HomeMy WebLinkAboutP.R. 25240 - CONTRACT FOR ENGINEERING SERVICES FOR THE DESIGN PREPARATION OF PLANS AND BIDDING DOCUMENTS, CONSTRUCTION QUALITY ASSURANCE, AND LAND SURVEYING FOR CELL 47. City of
,1 n r t r t ft u �
Ietus
www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
Date: October 26, 2026
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Jessie Dehn, P.E., Director of Public Works
RE: P.R. 25240 — Authorize a Contract for Engineering Services for the Design,
Preparation of Plans and Bidding Documents, Construction Quality Assurance,
and Land Surveying for Cell 47 and Associated Site Improvements at the City of
Port Arthur Municipal Landfill for$464,655.00 from SCS Engineers
Introduction:
The proposed resolution authorizes the City Manager to execute a Professional Services
Agreement with SCS Engineers for engineering services associated with the design,preparation
of construction plans, technical specifications and bidding documents, bid-phase support,
construction quality assurance, land surveying, and related technical documentation for Cell 47
and associated site improvements at the City of Port Arthur Municipal Landfill. The total
contract amount shall not exceed $464,655.00.
Background:
The City of Port Arthur Municipal Landfill encompasses approximately 407 acres, of which
approximately 160 acres are permitted for landfill disposal. Approximately 130 acres have been
constructed and are currently receiving waste.
Cell 47 is the next planned disposal cell and will provide approximately 9.2 acres of additional
landfill disposal capacity. The project includes the development of a Subtitle D disposal cell
incorporating an alternate liner system and associated improvements,including a south detention
pond, add-on sideslope berms,run-down channels,on-site roads,perimeter drainage extensions,
and leachate force main extensions.
The development of Cell 47 is necessary to support the continued operational capacity of the
City's Municipal Landfill.
"Remember,we are here to serve the Citizens of Port Arthur"
444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
SCS Engineers has submitted a proposal to provide the professional engineering services
necessary to advance the Cell 47 project. The proposed scope of services includes:
• Preparation of updated construction plans, technical specifications, and bidding
documents;
• Bid-phase support;
• Construction quality assurance services;
• Land surveying;
• Coordination of geotechnical testing; and
• Preparation of required liner evaluation documentation.
The engineering plans and supporting technical documentation will be prepared in general
accordance with applicable Texas Commission on Environmental Quality(TCEQ)requirements
and the City's Municipal Landfill permit, as amended or modified.
SCS Engineers' proposed compensation consists of $49,400.00 for construction plans,
specifications, and bidding documents, and an estimated $415,255.00 for construction quality
assurance services, resulting in a total contract amount not to exceed $464,655.00.
Budget Impact:
SCS Engineers submitted a proposal in the amount of $49,400.00 for construction plans,
specifications, and bid documents, and an estimated $415,255.00 for construction quality
assurance services, for a total not-to-exceed amount of$464,655.00. Services will be invoiced
on a time-and-expense basis and will not exceed the task budgets without City approval.
Funding for the services is available under Public Works Account Number 403-50-000-8525-
00-10-000, Project No. LF0001.CON.
Recommendation:
Staff recommends that the City Council approve P.R. No. 25240, authorizing the City Manager
to execute a Professional Services Agreement with SCS Engineers in an amount not to exceed
$464,655.00 for engineering services associated with the design, preparation of construction
plans and bidding documents, construction quality assurance, land surveying, and associated
improvements for Cell 47 at the City of Port Arthur Municipal Landfill.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
PR 25240
10/22/2026 JD
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE
A PROFESSIONAL SERVICES AGREEMENT WITH SCS ENGINEERS
FOR ENGINEERING SERVICES ASSOCIATED WITH THE DESIGN,
PREPARATION OF CONSTRUCTION PLANS, SPECIFICATIONS, AND
BIDDING DOCUMENTS, CONSTRUCTION QUALITY ASSURANCE,
AND LAND SURVEYING FOR CELL 47 AND ASSOCIATED SITE
IMPROVEMENTS AT THE CITY OF PORT ARTHUR MUNICIPAL
LANDFILL,IN AN AMOUNT NOT TO EXCEED$464,655.00.FUNDING IS
AVAILABLE IN PUBLIC WORKS ACCOUNT NO. 403-50-000-8525-00-10-
000, PROJECT NO. LF0001.CON.
