action for damages or for specific performance of this
Agreement. Waiver of any default under this Agreement shall not be deemed a waiver of any
subsequent default.
Article VI
Devotion of Time, Personnel, and Equipment
6.1 Professional shall devote such time as reasonably necessary for the satisfactory
performance of the services under this Agreement. City reserves the right to revise or expand the
scope of services after due approval by City as City may deem necessary, but in such event City
shall pay Professional compensation for such services at mutually agreed upon charges or rates, a
copy of the Rate Schedule is attached hereto as Exhibit A, and within the time schedule prescribed
by City, and without decreasing the effectiveness of the performance of services required under
this Agreement. In any event, when Professional is directed to revise or expand the scope of
services under this Agreement, Professional shall provide City a written proposal for the entire
costs involved in performing such additional services. Prior to a professional undertaking any
revised or expanded services as directed by the City under this Agreement,the City must authorize
in writing the nature and scope of the services and accept the method and amount of compensation
and the time involved in all phases of the Project.
6.2 It is expressly understood and agreed to by Professional that any compensation not
specified in this Agreement may require approval by the City Council of the City of Port Arthur
and may be subject to current budget year limitations.
6.3 To the extent reasonably necessary for Professional to perform the services under
this Agreement, Professional shall be authorized to engage the services of any agents, assistants,
persons, or corporations that Professional may deem proper to aid or assist in the performance of
the services under this Agreement. The cost of such personnel and assistance shall be borne
exclusively by the Professional.
Page 3 of 11
City of Port Arthur, Texas
Professional Services Agreement
6.4 Professional shall furnish the facilities, equipment,telephones, facsimile machines,
email facilities, and personnel necessary to perform the services required under this Agreement
unless otherwise provided herein.
Article VII
Relationship of Parties
7.1 It is understood and agreed by and between the Parties that in satisfying the
conditions and requirements of this Agreement, Professional is acting as an independent
contractor, and City assumes no responsibility or liability to any third party in connection with the
services provided by Professional under this Agreement. All services to be performed by
Professional pursuant to this Agreement shall be in the capacity of an independent contractor, and
not as an agent, servant, representative, or employee of City. Professional shall supervise the
performance of its services and shall be entitled to control the manner, means, and methods by
which Professional's services are to be performed, subject to the terms of this Agreement. As
such, City shall not train Professional, require Professional to complete regular oral or written
reports, require Professional to devote his full-time services to City, or dictate Professional's
sequence of work or location at which Professional performs Professional's work, except as may
be set forth in Exhibit A.
Article VIII
Insurance
8.1 Before commencing work, Professional shall, at its own expense,procure, pay for,
and maintain during the term of this Agreement the following insurance written by companies
approved by the state of Texas and acceptable to City. The professional shall furnish to the City
Manager certificates of insurance executed by the insurer or its authorized agent stating coverages,
limits, expiration dates, and compliance with all applicable required provisions. Certificates shall
reference the project/contract number and be addressed as follows:
City of Port Arthur, Texas
Attention: Ronald Burton, City Manager
444 4th Street
Port Arthur, Texas 77640-1089
A. Commercial General Liability insurance, including, but not limited to,
Premises/Operations, Personal & Advertising Injury, Products/Completed Operations,
Independent Contractors and Contractual Liability, with minimum combined single limits
of $500,000 per occurrence, $500,000 Products/Completed Operations Aggregate, and
$500,000 general aggregate. Coverage must be written on an occurrence form. The
General Aggregate shall apply on a per-project basis.
B. Workers' Compensation insurance with statutory limits; and Employers'
Liability coverage with minimum limits for bodily injury: 1) by accident, $100,000 each
accident, and 2) by disease, $100,000 per employee with a per policy aggregate of
$500,000.
Page 4 of 11
City of Port Arthur, Texas
Professional Services Agreement
II
C. Business Automobile Liability insurance covering owned, hired, and non-
owned vehicles, with a minimum combined bodily injury and property damage limit of
$500,000 per occurrence.
