Loading...
HomeMy WebLinkAboutP.R. 25229 CLOSE-OUT DOCUMENTS AND RELEASE OF RETAINAGE TO GULF COAST ELECTRIC FOR THE TELECOMMUNICATIONS INFRASTRUCTURE IMPROVEMENT PROJECT. City of orr rthu Texas www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: October 15, 2026 To: The Honorable Mayor and City Council Members Through: Ron Burton, CPM, City Manager From: Suhail Kanwar, P.E., M.S., CFM, Director of Public Services/City Engineer RE: PR No. 25229: Authorizing the City Manager to Accept the Close-Out Documents and Release of Retainage to Gulf Coast Electric, Co., of Beaumont, Texas for the Telecommunications Infrastructure Improvements Project in Downtown Port Arthur. Funding available in the Account No. 305-00-000-2050-00-00-000 Project No. DT0003.CON. Introduction: The intent of this agenda item is to authorize the City Manager to accept the close-out documents and release retainage in the amount of $64,892.63 with Gulf Coast Electric, Co., of Beaumont, Texas, for the Telecommunications Infrastructure Improvements Project in Downtown Port Arthur. Funding is available in the Account No. 305-00-000-2050-00-00-000 Project No. DT0003.CON. Background: By Resolution No.25-494,the City awarded the project for telecommunications improvements between San Antonio Avenue and Shreveport Avenue to NW Atlas Services in the amount of$1,132,398.82. Following execution of the contract, NW Atlas Services notified the City that it was unable to furnish the required payment and performance bonds. The bonding requirements are mandatory under Texas law and the City's procurement documents and are a condition precedent to performance. A contractor's inability to provide these bonds renders the contractor legally unable to proceed and constitutes a failure to meet essential contract requirements. To protect the City's financial and legal interests and ensure compliance with statutory procurement standards, termination of the NW Atlas Services contract is both necessary and appropriate. The City was authorized to proceed with an award to the next lowest responsive and responsible bidder. Per Resolution No. 26-040, City Council awarded the contract to Gulf Coast Electric Co. for an amount of $1,297,852.64. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Public Works-Engineering has received Close Out Documents from Gulf Coast Electric, Co., of Beaumont, Texas,that includes the Certificate of Substantial Completion establishing completion as of April 30, 2026, the Contractor's Certificate and Release, the Contractor's Certificate of Warranty, the Contractor's Certificate of Guarantee, and the Contractor's Affidavit of All Debts Paid. Additionally, Gulf Coast Electric, Co., of Port Arthur, Texas is asking for release of retainage in the amount of $64,892.63. Budget Impact: Funds are available in Account No. 305-00-000-2050-00-00-000 Project No. DT0003.CON. Recommendation: It is recommended that the City of Port Arthur's City Council approve PR No. 25229 authorizing the City Manager to accept the Close-out documents and release the retainage in the amount of$64,892.63,with Gulf Coast Electric,Co.,of Beaumont,Texas, for the Telecommunications Infrastructure Improvements Project in Downtown Port Arthur. Funding is available in the Account No. 305-00-000-2050-00-00- 00-000 Project No. DT0003.CON. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 PR No. 25229 10/15/2026 RLD Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT THE CLOSE-OUT DOCUMENTATION SUBMITTED BY GULF COAST ELECTRIC CO. OF BEAUMONT, TEXAS, FOR TELECOMMUNICATIONS IMPROVEMENTS BETWEEN SAN ANTONIO AVENUE AND SHREVEPORT AVENUE IN DOWNTOWN PORT ARTHUR AND AUTHORIZING THE CITY MANAGER TO RELEASE THE RETAINAGE IN THE AMOUNT OF $64,892.63. FUNDS ARE AVAILABLE IN ACCOUNT NO. 305-00-000-2050-00-00-000. PROJECT NO. DT0003.CON WHEREAS, by Resolution No. 25-494, the City Council authorized the City to enter into a contract with NW Atlas Services of Florence, Texas, for telecommunications improvements between San Antonio Avenue and Shreveport Avenue in Downtown Port Arthur, in the total amount of $1,132,398.82; and WHEREAS, following execution of the contract, NW Atlas Services notified the City that it was unable to furnish the required payment and performance bonds for the project, as mandated by law and the contract documents; and WHEREAS, NW Atlas Services' failure to satisfy the bonding requirements constitutes an inability to perform under the contract, thereby necessitating termination of the agreement in order to protect the City's legal and financial interests; and WHEREAS, in accordance with applicable procurement requirements, the City was authorized to proceed with award of the project to the next lowest responsive and responsible bidder, Gulf Coast Electric Co. of Beaumont, Texas. Per Resolution No. 26-040, City Council awarded the contract to Gulf Coast Electric Co. for an amount of$1,297,852.64; and WHEREAS, Gulf Coast Electric Co. of Beaumont, Texas, has submitted the Certificate of Substantial Completion dated April 30, 2026 and the work to which the Certificate applies has been inspected, authorized, and declared to be complete in accordance with the contract documents and made a part hereof as (Exhibit A); together with the Contractor's Certificate and Release (Exhibit B), the Contractor's Certificate of Warranty (Exhibit C), the Contractor's Certificate of Guarantee (Exhibit D); and the Contractor's Affidavit of Debts Paid(Exhibit E); and, PR No. 25229 10/15/2026 RLD Page 2 of 4 WHEREAS, the retainage for the project is 5% of the work completed and billed, the Release of Retainage has been submitted by Gulf Coast Electric Co. of Beaumont, Texas, for the amount of $64,892.63, see(Exhibit G); and, WHEREAS, Gulf Coast Electric Co. of Beaumont, Texas, has completed the contracted project to the satisfaction of the City Engineer and the City Engineering staff, see(Exhibit F); and, WHEREAS, approval of PR 25229 and acceptance of the Close Out Documents and Release of Retainage is herein deemed an appropriate action. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Council hereby authorizes the City Manager to hereby accept the Certificate of Substantial Completion dated April 30, 2026 and the work to which the Certificate applies has been inspected, authorized, and declared to be complete in accordance with the contract documents and made a part hereof as (Exhibit A); together with the Contractor's Certificate and Release (Exhibit B), the Contractor's Certificate of Warranty (Exhibit C), the Contractor's Certificate of Guarantee (Exhibit D), the Contractor's Affidavit of Debts Paid (Exhibit E), and the Engineer's Certificate of Completion (Exhibit F); and, THAT, the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a Certificate of Acceptance (Exhibit H), including project photos (Exhibit I), for the completion of the Telecommunications Infrastructure Improvements Project in Downtown Port Arthur; and, THAT, the release of retainage be paid to Gulf Coast Electric Co. of Beaumont, Texas, for the retainage account number 305-00-000-2050-00-00-000 in the amount of $64,892.63, Project No. DT0003.CON (Exhibit G); and, THAT, a copy of the Resolution shall be spread upon the Minutes of the City Council Members. READ, ADOPTED AND APPROVED this the day of , A.D., 2026, at a of the City Council of the City of Port Arthur, Texas, by the following vote: Ayes: Mayor: Councilmembers: PR No. 25229 10/15/2026 RLD Page 3 of 4 Noes: Charlotte M. Moses Mayor ATTEST: Christe Whitley Ned,TRMC City Secretary PR No. 25229 10/15/2026 RLD Page 4 of 4 APPROVED AS TO FORM: APPROVED FOR DMINISTRATIO • Roxann Pais Cotroneo, Esquire Ronald Burton, City Attorney City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: ?)