INTEROFFICE MEMORANDUM
Date: October 29, 2026
To: The Honorable Mayor and City Council
Through: Ron Burton, CPM, City Manager
From: Chandra Alpough, CPM, CPRP, Director of Parks and Recreation
RE: P.R. 25254—Texas Parks and Wildlife Outdoor Grant Agreement for
Acceptance of a Grant for Enhancements to Pioneer Park and Washington Park
pending approval of P.O. 7459
Introduction:
The purpose of this agenda item is to request City Council approval of P.R. No. 25254
authorizing the City Manager to execute a grant agreement with the Texas Parks and Wildlife
Department (TPWD) for acceptance of a 2026 Local Park Outdoor Grant in the amount of
$1,104,294.00, which includes a fifty percent (50%) City cash match of $552,147.00, for
improvements to Pioneer Park (Project No. PR0030) and Washington Park (Project No.
PR0031).
Background:
Pursuant to Resolution No. 25-281, the City Council authorized the City Manager to submit an
application to the Texas Parks and Wildlife Department for a 2026 Local Park Outdoor Grant to
fund improvements and enhancements at Pioneer Park and Washington Park.
TPWD subsequently awarded the City a grant in the amount of$ 1,104,294.00, which includes
a fifty percent(50%) City cash match of$552,147.00,to support the proposed improvements at
both parks. Acceptance of the TPWD grant will provide substantial financial assistance toward
the City's planned recreational improvements at Pioneer Park and Washington Park. The
proposed improvements are intended to enhance existing park facilities, expand recreational
opportunities, and provide improved amenities for residents and visitors
The proposed improvements include the following:
Pioneer Park—3649 Dryden Road (Project No. PR0030)
• Installation of playground equipment.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
• Construction of a multi-sports court.
• Installation of pathways and fencing.
• Installation of signage.
• Landscaping and related site amenities.
Washington Park— 1217 Joe Louis Avenue (Project No. PR0031)
• Installation of playground equipment.
• Conversion of the existing tennis court into a multi-sports court.
• Renovation of the existing basketball court.
• Construction of pathways.
• Installation of fencing and signage.
• Landscaping and related site amenities.
Acceptance of the grant requires the City to provide a fifty percent (50%) cash match in the
amount of$552,147.00.
Budget Impact:
The grant award provides $1,104,294.00 in funding from the Texas Parks and Wildlife
Department, which includes the City's required fifty percent(50%) cash match of$552,147.00.
The City's matching contribution is budgeted in Other Capital Outlay Account No. 307-25-
067-8525-00-10-000, subject to applicable purchasing and expenditure approval requirements,
including approval of P.O. No. 7459.
Recommendation:
It is recommended that the City Council approve P.R. No. 25254 authorizing the City Manager
to execute a grant agreement with the Texas Parks and Wildlife Department for acceptance of
the 2026 Local Park Outdoor Grant in the amount of$1,104,294.00, which includes a City cash
match of$552,147.00,for improvements to Pioneer Park(Project No. PR0030)and Washington
Park(Project No.PR0031),subject to approval of P.O.No.7459 and compliance with applicable
grant and fiscal requirements.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
P. R. #25254
10/28/2026 ca- tnr
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A GRANT
AGREEMENT WITH THE TEXAS PARKS AND WILDLIFE DEPARTMENT FOR
THE ACCEPTANCE OF A LOCAL PARK OUTDOOR GRANT IN THE AMOUNT
OF $1,104,294 FOR THE INSTALLATION OF A PLAYGROUND EQUIPMENT,
MULTI-SPORTS COURT, PATHWAYS, FENCING, SIGNAGE, LANDSCAPING
AND SITE AMENITIES AT PIONEER PARK (3649 DRYDEN ROAD) PROJECT
#PR0030 AND INSTALLATION OF PLAYGROUND EQUIPMENT, RENOVATION
OF TENNIS COURT INTO A MULTI-SPORTS COURT, RENOVATION OF
BASKETBALL COURT, PATHWAYS, FENCING, SIGNAGE, LANDSCAPING AND
SITE AMENITIES AT WASHINGTON PARK (1217 JOE LOUIS AVENUE)
PROJECT # PR0031 WITH A 50% CASH MATCH OF $552,147.00 IN OTHER
CAPITAL OUTLAY ACCOUNT NUMBER 307-25-067-8525-00-10-000 PENDING
APPROVAL OF P.O. 7459.