D. Professional Liability Insurance to provide coverage against claims which
the Professional and all professionals engaged or employed by the Professional become
legally obligated to pay as damages arising out of the performance of professional services
caused by error, omission, or negligent act, with minimum limits of$1,000,000 per claim,
$1,000,000 annual aggregate
NOTE:If the insurance is written on a claims-made form, coverage shall be continuous(by
renewal or extended reporting period) for not less than thirty-six (36) months
following completion of this Agreement and acceptance by City.
8.2 With reference to the foregoing required insurance, Professional shall endorse
applicable insurance policies as follows:
A. A waiver of subrogation in favor of City, its officials, employees, and
officers shall be contained in the Workers' Compensation insurance policy.
B. The City, its officials, employees, and officers shall be named as additional
insureds on the Commercial General Liability policy, by using endorsement CG2026 or
broader.
C. All insurance policies shall be endorsed to the effect that the City will
receive at least thirty(30)days'notice prior to cancellation, non-renewal, or termination of
the policies.
8.3 All insurance shall be purchased from an insurance company that meets a financial
rating of B+VI or better as assigned by A.M. Best Company or equivalent.
Article IX
Right to Inspect Records
9.1 Professional agrees that City shall have access to and the right to examine any
directly pertinent books, documents, papers, and records of Professional involving transactions
relating to this Agreement. The professional agrees that the City shall have access during normal
working hours to all necessary Professional facilities and shall be provided adequate and
appropriate workspace in order to conduct audits in compliance with the provisions of this section.
City shall give the Professional reasonable advance notice of intended audits.
9.2 Professional further agrees to include in subcontract(s), if any, a provision that any
subcontractor agrees that City shall have access to and the right to examine any directly pertinent
Page 5 of 11
City of Port Arthur, Texas
Professional Services Agreement
Eppwwwwwwwwwwwww
books, documents, papers and records of such subcontractor involving transactions related to the
subcontract, and further, that City shall have access during normal working hours to all such
subcontractor facilities and shall be provided adequate and appropriate work space, in order to
conduct audits in compliance with the provisions of this section. City shall give any such
subcontractor reasonable advance notice of intended audits.
Article X
Miscellaneous
10.1 Entire Agreement. This Agreement and any and all Exhibits attached hereto
constitute the sole and only agreement between the Parties and supersede any prior or
contemporaneous understandings,written agreements,or oral agreements between the Parties with
respect to the subject matter of this Agreement.
10.2 Authorization. Each Party represents that it has full capacity and authority to grant
all rights and assume all obligations granted and assumed under this Agreement.
10.3 Assignment. The professional may not assign this Agreement in whole or in part
without the prior written consent of the City. In the event of an assignment by Professional to
which the City has consented, the assignee shall agree in writing with the City to personally
assume,perform, and be bound by all the covenants and obligations contained in this Agreement.
10.4 Successors and Assigns. Subject to the provisions regarding assignment, this
Agreement shall be binding on and inure to the benefit of the Parties and their respective heirs,
executors, administrators, legal representatives, successors, and assigns.
10.5 Governing Law and Exclusive Venue. The laws of the State of Texas shall govern
this Agreement, and the exclusive venue for any legal action concerning this Agreement shall be
in a District Court with appropriate jurisdiction in Jefferson County, Texas. The Parties agree to
submit to the personal and subject matter jurisdiction of said court.
10.6 Amendments. This Agreement may be amended only by the mutual written
agreement of the Parties.
10.7 Severability. In the event any one or more of the provisions contained in this
Agreement shall for any reason be held to be invalid, illegal, or unenforceable in any respect by a
court of competent jurisdiction, such invalidity, illegality or unenforceability shall not affect any
other provision in this Agreement,and this Agreement shall be construed as if such invalid,illegal,
or unenforceable provision had never been contained in this Agreement.
10.8 Survival of Covenants and Terms. Any of the representations, warranties,
covenants,and obligations of the Parties,as well as any rights and benefits of the Parties,pertaining
to a period of time following the termination of this Agreement, shall survive termination,
including,but not limited to, Section 3.3, Article X, and, in particular, Sections 10.13 and 10.14.
