Loading...
HomeMy WebLinkAboutP.R. 25252 - CONTRACT FOR THE MANHOLE REHABILITAION PROJECT. 3 a 77. urt rtltu _ INTEROFFICE MEMORANDUM Date: October 28, 2024 To: The Honorable Mayor and City Council Through: Ronald Burton, C.P.M., City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 25252 - Execute contract with Vortex Services LLC for the Manhole Rehabilitation Project. Introduction: This Agenda Item intends to seek the City Council's approval for executing a contract with Vortex Services LLC of Houston, Texas. The contract provides for the Manhole Rehabilitation Project through HGAC Contract No. TP07-25 in the total amount of$497,486.01. Background: The Manhole Rehabilitation Project is necessary to address deteriorating wastewater infrastructure, prevent infiltration and inflow, maintain structural integrity, and reduce the risk of sanitary sewer overflows. This rehabilitation project will be on an as needed basis. Rehabilitation will extend the life of existing manholes, minimize emergency repairs and long- term maintenance costs, and support the reliable operation of the City's wastewater collection system while protecting public health and safety. Vortex Services LLC of Houston, Texas has submitted a proposal for the Manhole Rehabilitation Project through HGAC Contract No. TP07-25 in the total amount of$497,486.01. The scope of services for the manhole rehabilitation includes mobilization,the installation of a Geopolymer liner, rebuilding bench and invert, if needed, and any necessary infiltration control at the applicable HGAC contract unit prices. Budget Impact: The total budgetary impact is $497,486.01. Funds are available from CIP Account No. 405-40-000-8516-00-00-000. Project No. WS0041.CON Recommendation: It is recommended that the City Council approve PR No. 25252, to execute a contract with Vortex Services LLC, as discussed/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" PR No. 25252 10/28/2026 cm Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH VORTEX SERVICES LLC OF HOUSTON,TEXAS, THROUGH HGAC CONTRACT NO. TP07-25, FOR THE MANHOLE REHABILITATION PROJECT WITH A TOTAL NOT-TO-EXCEED AMOUNT OF $497,486.01, WITH FUNDING ALLOCATED FROM ACCOUNT NO. 410-40-000-8516-00-00-000, PROJECT NO. WS0041.CON. WHEREAS, manhole rehabilitation is necessary to address deteriorating wastewater infrastructure, prevent infiltration and inflow, maintain structural integrity, and reduce the risk of sanitary sewer overflows,protecting public health and safety; and, WHEREAS, this rehabilitation project will be on an as needed basis that will extend the life of existing manholes, minimize emergency repairs and long-term maintenance costs, and support the reliable operation of the City's wastewater collection system; and, WHEREAS, Chapter 271 of the Texas Government Code allows a city, by resolution of its governing body, to participate in cooperative purchasing programs, such as The Interlocal Purchasing System (TIPS), as an alternative to formal bid process; and, WHEREAS, pursuant to Resolution No. 11-196, the City of Port Arthur entered into an interlocal agreement for cooperative purchasing with HGAC Cooperative Purchasing Program; and, WHEREAS, Vortex Services LLC of Houston, Texas has submitted a proposal, through HGAC Contract No. TP07-25 (Exhibit "A"), for the Manhole Rehabilitation Project in the total amount of$497,486.01; and, WHEREAS, the scope of services for the manhole rehabilitation includes mobilization, the installation of a Geopolymer liner, rebuilding bench and invert, if needed, and any necessary infiltration control at the applicable HGAC contract unit prices; and, WHEREAS, the City Council finds the approval of the agreement in the public interest and supports the efficient operation and maintenance of the City's water utility system. I PR No. 25252 10/28/2026 cm Page 2 of 3 NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT,the facts and recitals in the preamble are true and correct; and, THAT, the City Manager of City of Port Arthur is hereby authorized and directed to execute, in substantially the same form, a one (1) year contract with Vortex Services LLC of Houston, Texas (Exhibit"A") for the Manhole Rehabilitation Project for the unit prices shown in the proposal, with a total not-to-exceed amount of$497,486.01, for the same prices as shown in the contract and bid; and, THAT, the total budgetary impact of$497,486.01 is available in CIP Account No. 410- 40-000-8516-00-00-000, Project No. WS0041.CON; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED THIS day of 2026 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Charlotte M. Moses Mayor ATTEST: Christe Whitley Ned, TRMC City Secretary PR No. 25252 10/28/2026 cm Page 3 of 3 APPROVED AS TO FORM: Roxann Pais Cotroneo City Attorney APPROVED FOR ADMINISTRATION: Ronald Burt , PM City Manager eit.1.IL i( ieovkl.K/dam✓ Suhail Kanwar, P.E. Director of Public Services alvin Matthews, P.E. Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: . i ' 43. , k,1)I t o'z Dr. L da(Lyn) Boswell, ICMA-CM, CGFO Finance Director / tt, t,,A, • , Clifton E. Williams Jr. CPPB Purchasing Manager Exhibit"A" Contract with Proposal CONSTRUCTION CONTRACT AGREEMENT [Non-Federally Funded Projects] THIS AGREEMENT, made this day of 2026,by and between the CITY OF PORT ARTHUR, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER", and Vortex Services. LLC.,hereinafter called "CONTRACTOR". WITNESSETH: That for and in consideration of the payments, terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The CONTRACTOR will commence and complete the construction of the Manhole Rehabilitation Project Phase I. 2. The CONTRACTOR will furnish at his own expense all the materials, supplies, tools, equipment, labor, and other services necessary for the construction and completion of the Project described herein. 3. The CONTRACTOR agrees to perform all the Work described in the Contract Documents and comply with the terms therein for the estimated total not-to-exceed amount of $497.486.01,as shown in the Service Proposal. 