WHEREAS,the City of Port Arthur owns and operates the City of Port Arthur Municipal
Landfill, which encompasses approximately 407 acres, of which approximately 160 acres are
permitted for landfill disposal, with approximately 130 acres constructed and currently receiving
waste; and
WHEREAS, Cell 47 is the next planned disposal cell at the Municipal Landfill and will
provide approximately 9.2 acres of additional landfill disposal capacity necessary to support the
continued operation of the facility; and
WHEREAS, the proposed Cell 47 project consists of an approximately 9.2-acre Subtitle
D disposal cell incorporating an alternate liner system and associated site improvements,including
a south detention pond, add-on sideslope berms, run-down channels, on-site roads, perimeter
drainage extensions, and leachate force main extensions; and
WHEREAS, the City requires professional engineering services to facilitate the design
and development of Cell 47 and its associated site improvements, including the preparation of
updated construction plans, technical specifications and bidding documents, bid-phase support,
construction quality assurance, land surveying, coordination of geotechnical testing, and
preparation of the required liner evaluation documentation; and
WHEREAS, SCS Engineers has submitted a proposal to provide the aforementioned
professional services, with the design, construction plans, specifications, and bidding documents
task totaling $49,400.00 and the construction quality assurance services task estimated at
$415,255.00, for a combined total amount not to exceed $464,655.00; and
WHEREAS, the engineering plans, specifications, and related technical documentation
shall be prepared in general accordance with applicable Texas Commission on Environmental
Quality requirements and the City's Municipal Landfill permit, as amended or modified; and
WHEREAS, compensation for the services shall be based on a time-and-expense basis,
subject to the approved task budgets, and no expenditures in excess of the authorized task budgets
shall be incurred without prior written approval from the City; and
PR 25240
10/22/2026 JD
Page 2 of 3
WHEREAS, funding for the professional services is available in Public Works Account
No. 403-50-000-8525-00-10-000, Project No. LF0001.CON; and
WHEREAS, the City Council finds that authorizing the professional services agreement
with SCS Engineers is necessary and in the best interest of the City to advance the development
of Cell 47 and maintain the continued operational capacity of the Municipal Landfill.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR, TEXAS:
THAT,the facts and opinions in the preamble are true and correct; and
THAT, the City Manager is hereby authorized to execute a Professional Services
Agreement with SCS Engineers for engineering services associated with the design, preparation
of construction plans, specifications and bidding documents, bid-phase support, construction
quality assurance, land surveying, and related technical and regulatory documentation for Cell 47
and associated site improvements at the City of Port Arthur Municipal Landfill, in an amount not
to exceed$464,655.00, substantially in accordance with the agreement attached hereto as Exhibit
"A"; and
THAT, compensation for the authorized services shall be on a time-and-expense basis and
shall remain within the approved task budgets. Any increase to the authorized task budgets or the
overall contract amount shall require prior written approval by the City in accordance with
applicable City procedures and authorization requirements; and
THAT, funding for the services authorized herein is available in Public Works Account
No. 403-50-000-8525-00-10-000, Project No. LF0001.CON; and
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
READ,ADOPTED AND APPROVED this the day of ,A.D.
2026, at a meeting of the City of Port Arthur, Texas, by the following vote:
Ayes: Mayor:
Councilmembers:
Noes:
Charlotte M. Moses, Mayor
ATTEST:
Christe Whitley Ned, TRMC City Secretary
PR 25240
10/22/2026 JD
Page 3 of 3
APPROVED AS TO FORM:
Roxann Pais Cotroneo, Esq.
City Attorney
APPROVED FOR ADMINISTRATION:
flak
Ronald Burton ,% 'M
City Manag•
Jessie Dehn, P.E.
Director of Public Works
APPROVED AS TO AVAILABILITY OF FUNDS:
Lyn a Boswell, PhD, ICMA-CM
Director of Finance
Clifton E. Williams,Jr., CPPB
Purchasing Manager
PR No. 25240
SCS 12651 Briar Forest
Suite 205
ENGINEERS Houston, TX 77077
281-293-8494
October 21, 2026
Jessie Dehn, P.E.