10.9 Recitals. The recitals to this Agreement are incorporated herein.
Page 6 of 11
City of Port Arthur, Texas
Professional Services Agreement
10.10 Notice. Any notice required or permitted to be delivered hereunder may be sent by
first-class mail, overnight courier, or by confirmed telefax or facsimile to the address specified
below, or to such other Party or address as either Party may designate in writing, and shall be
deemed received three(3) days after delivery set forth herein:
If intended for City:
City of Port Arthur,Texas
444 4th Street
Port Arthur, Texas 77640
Attn: Ronald Burton, City Manager
Copy to:
City of Port Arthur, Texas
444 4th Street
Port Arthur,Texas 77640
Attn: Roxann Pais Cotroneo, City Attorney
10.11 Counterparts. This Agreement may be executed by the Parties hereto in separate
counterparts, each of which, when so executed and delivered, shall be deemed an original, but all
such counterparts shall together constitute one and the same instrument. Each counterpart may
consist of any number of copies hereof, each signed by less than all, but together signed by all of
the Parties hereto.
10.12 Exhibits. The exhibits attached hereto are incorporated herein and made a part
hereof for all purposes.
10.13 Professional's Liability. Acceptance of the Project Documents by City shall not
constitute nor be deemed a release of the responsibility and liability of Professional,its employees,
associates, agents or subcontractors for the accuracy and competency of their designs, working
drawings, specifications or other documents and work; nor shall such acceptance be deemed an
assumption of responsibility by City for any defect in the Project Documents or other documents
and work prepared by Professional, its employees, associates, agents or sub-consultants.
10.14 Indemnification. PROFESSIONAL AGREES TO INDEMNIFY AND HOLD
HARMLESS CITY FROM AND AGAINST ANY AND ALL LIABILITIES, DAMAGES,
CLAIMS,SUITS,COSTS (INCLUDING COURT COSTS,REASONABLE ATTORNEY'S
FEES AND COSTS OF INVESTIGATION)AND ACTIONS BY REASON OF INJURY TO
OR DEATH OF ANY PERSON OR DAMAGE TO OR LOSS OF PROPERTY TO THE
EXTENT CAUSED BY PROFESSIONAL'S NEGLIGENT PERFORMANCE OF
SERVICES UNDER THIS AGREEMENT OR BY REASON OF ANY ACT OR OMISSION
ON THE PART OF PROFESSIONAL, ITS OFFICERS, DIRECTORS, SERVANTS,
AGENTS, EMPLOYEES, REPRESENTATIVES, CONTRACTORS,
SUBCONTRACTORS, LICENSEES, SUCCESSORS OR PERMITTED ASSIGNS
(EXCEPT WHEN SUCH LIABILITY, CLAIMS, SUITS, COSTS, INJURIES, DEATHS
OR DAMAGES ARISE FROM OR ARE ATTRIBUTED TO THE NEGLIGENCE OF
Page 7 of 11
City of Port Arthur, Texas
Professional Services Agreement
THE CITY.PROFESSIONAL OBLIGATIONS UNDER THIS SECTION SHALL NOT BE
LIMITED TO THE LIMITS OF COVERAGE OF INSURANCE MAINTAINED OR
REQUIRED TO BE MAINTAINED BY PROFESSIONAL UNDER THIS AGREEMENT.
IF THIS AGREEMENT IS A CONTRACT FOR ENGINEERING OR ARCHITECTURAL
SERVICES, THEN THIS SECTION IS LIMITED BY THE INDEMNITY SPECIFIED IN
§ 271.904 OF THE TEXAS LOCAL GOVERNMENT CODE, AS AMENDED. THIS
SECTION SHALL SURVIVE TERMINATION OF THIS AGREEMENT
10.15 Conflicts of Interest. The professional represents that no official or employee of
the City has any direct or indirect pecuniary interest in this Agreement. Any misrepresentation by
Professional under this section shall be grounds for termination of this Agreement and shall be
grounds for recovery of any loss, cost, expense, or damage incurred by City as a result of such
misrepresentation.
10.16 Default. If at any time during the term of this Agreement, Professional shall fail to
commence the services in accordance with the provisions of this Agreement or fail to diligently
provide services in an efficient, timely and careful manner and in strict accordance with the
provisions of this Agreement or fail to use an adequate number or quality of personnel to complete
the services or fail to perform any of Professional's obligations under this Agreement, then City
shall have the right, if Professional shall not cure any such default after thirty (30) days written
notice thereof, to terminate this Agreement. Any such act by City shall not be deemed a waiver
of any other right or remedy of City. If, after exercising any such remedy due to Professional's
nonperformance under this Agreement, the cost to City to complete the services to be performed
under this Agreement is in excess of that part of the contract sum which has not theretofore been
paid to Professional hereunder, Professional shall be liable for and shall reimburse City for such
excess costs.
10.17 Confidential Information. Professional hereby acknowledges and agrees that its
representatives may have access to or otherwise receive information during the furtherance of
Professional's obligations in accordance with this Agreement, which is of a confidential, non-
public, or proprietary nature. Professional shall treat any such information received in full
confidence and will not disclose or appropriate such Confidential Information for Professional's
own use or the use of any third party at any time during or subsequent to this Agreement. As used
herein, "Confidential Information"means all oral and written information concerning the City, its
affiliates and subsidiaries, and all oral and written information concerning City or its activities,
that is of a non-public,proprietary or confidential nature including,without limitation,information
pertaining to customer lists, services, methods, processes and operating procedures, together with
all analyses,compilations,studies or other documents,whether prepared by Professional or others,
which contain or otherwise reflect such information. The term "Confidential Information" shall
not include such information that is or becomes generally available to the public other than as a
result of disclosure to Professional or is required to be disclosed by a governmental authority under
applicable law.
10.18 Remedies. No right or remedy granted or reserved to the Parties is exclusive of
any other right or remedy herein by law or equity provided or permitted; but each right or remedy
shall be cumulative of every other right or remedy given hereunder. No covenant or condition of
Page 8 of 11
City of Port Arthur, Texas
Professional Services Agreement
this Agreement may be waived without the written consent of the Parties. Forbearance or
indulgence by either Party shall not constitute a waiver of any covenant or condition to be
performed pursuant to this Agreement.
10.19 No Third-Party Beneficiary. For purposes of this Agreement, including the
intended operation and effect of this Agreement, the Parties specifically agree and contract that:
(1) this Agreement only affects matters between the Parties to this Agreement, and is in no way
intended by the Parties to benefit or otherwise affect any third person or entity notwithstanding the
fact that such third person or entity may be in contractual relationship with City or Professional or
both;and(2)the terms of this Agreement are not intended to release,either by contract or operation
of law, any third person or entity from obligations owing by them to either City or Professional.
[The Remainder of this Page Intentionally Left Blank]
Page 9 of 11
City of Port Arthur, Texas
Professional Services Agreement
EXECUTED this day of , 2026.
CITY:
CITY OF PORT ARTHUR,TEXAS,
A Texas home-rule municipality,
By:
Ronald Burton, City Manager
ATTEST:
Christe Ned Whitley,City Secretary
APPROVED AS TO FORM:
Roxann Pais Cotroneo,City Attorney
EXECUTED this day of , 2026.
PROFESSIONAL:
SCS ENGINEERS
By:
Name:
Page 10 of 11
City of Port Arthur, Texas
Professional Services Agreement
Exhibit A
Scope of Services/ Schedule
Page 11 of 11
City of Port Arthur, Texas
Professional Services Agreement
SCS ENGINEERS Environmental Consulting & Contracting
October 2, 2026
SCS Proposal No. OP160161.25
Mr.Jessie Dehn (sent via e-mail)
Director of Public Works
City of Port Arthur
444 4th Street
Port Arthur,TX 77640
Subject: Proposal for Groundwater, Landfill Gas, and Air Quality Services
November 2026 to August 2027
City of Port Arthur Landfill
Port Arthur,Jefferson County,Texas
Dear Mr. Dehn:
SCS Engineers(SCS) is pleased to present this proposal for continuing to provide groundwater and gas
monitoring services as well as air compliance services for the City of Port Arthur Landfill.We appreciate
the opportunity to provide these services thus far,and we look forward to continuing to provide these
important services for the City. This scope of work covers the period from November 2026 to August
2027.