WHEREAS, pursuant to Resolution No. 25-281, the City Council authorized the City
Manager to submit an application to the Texas Parks and Wildlife Department ("TPWD") for a
2026 Local Park Outdoor Grant to fund improvements and enhancements at Pioneer Park and
Washington Park; and
WHEREAS, TPWD has awarded the City a grant in the amount of$1,104,294.00, which
includes the City's required fifty percent (50%) cash match in the amount of $552,147.00 to
support improvements at Pioneer Park, located at 3649 Dryden Road (Project No. PR0030), and
Washington Park, located at 1217 Joe Louis Avenue(Project No. PR0031); and
WHEREAS, the grant-funded improvements at Pioneer Park include the installation of
playground equipment, a multi-sports court, pathways, fencing, signage, landscaping, and related
site amenities; and
WHEREAS, the grant-funded improvements at Washington Park include the installation
of playground equipment, the conversion of the existing tennis court into a multi-sports court,
renovation of the existing basketball court, construction of pathways, installation of fencing and
signage, landscaping, and related site amenities; and
WHEREAS, acceptance and administration of the grant require the City to provide a
fifty percent (50%) cash match in the amount of $552,147.00, resulting in a combined project
funding award amount of$1,104,294, as delineated in Exhibit"A"; and
WHEREAS, the City's required cash match is budgeted in Other Capital Outlay Account
No. 307-25-067-8525-00-10-000, subject to the applicable purchasing and expenditure approval
requirements, including approval of P.O. No. 7459; and
WHEREAS, the City Council finds that acceptance of the grant and completion of the
proposed improvements will enhance recreational opportunities, improve public park facilities,
and promote the health, safety, and general welfare of the residents of the City; and
P. R. # 25254
10/28/2026 ca- tnr
WHEREAS, the City Council further finds that entering into the grant agreement with
TPWD and accepting the grant funds, subject to the City's matching contribution and the terms
and conditions of the grant agreement, are in the best interest of the City.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR, TEXAS:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That the City Council hereby authorizes the acceptance of the 2026 Local Park
Outdoor Grant awarded by the Texas Parks and Wildlife Department in the amount of
$1,104,294.00, which includes the City's required cash match of$552,147.00, for improvements
to Pioneer Park(Project No. PR0030) and Washington Park (Project No. PR0031).
Section 3. That the City Manager is hereby authorized to execute a grant agreement with
the Texas Parks and Wildlife Department, substantially in the form attached hereto as Exhibit
"A," and to execute any related documents reasonably necessary to accept, administer, and
implement the grant, provided that such documents are consistent with the purposes and material
terms of the grant authorized herein. Such authorization is contingent upon approval of P.O. No.
7459
Section 4. That the City's required cash match in the amount of $552,147.00 shall be
provided from Other Capital Outlay Account No. 307-25-067-8525-00-10-000, subject to the
availability and proper appropriation of funds and applicable expenditure authorization
requirements.
Section 5. That a copy of the caption of this Resolution be spread upon the Minutes
of the City Council.
READ, ADOPTED AND APPROVED THIS day of , A.D., 2026, at
a Regular Meeting of the City Council of the City of Port Arthur, by the following vote:
AYES: (Mayor)
Councilmembers:
NOES:
Charlotte M. Moses, Mayor
ATTEST:
Christe Whitley Ned, City Secretary
P. R. # 25254
10/28/2026 ca
APPROVED AS TO F •
Roxann Pais Cotroneo, Esq.
City Attorney
APPROVED ;.: .0 ADMINISTRATION:
Ron Burton, CPM
City Manager
etqa1.7,
Chandra Alpough, CPM
Director of Parks and Recreation
APPROVED AS TO AVAILABILITY OF FUNDS:
Gant .:20, 6,_2) ,/}11/0 lisc;/1
Director of Finance
01%4
Clifton Williams, CPPB
Purchasing Manager
Exhibit "A"
TEXAS PARKS AND WILDLIFE
Recreation Grants
FEDERAL SUB-AWARD
Department Contract Number: CA-0010173
Grant Project Number: 48-01321
Sub-Recipient Name (Must match UEI): City of Port Arthur
Sub-Recipient Unique Entity Identifier: EMVNEFYW2KN4
Project Name: Washington Park and Pioneer Park Revitalization in Port Arthur
Federal Award Identification Number (FAIN): P26AP01199
Assistance Listings Number and Title: 15.916
Award Date: 08/02/2026
Period of Performance: 10/01/2026 - 09/30/2029
Federal Award: $552,147.00
Sub-Recipient Cost Share: $552,147.00
Total Project Cost: $1,104,294.00
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 1
SECTION 1 - PROJECT DESCRIPTION AND LOCATION
This sub-award is entered into by the Texas Parks and Wildlife Department(Department), and the City
of Port Arthur(Sub-Recipient). This sub-award is funded through Department of the Interior National
Park Service 54 U.S.C. 200305 Land and Water Conservation Fund issued to the Department on
08/02/2026
The scope of this Grant Agreement includes:
The City of Port Arthur will redevelop Washington (6.06 acres) and Pioneer Park (20 acres).
At Pioneer Park this project will: install a playground with fall protection and shade and develop a multi-sports
court, pathways, fencing, signage, landscaping and site amenities.
At Washington Park this project will: install a playground with fall protection and shade, renovate tennis court
into a multi-sports court, and
renovate basketball courts, pathways, fencing, signage, landscaping, and site amenities.
Washington Park is located at 1217 Joe Louis Avenue, Port Arthur, Texas 77640.
Pioneer Park is located at 3649 Dryden Road, Port Arthur, Texas 77640.