§1 I tr. (1 y "Lyn" Boswell, M.A., I MA-CM Clifton illiams, CPPB Director of Finance Purchasing Manager Suhail Kanwar, PE, Director of Public Services/City Engineer EXHIBIT A r ..Al I Eft .4v.) ARCEN'EAUX WILSON&COLE engineering I surveying 1 planning SUBSTANTIAL COMPLETION INSPECTION PUNCH LIST DATE: April 30, 2026 PROJECT: Telecommunications Infrastructure Improvements in Downtown Port Arthur between Fort Worth Ave. and Shreveport Ave between Procter Street and 4th Street AWC Job No. CPA-986 ATTENDEES: Keestan Cole - Arceneaux Wilson & Cole LLC (AWC) Simon Carron - AWC Suhail Kanwar - City of Port Arthur (CPA) Gregory Casmire - CPA Clifton Williams - CPA . Joseph Hancock - Gulf Coast Electrical Jimmy Picard - Gulf Coast Electrical Kelvin Solco - The Solco Group The following items are to be corrected or completed to comply with the Contract Documents, Technical Specifications and Construction Plans. GENERAL ITEMS - Fire Lane striping along new paving at the Gulf Coast Museum will need to be painted - Backfill with base material around the base of existing power pole at the intersection of Austin Ave. and re-attach ground wire - Backfill and compact (3) excavations for waterline repairs on City of Port Arthur waterline after notification that the city staff is complete with the repairs - Smooth edge of new concrete paving along brick wall on North side of the alley way at Dallas - Seal saw cut on north side of alley way at Dallas - Smooth and grout broken sections of paving at tie-in to the existing paving et San Antonio. - General note for site conditions: cleanup up of all construction trash, debris and equipment. 409.724.7888 3120 Central Mall Drive Port Arthur,TX 77642 Engineering Surveying awcen9.com F-16`194 10194049 A.IAIL comic TAILTAIr �. - General note-for project site: Complete final grading and cleanup of all remaining areas throughout the project site. END OF PUNCH LIST OMB Number:0610-0096 ArN1 Expiration Date: 01/31/2025 %` ,S -1 1 .''.,h `,t_ _ 4 ECONOMIC DEVELOPMENT ADMINISTRATION FINAL ACCEPTANCE REPORT EDA Award Number:08-79-05480 Date: Recipient: City of Port Arthur Co-Recipient(s): N/A Recipient's Authorized Representative: Ron Burton City Man 409-983-8102 . 'ellnf di Phone Number Contract# 1 of 1 Contracts Contract: ,kair d Date: 01/27/2026 Project/Contract Description: Proposed Communications Initauttmacture The following representatives were present during the final in i ion(include Name/Title): Owner: Suhail Kanwar,PE, Gregory Casmire, Clifton Williams Architect/Engineer: Keeston X. Cole, PE, Simon Carroll Contractor: Joseph Hancock,Jimmy Picard EDA Representative (if applicable): N/A Other: RECITAL: The work performed under this contract was invectuil on 04-30-2026 (date) for the purpose of determining acceptability ofannunituction. The Date of Acceptance is hereby established as 04-30-26 The"Date of Acceptance" is the date which the Owner maytw.aw y and/or use the facility for the purpose for which it is intended in accordance wuiiT the contract documents and all work for the facility has been completedwith'ihe exception of minor cleanup and minor corrective action as shown in the Archite.itffitigineer's list made during the final inspection. Keeston