4. Work, following the Contract dated after the Notice to proceed, the Contractor shall complete the WORK within 365 consecutive calendar days. S. The term "CONTRACT DOCUMENTS" means and includes the following: ✓ AGREEMENT • PROPOSAL • PERFORMANCE BOND ie PAYMENT BOND • NOTICE TO PROCEED 6. The OWNER will pay to the CONTRACTOR in the manner and at such times as outlined in the General Conditions such amounts as required by the Contract Documents. 7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors,administrators,successors,and assigns. Page 1 of 2 CONSTRUCTION CONTRACT AGREEMENT [Non-Federally Funded Projects] IN WITNESS WHEREOF, the Parties hereto have executed, or caused to be executed by their duly authorized officials,this Agreement in two (2) copies, each of which shall be deemed an original on the date first above written. APPROVED IN FORM: OWNER: CONTRACTOR: OWNER: Vortex Services LLC CITY OF PORT ARTHUR BY By NAME NAME _ ADDRESS TITLE Page 2 of 2 gis I e s To: City Of Port Arthur _ Contact: Jess Liao Address: 444 4th St. Phone: (409)983-8193 Port Arthur,TX US Email: Project Name: TX-Port Arthur-FY27 Manhole Rehab-HGAC Bid Number: 2633506 Project Location: Port Arthur,TX Bid Date: 10/7/2026 Proposal Based on HGAC Contract TP07-25 Item# Item Description Estimated Quantity Unit Unit Price Total Price P49 Mobilization-Texas 1.00 EACH $4,784.00 $4,784.00 G17 Rehabilitation(Standard 4-ft Diameter)- 1-inch 1,000.00 VF $450.00 $450,000.00 Geopolymer liner G47 Rebuild Bench and Invert 35.00 EACH $1,000.00 $35,000.00 B18 Infiltration Control-Chemical Grout(Will Bill As 1.00 GAL $250.00 $250.00 Needed) B19 Infiltration Control-Quad-Plug(5 Gallon)(Will Bill As 1.00 EACH $100.00 $100.00 Needed) Bid Price Subtotal: $490,134.00 Total Payment And Performance Bond 1.50%: $7,352.01 Total Bid Price: $497,486.01 Notes: • Our manhole rehab is figured utilizing flow through plugs.Any dewatering and or bypass pumping will be provided by Owner(if necessary). Please note, in order to install our plugs and divert the flow on force mains we assume the incoming lines are protruding at least 3"into the manhole which will allow us to attach Fernco type coupling systems.If additional bypass,dewatering,or flow control is needed it will be provided by Others. • Owner will provide a portable hydrant meter and access to onsite water for our use free of charge. • Proposal includes standard signs and cones.Any additional maintenance of traffic(MOT)and/or traffic control required will be provided by Others. • Owner will provide access to each and every manhole and or structure.This may include but not limited locating,exposing,and raising buried MH's prior to our crew mobilizing. • If necessary,Owner will provide Permits&Fees.Vortex will provide our standard insurance coverage. OCP or railroad insurance&or longshoreman insurance is not included. • Our Bid Proposal is valid for 30 days from the bid date. • Site Restoration will be performed by Others. • This is a unit priced contract and the actual billing will be based on installed quantities.If the installed quantities vary greater than 10%of the bid quantities,Vortex reserves the right to adjust our unit price accordingly. • Standard wages are included.Therefore, Prevailing wages and or Union Wage Rates are not included in this bid proposal. Client/GC must notify Vortex if the project is Certified payroll prior to contract execution or additional fees may apply. • Our bid proposal as submitted reflects the current material pricing established on or before the bid date listed within our proposal. In the event of unforeseen price increases of our raw materials,Vortex reserves the right to adjust our unit rate or overall bid proposal accordingly to account for such price increases. • Payment terms: Net 30 days.Interest will be added to balances outstanding after 30 days • Vortex's bid proposal shall be incorporated into the subcontract agreements.Vortex will initiate this project upon an agreement or receipt of a subcontract or purchase order. Copies of payment and performance bonds must be provided to Vortex. • Any delays besides weather that is outside of our control will be billed at a standby rate of$1,250/hour,for the CIPP Lining Crew&$650/hour for the Clean&CCTV Crew. • Typically any debris collected from the Manhole(MI-1)rehab process is removed by hand but if there is a significant amount of debris collected,the Owner shall provide a Vac Truck to remove debris collected and dispose the debris that is pulled from the cleaning process. Please note,Vortex can also provide a vac truck at$550/HR(*4 hr min,travel time will be billed port to port) • The Owner will have to provide site access improvements including(but not limited to)clearing of any trees,shrubs,fence,sheds,vegetation etc. to provide an unobstructed access for our work.This also includes coordinating site access permissions with the property owners and the City.We are able to complete our work if our trucks can be staged within 50'from both the upstream and downstream manholes. If certain site conditions restrict this and require us to stage greater than 50',then our trucks will require a road to drive the equipment to each manhole and it needs to be somewhat of level.Therefore it may be required for the owner to install a temporary easement access road by installing rock/road base,installing culverts,matting etc to aid in creek crossings or wet areas.The install and removal of these site improvements will be provided by Others. Page 1 of 2 • Since the owner did not provide H2S levels,Vortex is assuming the existing structures to get rehab fall below our manufacturer's recommended H2S levels. • Vacuum,hydrostatic,holiday/spark testing are not included in this bid proposal. ACCEPTED: CONFIRMED: The above prices,specifications and conditions are satisfactory and Vortex Services LLC are hereby accepted. Buyer: Signature: Authorized Signature: Date of Acceptance: Estimator: Nate Kennedy (832)392-1816 nkennedy@vortexcompanies.com Page 2 of 2