Director of Public Works
City of Port Arthur
444 4th Street
Port Arthur, Texas 77640
Subject: Proposal to Provide Engineering Services for the Design, Preparation of Plans
and Bidding Documents, Construction Quality Control and Land Surveying for
the Construction of Cell 47 and other Associated Site Improvements at the City
of Port Arthur Municipal Landfill
Dear Mr. Dehn:
Per your request, SCS Engineers (SCS) is pleased to present this proposal to the City of
Port Arthur (City) to provide engineering services for the design, preparation of plans and
bidding documents, construction quality control and land surveying for the construction of
Cell 47 and other Associated Site Improvements at the City of Port Arthur Municipal Landfill.
The City of Port Arthur Municipal Landfill sits on 407 acres of land. 160 acres are permitted
for landfill disposal, with 130 acres already constructed and receiving waste. Cell 47 is the
next disposal cell. Cell 47 is a 9.2-acre disposal cell with a Subtitle D and an alternate liner.
This project will include the excavation and construction of Cell 47, and the various other
improvements associated with the cell, including construction of the south pond, add-on
sideslope berms, run-down channels, on-site roads, the extension of the perimeter
drainage system, and the extension of the leachate forcemain system.
SCOPE OF SERVICES
TASK 1:CONSTRUCTION PLANS, SPECIFICATIONS,AND BID DOCUMENTS
SCS will design and prepare construction plans, technical specifications, and bidding
documents for use by the City of Port Arthur for the construction of Cell 47 at City of Port
Arthur Municipal Landfill. In addition to the disposal cell, these plans will incorporate the
previously prepared plans for the construction of erosion and sediment controls on the
landfill and the south pond.
For this proposal, SCS will utilize the August 2024 Construction Plans for Cell 47 and
Associated Site Improvements Construction Plans and Bid Documents. These plans and
bid documents will be updated to reflect the current conditions at the site.
Cell 47 will be designed with a leachate forcemain that will tie into the existing forcemain
and a cell dewatering system.
.... .... scsengineers.corn
Jessie Dehn, P.E. I Page 2 I October 21, 2026
The plans for Erosion and Sedimentation Control and the South Detention Basin will be
incorporated into the construction package from the Erosion and Sedimentation Control
and Detention Basin construction package prepared in February 2023 and updated with
the most recent topography. SCS has budgeted to include a drone survey to obtain the
most recent topography.
SCS will design and prepare construction plans for Cell 47 and assorted site improvements.
These plans will include:
• Cover Sheet,
• Existing Conditions Plan,
• Site Layout Plan,
• Cell 47 Excavation and Underdrain Plan,
• Cell 47 Excavation and Underdrain Plan Construction Point Sheet,
• Cell 47 Top of Liner Subgrade Plan,
• Cell 47 Top of Liner Subgrade Construction Point Sheet,
• Cell 47 Top of Protective Cover Plan,
• Cell 47 Top of Protective Cover Construction Point Sheet,
• Liner, Liner Tie-Ins, LCS and Underdrain Details,
• Underdrain and LCS Details (3 sheets),
• Access Road Plan and Points,
• Access Road Details,
• Erosion and Sedimentation Control Plan,
• Erosion and Sedimentation Control Details,
• Add-On Berm and Downchute Details,
• Low-Water Crossing Details,
• North Detention Basin Plan - 1,
• North Detention Basin Plan - 2,
• Confluence Structure 1 Details,
• Confluence Structure 2 Details,
• South Detention Basin Plan - 1,
• South Detention Basin Plan - 2,
• Confluence Structure 3 and 4 Details,
• Culvert Structure Details,
• Discharge Structure Plan,
• Discharge Structure Details, and
• Monitoring Well Details.
SCS will utilize the drone topographic survey of the landfill for the design as mentioned
above.
SCS will prepare Technical Specifications for the construction of the earthwork,
geosynthetic liner, and leachate collection system as appropriate. SCS will also prepare bid
quantities, an Engineer's Estimate of Costs, and a bid tabulation sheet for the City's use in
evaluating the bids.