X.Cole 05/01/2026 Architect/Engineer(Print) Architect/Engineer(S ere) Date The Contractor agrees that the Date of Acceptance is also the&tie of commencement of all warranties required by the contract documents and that he/she Or Contractor)has released all liens on the project, including material,men and_mechanics iixeins or others filed by the Contractor. The Contractor will complete the work on.the Arrdhr ltect/Engineer's list of minor cleanup and corrective work within 14 days of t:}Dar,eff Acceptance. Contractor(Print) Contractor Signature Date . The Owner accepts the work as complete/substaniialik complete and will assume full possessio thereof on o5l1526 (date)-• . - -) 41),___ 2,1"1/ <. Owner (Print Owner Signatu Date —s EXHIBIT B CONTRACTOR'S CERTIFICATE AND RELEASE FROM: GULF COAST ELECTRIC CO. (Name of Contractor) TO: CITY OF PORT ARTHUR gO `O (owner) REFERENCE CONTRACT NO. CPPA- 86,Contract No. 1 ENTERED INTO THE is DAY OFF%- t ,BETWEEN THE CITY OF PORT ARTHUR AND GULF COAST ELECTRIC CO. (Name of Contractor) OF PORT ARTHUR TEXAS (City) (State) FOR THE CITY OF PORT ARTHUR DOWNTOWN INFRASTRUCTURE IMPROVEMENTS (Name of Project) KNOW ALL MEN BY THESE PRESENTS: 1. The undersigned hereby certifies that there is due from,and payable by,the Owner to the Contractor under the contract and duly approved Change Orders and modifications the balance of ($ 0 2. The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: (a) (b) (c) (d) (Itemize claims and amounts due) (If none,so state) 3. The undersigned further certifies that all work required under this contract,including work required under Change Order(s)numbered , has been performed in accordance with the terms thereof, and that there are no unpaid claims for materials, supplies, or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract,and that the wage rates paid by the Contractor were in conformity with the contract provisions relating to said wage rates. 4. Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under, or pursuant to, the above mentioned contract or any modifications or change thereof. 5. That in consideration of the payment of the amount stated in Paragraph I hereof,the undersigned does hereby release the Owner and Operator from any and all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the Owner; provided, however, that if for any reason the Owner does not pay in full the amount stated in Paragraph 1 hereof,said deduction shall not affect the validity of this release,but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof. The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of any amount which may be deducted from Paragraph 1 hereof, he will release the Owner and Operator from any and all claims of any nature whatsoever 1 arising out of said contract or modification thereof, and will execute such further releases or assurances as the Owner and Operator may request. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this I U day of "5-1.,,,.E ,20ZCo. [SEAL] GULF COAST ELECTRIC CO. (Contractor) BY: ) // ;44 Pre K d t� f (Signature and Title o fficer) J,., :C cr 2i , being first duly sworn on oath, deposes and says, first, that (Affiant) he is the ��5, ."2"-1" of GLtitc �)c�y,� l�G • L > C (Title) (Name of Company) second,that he has read the foregoing certificate by him subscribed as ffe`Jt (Title) of Ler5A- ec 'C Cc) `mac, (Name of Company? Affiant further states that the matters and things stated herein are true. (Affiant) Subscribed and sworn to before me this 'CIJA day of 20 2.(0 .My commission expires I �� I ?C I . (Date) • j) 1 Amy K Pllepai f ;::ti--�J/ P- 1 My Commission Expires (Notary Pubti q� ✓ / LI /1 11/18/2029 ��/ 1 / Notary ID1S5540556 EXHIBIT C CONTRACTOR'S CERTIFICATE OF WARRANTY FROM: Gulf Coast Electric Co.,Inc. (Name of Contractor) TO: City of Port Arthur (Owner) REFERENCE CONTRACT NO.: 26-040 1-11 CONTRACT ENTERED INTO THE rQ DAY OF BETWEEN THE CITY OF PORT ARTHUR AND G A(V (j c..4 E k cl-'. L l �. OF act,L.—n,a"/) �x FOR THE PROJECT C.—. i 4 Pe, ak,r- t lac.gin)Z) j 11`J KNOW ALL MEN BY THESE PRESENTS: 1.) 'c C Oo-5 .- t-I fd/.'L (o.� ;does hereby guarantee all of the work done under the (Name of Contractor) above referenced contract to be free from faulty materials in every particular,and free from improper workmanship,and against injury from proper and usual wear;and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect,and to make good all damage caused to other work or materials due to such required replacement or re-execution. 2.) This guarantee shall cover a period of one(l)year from the date of acceptance of all work under this contract by Owner,as evidenced by the Contractor's Certificate of Completion. 3.) This Certificate is given in connection with the final payment under the contract between the Owner and (7-�� (d �PGir:� (d� L • ,and with the knowledge that it will be relied upon in (Name of Contractor) Making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this I 9 4N day of Cc f ,2026. {SEAL) (Contractor) BY: (Signat ) Vk nc,,L/Pfts,Ien. (Printed Name/Title of Officer) 1-Warranty K� ;" , • r;cc '. ,being first duly sworn on oath,deposes and says,First,that,he/she is the (Affiant) C«S,1-e..,V of (.7t- I c C 6cr t- t_.l e(1-r. (e)) , \c , , (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as rie5,a,-e (Title) of &«\c (,i)c4 E—Ikc,i-nc (. ).) -t, (Name of Company) Affiant further states that the matters and things stated herein are true. (Affiant) Subscribed and sworn to before me this ICI °.\ day of 0( 1"-Ci 11--(' , 2026. My commission expires 1 )- )S 2-0 2:-9 _ _ _ _ —Amy K Plleggi ! ic My C ry 101 5 Expires L ARY 11H 8f2029 Notary ID135540556 2-Warranty EXHIBIT D CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM:CITY OF PORT ARHUR TO:GULF COAST ELECTRIC CO. FOR:CITY OF PORT ARTHUR DOWNTOWN INFRASTRUCTURE IMPROVEMENTS REFERENCE CONTRACT NO.CPA-986 2 td?ontract No. 1 ENTERED INTO THE 1G DAY OF Z(S BETWEEN THE CITY OF PORT ARTHUR AND GULF COAST ELECTRIC CO. OF PORT ARTHUR,TEXAS FOR: CITY OF PORT ARTHUR DOWNTOWN INFRASTRUCTURE IMPROVEMENTS KNOW ALL MEN BY THESE PRESENTS: 1. GULF COAST ELECTRIC CO does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free from improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials,due to such required replacement or re-execution. 2. This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this Contract,as evidenced by the Engineer's Certificate of Completion. 3. This Certificate is given in connection of the final payment under the contract between the Owner and GULF COAST ELECTRIC CO and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this a day of ,20 7.40 . [CORPORATE SEAL] GULF COAST ELECTRIC CO (Contractor) BY: I< 1/2 • 12 c qrc)- ,being first duly sworn on oath,deposes and says,first that he is the PAC r. h'- second,that he has read the foregoing certificate by him subscribed as ?h,f a,der1}" of Gtt( � �c 4(0-of C c- � 2 c. Affiant further states that the matters and things stated herein are true. (Affiant) Subscribed and sworn to before me this t`i() , day of 20 Z(o My commission expires I\ I z-6-7iCl rate) Amy is PNi � ( My Commission eEzggptres 11/18/2029 Notary 1D135540556 1 (, 9-4 (Notary Publi 2/2 EXHIBIT E CONTRACTOR'S AFFIDAVIT OF ALL BILLS PAID Project: Telecommunications Infrastructure Improvements in Downtown Port