SCOPE OF WORK
This scope of work covers semiannual groundwater and gas monitoring, as well as air compliance
services, for the period from November 2026 to August 2027. These services are required to be
completed within the City's FY 2026-2027 fiscal year.This scope will enable a continued management
of groundwater issues, as well as air compliance matters, at the landfill. Our proposed scope of work
is noted below.
Task 1 - November 2026 Detection/Assessment Monitoring, Methane Monitoring,
and Annual Groundwater Report Services
Field Services
A qualified field technician will sample all fifteen (15)groundwater monitoring wells in accordance with
the site Groundwater Sampling and Analysis Plan (GWSAP)and current practice.The technician will be
dispatched with the current site GWSAP. Each well will be inspected for condition, and observations
will be documented. Field measurements including water level, pH, specific conductivity, and
temperature will be made using equipment supplied by SCS. Each well will then be purged and
sampled using the already-installed dedicated low-flow pumps in accordance with the GWSAP. Several
wells are in assessment monitoring status but sampled for detection monitoring parameters as
approved by the Texas Commission on Environmental Quality (TCEQ). Samples will be packaged and
sent to the laboratory for analysis. SCS will also inspect the well pads and clear vegetation as
necessary.
As a result of a confirmed statistically significant exceedance (SSI) of cobalt in monitoring well MW-4
during a previous groundwater sampling event,and subsequent verification sampling event, well MW-
12651 Briar Forest Dr. #205, Houston,TX 77077 1817-358-6162
Mr. Jessie Dehn
October 2, 2026
Page 2
4 and two adjacent wells, entered into assessment monitoring. However, these wells were only
sampled for Appendix I monitoring parameters. Based on previous results the cobalt concentrations
decreased below the applicable statistical standard but the barium concentration in these wells
exceeded their standard. Monitoring wells MW-1 and MW-4 will remain in assessment monitoring for
Appendix I parameters until the barium concentrations decrease below the applicable statistical
standard for two consecutive events.
An SCS field technician will monitor methane concentrations in the fifteen perimeter gas probes and
at the scale house in accordance with the site Landfill Gas Management Plan (LFGMP) and current
practice. In addition, the pumphouse and a shed will also be monitored. The technician will be
dispatched with the current site LFGMP. Each probe and the gatehouse will then be monitored using
a calibrated methane gas detector in accordance with the LFGMP.
Each time monitoring is conducted, the integrity of the gas monitoring probes and groundwater
monitoring wells will be inspected by the sampler. The sampler will record pertinent information on
appropriate field forms.The sampler will perform the following at each monitoring event:
• Verify that the gas monitoring probe or monitoring well is clearly labeled on the outer casing or
lid.
• Verify that the protective casing is intact and is not bent or excessively corroded.
• Verify that the concrete pad is intact(no evidence of cracking or heaving).
• Padlock replacement as necessary.
• Verify that the inner casing is intact.
If damage or excessive wear to a gas monitoring probe or groundwater monitoring well is observed, it
will be reported to the Landfill Manager.
Field monitoring data records will be maintained for all methane monitoring and kept on-site as part
of the Site Operating Record. If any gas probe measurements show any exceedance (defined as
methane exceeding 25%of its lower explosive limit in structures or 100%of the lower explosive limit
at the perimeter probes), the SCS technician will immediately report this information to the Landfill
Manager or his/her designated representative. SCS senior staff will consult with the City regarding
appropriate action.
Analytical and Reporting Services
Lab Analysis
SCS will oversee all laboratory-related activities for the project.SCS will coordinate with the laboratory
prior to sampling to order the appropriate sample containers.After sampling is complete, SCS will be
responsible for proper delivery to the laboratory.SCS will monitor the progress of sample testing,and
address lab issues as they arise. Metals analysis on the water samples will be for total metals, as
required under the Subchapter J rules.
Reporting
This scope includes preparing and submitting the annual detection monitoring report that is a
requirement for Type I landfills under Subchapter J rule 30 TAC 330.407(c).
The first report will summarize all groundwater activities for the calendar year, including the results
from the May 2027 groundwater sampling event, provide an updated groundwater flow map as
Mr. Jessie Dehn
October 2, 2026
Page 3
required by 30 TAC 330.407(c)(4), and updated groundwater flow velocity calculations as required by
30 TAC 330.407(c)(3).
Statistical analysis will be conducted as required by 30 TAC 330.407(b) for all wells. Note that TCEQ
requires statistical analysis of data from all wells that have completed background data collection,
upgradient and downgradient. We anticipate continuing to use the well-accepted Sanitas® software
to conduct the analysis,for which the City of Port Arthur owns a site license.TCEQ solid waste staff are
familiar with this software.SCS staff have utilized this statistical software for numerous Texas landfills.
A draft copy of the annual report will be submitted to the City within 60 days of sampling for review
and comment prior to submitting a final draft to the City and the TCEQ. SCS will submit an electronic
copy of the annual report to the City and two copies to the TCEQ, including an electronic copy on CD.
The Texas Page Ones (Form 0312) will first be submitted to the appropriate City personnel for
signature. The data will be merged into a pre-existing electronic database that contains all Subtitle-D
groundwater monitoring data obtained at the site. The City will be informed of any significant
developments that are observed at this stage of data review.
Task 2— February 2027 Methane Monitoring
This task has the same scope as the methane monitoring portion of Task 1.
Task 3 — May 2027 Detection Monitoring, Methane Monitoring, and Semi-annual
Groundwater Report Services
This event has the same scope as Task 1, except no Annual Report is required. A semi-annual
groundwater sampling report will be prepared by SCS and submitted to the TCEQ. A leachate sample
will be collected during this event.
Task 4—August 2027 Methane Monitoring
This task has the same scope as the methane monitoring portion of Task 1.
Task 5—Air Quality Services
Title V Reporting
The landfill's Title V Permit requires the submittal of semi-annual deviation reports and the submittal
of an annual compliance certification. Although semi-annual deviation reports are not required if no
deviations from the Title V permit requirements occurred during a semi-annual period, TCEQ has
requested that landfills be proactive and submit reports explicitly stating that no deviations occurred.
As such, consistent with TCEQ's request, and our approach to satisfying TCEQ's requirements in prior
years,this work includes the filing of two semi-annual deviation reports in FY 2026-27.This work also
includes the preparation of the Title V annual certification report. We will track the required submittal
deadlines and notify you in advance as information is required, and as signatures are needed.
Each submittal will consist of a cover letter, a certification form that must be signed by the City and
contain the appropriate TCEQ certification and deviation forms.We will contact you to discuss whether
any potential deviations occurred during each reporting period prior to submitting any certification
Mr. Jessie Dehn
October 2, 2026
Page 4
forms to you for your certification.Any discovered deviations will be explained and included as such in
the Title V paperwork. Upon completion of all paperwork and receipt of the signed certification pages,
we will transmit the information to TCEQ and,for the annual certification, also copy EPA.
of an annual certification each year. Although semi-annual deviation reports are not required if no
deviations from the Title V permit requirements occurred during a semi-annual period, TCEQ has
requested that landfills be proactive and submit reports explicitly stating that no deviations occurred.
As such, consistent with TCEQ's request and our approach to satisfying TCEQ's requirements in prior
years, this work includes the filing of two semi-annual deviation reports in FY 2026-2027. This work
also includes the preparation of the Title V annual certification report. We will track the required
submittal deadlines and notify you in advance, as information is required and as signatures are
needed.
Each submittal will consist of a cover letter, a certification form that must be signed by the City, and
contain the appropriate TCEQ certification and deviation forms.We will contact you to discuss whether
any potential deviations did occur during each reporting period prior to submitting any certification
forms to you for your signature as Responsible Official. Any discovered deviations will be explained
and included as such in the Title V paperwork. Upon completion of all paperwork and receipt of the
signed certification pages, we will transmit the appropriate paperwork to TCEQ and, for the annual
certification,to EPA.
Emissions Fee Calculations
As part of this scope, we will also prepare the TCEQ emissions fee remittance form.As the holder of a
Title V air permit in the State of Texas,the City is required to pay emissions fees to support Texas'Title
V program. Consistent with prior years,we anticipate that the TCEQ will mail you a fee remittance form
in April 2026. We will complete the emissions fee form, and remit this form to TCEQ on the City's
behalf. Please note that the fees themselves are not included in this proposal; you should be billed
directly for these in October or November of 2026 after TCEQ's fiscal year closes and the per ton fee
amount is established.
Calendar Year 2026 Greenhouse Gas Reporting
We will prepare the required reporting associated with the Federal mandatory GHG reporting rules in
calendar year 2027 for calendar year 2026 emissions. This work includes the preparation and
submittal of the required GHG emissions estimates and associated information required by the GHG
reporting rule.The deadline for this submittal is March 31, 2027.
As was completed this past March, electronic reporting will be used to file all required information
related to the GHG reporting rule. We will work with you to enter all online information for review and
certification.
We will have most of the information necessary to complete the GHG emissions estimates based on
prior work. We will contact you regarding any information that might be needed. When the reporting
has been completed, we will provide a memorandum for your files including backup calculation
spreadsheets and pertinent assumptions.
Mr. Jessie Dehn
October 2, 2026
Page 5
Task 6 (Contingent) — Respond to Future TCEQ Correspondence Regarding Groundwater
Monitoring
This task allows for the response to potential future TCEQ letters regarding groundwater monitoring
submittals. This task has been added to the proposal because it is SCS' experience that the TCEQ
Permits staff are generating increasing amounts of correspondence requiring non-routine responses.
Because the actual need for these services is unknown at this time, Task 6 will be billed on a time-
and-materials basis utilizing SCS'current fee schedule.The City will be consulted,and approval will be
obtained prior to incurring any Task 6 costs.
Task 7— Resampling (only as needed)
Groundwater monitoring results occasionally indicate that resampling of a well must be conducted in
order to avoid the cost of regulatory actions such as assessment monitoring or corrective measures.
SCS takes all possible measures to avoid the need for resampling, including lab re-analysis,additional
statistical analysis, and implementing Alternate Source Demonstrations where possible. As a result,
the requirement for resampling is not a common occurrence at the City of Port Arthur Landfill. The
Task 7 total budget allows for two resampling events for two wells for the one-year term of this
proposal, if necessary.
Task 8 —Alternate Source Demonstrations
Groundwater monitoring results also occasionally indicate the need for an Alternate Source
Demonstration (ASD),to avoid unnecessary assessment monitoring. It has become crucial under the
new rules to avoid unnecessary assessment monitoring, because rule 30 TAC 330.409(b) dictates
that all downgradient wells must go into assessment instead of just one well as under the old rules. In
order for the City to budget for this possibility,we have included Task 8 that includes budget estimated
to be sufficient for two ASDs.ASDs vary widely in the required level of effort and associated cost, and
the budget listed in this optional task is for two ASDs. Task 8 will be billed on a time-and-materials
basis utilizing SCS'current fee schedule.The City will be consulted,and approval will be obtained prior
to incurring any Task 8 costs.
Task 9 — Background Evaluation Report
An update of the statistical background database of groundwater monitoring data will be performed
in accordance with the GWSAP for the landfill,TCEQ guidance, and EPA Unified Guidance.
Updating improves the background data set by incorporating natural groundwater changes that
occur over time. Updating can result in fewer false positives and reduce the need for expensive
assessment monitoring. Background may be updated no more often than every two years.
Sanitas statistical software will be used for background analysis. The background evaluation will
include both statistical and visual outlier analysis to verify or remove any background data that is
non-representative of groundwater concentrations. Additionally, Sen's Slope tests, parametric and
non-parametric limit analysis, and time series charts will be utilized to propose new statistical
analysis that will be utilized to compare compliance data in future groundwater monitoring reports.
Mr. Jessie Dehn
October 2, 2026
Page 6
Task 10—On-Call Air Services
Consistent with our years of providing landfill engineering and consulting services, it is recommended
that a budget be established for a variety of non-routine engineering and technical services that may
be required during the fiscal year. Also,the City's management team may encounter questions related
to TCEQ inspections and other matters where it may be advantageous to have ready access to
consulting support.
This budget will only be used with the City's prior authorization on a time-and-materials basis using the
SCS fee schedule in effect at that time. Further, any charges to this task will be fully detailed in our
invoice.
FEE AND SCHEDULE
Project fees are detailed in Table 1.Billing will be conducted on a lump sum, monthly percent complete
basis.
Table 1. Tabulation of Estimated Fees
Proposed
Task# Description Fee
1 November 2026 Detection Monitoring, Methane Monitoring, $51,600
and Annual Groundwater Report Services
2 February 2027 Methane Monitoring $6,200
3 May 2027 Detection Monitoring, Methane Monitoring, and $51,600
Semiannual Groundwater Report Services
4 August 2027 Methane Monitoring 6,200
5 Air Quality Services $15,300
Respond to Future TCEQ Correspondence Regarding $10,900
6 Groundwater Monitoring *
7 Resampling (Two events, two wells and reporting) * $17,600
8 Alternate Source Demonstrations* $8,900
9 Background Evaluation Report $15,400
10 On-Call Air Services* $6,500
Total I $190, 200
*Time-and-materials tasks. As noted above,the estimated fees for these tasks will be invoiced using
SCS' current fee schedule(attached).
SCS will maintain a schedule for all our services and perform our work to meet compliance and
regulatory deadlines.
ADDITIONAL SERVICES
As with our current monitoring project, the following services are not a part of this scope and will be
considered additional services. No such additional services will be initiated by SCS prior to receiving
the City's approval:
Mr. Jessie Dehn
October 2, 2026
Page 7
• Sampling for constituents not listed in the GWSAP;
• Field services time extending beyond three days for one event caused by slow well recharge,
well access problems, mechanical problems, or weather problems;
• Disposal of purge and other wastewater. It is assumed City will provide drums at each sample
location and will be responsible for emptying drums;
• Well or gas probe repair;
• Follow-up required by landfill gas exceedances;
• Attending TCEQ inspections;
• Redevelopment or any other monitor well maintenance required for field sampling or
requested by any party;
• Additional time associated with VOC occurrences or any exceedances of federally-promulgated
Maximum Contaminant Limits;
• Amending GWSAP; and
• Sampling and analyzing water samples from wells other than the 15 Subtitle D groundwater
monitoring wells.
SUMMARY
SCS appreciates this opportunity to continue to provide these groundwater services for the City of Port
Arthur. As with other recent projects for the City, receipt of a Purchase Order will suffice for our notice
to proceed. In view of our history of working with the City, we have not included a Statement of
Qualifications. Nevertheless,we would be pleased to provide further information on our qualifications
and experience, if requested. If you have any questions related to this proposal, please feel free to
contact J. Roy at(817) 358-6156 or Gil at(817) 358-6162.
Sincerely,
Gil Gabaldon, P.G. J. Roy Murray, P.E.
Sr. Project Professional Vice President/Houston Office Director
SCS ENGINEERS SCS ENGINEERS
TBPE Registration No.F-3407
cc: Mr.Justin Thomas, City of Port Arthur Landfill Manager
Mr.Jorge Morales, Environmental Operations Manager
Ms. Isabella Aguirre, P.E., SCS Engineers