SCS will assist the City in preparing the Standard City Bid Documents.
scsengineers.com
Jessie Dehn, P.E. I Page 3 I October 21, 2026
These plans, specifications, and bid documents will be prepared in general accordance
with the TCEQ's regulations and the City of Port Arthur's latest permit, as amended or
modified.
SCS will prepare a PDF of the bid package for distribution to Contractors. This bid package
will include the standard bid documents, technical specifications, and appendices that
include construction drawings.
SCS will participate in a mandatory pre-bid meeting at the City landfill office.
SCS will address technical questions from contractors during the bidding phase of the
project. The bid documents will require that only written requests require a response.
Addenda will be issued, if required, to all contractors who attend the pre-bid conference
and are plan holders.
After the bids are received, SCS will tabulate the bids, identify the apparent low bidder, and
confirm the qualifications of the low bidder.
TASK 2:CONSTRUCTION QUALITY ASSURANCE SERVICES
The City of Port Arthur Municipal Landfill Construction Quality Assurance (CQA) project
involves the construction of an approximate 9.2-acre composite lined Cell 47 and the
various other improvements associated with the cell, including construction of the south
pond, add-on sideslope berms, run-down channels, on-site roads, the extension of the
perimeter drainage system, and the extension of the leachate forcemain system.
A contractor will dewater the cell, excavate the cell, prepare the subgrade surface, provide
and install a double-sided geocomposite underdrain and sump, install a 1-foot thick
compacted cohesive soil barrier layer, provide and install a geosynthetic clay liner (GCL),
provide and install the 60-mil HDPE flexible membrane liner, provide and install a
geocomposite, provide and install the leachate collection system, install a 2-foot thick
protective cover soil, construction of the south pond, add-on sideslope berms, run-down
channels, on-site roads, the extension of the perimeter drainage system, and the extension
of the leachate forcemain system.
SCS has assigned a task manager (TM) to handle the scheduling of the SCS personnel,
monitor the task budget, and assist in the preparation of the documentation report. A
certifying engineer (CE) has been assigned to the project. This individual will review the
progress of the project, review the field reports and files, make site visits to insure that
construction is properly conducted, and certify the documentation report.
The TM shall be responsible for the overall operations of the CQA project. This will include
selecting project staff, insuring that the field operation for CQA is set-up properly, insuring
all field and laboratory documentation is complete and accurate, and insuring that the
project remains within the budget constraints. Any problems or conflicts, which may arise
during the project, shall be brought to the attention of the CE and City.
The CE shall be responsible for insuring that the project has met the permit requirements
established in the SLQCP. This individual shall make sufficient visits to the site to be familiar
scsengineers.com
Jessie Dehn, P.E. I Page 4 I October 21, 2026
with the work and to review the documentation process. The certifying engineer shall, upon
completion of the project, certify that the work does in fact, meet the permit requirements.
This person shall be a registered engineer in the State of Texas. He also will attend the pre-
construction meeting, weekly construction meetings, and a final construction walk-through
meeting. and the CE will assist in preparation of the documentation report.
SCS plans to send a qualified senior site CQA technician to the site to review the work to-
date, set-up field operations and perform the pre-construction testing. This individual will
perform all the necessary field-testing, sampling, monitoring and documentation phases of
the work to completion.
The senior site technician shall also be responsible for preparing daily reports, recording
and distributing project meeting minutes, forwarding field documentation to the SCS office
for computer data entry and keeping the City, TM, and CE informed as to the status of the
project.
General Contractors (GC) for landfill work typically work Monday through Saturday with
Sunday off. GCs may work Sunday to make up for lost weather days or if they are behind
schedule. For the senior CQA technician, SCS has budgeted for an estimated 60 hours per
week for 22 weeks. This is only a budget estimate, SCS will only invoice for hours worked.
During geosynthetic liner installation, SCS will mobilize a second CQA technician. Liner
Installation Contractors (LIC) typically work 11 hour days Monday through Saturday with
Sunday off. LICs may work Sunday to make up for lost weather days or if they are behind
schedule. For the second CQA technician, SCS has budgeted for an estimated 70 hours
per week for three weeks. This is only a budget estimate, SCS will only invoice for hours
worked.