Arthur Between Fort Worth Avenue and Shreveport Avenue Between Procter Street and 4th Street Location: Port Arthur,Texas Owner: City of Port Arthur County of Jefferson State of Texas The undersigned hereby certifies that, except as listed below, all previous progress payments received on account of the Work, have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. Exceptions: NONE Signature: / P) - Print: (Ke Date: C Z Sworn to and subscribed to me, a Notary Public,this I� day of C'C ,2026. (Notary Public) My Commission Expires: I`- i g-74Z-61 Amy K Pileggi ( My Commission Expiros • irrilI 2029 1 Notary ID135540556 EXHIBIT F ENGINEER'S CERTIFICATE OF COMPLETION Project: City of Port Arthur Downtown Infrastructure Date Of Issuance:June 16,2026 Owner(s): City of Port Arthur Owner's Project No.: CPA-986, Contract No. 1 f 2thI Zir C440 Engineer: Arceneaux Wilson&Cole LLC Contractor: Gulf Coast Electric Co. This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: TO City of Port Arthur [OWNER] AND TO Gulf Coast Electric Co. [CONTRACTOR] The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the Contract Documents on June 12,2026 '�Q1TF� OF Executed by Engineer on June 16,2016 ,2026. fr -•• �) • •' t t# 0 KEESTAN X.COLE 0 C ,/v 1Ts Nowar BY: ARCENEAUX WILSON & COLE LLC [SEAL] 1'1 EXHIBIT G WM .. ARCENEAUX WILSON&COLE engineering I surveying I planning May 21, 2026 City of Port Arthur RE: Monthly Pay Application No. 3 Telecommunication lmpro vemen is Between San Antonio Ave&Shreveport Ave AWC Job No. CPA-981 To whom this may concern: Attached is Monthly Invoice No. 3 for Telecommunication Improvements Between San Antonio Ave & Shreveport Ave. These invoices will pay Gulf Coast Electric Co.for the release of retainage. The amount due to Gulf Coast Electric Co. is $64,892.63. Based on these invoices the project is 100% complete. If you have any questions or require further information, please contact me at my office. NY‘AYOLCA- O. 2-16- Sincerely, ARCENEAUX WILSON &COLE LLC Let/ Keestan Cole, PE President 409 724.7888 3120 Central Mall Drive Port Arthur;TX 77642 Engineering Surveying awceng.com F-16194 10194049 * am ARCENEAUX WILSON&COLE CONTRACT FOR CONSTRUCTION aneinoorine I wrwyirg I donning OF TELECOMMUNICATION IMPROVEMENTS BETWEEN SAN ANTONIO AVE AND SHREVEPORT AVE TO SERVE CITY OF PORT ARTHUR OWNER: City of Port Arthur CONTRACTOR: Gulf Coast Electric Co. AWC Job No. CPA-986 Date: May 21, 2026 AWC Construction Phase No. Estimate Period: 4/24/2026 - 5/21/2026 Monthly Estimate No. 3 Contract Date: February 3, 2026 Contract Amount $1,297,852.64 Notice to Proceed: February 4, 2026 Change Orders: $ - Contract Time: 86 Calendar Days Total Contract Amount Approved Time Extensions: Days to Date: $1,297,852.64 Amount Placed to Date: $1,297,852.64 Revised Contract Time: 86 Calendar Days Material on Hand Not in Place: $ - Days to Date: 107 Days iSubtotal: $1,297,852.64 Original Completion Date: April 30, 2026 5% Retainage: $ 64,892.63 Revised Completion Date: April 30, 2026 Balance: $1,232,960.01 Percent Time Used: 124% Less Amounts on Percent Complete: 100% Previous Estimates: $1,232,960.01 TOTAL AMOUNT DUE THIS ESTIMATE $ 64,892.63 J1ErOFTF‘1 Recommended for Approval: i /$*• /\ •• 11 /*• •*1 KEESTAN X. COLE llVp• . 114225v.,'4''/ I *°0/sTERI••?m tjssi• • • . •40 Keestan X. Cole, PE [SEAL] 1 litCIVIC MONTHLY ESTIMATE NO.3 ARCENEAUX WILSON&COLE synwirc I z+..,«o I Par.. May 21,2026 Quantity Total Approx. This Amount This Total Amount To Item Description of Bid Item Qlti Unit Estimat Quantity To Unit Price Estimate Date Date e Base Bid Items SCHEDULE A-SAN ANTONIO AVk TO WACO AVE 1. Mobilization,Bonds,and Insurance 1 LS 1 S 10,000.00 S - S 10,000.00 2. Electrical Pullboxes-48"x 72" 5 EA 5 S 11,000.00 $ - $ 55,000.00 3. 