HomeMy WebLinkAboutP.R. 25275 ROSE HILL PARK PREFABRICATED RESTROOM FACILITIES. 074 www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: November 8, 2026 To: The Honorable Mayor and City Council Through: Ron Burton, CPM, CityManager g g From: Chandra Alpough, CPM, CPRP, Director of Parks and Recreation RE: P.R. 25275 —Rose Hill Park Prefabricated Restroom Facilities-Restroom Facilities LTD Introduction: The intent of this Agenda Item is to request the City Council's approval of P.R. No. 25275 authorizing the City Manager to enter into a contract with Restroom Facilities LTD of Marble Falls, Texas through Buyboard Cooperative Purchasing Contract No. 781-25 for a turnkey installation of a prefabricated restroom building at Rose Hill Park in the amount of $508,905.00. Background: Pursuant to Resolution No. 24-176, the City Council approved and adopted the Rose Hill Park Master Plan,establishing the vision and improvements necessary to revitalize and enhance Rose Hill Park. The Rose Hill Park Hardscape and Landscape Improvements project is intended to implement the approved Master Plan and enhance the park through the construction and installation of planned hardscape, landscape and related site improvements. The Rose Hill Park improvements are designed to transform the park into a premier recreational and community gathering destination for the City of Port Arthur, consistent with the City Council-adopted Rose Hill Park Master Plan. Part of the approved and adopted plan included a prefabricated restroom facility on the park. Restroom Facilities Ltd of Marble Falls, Texas submitted a bid for a turnkey installation of a prefabricated restroom building at Rose Hill Park. The installation of prefabricated restroom facilities will enhance visitor convenience and accessibility while providing improved accommodations for residents and visitors participating in recreational activities, community events, and other gatherings. Budget Impact: Funding in the amount of$508,905.00 is available in Capital Improvement Account Number 307-25-067-8525-00-10-000; Project Number PR0018 "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Recommendation: It is recommended that the City Council approve P.R.No.25275 authorizing the City Manager to enter into a contract with Restroom Facilities LTD of Marble Falls,Texas through Buyboard Cooperative Purchasing Contract No. 781-25 for a turnkey installation of a prefabricated restroom building at Rose Hill Park in the amount of$508,905.00. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 P. R. #25275 11/8/2026 ca RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH RESTROOM FACILITIES LTD OF MARBLE FALLS, TEXAS THROUGH BUYBOARD COOPERATIVE PURCHASING CONTRACT NO. 781-25 FOR A TURNKEY INSTALLATION OF A PREFABRICATED RESTROOM BUILDING AT ROSE HILL PARK IN THE AMOUNT OF $508,905.00. FUNDS ARE AVAILABLE IN THE PARKS AND RECREATION CAPITAL IMPROVEMENT ACCOUNT NUMBER 307-25-067-8525-00-10-000 PROJECT CODE PR0018 WHEREAS, pursuant to Resolution No. 24-176, the City Council approved and adopted the Rose Hill Park Master Plan for the City of Port Arthur; and WHEREAS, the Rose Hill Park Improvements are designed to transform the park into a premier recreational and community gathering destination for the City of Port Arthur, consistent with the City Council-adopted Rose Hill Park Master Plan; and, WHEREAS, part of the approved and adopted Rose Hill Park Master Plan included a prefabricated restroom on the park; and, WHEREAS, Chapter 271 of the Texas Government Code allows a city, by resolution of its governing body, to participate in cooperative purchasing programs, such as Texas BuyBoard as an alternative to formal bid process; and, WHEREAS, pursuant to Resolution No. 02-341, the City of Port Arthur entered into an interlocal agreement for cooperative purchasing with Texas BuyBoard; and, WHEREAS, Restroom Facilities Ltd. of Marble Falls, Texas, is part of the BuyBoard Cooperative Purchasing Program under Contract No. 781-25 and submitted a bid for a turnkey installation of a prefabricated restroom building at Rose Hill Park in the amount of$508,905.00 (attached hereto as Exhibit"A"). NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: Section 1. That the facts and opinions in the preamble are true and correct. Section 2. That the City Council hereby authorizes the City Manager to enter into a contract with Restroom Facilities LTD of Marble Falls, Texas, through BuyBoard Contract No. 781-25, for a turnkey installation of a prefabricated restroom building at Rose Hill Park in the amount of$508,905.00 (attached hereto as Exhibit"A"). Section 3. Funds are available in the Parks and Recreation Capital Improvement Account, account number 307-25-067-8525-00-10-000, Project Code PR0018. Section 4. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , A.D., 2026, at a Regular Meeting of the City Council of the City of Port Arthur,by the following vote: AYES: (Mayor) Councilmembers: NOES: Charlotte M. Moses Mayor ATTEST: Christe Whitley Ned, TRMC City Secretary P. R. # 11/8/2026 ca APPROVED AS TO FORM: Roxann Pais Cotroneo, Esq. City Attorney VED AS TO ADMIN TRATION: • Ron Burton, CPM City Manager j11,01OtA(' Chandra Alpough, CPM Director of Parks and Recreation APPRO AS TO AVAILABILITY OF FUNDS: Boswell, PhD Director of Finance /I Clifton Williams, CPPB Purchasing Manager Exhibit "A" R F L Restroom Facilities Ltd A corworth Company TURNKEY QUOTATION PROJECT NAME: ROSE HILL PARK - PREFABRICATED RESTROOM BUILDING OWNER: THE CITY OF PORT ARTHUR, TEXAS DATE: NOVEMBER 5, 2026 Restroom Facilities Limited (RFL), the Nation's leading specialized restroom design/build firm since 1988, offers to furnish and install, per plans and specifications, subject to our attached Scope of Work, and the Standard Terms and Conditions of Sale, which become part of our offer to sell. BUYBOARD CONTRACT# 781-25 TOTAL PURCHASE PRICE MODEL# B424CEDFST @ $ 508,905.00 This amount includes freight, crane and installation. Payment terms: 50% installment with order; 45% in progress billings during construction; and balance of 5% upon completion of delivery and installation, no retention. Payment of 95% must be received by RFL prior to scheduling of delivery and installation. Thank you for considering RFL as your restroom specialist for this project. HOW WE WORK Once plans have been approved and engineer stamped, the manufacturing process begins. The manufacturing process begins with execution of sales order and receipt of approved submittals, color selections and progress payments. It is the responsibility of the Client to respond to color selections in 1-3 days, if this condition is not met it will delay the construction process and the Client may incur additional charges. In-plant inspection reports and certifications will be provided by an independent inspection agency. The client must prepare the site in accordance with the "Scope of Work by Client" attached and coordinate any required on site inspections. Client is required to provide verification that the site is ready for delivery in accordance of Client's scope of work. Exclusions: A. Sidewalks beyond building slab. B. Site issues beyond the control of RFL. Initial Initial Page 1 of 9 1707 Colt Circle, Marble Falls,Texas 78654 • Phone: 512.222.5454 • www.restroomfacilities.com C. Damage to existing improvements. D. Protection of existing utilities, landscaping, and improvements. E. If required per geotech report, footing, piers, and/or select fill labor and materials to be provided by others. F. Excavation and backfill of trenches G. Any components not explicitly listed or written in the specification section of the bid documents CLIENT'S SCOPE OF WORK TURNKEY INSTALLATION OF RESTROOM BUILDING WITH ATTACHED SLAB 1. SURVEY STAKES: Provide ten foot offset stakes and locate front corners of building, existing utilities, and inverts within the area of construction. Locate and mark final slab elevation. 2. SUBGRADE PAD: Detailed instructions to prepare the building site are as follows: 2.1. Excavate down ten inches below the finish floor elevation (the slab is eight inches thick on top of a two inch sand bed). 2.2. Import six inches of - road base rock, and pour for a footing and/or piers. 2.3. Compact to 95%, or to local code requirement. If RFL installer questions 95% compaction Client will be required to sign off on approval of setting of the building. 2.4. Compact one foot over in all directions (over build). 2.5. Supply approximately enough clean sand to develop a 2" bed on compacted soil, on side of site, for fine grading. 2.6. Excavate and backfill trenches up to and within building pad for RFL supplied underground utility service kits. 2.7. Provide water and inspection for RFL supplied underground sewer kit. 2.8. All irrigation should be turned off prior to delivery to allow the surrounding soils to dry and bear the weight of the truck and crane. Any damage to area after verification of path in is the responsibility of the Client. 2.9. Check corner locations against plans for proper sizing. 2.10. Verify finish floor elevation for concrete slab (shipped fully attached to the building.) 2.11. Excavate one foot perimeter footing if required by local code to specified depth. 2.12. Verify that pad is level and flat and at correct elevation. 3. SITE ACCESS AND STORAGE: Provide suitable safe clear access to allow a crane (minimum 110 tons), and the building on a semi-trailer (up to 40 tons) to reach site (14' width, 70' length, and 14' in height). If path to site is over existing utilities, sidewalks, or other damageable areas, proper Initial Initial Page 2 of 9 1707 Colt Circle, Marble Falls,Texas 78654 • Phone: 512.222.5454 • www.restroomfacilities.com marking, plating or other appropriate protection must be provided by and paid for by CLIENT. CLIENT is responsible for removing any overhead obstructions (i.e. power lines, trees). CLIENT is responsible for scheduling and paying for the de-energizing of any power lines, if powerlines are not de-energized in a timely manner any additional truck and / or crane cost will be the responsibility of the Client. CLIENT is responsible for rerouting or blocking of traffic to ensure safe and clear access, or if required by local or State jurisdiction. to delivery site and will be responsible for associated costs. Upon agreed delivery schedule client will be responsible for additional crane and trucking charges if any delays are incurred due to weather, lack of inspections, lack of pad being prepared, or any other cause for delay.. This proposal provides for a 110 ton crane with access to within 25' of the building pad. The proposal is based on four (4) hours of crane time. If access is limited a larger crane may be required. All additional crane costs shall be borne by the CLIENT. A direct route to the project site is assumed. Should routes be altered due to road closures or restrictions, additional fees may apply. 