Lodging, per diem and vehicle for the CQA technicians are charged on a per day basis
based on 7 days per week for the duration of the CQA technicians stay on the project.
SCS will supply the services of a registered land surveyor. The surveyor will document the
subgrade, liner grade and top of protective cover layer and to provide the geomembrane
panel placement, seam and repair location drawings, and set red-liner posts per TCEQ
regulations. Seven sets of record drawings will be furnished for the documentation report.
The surveyor's work shall be coordinated by the CQA senior site technician. Costs for
surveying services have been included with this task.
SCS will conduct a drone survey of the completed project to document the as-built
conditions of all the improvements.
Geotechnical testing shall be performed by qualified laboratories selected by SCS and
approved by the City. Emailed test results shall be required from the lab upon completion
of any testing. Emails shall be sent to the senior site technician who in turn shall provide
the TM and CE copies as needed. Final test results required for the documentation report
shall be sent directly to the TM.
SCS will prepare the required Liner Evaluation Reports. The report shall be a culmination of
all the field and laboratory aspects of the project and will be signed and sealed by a
scsengineers.com
Jessie Dehn, P.E. I Page 5 I October 21, 2026
professional engineer, registered in the State of Texas. This report shall include the
following information:
• A narrative describing the construction of the cells, test methods and results,
• Field reports, field and laboratory test results,
• Pertinent information regarding any design changes/permit modifications,
• Personnel resumes of key individuals involved with the project,
• Survey elevation drawing, GCL and geomembrane panel locations, and
• Certification of final construction.
A substantially complete copy of this report shall be made available to the City for review
no later than two weeks after completion of the granular drainage layer installation
activities. The final copy shall be completed within one week following return of the draft
submittal. A total of seven copies of each report shall be reproduced, with three being
submitted to the TCEQ, two being retained by SCS, and two delivered to the City of Port
Arthur.
SCHEDULE
SCS will initiate work immediately upon Notice to Proceed from the City. SCS anticipates
submittal of the 90 percent complete draft of the Construction Plans, Technical
Specifications, and Bid Documents for Cell 47 to the City for your review and comment
within 90 days of receipt of notice to proceed. The 100 percent complete set will be
submitted to the City within 10 days of receipt of comments on the 90 percent set.
Field staff will mobilize following the receipt of notice to proceed on the construction quality
assurance task and within 2 days of contractor's completion of excavation. SCS has
estimated the construction schedule at 24 weeks for the construction of Cell 47. SCS has
budgeted to have the CQA Technician on-site for a maximum of 22 weeks and the 2nd CQA
Technician on-site for a maximum of 3 weeks.
FEE
SCS proposes to perform the Task 1, Construction Plans, Specifications and Bid Documents
for $49,400 and Task 2, Construction Quality Assurance Services for an estimated
$415,255; for a total of $464,655. These projects will be invoiced on a time and expense
basis not to exceed the task budget without the City's approval. These fees are based on
the following assumptions:
Task 1—Construction Plans, Specifications and Bid Documents
Staff Estimated Unit Fee Fee
Hours
Satellite Office Manager 36 $280.00 $10,080.00
Senior Project Professional 60 $185.00 $11,100.00
Associate Staff Professional 60 $125.00 $7,500.00
CAD Designer 60 $150.00 $9,000.00
Assistant Office Service Manager 6 $120.00 $ 720.00
Drone Survey (lump sum) 1 $8,000.00 $8,000.00
scsengineers.com
Jessie Dehn, P.E. I Page 6 I October 21, 2026
Expenses 1 $3,000.00 $3,000.00
Total $49,400.00
Task 2-Construction Quality Assurance Services
Staff Estimated Unit Fee Fee
Hours
Satellite Office Manager/Certifying Engineer 120 $280.00 $33,600.00
Project Manager 200 $210.00 $42,000.00
Senior Project Professional 120 $185.00 $22,200.00
Associate Staff Professional 160 $125.00 $20,000.00
CAD Designer 40 $150.00 $6,000.00
Senior CQA Technician 1,320 $105.00 $138,600.00
2nd CQA Technician 210 $100.00 $21,000.00
Assistant Office Service Manager 20 $120.00 $2,400.00
Expenses 1 $1,100.00 $1,100.00
Geotechnical Testing
STRUCTURAL FILL/SUBGRADE
Lab Compaction -ASTM D698 (1 per soil type) 3 $285 $ 855.00
Moisture-ASTM D2216 (1 per soil type) 3 $25 $ 75.00
Particle Size - ASTM D422/D1140 (1 per soil 3 $85 $ 255.00
type)
Atterberg Limits- ASTM D4318 (1 per soil type) 3 $140 $ 420.00
Permeability-ASTM D5084 (1 per soil type) 3 $400 $1,200.00
DRAINAGE STONE
Particle Size - ASTM D422/D488 (1 per 3,000 1 $115 $ 115.00
c.y.)