An Official Boundary Map that meets program requirements is required before final reimbursement and project
closeout.
Permanent Public Park & Recreation Dedication. All land or water receiving program assistance shall be
dedicated for public park and recreation use in perpetuity. No property acquired or developed with program
assistance shall be converted to other than public park and recreation uses without the approval of the
Department and the substitution of other park and recreation properties of at least equal fair market value and
equivalent park and recreation usefulness.
Build America, Buy America language: As required by Section 70914 of the Bipartisan Infrastructure Law (also
known as the Infrastructure Investment and Jobs Act), P.L. 117-58, on or after May 14, 2022, none of the
funds under a federal award that is part of Federal financial assistance program for infrastructure may be
obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in
the project are produced in the United States, unless subject to an approved waiver. The requirements of this
section must be included in all sub-awards, including all contracts and purchase orders for work or products
under this program. The attached Federal Agreement can be referenced for additional information.
This sub-award is not for research and development.
SECTION 2 -SPECIFIC CONDITIONS
N/A
SECTION 3 - PRE-AWARD INCURRENCE OF COSTS
The Recipient is authorized to incur pre-award costs up to $118,000.00 on or after 01/01/2026 in accordance
with 2 CFR § 200.458— Pre-award costs.
SECTION 4 -APPROVED INDIRECT COST RATE
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 2
SECTION 5 - KEY OFFICIALS
Key officials are essential to ensure maximum coordination and communications between the parties
and the work being performed. They are:
FOR TEXAS PARKS AND WILDLIFE DEPARTMENT:
Dana Lagarde
Director of Recreation Grants
4200 Smith School Road
Austin, Texas 78744
Grant Manager:
Dan Reece
Recreation Grants Branch
4200 Smith School Road
Austin, Texas 78744
(512) 389-8224
dan.reece(c itpwd.texas.gov
Grant Coordinator:
Kara Escajeda
Recreation Grants Branch
4200 Smith School Road
Austin, Texas 78744
(512) 389-8224
kara.escajeda(a�tpwd.texas.gov
Audit Team Lead:
Marcy Cavazos Colunga
Recreation Grants Branch
4200 Smith School Road
Austin, Texas 78744
(512)389-8116
Marcy.CavazosColunga@tpwd.texas.gov
FOR GRANT SUB-RECIPIENT: The Sub-Recipient must request prior written approval from the
Department for a change in key personnel identified below.
Official Point of Contact
Ron Burton
City Manager
444 4th Street
Port Arthur, Texas, 77640
(409) 983-8100
picportarthur@aol.com
Project Coordinator
Chandra Alpough
Director of Parks and Recreation
444 4th Street
Port Arthur, Texas, 77640
(409) 983-8152
chandra.alpough(4ortarthurtx.gov
Fiscal Contact
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 3
Amy Landry
sr. accountant/grants officer
305 East Maxan St.
Port Isabel, Texas, 78578
(956) 943-2682
amy.landry@portarthurtx.gov
SECTION 6—STANDARD FINANCIAL MANAGEMENT CONDITIONS
The term "financial management conditions" refers to generally applicable policies and procedures for the
accounting, reporting, and management of grant funds. Failure to follow a state or federal law applicable to
the disbursement of grant funds may subject the Sub-Recipient to statutory, common law, and contractual
remedies that may include administrative action, suspension of grant payments, termination, and in-eligibility
for future grants.
The sub-recipient's financial management system must provide for the following:
(1) Identification of all Federal awards received and expended and the Federal programs under which they
were received. Federal program and Federal award identification must include, as applicable, the Assistance
Listings title and number, Federal award identification number, year the Federal award was issued, and
name of the Federal agency or pass-through entity.
(2)Accurate, current, and complete disclosure of the financial results of each Federal award or program in
accordance with the reporting requirements in 2 CFR 200.328 and 200.329. When a Federal agency or
pass-through entity requires reporting on an accrual basis from a subrecipient that maintains its records
other than on an accrual basis, the subrecipient is not required to establish an accrual accounting system.
This subrecipient may develop accrual data for its reports based on an analysis of the documentation on
hand.
(3) Maintaining records that sufficiently identify the amount, source, and expenditure of Federal funds for
Federal awards. These records must contain information necessary to identify Federal awards,
authorizations, financial obligations, unobligated balances, as well as assets, expenditures, income, and
interest. All records must be supported by source documentation.
(4) Effective control over and accountability for all funds, property, and assets. The subrecipient must
safeguard all assets and ensure they are used solely for authorized purposes. See 2 CFR 200.303.
(5) Comparison of expenditures with budget amounts for each Federal award.
(6) Written procedures to implement the requirements of 2 CFR 200.305.
(7)Written procedures for determining the allowability of costs in accordance with 2 CFR 200 Subpart E and
the terms and conditions of the Federal award.
SECTION 7 -AWARD AND PAYMENT
A. The Department will provide funding to the Sub-Recipient in an amount not to exceed $552,147.00 for
the project described under Section 1-Project Description and Location and in accordance with the
Department-approved Budget Summary attached.