4. UTILITIES: Bring water, sewer, and power (if applicable) utilities into point of connection Christy boxes (supplied by RFL), within six feet of the building line at the location shown on our plan. 4.1. Water: RFL will furnish a water point of connection (isolation valve), from mechanical chase to a Christy box six feet from the building line. CLIENT must have a licensed plumber connect the water supply line inside of the building plumbing chase room, and connect service to the valve located outside of the building. 4.2. Sewer: RFL will furnish a sewer point of connection from mechanical chase to a Christy box six feet from the building line. CLIENT must have a licensed plumber install sewer vent stack (provided by RFL) inside of the plumbing chase room, and connect service outside of the building. Depth of sewer line (below finished floor elevation) will be approximately 30" at bottom of sewer line at a distance of 6' from building. It is the responsibility of the Client to meet up with RFL's supplied sewer line at this depth. Client will be responsible for the hiring of a licensed plumber to acquire appropriate plumbing permit, to install prefabricated underground plumbing kit into pre dug trench, and to make connections between underground stubups and internal building plumbing located in the plumbing chase room within the building. RFL installer will be on site to answer any questions or give direction as to proper installation of said plumbing kit as requested by licensed plumber or client. 4.3. Electrical: (when this option is chosen) RFL will furnish and install a PVC conduit to the point of connection six feet from the building line. CLIENT to pull the electrical service line through the conduit and connect to the main panel lugs inside the building. All electrical inside the building will be furnished and installed by RFL, except as noted above in exclusions. Initial Initial Page 3 of 9 1707 Colt Circle, Marble Falls,Texas 78654 • Phone: 512.222.5454 • www.restroomfacilities.com R„. 4.4. If the utilities are not available and connected to building when we depart the site, an additional charge will be billed to the CLIENT in the amount of 1,500 per day to 2,800 per day (dependent on location) to send an installation crew back to site to flush out plumbing lines, pressurize building plumbing, test for leaks, test all other components of the building (plumbing, sewer, electrical), and conduct a final walk through of the building. 4.5. A minimum 11/2" line with 50 gpm at 60 psi pressure minimum is required to ensure that water closets will operate as designed. If this is not available an auxiliary holding tank may be required. 5. SPECIAL CONDITIONS AND COSTS: If specifications and / or local ordinances by owner and /or local jurisdiction require any testing, work by licensed plumbers, work by licensed electricians, or special inspections, costs, if any, shall be borne by CLIENT. 6. PERMITS AND FEES: All building permits and fees shall be borne by CLIENT. 7. INSPECTIONS: We require that all inspections be scheduled with adequate notice to ensure that the underground plumbing and electrical work is approved prior to placement of building. We require that final inspection and acceptance by owner and building officials be performed immediately following RFL's completion of installation. If any conditions exist in which RFL cannot conduct a final walkthrough (no utilities / partial utilities available during install, or other circumstances beyond our control) there will be an additional charge of 1,500 to 2,800 (dependent on location) per day to send an RFL install crew or crew member back out to site at a later date to complete the installation. We also require final inspection and acceptance immediately following RFL's conclusion of any correction items. 8. SITE CLEANUP AND DEBRIS REMOVAL: CLIENT shall provide an on-site trash bin for disposal of one pick up load of debris. All excess spoils shall be the responsibility of the CLIENT. All rough and final grading shall be by CLIENT. 9. VERIFICATION OF PREPARED PAD: Client must verify elevation, compaction of pad as well as the pad being flat and level prior to delivery of building(s). Initial Initial Page 4 of 9 1707 Colt Circle, Marble Falls, Texas 78654 • Phone: 512.222.5454 • www.restroomfacilities.com STANDARD TERMS AND CONDITIONS OF SALE 1. LINKAGE: These Terms and Conditions of Sale shall apply and form a part of the Company's Offer to Sell and supersede all other expressed or implied terms and be linked to our Agreement for work whether or not signed by the Purchaser. 2. ACCEPTANCE: Unless otherwise expressly stated herein, the Company's Offer supersedes all previous quotations and expires, unless accepted by purchaser, within ten (10) days from date of Offer. None of the Terms and Conditions contained in this quotation may be added to, modified, superseded or otherwise altered except by a written instrument signed by the President of the Company. Each shipment to buyer from the Company shall be deemed to be only under these Terms and Conditions of Sale, which shall become part of our Offer to Sell, notwithstanding any Terms and Conditions that may be contained in any purchase order or other form of the buyer, notwithstanding the shipment, acceptance of payment or similar act of the Company. All Purchase Orders when accepted by the Company at 1707 Colt Circle, Marble Falls, Texas 78654, will be in accordance with the Laws of the State of Texas. All orders are subject to review by the Company in accordance with the Company's Offer to Sell before final acceptance is authorized. All disputes shall be governed by applicable Texas Law and all claims shall be filed and litigated in Burnet County, Texas, with the prevailing party recovering attorney's fees. 3. PRICES: Initial payment is due no later than 30 days from receipt of invoice. All subsequent progress payments are due no later than 30 days from receipt of invoice. If payment is not made by client in accordance with the Contract Terms, interest will be charged at the rate of 1 -1/2% (one and one/half percent) per month until paid. If an order is accepted by the Company, and a delivery date is accepted by the Client, and delivery is delayed by the Client, payment of all but 5% is due upon completion at the Point of Manufacture. A 2-1/2% (two and one/half percent) per month added fee shall be due for each month the shipment is delayed. Client shall approve Phase 1 plans and have color selections chosen and back to RFL no later than 15 days of receiving Phase 1 plans for review and color selection. If Phase 1 plans are not approved and / or color selections are not submitted to RFL within 15 days Client will incur a 1.5% fee of total project amount per month commencing at the 16 day mark. Fee shall continue on a monthly basis until Phase 1 approvals and /or color selections are received by RFL. If, during the performance of this contract, the price of construction materials increases, through no fault of RFL, the price of the contracted building shall be equitably adjusted by an amount reasonably necessary to cover any such price increase. Such price increases to the client shall be documented through change orders or invoices. Where the delivery of contracted buildings is delayed, through no fault of RFL, as a result of material shortage, Initial Initial Page 5 of 9 1707 Colt Circle, Marble Falls, Texas 78654 • Phone: 512.222.5454 • www.restroomfacilities.com material unavailability, or shipping regulation changes, RFL shall not be liable for any additional costs or damages associated with such delays. 4. TERMINATION: Purchaser shall be responsible for costs of work performed which will include overhead and profit. Contract may not be canceled once production has commenced. 5. TITLE AND LIEN RIGHTS: All Products remain the personal property of the Company, whether or not affixed to any other real property or structure, until the total amount of the contract including any change orders has been fully paid. The Company shall, in the event of the purchaser's default, have the right to enter upon any premises and repossess such structures and equipment wherever it may be located. 6. LACHES: Failure of the Company to exercise any right or remedy under this contract shall not be deemed a waiver of such right, nor shall any lien or other right of the Company be lost or impaired by laches or in any manner or by any act or failure to act. 7. LIMITATION OF LIABILITY: Under no circumstances, unless stated in our Offer to Sell or bid, shall the Company have any liability for liquidated damages, for collateral, consequential special damages, loss of profits, loss of production, delay in the progress of construction, whether resulting from delays in delivery, performance, breach of warranty, due to lack of timely performance in reviewing and approving shop drawings, completing site preparation or lack of payment in accordance with the terms set forth herein. The aggregate total liability of the Company under the contract, whether for breach of warranty or otherwise shall in no event exceed the contract price. Buyer agrees to indemnity and holds harmless the Company from all claims by third parties which extend beyond the foregoing limitations on the Company's liability. 8. DELIVERY: Except as may be otherwise specified in the attached Offer, delivery will be F.O.B. point of manufacture. "The City of Port Arthur shall contact the Vendor when it is ready to request delivery of the restroom facilities. Upon receipt of the City's request, the Vendor shall provide the City with an estimated delivery date and time. The delivery date and time shall be coordinated between the City and the Vendor and confirmed prior to delivery. No specific delivery date is established or guaranteed under this Proposal unless and until mutually confirmed by the parties." The Company shall in no event be liable for delays caused by fires, acts of God, strikes, labor difficulties, acts of Government or military, delays in transportation or procurement of materials or causes of any kind beyond the Company's immediate control. If building is ready for shipment and Initial Initial Page 6 of 9 1707 Colt Circle, Marble Falls,Texas 78654 • Phone: 512.222.5454 • www.restroomfacilities.com Customer delays said shipment, Company shall store the facility at the point of manufacturing and charge 2-1/2% (two and one/half percent) per month as a storage charge. If shipment arrives and site is not ready, Owner shall pay any off-site storage fees as applicable. 9. WARRANTY: All structural elements produced by the company are warranted to the purchaser to be free from defects in material, workmanship and title. The Company will replace or repair, at its option, defects in workmanship or any part which is proven defective within Twenty (20) years from delivery. This warranty applies only where the Company has been notified in writing of the defect within the warranty period and where any equipment has been properly operated and maintained in accordance with the Company's instructions: the Company having no responsibility for abuse, neglect, minor leaks in plumbing, or improper storage. Company shall have no responsibility for improper grading of concrete or soil around the building that does not allow for proper drainage of water away from the building. Example: improper drainage of water could cause cracking of brick, cultured stone, natural stone, cmu, hardie materials, or other types of exterior finishes, as well as swelling, rot, mold, or mildew of any type of lumber that has prolonged exposure to water. Typically the final grade must be sloped away from the foundation by 1/2 inch per foot over a minimum distance of 10 feet (site plans, civil engineer, or others can and may override the above recommendation, as it is a typical recommendation and site conditions vary). Keeping the proper slope allows water to drain away from the foundation. Should any issues arise where additional work must be performed RFL retains the right to perform this work at the earliest opportunity. Should it be necessary to have this work performed by others due to the nature of the work or a conflict in scheduling, RFL must be notified 48 hours in advance in writing and given the opportunity to perform said work. Should it be necessary to have this work performed by others a written estimate must be approved by RFL in advance of any work being undertaken. The Company assigns any and all warranties for fixtures, appliances, and other equipment manufactured by others to said other manufacturer. Due to its nature, concrete is prone to settling and cracking. Minor cracking in the concrete is normal and is not the responsibility of RFL. Checking, warping, twisting, or splits in timbers are natural occurrences and are not the responsibility of RFL. We use high quality 304 stainless steel in our products and under certain conditions and/or improper maintenance stainless steel may rust. Minor rust spots or discoloration are not the responsibility of RFL. The foregoing shall constitute the said liability of the Company and the sole remedy to the purchaser. Company's warranties as set forth in this paragraph are exclusive and are in lieu of, and purchaser hereby waives all other warranties, expressed or implied, including without limitation, any implied warranties or merchantability and fitness. This warranty shall be void if payment in full for the project is not received by the Company in accordance with these Terms and Conditions of Sale. Initial Initial Page 7 of 9 1707 Colt Circle, Marble Falls,Texas 78654 • Phone: 512.222.5454 • www.restroomfacilities.com 10. CREDIT: (Deposit and Progress Payments) 11. MUNICIPAL AND FEDERAL GOVERNMENT AGENCIES: Orders may require deposits or progress payments. If buyer's financial situation justifies such action, the Company may at its election require payment in advance or cancel the order as to any unshipped item and require payment of its reasonable cancellation charges. If the buyer delays completion of manufacture or a delay in shipment, the Company shall require payment according to the percentage of completion. In the event of the default of the buyer, the Company is entitled to the full amount due including reasonable attorneys fees, costs, storage, expenses of physical recovery, and interest at 1-1/2% (one and one/half percent) per month. 12. CLIENTS AND NON-GOVERNMENT AGENCIES: Orders may require deposits or advance payment as well as progress payments subject to the buyer's creditworthiness in accordance with the Company's applicable credit policies. Breach of any payment terms shall accelerate full payment which shall be due the balance of the contract amount including change orders. Initial Initial Page 8 of 9 1707 Colt Circle, Marble Falls,Texas 78654 • Phone: 512.222.5454 • www.restroomfacilities.com Restroom Facilities Limited John Putman, President Date Client Name Name and Title Date Initial Initial Page 9 of 9 1707 Colt Circle, Marble Falls,Texas 78654 • Phone: 512.222.5454 • www.restroomfacilities.com