6"SCH 40 Electrical Conduit-Installed by Open Trench 2956 LF 2956 $ 70.00 $ - 5 206,920.00 4. Fiber Optic Pullboxes-30'x 48" 5 EA 5 $ 3,400.00 $ - 5 17,000.00 5. 4"Opti-Com Systems Fiber Optic Conduit orApproved E 2930 LF 2960 $ 85.00 $ - $ 251,600.00 6. Stormwater Pollution Prevention Plan Design&Implem 1 LS 1 $ 10,000.00 $ - S 10,000.00 7. Demo and Removal of Existing Asphalt 2664 SY 2664 $ 60.10 $ - $ 160,106.40 8. 11/2"Type D Asphalt 2664 SY 2664 $ 60.10 $ - $ 160,106.40 SCHEDULE B-WACO AVE TO SHREVEPORT AVE 1. Electrical Pullboxes-48"x 72" 2566 LF 3520 $ 12.50 $ - S 44,000.00 2. 6"SCH 40 Electrical Conduit-Installed by Open Trench 31 LF 1460 $ 70.00 $ - $ 102,200.00 3. Fiber Optic Pullboxes-30"x 48" 92 LF 90.666667 $ 75.00 S - $ 6,800.00 4. 4"Opti-Com Systems Fiber Optic Conduit orApproved E 382 LF 2139.6552 $ 58.00 S - S 124,100.00 5. Stormwater Pollution Prevention Plan Design&Implem 48 LF 172.41379 $ 58.00 S - $ 10,000.00 6. Demo and Removal of Existing Asphalt 20 LF 786.62831 $ 89.00 $ - $ 70,009.92 7. 11/2"Type D Asphalt 25 LF 853.77951 $ 82.00 $ - S 70,009.92 TOTAL $ - $ 1,297,852.64 • m g o _=•Co ► O. CNnf Y 1m Ei Z n $ 833 8 f.l3 —o, "08 1 i vryi�v— 9i I- N �o� 1 h oo m o0 00 ff 4o i Y N N et N .§ C 2 H ' N H , 1 — i' '' Z C U a. `e`eC H p p $gs _ O 8 O N _ i p 4 G 2 p Q R C G p.. _ 3 t ~ �. II' 2z - z I Iv $ 'e C i... co si F c _ � �t $ �� `, fd v, 'ri 'ri �O '". F a Q — 0 t t y .1 t m a La i 7L - ug Pg E g F sr H 1 $ + t a j- y `$ C i I ,c P t52 : g .E ^ fix F. y �v < ,rz,. l 'z PI I1 i a^ X yi O 1_flil ; 'OU :� g , _ r R u IH n v � L iv � : / >< < = oena vi ,o e uo vi4eZ .c H E`' c<, y •r Cow W Cg 14 o = x u x z J a 0 r. LT0 } y E a W �a 24- 1 W 0. r gliZI \ > .$ $ s Cg c 5 i c 'Q z x O 2z - s o e - t' = € Q iollwC.; La. Dg 1;:-2. .a W t = 3``%� C s ill - a < g` = E W � 5 U g. 0 U -g < -24 z U � $ C .�d � ° n y � x o 4 c ' W 'ail, A xE e " QgE3 d -. A , z' 4 ' h Q a — ,„ > $ 3 ; i c2 o Q ..ram OC HPJ II � w111111 t1I1UI O U z d 0 0 0 0 0 0 N N 0000000 (') W 0 0 0 0 0 0 (•1 C) 000000 ,0 (0 0 12 g 0 0 (O O O O (0 (A 0 0 0 (n o o 0 N Q (p ^ 0 0 Q (0 00 0 0 0 O pp 0 0 0 0 O Z N 0 I, co CO (O (n 0 0 N v- (c) N (0 (A (O O Q CO CD N N O N 00 00 N U) 6 () r) co H W cc v N VD (A IA Vf VI V) 19 W W (A (A (A V) IA /9 N , i W = ro a. N N U 0 N W N N z Z U 0 v) :n QOU F 31 dtA v) (A w w (A d) U1 (A ,A VI69 w (A w w 0 Z L U E m a, m o _ z o 0) 0 e o o c o o 0) a o 0 o_ o U o 0 0 0 o a o 0 0 0 0 0 0 0 0 0 O 0 0 N C7 a 0 o 0 0 0 0 0 0 0 0000000 0 L ¢Q a Q 0. 0 0 0 0 0 0 0 0 O O 0 O O N N 1 000000 V. V. 000000a, (D WO ._. 0000000 O O O O O O 0) 0) N _1 1- W,_(y 00N0000. 0 0000000 (A O O 01 O (O O .- .- ONCO ODUr I-• J O 0 t; O 1() co' r - 0 0 0 ? N (O •t O co- O N. O a r f .- (N O - ( O CO v 0 N r r 0) H 2 In O o N N N(0 U 0 fA (A M fA IA IA fA fA H W w 0 IA h (A (A W v: Zz 0 '= Qtx Z W Z W U. 'c Z LL 0:W CC H X 0 W 0 0 0 0 W 5a Qc, `nZo I- O 2 a i- z ca 0 0 0 (A w (A w 0 N w (A to (A (A 1A to co _�z z <zW z y 4 > 0 Q ' Q � <.`' 0 0 NOL W a)0 E W a Z E W O y I- d Q .I F a Q w N- OU 2 r i-m r%1 N » w rA e) (A to (A 1A V) v) w (A (A (A w w. z Z 0000000 O 0 0 0 0 0 00 0N1 ] 0 0 0 N 0 0 0 tp (0 0 0 0 0 0 cr, N r- O O N 0 0 0 O O 0000000 N 0 0/5 Y �r' W 000, 000 � .- O N oD - 0 0 0 OD W Q CD N O r 0 0 0 v N (O. 0 0 0 r 0 0 0. U + .- v1 0 .- u) (- CO (0 o o N .- N. r 0)N • 2 a 0 N N N O-0 a ,-,. CC Q j. 0 (A to to w VI VI W) W (A (A M (A V) w V)jp Ir 0 0 0 0 0 0 0 0 0 0 0 0 0 N N P O 000000 7 V 0000000 0jcc W 0 0 0 0 0 0 (O (O O O O O O 0) O) N 0 W 000/ 00000 0000000 (A LL O O O) 0 (0 0 .- , O N 00 .- 0 0 0 00 O (O (0 r . 