B. The Sub-Recipient shall obtain prior approval from the Department for budget and program revisions
and shall request payment via the Department's Recreation Grants Online Grant Management
System.
C. Expenses charged against awards under the Sub-award may not be incurred prior to the beginning of
the Sub-award, except as provided for in Section 3- Pre-Award Incurrence of Costs, and may be
incurred only as necessary to carry out the approved objectives, scope of work and budget with prior
approval from the Department Key Officials. The Sub-Recipient shall not incur costs or obligate funds
for any purpose pertaining to the operation of the project, program, or activities beyond the expiration
date stipulated in the award.
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 4
D. Indirect costs will not be allowable charges against the award unless specifically included as a line item
in the approved budget incorporated into the award.
E. The Sub-Recipient must meet their cost share commitment over the life of the award. At least 50.00%
non-federal cost-share is required for costs incurred under this Sub-award.
F. Reimbursement will be the default method of payment.
G. Any funds paid to the Sub-Recipient exceeding the amount that the Sub-Recipient is determined to be
entitled to under the award constitutes a debt to the State of Texas and must be returned.
H. Payments made for costs determined to be unallowable by the Department must be refunded to the
Department.
SECTION 8- PERFORMANCE REPORTING
The Sub-Recipient must submit quarterly performance reports through the Recreation Grants Online System
within 30 calendar days after the reporting period. Sub-Recipient must submit the final performance report 90
calendar days after the conclusion of the period of performance. The Department may extend the due date for
any performance report with justification from the Sub-Recipient.
When a significant development that could impact the Sub-award occurs between performance reporting due
dates, the Sub-Recipient must notify the Department. When significant developments occur that negatively
impact the Sub-award, the Sub-Recipient must include information on its plan for corrective action and any
assistance needed to resolve the situation.
SECTION 9- DEVIATIONS AND MODIFICATIONS
The Sub-Recipient is required to report deviations from the approved budget, project or program scope, or
objective, and request prior approval from the Department for budget and program plan revisions, in
accordance with 2 CFR 200.308 Revision of Budget and Program Plans.
This Sub-award may be modified only by a written instrument executed by the parties. Modifications will be in
writing and approved by the Department and the authorized representative of the Sub-Recipient.
SECTION 10- REMEDIES FOR NON-COMPLIANCE
The Department may implement specific conditions if the Sub-Recipient fails to comply with the U.S.
Constitution, Federal and State statutes, regulations or the terms and conditions of the award.
If the Department determines that noncompliance cannot be remedied by imposing additional conditions, the
Department may take one or more of the following actions, as appropriate in the circumstances:
(1) Temporarily withhold payments until the Sub-Recipient takes corrective action;
(2) Disallow costs for all or part of the activity associated with the noncompliance of the Sub-Recipient;
(3) Suspend or terminate the award in part or in its entirety;
(4) Recommend suspension or debarment proceedings be initiated by the Federal agency.
(4)Withhold further funds (new awards or continuation funding) for the project or program; and
(5) Pursue other legally available remedies.
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 5
SECTION 11 -TERMINATION
The award may be terminated in part or in its entirety as follows:
(1) By the Department if the Sub-Recipient fails to comply with the terms and conditions of the Sub-award.
(2) By the Department with the consent of the Sub-Recipient, in which case the two parties must agree
upon the termination conditions. These conditions include the effective date and, in the case of partial
termination, the portion to be terminated.
(3) By the Sub-Recipient upon sending the Department a written notification of the reasons for such
termination, the effective date, and, in the case of partial termination, the portion to be terminated. However, if
the Department determines that the remaining portion of the award will not accomplish the purposes for which
the award was made, the Department may terminate the award in its entirety.
(4) By the Department pursuant to the terms and conditions of the award, including, to the extent authorized
by law, if an award no longer effectuates the program goals or agency priorities.
When the award is terminated in part or its entirety, the Department and the Sub-Recipient remain responsible
for compliance with the requirements in 2 CFR 200.344 and 200.345.
Notification of Termination Requirement
The Department must provide written notice of termination to the Sub-Recipient unless the award is being
terminated by the Sub-Recipient. If the Sub-Recipient initiates the termination of the award, then the Sub-
Recipient must provide written notice of the termination to the Department. The written notice of termination
should include the reasons for termination, the effective date, and the portion of the award to be terminated, if
applicable.
Opportunities to Object, Hearings, and Appeals
Upon initiating a remedy for noncompliance, the Department must provide the Sub-Recipient with an
opportunity to object and provide information challenging the action. The Department will comply with any
requirements for hearings, appeals, or other administrative proceedings to which the Sub-Recipient is entitled
under any statute or rule applicable to the action.
Effects of Suspension and Termination
Costs to the Sub-Recipient resulting from obligations incurred by the Sub-Recipient during a suspension or
after the termination of the award are not allowable unless the Department expressly authorizes them in the
notice of suspension or termination or subsequently. However, costs during suspension or after termination
are allowable if:
(1)the costs result from obligations that were properly incurred by the Sub-Recipient before the effective date
of suspension or termination, and not in anticipation of it; and
(2) the costs would be allowable if the award was not suspended or expired normally at the end of the period
of performance in which the termination takes effect.