Permeability-ASTM D2434 (1 per 3,000 c.y.) 1 $305 $ 305.00
Calcium Carbonate Content-J&L Test Method 1 $460 $ 460.00
S-105-89 (1 per 3,000 c.y.)
Geosynthetic Clay Liner Conformance Testing
Mass per Unit Area - ASTM D5993 (1 per 5 $75 $ 375.00
100,000 s.f.)
Hydraulic Conductivity GRI-GCL-2 OR ASTM 5 $400 $2,000.00
5084 (1 per 100,000 s.f.)
Lap Joint Permeability- Flow box 1 $5,250 $5,250.00
Direct Shear - ASTM D6243 (1 per adjoining 3 $1,500 $4,500.00
material)
In Plant Sampling (per hour) 20 $125 $2,500.00
60 mil HDPE Conformance Testing
Density-ASTM D1505/792 (1 per 100,000 s.f. 5 $60 $ 300.00
and every resin lot)
Carbon Black Content - ASTM D1603 (1 per 5 $65 $ 325.00
100,000 s.f. and every resin lot)
Carbon Black Dispersion - ASTM 5596 (1 per 5 $75 $ 375.00
100,000 s.f. and every resin lot)
scsengineers.com
Jessie Dehn, P.E. I Page 7 I October 21, 2026
Thickness - ASTM D5199/5594 (1 per 100,000 5 $40 $ 200.00
s.f. and every resin lot)
Tensile Properties-ASTM D638 (1 per 100,000 5 $100 $ 500.00
s.f. and every resin lot)
In Plant Sampling (per hour) 20 $125 $2,500.00
Construction Testing
Peel/Shear - ASTM D4437 (1 per 500 I.f. of 60 $64 $3,840.00
weld)
Other Expenses
CQA Technicians Vehicle (per day)* 175 $65 $11,375.00
CQA Technician Lodging/Per diem (per day)* 175 $180 $31,500.00
Certifying Engineer Travel (per day) 24 $300 $7,200.00
FedEx/Shipping (per week) 22 $400 $8,800.00
Final Report Binders and Copies (per report) 1 $2,200 $2,200.00
CQA Technician Mobilization/Demobilization 4 $2,500 $10,000.00
(per each)**
Miscellaneous Supplies (per week)* 22 $65 $1,430.00
Troxler Rental (per week) 22 $250 $5,500.00
Surveying (lump sum) 1 $24,000 $24,000.00
TOTAL $415,255.00
*This estimate includes fees for 2 CQA monitors.
**This fee includes time and expenses.
Any additional Services that the City may request with regards to this project (i.e.: meetings
not otherwise specified in the scope of services above (e.g.: meetings with the TCEQ, City
Council, etc.), permit modifications or other tasks not included in the above scope of
services, will constitute a change order for additional services, or prepared as additional
task orders.
As with other recent projects for the City, receipt of a Purchase Order will suffice for our
notice to proceed.
SCS appreciates this opportunity to present this proposal for your consideration. If you
have any questions, please feel free to contact J. Roy Murray at (817) 358-6156.
Sincerely,
p �M Yr
RA,-iiii-re*".1 1V•-
J. Roy Murray, P.E. Naima Rahman, Ph.D., P.E.
Vice President Project Professional
SCS Engineers SCS Engineers
817-358-6156 817-358-6118
jmurray@scsengineers.com nrahman@scsengineers.com
.... •••• • scsengineers.com
Jessie Dehn, P.E. I Page 8 I October 21, 2026
scsengineers.com