0 0 0 ? N (O . O 0 0 r)' >, U W Q •- (0 0 .- 0 .- CO O or N .- r r 0)W a N N N W z 10 0• ' N ilW a m E to IA (A (A (A (A (A VI (A W (A IA W w (A to O > WW r- a.• m Q 7 ¢ z o WO `m c 0 t (- W v - < CC 0 , Ut �m 0 o x x05x x 0 v m ELL m3 ~ 0 0 gym 0 5 a H z c (J a' N d «� LL J J J = J J J 0 p U '� L 07 0 ¢ z a a O f- y = a 0 r F. ¢ c o d z O g ( 0 a g N w Z a Zcc Eo o -0 0 0 )) -I ¢ 00 a -a O cwm ¢ � � zzaQ ¢ Or- zzaQQ <y ad aa <0 V I" w 0 _Julw m aa < W m ° ° ¢ U 3 0 40 I W is) u. 'v <0 Q Q 3 W i0 I. e co Q Q r-¢ J C C Y1 0. a y E m Q _` m C m o C)- 3 0 L (-' m 0 N 0 C L 0 C C O y " Q •- N r') Cr (0 CO r CO v- N M Q (0 (0 r ia)Uw C C E ° E I ,1 0 C E 0 m a U 0 O Q pc CO o) W U ¢ 0 5 D t- EXHIBIT H CERTIFICATE OF ACCEPTANCE FOR TELECOMMUNICATIONS IMPROVEMENTS IN DOWNTOWN PORTARTHUR FOR THE CITY OF PORT ARTHUR To: Gulf Coast Electric Co. of Beaumont, Texas This document is to certify that the City of Port Arthur, Texas, accepts the completion of the telecommunications Improvements between San Antonio Avenue and Shreveport Avenue in Downtown Port Arthur Project, based on the Engineer's Certificate of Completion by the City Engineer, Contractor's Affidavit of Bills Paid, the Contractor's Certificate and Release, and Contractor's Certificate of Warranty from Gulf Coast Electric Co. of Beaumont, Texas. Ronald Burton, CP City Manager ATTEST: Christe Whitley Ned, TMRC City Secretary EXHIBIT I PRE—CONSTRUCTION/LOCATIONS *-I ri r:- i • r r: '. ,. : _ ,ayam;_ ` � > .,..-•:`'.� .�'.itrA-4 its'.364 to A1,-.'i6n 3-�d.Sia'3:r . ,.,.:.n s..c':acT aas, .. .s, ...> - • OM X E — - / '- ` WATER OISTRIBUTIO • «+ r ' -„ 1 \. . .r.-.---77 IF t 1 . \ ,\ � Mw PRE-CONSTRUCTION/LOCATIONS / mix ti 3 'e z - a 1 4-: • • • I ' • CONSTRUCTION/INSTALLATION ' , wilt t' 1 . • +. .mow- * a' ' } K W, M Fill — ____... .. d _ 3 10r*' .iga. i .. Wormille yy ' Y. y , . . . AN* _. - f ',,.} j` { p • ° �� : - -. � •- - -- 'r.., .._ .,....... .,„,..„,„ 0'4- 'sr- 44.),, , x' .. r. w � A' , Lvt . "..... te _... b y � .. ei- • % . z ii•, r POST-CONSTRUCTION/ & INSTALLATION It imer/ . ' ,..... ,,,.. •I . t- • i . 1' - '-.." ' ' ''''''''7.4'1'.-7--t"4i1.!'.,7--.-. t ., i:' , , , , • : 1 • . I ' VAN - ... '.:-. 1,, r t` ‘ „-' -Ire-cc' - _ -, -, . • ....------ --,, ... A , 4.;. . . ., 1 .. , i r. IF i'NW, r 4; 4."7 ' ' ' '- - '—Wirsidir ... •••• r- ,,,,r s.,...i,,.,_,:,,,,il 7::::.ii::-;is-44V'-:'-:, 1 '. I li ........aw,_ '. T...C1- . ki 1 ..,..,,,, .... ,,..... ,..,„..,...„. .2..= , .. .. . , „ . .... ..„... ... .. . .... .. . ...... .... ,. ..... . ., .. .,,,,,.„.... „.„,..,.......:. ....„ ..„.,„, .,..... .. , ...„. _. .. • ,..,. . , ......., .._ _ . . . ...,,,w... ..,...„.. •: ,... ., , . ....:-.„ . . ..r.7,7-1:-73,-,f,,40,,,,,i.•::-„i:04.;4,0,.: • ---.-....,,,._„,,- „:::::::z..... .7,- . . --- - ....,-,:-.474,-t-t...:.--:'''''',-•-:::-V-c':.7., '''' -,,:-,-,..,,, ;,-'Z',V;ic--,-----7', .,•,-;-',.'-'',1:-•'''''''''''•-!•:--- ' '''''.•'-'•-,t1P.;Z -, - 44f;' ,:',Ni, • ';''''''''''';;i4.i'';P::,•44-;:'*:•;*I:':•:-.,':- -'''.:',:7-*'::.•' -::4,74-44,..-.;-.1*S•V•••;-,, '.1---,_:':'!.:,,.•-,'X',4*,:'::--J1.- .1 - ,. - •,,,i.N.,..:,:it:14:1;14,'-$.„.,-..:i'-,7,-.,..i-;,•4._.,fil-•"* •-''-`,,.'-'4./•,-.!•'?i-..1-•-•-•',--77.;_lattRi' -,..,:;_ic:.:;:ii.'••''.:•'&-Viki.,_*'°,1:1:.1-,...4.,'„4-ir.-.:.7. ,-,,,;.,,,4,,it,-1, ••.-i.„,,, , ::,,v, '.-1'.',.....:4!-v_tt,t,'.- ,'' - -.'tf--;-;;CeitC474,,,W**.:74.?.7.7,,'?e,','•'',.•,..•,'7.,..r.l•,,,,,,,:-.•;:,--:4---;-.'-',----•,,'".---' — ..4.. ..,. , ...„...--,•-•,....-'"iii=.7—',-,".:;,.;,:, •--. :1 I ' - ... ., . 1 — •--.#--4,0010,„ .. , , .. N.:1,,,..1.-4.- Cii_V-,-#17.--;•'; ''''''',-•!ft00 .i.„--: 1 - * z. .