SECTION 12 -CLOSEOUT
The Department will close out the grant award when it determines that all applicable administrative actions
and all required work of the grant have been completed by the Sub-Recipient. The Sub-Recipient must submit
all financial, performance, and other reports as required by the terms and conditions of the grant award. The
Sub-Recipient must promptly refund any balances of unobligated cash that Department paid in advance or
paid and that is not authorized to be retained by the Sub-Recipient for use in other projects. Liquidation of all
costs must occur within 90 days of performance period end date. When justified, the Department may
approve extensions for the Sub-recipient.
SECTION 13 - RECORDS RETENTION AND ACCESS
The Sub-Recipient must maintain and retain records until the third anniversary of the later date of(1)the grant
completion or expiration or (2)the resolution of all issues that arose from any litigation, claim, negotiation,
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 6
audit, open records request, administrative review, or other action involving the grant or documents. Records
to be retained include but are not limited to financial records, supporting documentation, and statistical
records.
The Federal Agency, Department, the State Auditor's Office, or any of their authorized representatives, must
have the right to access any documents, papers, financial statements, or other records of the Sub-Recipient
pertinent to the Sub-award, to perform audits, execute site visits, or for any other official use. This right also
includes timely and reasonable access to the Sub-Recipient's personnel for the purpose of interviewing and
having a discussion related to such documents or the Sub-award in general. This right of access is not limited
to the required retention period but lasts as long as the records are retained.
SECTION 14 -TERMS OF ACCEPTANCE
By accepting funds under this grant, the Sub-Recipient agrees to comply with the terms and conditions of this
Sub-award, the Program Guidance, and 2 CFR 200. Sub-Recipient also agrees to comply with assurances
and certifications made in its approved grant application, and applicable federal statutes, regulations and
guidelines. Sub-Recipient agrees to fulfill the grant in accordance with the approved grant application,
budgets, supporting documents, and all other representations made in support of the approved grant
application.
Any change in local, state, and federal rules, regulations, or laws applicable to the Program that occurs during
the term of the Sub-award shall be automatically incorporated into the Sub-award without written amendment
and shall become a part of the Agreement as of the effective date of the rule, regulation, or law.
Signature Authority
The person or persons signing this Sub-award on behalf of the Sub-Recipient hereby warrant and guarantee
that they are duly authorized by the Sub-Recipient to execute this Sub-award on behalf of the Sub-Recipient
and to validly and legally bind the Sub-Recipient to all the terms of this agreement.
Entire Agreement; Modifications Must Be in Writing
This Sub-award and each of its provisions will be binding upon the parties and may not be waived, modified,
amended or altered unless with prior written approval by both parties.
Venue; Governing Law
This Sub-award shall be governed by the laws of the State of Texas. The proper place of venue for suit on or
in respect of the Agreement shall be Travis County.
SECTION 15—ATTACHMENTS INCORPORATED BY REFERENCE
The following completed documents are attached to and made part of this Agreement:
TPWD Approved Budget Summary
TPWD Assurances for Federal Subawards (Signature Required)
TPWD Recipient Monitoring Plan
Working Boundary Map
Land Dedication (Signature Required)
Federal Assurances (Signature Required)
Federal Award
THC Review
TPWD Environmental Review
Recreational Grants Manual
SECTION 16—SIGNATURES
The signed Sub-award must be submitted to Recreation Grants Online within 15 days of the Sub-Recipient's
date of signature. If not returned within 120 days of the Date of Issuance, this Sub-award is null and void.
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 7
IN WITNESS WHEREOF, the parties hereto have executed this Sub-award on the date(s) set forth below.
TEXAS PARKS AND WILDLIFE DEPARTMENT
Signature:
Name and Title:
Date of Issuance:
SAM Number, Date, Initials:
SUB RECIPIENT NAME:
Signature of Authorized Representative:
Name and Title:
Email:
Phone:
Date:
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 8
TEXAS PARKS AND WILDLIFE
Recreation Grants
FEDERAL SUB-AWARD
Department Contract Number: CA-0010173
Grant Project Number: 48-01321
Sub-Recipient Name (Must match UEI): City of Port Arthur
Sub-Recipient Unique Entity Identifier: EMVNEFYW2KN4
Project Name: Washington Park and Pioneer Park Revitalization in Port Arthur
Federal Award Identification Number(FAIN): P26AP01199
Assistance Listings Number and Title: 15.916
Award Date: 08/02/2026
Period of Performance: 10/01/2026 - 09/30/2029
Federal Award: $552,147.00
Sub-Recipient Cost Share: $552,147.00
Total Project Cost: $1,104,294.00
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 1
SECTION 1 - PROJECT DESCRIPTION AND LOCATION
This sub-award is entered into by the Texas Parks and Wildlife Department(Department), and the City
of Port Arthur(Sub-Recipient). This sub-award is funded through Department of the Interior National
Park Service 54 U.S.C. 200305 Land and Water Conservation Fund issued to the Department on
08/02/2026
The scope of this Grant Agreement includes:
The City of Port Arthur will redevelop Washington (6.06 acres) and Pioneer Park (20 acres).
At Pioneer Park this project will: install a playground with fall protection and shade and develop a multi-sports
court, pathways, fencing, signage, landscaping and site amenities.
At Washington Park this project will: install a playground with fall protection and shade, renovate tennis court
into a multi-sports court, and
renovate basketball courts, pathways, fencing, signage, landscaping, and site amenities.
Washington Park is located at 1217 Joe Louis Avenue, Port Arthur, Texas 77640.
Pioneer Park is located at 3649 Dryden Road, Port Arthur, Texas 77640.
An Official Boundary Map that meets program requirements is required before final reimbursement and project
closeout.
Permanent Public Park & Recreation Dedication. All land or water receiving program assistance shall be
dedicated for public park and recreation use in perpetuity. No property acquired or developed with program
assistance shall be converted to other than public park and recreation uses without the approval of the
Department and the substitution of other park and recreation properties of at least equal fair market value and
equivalent park and recreation usefulness.
Build America, Buy America language: As required by Section 70914 of the Bipartisan Infrastructure Law (also
known as the Infrastructure Investment and Jobs Act), P.L. 117-58, on or after May 14, 2022, none of the
funds under a federal award that is part of Federal financial assistance program for infrastructure may be
obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in
the project are produced in the United States, unless subject to an approved waiver. The requirements of this
section must be included in all sub-awards, including all contracts and purchase orders for work or products
under this program. The attached Federal Agreement can be referenced for additional information.
This sub-award is not for research and development.
SECTION 2 -SPECIFIC CONDITIONS
N/A
SECTION 3 - PRE-AWARD INCURRENCE OF COSTS
The Recipient is authorized to incur pre-award costs up to $118,000.00 on or after 01/01/2026 in accordance
with 2 CFR § 200.458— Pre-award costs.
SECTION 4 -APPROVED INDIRECT COST RATE
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 2
SECTION 5 - KEY OFFICIALS
Key officials are essential to ensure maximum coordination and communications between the parties
and the work being performed. They are:
FOR TEXAS PARKS AND WILDLIFE DEPARTMENT:
Dana Lagarde
Director of Recreation Grants
4200 Smith School Road
Austin, Texas 78744
Grant Manager:
Dan Reece
Recreation Grants Branch
4200 Smith School Road
Austin, Texas 78744
(512) 389-8224
dan.reece(c tpwd.texasgov
Grant Coordinator:
Kara Escajeda
Recreation Grants Branch
4200 Smith School Road
Austin, Texas 78744
(512) 389-8224
kara.escajeda@tpwd.texas.gov
Audit Team Lead:
Marcy Cavazos Colunga
Recreation Grants Branch
4200 Smith School Road
Austin, Texas 78744
(512)389-8116
Marcy.CavazosColunga@tpwd.texas.gov
FOR GRANT SUB-RECIPIENT: The Sub-Recipient must request prior written approval from the
Department for a change in key personnel identified below.
Official Point of Contact
Ron Burton
City Manager
444 4th Street
Port Arthur, Texas, 77640
(409) 983-8100
picportarthuraol.com
Project Coordinator
Chandra Alpough
Director of Parks and Recreation
444 4th Street
Port Arthur, Texas, 77640
(409) 983-8152
chandra.alpoughcc portarthurtx.gov
Fiscal Contact
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 3
Amy Landry
sr. accountant/grants officer
305 East Maxan St.
Port Isabel, Texas, 78578
(956) 943-2682
amy.landry(a portarthurtx.gov
SECTION 6—STANDARD FINANCIAL MANAGEMENT CONDITIONS
The term "financial management conditions" refers to generally applicable policies and procedures for the
accounting, reporting, and management of grant funds. Failure to follow a state or federal law applicable to
the disbursement of grant funds may subject the Sub-Recipient to statutory, common law, and contractual
remedies that may include administrative action, suspension of grant payments, termination, and in-eligibility
for future grants.
The sub-recipient's financial management system must provide for the following:
(1) Identification of all Federal awards received and expended and the Federal programs under which they
were received. Federal program and Federal award identification must include, as applicable, the Assistance
Listings title and number, Federal award identification number, year the Federal award was issued, and
name of the Federal agency or pass-through entity.
(2)Accurate, current, and complete disclosure of the financial results of each Federal award or program in
accordance with the reporting requirements in 2 CFR 200.328 and 200.329. When a Federal agency or
pass-through entity requires reporting on an accrual basis from a subrecipient that maintains its records
other than on an accrual basis, the subrecipient is not required to establish an accrual accounting system.
This subrecipient may develop accrual data for its reports based on an analysis of the documentation on
hand.
(3) Maintaining records that sufficiently identify the amount, source, and expenditure of Federal funds for
Federal awards. These records must contain information necessary to identify Federal awards,
authorizations, financial obligations, unobligated balances, as well as assets, expenditures, income, and
interest. All records must be supported by source documentation.
(4) Effective control over and accountability for all funds, property, and assets. The subrecipient must
safeguard all assets and ensure they are used solely for authorized purposes. See 2 CFR 200.303.
(5) Comparison of expenditures with budget amounts for each Federal award.
(6) Written procedures to implement the requirements of 2 CFR 200.305.
(7)Written procedures for determining the allowability of costs in accordance with 2 CFR 200 Subpart E and
the terms and conditions of the Federal award.
SECTION 7 -AWARD AND PAYMENT
A. The Department will provide funding to the Sub-Recipient in an amount not to exceed $552,147.00 for
the project described under Section 1-Project Description and Location and in accordance with the
Department-approved Budget Summary attached.
B. The Sub-Recipient shall obtain prior approval from the Department for budget and program revisions
and shall request payment via the Department's Recreation Grants Online Grant Management
System.
C. Expenses charged against awards under the Sub-award may not be incurred prior to the beginning of
the Sub-award, except as provided for in Section 3- Pre-Award Incurrence of Costs, and may be
incurred only as necessary to carry out the approved objectives, scope of work and budget with prior
approval from the Department Key Officials. The Sub-Recipient shall not incur costs or obligate funds
for any purpose pertaining to the operation of the project, program, or activities beyond the expiration
date stipulated in the award.
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 4
D. Indirect costs will not be allowable charges against the award unless specifically included as a line item
in the approved budget incorporated into the award.
E. The Sub-Recipient must meet their cost share commitment over the life of the award. At least 50.00%
non-federal cost-share is required for costs incurred under this Sub-award.
F. Reimbursement will be the default method of payment.
G. Any funds paid to the Sub-Recipient exceeding the amount that the Sub-Recipient is determined to be
entitled to under the award constitutes a debt to the State of Texas and must be returned.
H. Payments made for costs determined to be unallowable by the Department must be refunded to the
Department.
SECTION 8- PERFORMANCE REPORTING
The Sub-Recipient must submit quarterly performance reports through the Recreation Grants Online System
within 30 calendar days after the reporting period. Sub-Recipient must submit the final performance report 90
calendar days after the conclusion of the period of performance. The Department may extend the due date for
any performance report with justification from the Sub-Recipient.
When a significant development that could impact the Sub-award occurs between performance reporting due
dates, the Sub-Recipient must notify the Department. When significant developments occur that negatively
impact the Sub-award, the Sub-Recipient must include information on its plan for corrective action and any
assistance needed to resolve the situation.
SECTION 9- DEVIATIONS AND MODIFICATIONS
The Sub-Recipient is required to report deviations from the approved budget, project or program scope, or
objective, and request prior approval from the Department for budget and program plan revisions, in
accordance with 2 CFR 200.308 Revision of Budget and Program Plans.
This Sub-award may be modified only by a written instrument executed by the parties. Modifications will be in
writing and approved by the Department and the authorized representative of the Sub-Recipient.
SECTION 10- REMEDIES FOR NON-COMPLIANCE
The Department may implement specific conditions if the Sub-Recipient fails to comply with the U.S.
Constitution, Federal and State statutes, regulations or the terms and conditions of the award.
If the Department determines that noncompliance cannot be remedied by imposing additional conditions, the
Department may take one or more of the following actions, as appropriate in the circumstances:
(1) Temporarily withhold payments until the Sub-Recipient takes corrective action;
(2) Disallow costs for all or part of the activity associated with the noncompliance of the Sub-Recipient;
(3) Suspend or terminate the award in part or in its entirety;
(4) Recommend suspension or debarment proceedings be initiated by the Federal agency.
(4) Withhold further funds (new awards or continuation funding) for the project or program; and
(5) Pursue other legally available remedies.
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 5
SECTION 11 -TERMINATION
The award may be terminated in part or in its entirety as follows:
(1) By the Department if the Sub-Recipient fails to comply with the terms and conditions of the Sub-award.
(2) By the Department with the consent of the Sub-Recipient, in which case the two parties must agree
upon the termination conditions. These conditions include the effective date and, in the case of partial
termination, the portion to be terminated.
(3) By the Sub-Recipient upon sending the Department a written notification of the reasons for such
termination, the effective date, and, in the case of partial termination, the portion to be terminated. However, if
the Department determines that the remaining portion of the award will not accomplish the purposes for which
the award was made, the Department may terminate the award in its entirety.
(4) By the Department pursuant to the terms and conditions of the award, including, to the extent authorized
by law, if an award no longer effectuates the program goals or agency priorities.
When the award is terminated in part or its entirety, the Department and the Sub-Recipient remain responsible
for compliance with the requirements in 2 CFR 200.344 and 200.345.
Notification of Termination Requirement
The Department must provide written notice of termination to the Sub-Recipient unless the award is being
terminated by the Sub-Recipient. If the Sub-Recipient initiates the termination of the award, then the Sub-
Recipient must provide written notice of the termination to the Department. The written notice of termination
should include the reasons for termination, the effective date, and the portion of the award to be terminated, if
applicable.
Opportunities to Object, Hearings, and Appeals
Upon initiating a remedy for noncompliance, the Department must provide the Sub-Recipient with an
opportunity to object and provide information challenging the action. The Department will comply with any
requirements for hearings, appeals, or other administrative proceedings to which the Sub-Recipient is entitled
under any statute or rule applicable to the action.
Effects of Suspension and Termination
Costs to the Sub-Recipient resulting from obligations incurred by the Sub-Recipient during a suspension or
after the termination of the award are not allowable unless the Department expressly authorizes them in the
notice of suspension or termination or subsequently. However, costs during suspension or after termination
are allowable if:
(1)the costs result from obligations that were properly incurred by the Sub-Recipient before the effective date
of suspension or termination, and not in anticipation of it; and
(2)the costs would be allowable if the award was not suspended or expired normally at the end of the period
of performance in which the termination takes effect.
SECTION 12 -CLOSEOUT
The Department will close out the grant award when it determines that all applicable administrative actions
and all required work of the grant have been completed by the Sub-Recipient. The Sub-Recipient must submit
all financial, performance, and other reports as required by the terms and conditions of the grant award. The
Sub-Recipient must promptly refund any balances of unobligated cash that Department paid in advance or
paid and that is not authorized to be retained by the Sub-Recipient for use in other projects. Liquidation of all
costs must occur within 90 days of performance period end date. When justified, the Department may
approve extensions for the Sub-recipient.
SECTION 13 - RECORDS RETENTION AND ACCESS
The Sub-Recipient must maintain and retain records until the third anniversary of the later date of(1)the grant
completion or expiration or (2)the resolution of all issues that arose from any litigation, claim, negotiation,
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 6
audit, open records request, administrative review, or other action involving the grant or documents. Records
to be retained include but are not limited to financial records, supporting documentation, and statistical
records.
The Federal Agency, Department, the State Auditor's Office, or any of their authorized representatives, must
have the right to access any documents, papers, financial statements, or other records of the Sub-Recipient
pertinent to the Sub-award, to perform audits, execute site visits, or for any other official use. This right also
includes timely and reasonable access to the Sub-Recipient's personnel for the purpose of interviewing and
having a discussion related to such documents or the Sub-award in general. This right of access is not limited
to the required retention period but lasts as long as the records are retained.
SECTION 14 -TERMS OF ACCEPTANCE
By accepting funds under this grant, the Sub-Recipient agrees to comply with the terms and conditions of this
Sub-award, the Program Guidance, and 2 CFR 200. Sub-Recipient also agrees to comply with assurances
and certifications made in its approved grant application, and applicable federal statutes, regulations and
guidelines. Sub-Recipient agrees to fulfill the grant in accordance with the approved grant application,
budgets, supporting documents, and all other representations made in support of the approved grant
application.
Any change in local, state, and federal rules, regulations, or laws applicable to the Program that occurs during
the term of the Sub-award shall be automatically incorporated into the Sub-award without written amendment
and shall become a part of the Agreement as of the effective date of the rule, regulation, or law.
Signature Authority
The person or persons signing this Sub-award on behalf of the Sub-Recipient hereby warrant and guarantee
that they are duly authorized by the Sub-Recipient to execute this Sub-award on behalf of the Sub-Recipient
and to validly and legally bind the Sub-Recipient to all the terms of this agreement.
Entire Agreement; Modifications Must Be in Writing
This Sub-award and each of its provisions will be binding upon the parties and may not be waived, modified,
amended or altered unless with prior written approval by both parties.
Venue; Governing Law
This Sub-award shall be governed by the laws of the State of Texas. The proper place of venue for suit on or
in respect of the Agreement shall be Travis County.
SECTION 15—ATTACHMENTS INCORPORATED BY REFERENCE
The following completed documents are attached to and made part of this Agreement:
TPWD Approved Budget Summary
TPWD Assurances for Federal Subawards (Signature Required)
TPWD Recipient Monitoring Plan
Working Boundary Map
Land Dedication (Signature Required)
Federal Assurances (Signature Required)
Federal Award
THC Review
TPWD Environmental Review
Recreational Grants Manual
SECTION 16—SIGNATURES
The signed Sub-award must be submitted to Recreation Grants Online within 15 days of the Sub-Recipient's
date of signature. If not returned within 120 days of the Date of Issuance, this Sub-award is null and void.
City of Port Arthur-Washington Park and Pioneer Park Revitalization in Port Arthur 7
IN WITNESS WHEREOF, the parties hereto have executed this Sub-award on the date(s) set forth below.
TEXAS PARKS AND WILDLIFE DEPARTMENT
Signature:
Name and Title:
Date of Issuance:
SAM Number, Date, Initials:
SUB RECIPIENT NAME:
Signature of Authorized Representative:
Name and Title:
Email:
Phone:
Date: