P.R. 25273 CONSTRUCTION OF ROSE HILL PARK HARDSCAPE AND LANDSCAPE IMPROVEMENTS.
www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: November 18, 2026 To: The Honorable Mayor and City Council Through: Ron Burton, CPM,City Manager From: Chandra Alpough, CPM, CPRP,Director of Parks and Recreation RE: P.R. 25273 —Construction of Rose Hill Park Hardscape and Landscape Improvements Introduction: A resolution authorizing the City Manager to award and execute a construction contract with N&T Construction of Beaumont, Texas, for the Rose Hill Park Hardscape and Landscape Improvements Project in an amount not to exceed $3,774,755.00. Funding is available in Capital Improvement Account Number 307-25-067-8525-00-10-000, Project Number PR0018. Background: Pursuant to Resolution No. 24-176, the City Council approved and adopted the Rose Hill Park Master Plan, establishing the framework for the revitalization and enhancement of Rose Hill Park. To advance the improvements contemplated under the adopted Master Plan, the City's Purchasing Division advertised an invitation to bid for the Rose Hill Park Hardscape and Landscape Improvements Project on August 12,2026,and August 19,2026.Three(3)bids were received and publicly opened on September 23, 2026. Following evaluation of the submitted bids, City staff determined that N&T Construction of Beaumont, Texas, submitted the lowest responsive bid from a responsible bidder, with a proposed construction cost of $3,774,755.00. Accordingly, staff recommends awarding the construction contract to N&T Construction. The project encompasses substantial park improvements, including the development of enhanced family recreation areas, a new playground and splash pad, a stage and shade pavilions, a multi-use open field for community events and activities,expanded picnic areas,and additional seating and park amenities. Additional improvements include new sidewalks and pedestrian pathways, ADA-accessible routes, parking lot and driveway enhancements, decorative fencing, park entrance features, site lighting, landscaping, and the installation of trees and shrubs. Collectively, these improvements are intended to enhance the park's accessibility, safety, appearance, and functionality while providing an inclusive, family-friendly environment that accommodates recreational activities,public gatherings, and community events. The proposed construction contract provides for a project completion period of two hundred ten (210) calendar days, commencing upon issuance of the Notice to Proceed, subject to the terms and conditions of the executed contract. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Budget Impact: Funding in the amount of$3,774,755.00 is available in Capital Improvement Account Number 307-25-067-8525-00-10-000; Project Number PROO18 Recommendation: It is recommended that the City Council approve the resolution authorizing the City Manager to award and execute a construction contract with N&T Construction of Beaumont, Texas, in an amount not to exceed $3,774,755.00, for the construction of the Rose Hill Park Hardscape and Landscape Improvements Project,with funding available in Capital Improvement Account Number 307-25-067-8525-00-10-000, Project Number PR0018. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 P.R.No. 25273 11/08/2026 ca-tnr RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO AWARD AND EXECUTE A CONSTRUCTION CONTRACT WITH N&T CONSTRUCTION OF BEAUMONT, TEXAS, FOR THE ROSE HILL PARK HARDSCAPE AND LANDSCAPE IMPROVEMENTS PROJECT, IN AN AMOUNT NOT TO EXCEED $3,774,755.00; PROVIDING FOR A PROJECT COMPLETION PERIOD OF 210 CALENDAR DAYS; AND PROVIDING FUNDING FROM CAPITAL IMPROVEMENT ACCOUNT NUMBER 307-25- 067-8525-00-10-000, PROJECT NUMBER PR0018. WHEREAS, pursuant to Resolution No. 24-176, the City Council of the City of Port Arthur, Texas, approved and adopted the Rose Hill Park Master Plan, establishing the City's vision for the revitalization, enhancement, and improvement of Rose Hill Park; and WHEREAS, the City intends to implement the improvements contemplated by the adopted Master Plan through the Rose Hill Park Hardscape and Landscape Improvements Project, which is designed to enhance the park's recreational opportunities, accessibility, safety, aesthetics, and overall functionality; and WHEREAS, the proposed improvements include,but are not limited to, enhanced family recreation areas, a new playground and splash pad, a stage and shade pavilions, a multi-use open field for community activities and events, expanded picnic areas, additional seating and park amenities, sidewalks and pedestrian pathways, Americans with Disabilities Act (ADA)- accessible routes, parking lot and driveway improvements, decorative fencing, park entrance features, site lighting, landscaping, and the installation of trees and shrubs; and WHEREAS, the completed improvements are intended to establish Rose Hill Park as an enhanced recreational and community gathering destination, providing an inclusive, accessible, and family-friendly environment for residents and visitors of the City of Port Arthur; and WHEREAS, on August 12, 2026, and August 19, 2026, the City's Purchasing Division advertised an invitation to bid for the Rose Hill Park Hardscape and Landscape Improvements P. R.No. 25273 11/08/2026 ca-tnr Project, as reflected in the solicitation documentation attached hereto as Exhibit "B -Subsection: A"; and WHEREAS, three (3) bids were received and publicly opened on September 23, 2026, with the results reflected in the bid tabulation attached hereto as Exhibit "A"; and WHEREAS, following its evaluation of the submitted bids, City staff determined that N&T Construction of Beaumont, Texas, submitted the lowest responsive bid from a responsible bidder and recommended the award of the construction contract to said company in the amount of$3,774,755.00; and WHEREAS, the construction contract provides for a project completion period of 210 calendar days, commencing upon the issuance of the Notice to Proceed, in accordance with the terms and conditions of the construction contract; and WHEREAS, City staff recommends that the City Council authorize the City Manager to award and execute a construction contract with N&T Construction of Beaumont, Texas, for the Rose Hill Park Hardscape and Landscape Improvements Project in an amount not to exceed $3,774,755.00; and WHEREAS, funding for the project is available in Capital Improvement Account Number 307-25-067-8525-00-10-000, Project Number PR0018. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: Section 1. That the facts and opinions in the preamble are true and correct. Section 2. That the City Council hereby authorizes the City Manager to enter into a contract with N&T Construction of Beaumont, Texas, for the construction of Rose Hill Park Hardscape and Landscape Improvements with a projected budgetary impact of$3,774,755.00; in substantially the same form as attached hereto as Exhibit`B". P.R.No. 25273 11/08/2026 ca-tnr Section 3. That funding for this expenditure is available in Capital Improvement Account Number 307-25-067-8525-00-10-000, Project Number PR0018. Section 4. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , A.D., 2026, at a Regular Meeting of the City Council of the City of Port Arthur, by the following vote: AYES: (Mayor) Councilmembers: NOES: Charlotte M. Moses Mayor ATTEST: Christe Whitley Ned, TRMC City Secretary P. R.No. 25273 11/08/2026 ca APPROVED AS TO FORM: yy Roxann Pais Cotroneo, Esq. City Attorney APPROVED FOR ADMINISTRATION: 41kk Ron Burton, C City Mana Nt014 I 0602411 - Chandra Alpough, CPM, CPVP Director of Parks and Recreation APPROVED AS TO AVAILABILITY OF FUNDS: nd oswell, Ph Director of Finance Clifto Williams, CPPB Purchasing Manager P. R.No.25273 11/08/2026 ca EXHIBIT "A" e e. d n o ,_ co V O rn oa>) c > rn v n m n co CD o a en m N N C) C+f e CD n m U cru N N w W > ¢a N O O N 00000 000000000 0000 0 N N 0 0 0 0 0 0 C 0000 00000 000000000 0000 0r- I- 6000 '- 0 O O O O O O O O O O O O O O O O O O O O O O O en M n N V CO O CO N •U CO O O N 000 . . O N 0 0 0 0 0 0 N 0000 CO Cr CO V CO V V CO M O O M O CO V M 0 CO N N 0 0 0 0 N 0000 CA N (D V CO M CO O) 7 O)CO)CO CC CO N N 69 CO n V N n CO O N O CO O N V' O O) CO CO N N C) CO it_ en N V 0 EA fH EA M 69 69 CA N N CO Tr V n n co en CO CO Cc) N 0 V) CO 63 F- a — U)CA N N fA fA fA V)fA N NJ CO�U) CD 69 0 6969 V9 fA EA C5 0 O 2 U F- 0 O 0 0000 0 0 0 0 0 0 0 0 0 0 0 CO N N o 0 0 0 0 0 C O O O 0000 0 0 0 0 0 0 0 O O O N N N 0 0 0 0 1- 0 O O O O O O o 6 O N O) O O O O O 0 0 0 O OO ,- CO CO CO en CO U C CO 0 0 0 CO 0 n 0 696900000 0 0 0 _ _ _ 69 • C CO 0 0 O CO CO 0 CO 0 0 0 0 0 0 0 N)EA 69 69 to EA 69 O) N CO U)69 69 N N n N O O N O o a M N V CA CO U) N N CO V n n U)fA EA U) 69 EA 69 C VI 69 atl o E 2 U = 0 0 0 0 0 0 0 O O o 0 0 0 0 0 0 0 0 0 o CD CO M 0 CO V V O) '- TsCD O O CD O O CO CO V CDCO O O O O O CD V 0000 n co. en 0) V. O) CO O N .5 O O O O N CO en to O n O CO O CO CO en CT co 6O V CO V' CO N N N O CO F w O O CO CO CO O n CC 1- N CO V V 0CD CO (C) CO n 0 V V n 0 O) CO CO 0 N CO O) O 7- CD CO CO.CO IO - n C N co. V V N O) 0 M O) CO 1- N CD O) CO V CO CD M O N CO O. CO V 69 M O) CO Ch ,- .- n N) O n O) M n N 0) n CO n Oi V n O N V V)V)CA EA fH N O1 N N CO CD en n CO en N EA di CO M N NN CA EA Vy rW EA fA V)fA EA(A N V CA n V)0EA 49 69 CA EA CA (A 0 N U CO a LL O 0 0000 0 O) 0 0 0 0 0 O 0 0 0 M M n V V a, V)N tD O O O O N CD O N � 0 0 0 0 0 N O O O a0 coCD o V � � M CO N O O O N N O CO O N n CO O CO CO enO CO O O) of O) N n O) O) M N co O O O) O) O M CA EA V V CO CO CO co n O 4) co CA V V CA N CO O) O) O O CO V 1- CO CO V V N 0 CO O) CA CA CA CA CA EA CO 69 re 69 NIV COLL N 69 W U) la EA fA M a CA C u va 0 •c a m CO O CO 0 0 CO CO 0 0 M CO 0 O) CO N V N n 0 O CD O O N O) V N V CO n 0 1- O) N CO O) CO 0 CD O N CD CO C CO N M O. V CO VI CO N V COV O .- O) t- ea O O n n N Oi ,- . Di O ai O R V O n CV O n M Oi O n O O O ri n CO CO en x n 0 CO 0 CO 0 CO N n CO 0 N N O) n 0 CO CO n CO W VI n C O C CO COV I- n O n N 0 O.N N V 1- n N N CO 0) N N CO N V V -c- N .- 0) CO N M (- N CO n N n 0 CO M i n M Cb M 5 oO CO O O N O) N CO CD co'O) n n CD N N V N CO n N- CO N CA CA 0 CA CA NJ CA CA CO CT CD N M M CO CO V N CA d) CO N TO (-CA CA en fA CA CA fa H fA CD C CA fA EA EA CA CA • O U F- CO O N 0 M N CO O CO N O CO N N N n N N N n V N CO N CO n 0 . CO CO CO O) Q1 O) N CO CO C CO N 0 V CO ^ CO COM N O O N x O O n CT N O CO O N 64 V 0 n N n en CC r• V CO V V en CO N Cv in 0 CO 0 CO n 0 N EA CA 0 N N O) n CO CO EA CA F_ CC n o n O.N CA CO CO Cr) CO N N V V. EA EA EA fA fA CA CA W a n CO n 0 fA CO CO CO O CO 0 N N • n n CO fa N 49 COCA O) N 0 ,o EA CA EA 0 CO 69 U D c _ D C l C C N N N C Cr _ iii N NM N N C2 C iq N 15 N N 1. __ N 15 CO V CO N .- 0 0 I- .- (- N N CO V C° n N O n N N CO n N En CA x O co en CO CO cc, CO ,- CO V o M cc) n CO c--) 0 •- c a m 0. 0 Q a ‘- E C a m m `m a 8 N _ a) - A N y 1- O 1O. y O to 3 ° C F' N N C c) E 't 2 a E y 0 a) Cn '_"' C O '5 o. 5 ~ m I a m 3w fr > _ w IIE A a o ti m 2 N a E c 3 c Z -E ° 3 ) t' T m -8I- Q t x c - r ° m C EH C > ,N E -13 ° c Z CC w wCdNy E C 3 y a a3 N g n a) Y w N G ' T. > c a c a) ` ° o0Ern ° E a a) a) Oy E ym3 To Q L. c moCC � a rn o c c u -I m cm o a m a co n 33am ; a v a a m ° ) 6 ao mmNW OLL mOCCO. C OC ` 0 NVv .0 wo CC Kc cU m o aar O - a a o 0 o in C a) y0 a) U U E't ar o co C CO O U o = g f m c, 2 a1 a; n o w W a. m m o p 0 1 C a' DC N 2 ce c a. CwCECC c C9 C O) ° O i v CUw ~ Cw8.0 o U c m 0 e w E d c E C5c mc 2 Ea. acHEEE ° pNE )CEE N a oCC c 0 o p m C x pa a6 a o >m 6 U U° U c . c c ° c ooc0000 aCO Q. o CL a i U , y p cn F- wp p0 iN a2 cnM c- F� ioO < OOOO= - C N M 7 N M V m r- N COV N CD n CO N.- N CO ', .. N CO V N CO n CO 01 0 0 0 N N N N N N N N C en M en Ca V V V 4 V V V V V C W ! ,- .- 0. q a U ro a • p a a 3k 0 •p co . i c Q E Ts m v ✓ (7 a o 8 a e e e e M CO CD - 0) (- m 0) con 100 m o o o co CD r C7 m N en O CD� 0 W CA 0 O 000 O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O CO 0000 O O O O O O O O O O O O O O O O O O 00. 00000 0 0 0 O O CO ^ O O 6 6O O O N O n O . m O O c0 O N O cc-) O 6 O O 6 O O 6 O CO O CD O CIN N. 0 N O O O (O 0) C) N- O (D N N OD O CO O en O O O N O Cl, CD 0 M 0 CO O CO_C) CO CO CO N .- C) CO CD C) C) CO .-- x- CD N CO CD 0 W N CO O 0 O) V C) x- (D O n N C) C- O M N V' N CO (O m V O N 6 O 6 n ' O O O CO N: V' Cp N- CD V' O CM CO N (A CD 0 0) 0 CA CA 0) N V 69 C) N V 0) 0) N 0 069 0C) CO N 0 CM N (A CA 49 7 N CA 49 C) N (A 0 49 CA fA 49 CA CA CA(A CA CA V' (A fA CA fA fA (A d! CA 1A V) (A e CA CA O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O 0 0 0 0 0 0 O O O. O O O O O O O O O O O O O O O O O O O O O O O O O O O O CO O O - O O O N O V co n O CO O O O C•) O 0 0 0 CO O O aD O N N 0 CA 0 0 CO 0) C) 0) N- aD N- 0) CD N N V O CO 0 O O O N- O C) CO C) 0 (A CA CA (A(A .- C) O CO O CO r CA CA CD ,- O CD N CD 0 N N 0 fA 0) (A C) 00 69 N O f` (0 n C CI r-CDCDCDO r. Cp (A (A C) CO CA(A EA CA CA (A (AEA CA IA(A N 0 fA(A C) N CA IA V' (A CA CA N 0 CD CO 0 CD V 0 O O aD O O O O O O O O O O O N- O O CD aD O C) 0 0 r C O O '- O V CD O) N CD O O CD O O O O O O) O O O O O O) O O C0 r N CO O CO .- Nr V O O O CO 4 0) O CD ? O O O 6 CO O V O N O 6 CD CO O CD 6 O O N aD N N d) N . O) O N r CO n N. 0 N- O O N 0 C) 0) CO N N O C) C) C) N C) O N O) CO CO (0 C) 0 C9 "Cr CO (O .- - N C) O C) CO. CO 0) 0) n x- N 0CD N N N- N CO N. m C9 CO CD Cr, V: N e- V. (0 V' V. CO.(0 C) O (O Ch C N O V O CO CO co O 0) 0) CO aO Cn C) aD O r N V - 0) aD C) CC N 05 (D N (A O CO CO CD (O V (A Vi N CA O V' (A V' CO 0 N m O N CO 0 at N CA FA CA h (A(A N 49(A (A fA N (A (A IA - 69(A CA(A (A w (A(A W CA W (A CA fA IA IA 63 CD Cu CO CO CO CO O O N O O O O O CD O O CO O O C) O O CO N O ,- O m V' O O m O) CO O O 0) 0 0 0 0 0 0 0 CO CD CO O N O O C) O O V C) CO .- CO V' 0 0 0 CD CO N 6 0) 01 CO O (O O N 46 n V' O r 6 O C) O O CD O N 0) C) C) CO O N co to CA(A N O CD 03 C) N CD N CO CD N n V' CD O N n co r co N N V CO (A CA N CO O - r CO r' N C) CO V' O N. C) N C) CO 0) co N (A (A N Cb 0 (A 69 V C) N N C) N (9 03 06 N: V' N N V CO fA CA CO CO CA CA(A(A CA CA 69 FA (A(A N 0) CA CA N N (A (A (A CA(A CA CA O O V' 0) O CO O O CO N O N O n CO O O O m O CO m C) C) N O 0) n V O N O n V ,- N co co co CO N O CO V; N C) O N- 0) V C) CI I' V. m (0 C) V' C) V' co CD 40 r CD CO CO aD 6) O) N O n 6 C) CO N GD 4C) 0) 0) N- V C) V V N N N C) Ci C) O) O C) Cn 6 R m 6 O Cr N N N. V' O CO CD 0) CO N. CD N 0 N. N C) N. CO CD N- 0) C) C) O n CO O N CO m O N N CD n N. N CO CO CO V. O Cn CO N O O N Of N O CD CO O O N C) O CO N CO Cn O) 1- C1 N CO O 0) N N m N C) CO CO O O Cb CO C) aD O V O V' N N O m O CO O CD V' V' CO 0) N- 0C N co co N CA V' CD (A CO C7 N 0 C) CA CD FA N C) h CA aD CO CO N C) 69 CA (A M .- (A N (A (ACV (A (A (A H9 CA CA CA CA CI (A(A C9 N (A CA(A (A(A - CA(A xr- 63 ✓ V' CD N- n r r O N- O CO N O r C) C) C) C7 O V' O CO CO CO N N CO N 0) CO 0 N N CA 0 0 N CO CO co .- N. O. CO 0) CO 0 n - O N 4 CO C) CO co CO 1- N N- .- 0) Cb r n N.: CO N CD CO N N CO 4 6 m CO r m N N N uO CO 6 C) aD W O) CO N▪ N V' (A CA CA N. V. CO N C) C) C0 0) V' N C) N C) C) V O 0 N. V' N CO N CO (A (A(A 0 0 N o) V V' 0 0 C) N. C) V.. V. 0 .7 N C) CO CD CA 0) (A N CO 0 69 CO V' C) V' Cn N C) 0) V N O C) Q fA 63 CO O to CA CA(A 69 CA(A CA M CA N 0) Vi CA CO M CA CA CA 0 CA (A (A T _ 0 0 0 0 f0 0 _ (0 (0 0 0 0 00 N CO (0 (0 0 (0 y W - N D a) a) a1 a) D W - N a) 0) D m y N N N N W W. - - y N ✓ O N- CO f` V. CO N 0 V C) N- CO co n CO CD CO CD N 01 .- ' CD V r N 0 CD 01 0 CO 0) C) V' NV. 0) CO x- CO C) CO x- O CO N N. n '- O 0) N m CO C W 0 0 N C a) 0 N U (a O x LL w 0. O a) C 0 y a) .X O a) ~Oiv u.0 a O a c a x a) o o c E m 4 a o C _ U A C N a) v in O O L C O a) O .e.. O N d y a o 0 J m 0' h c O a a) E (0 C m z E o) m C c D (0. 12 m C J 2 NY .� b O c 0 'O C 1 ▪ a N 0) O C N `2 .c W 0 tT to U N N O C E - o 3 1—a .S m y D 9_' o m m m m L 'g u t �_ ma)co m E o 3 J E O J O J 0) O) W C J O NCO U) 0 .^ C O 0, J 0 C 9 C C 0 O n' O Y J J J N •V .0 E C 3 V a 0 m �j J T C C C O U 'O a Q1 D Of E C > C O O • > o r s t t c m m c Z E N 0 c E N N O O y > y 0 0) 0( OI Q (0 'a-i d d' O 0) 10 O J t0 N MU- 7 C G D. t 4 (0 J .0 J J J J f0 OI LL LL (n ON U 0 O 0) C > 4. E 2 L C C C C N N m N U (0 C Y U o (0 m 'L N 1 R c m m a, rn.m c 2`2`-.o L .4 0 > > v O m u t .� ,0 a s m m m :° c W 'C D. O U N J "' - 1 .1 I-' .0 'C Co" U - a 7 cn- ...N O- h. N N O C L E (0 0 a) a, N J a C > > E 0 S a) _l c m C C c u �0 O 0 v v 's _ J COn (n (n1- © 222 m J W a,, O ow 23 2 ..... ` N .o (n at c c c d E J F (n (n N (n (n'6 c = (n (n a U o m ' rn E d (° N .N N D• 0 0 0 > E Y J J J J J J Co E (0 J J Y U. CD 0 6 .D.. W O 0) >> C aN x m <n CC a U U U N O m LL Z Z Z Z Z U O a Z Z (O O (n (n CD a (n O. Q LL > h CI) W CO N C x- N C) 1- N C) V CO 0 N. CO 0 ( 1- N C) V. CO CD N .- N C) V CO (O cre'- N C) ✓ x- > CO CO CO CD O CO 6 CD O O O O O O O O O O O O N- - n r N- N- O CD cci: O V V co O 0. Cks N W L N •C C 0) C 3 O J U LL t m a •> (q N U) v ' N Io 0) N. (Ni co a) (n v N m 4 V 0) O yMy CO C CN O V N CD CV CO ID 111 w CA M N 0) E9 w Ch 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 O O O O O O O O O O O O O O U) C0 M O O M 0 0 0 0 0 0 0 N O W O O O O O O O O U) 0 0 0 06 0 0 06 n N O 6 o O O O O O O O N O M 0 0 0 0 CO O O O) N CO CO 0 03 Cn 0 0 0 N V N co O O n 0000690 0 0 V- 0 CO 0 CO 0 r O 0 N 0) aD 0 V 0 N V 0) V CD 0101 CD O N 0000 Cn I` O V V 69 Vi C. M O O D U) N O O N. 69 69 m O O coCD O N CO V V 6CO 0Ge CA Vi EA CA VI N C0 CO 0 V V)0 EA N r W Vi W V)M V) E9 CA E9(H Vf 69 M N E9 N N. 0 E9 N C..i 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 C0 Cn 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 7 co O O 0 0 0 0 0 O 0 0 0 O 6 6 6 U) O O O U) O O 6 6 O CO O O 6 0 0 0 0 0 0 O 0 U) 0 0) co co aO CD CD 0 O I- 10 EO N N 0) 69 EA C9 M 0 000069 0 0 NS CO 0 CA 0 CO CD CD V. V' 0 VV VV MM E9 E9 EA E9 0 O O O C0 64 m CO O N (O Ge CA Ge y N. VI 0 7 0 VI N E9 V) 0 V 0 0 0 O CD O N aV 0 CD CO 0 0 0 0 0 0 0 O) N O CD O U) 0 0 CD 0 0 CO N N 0 V 0 0 0 0 M V M N M 7 O) 0 V N N CO CO CD O) N M CD 0 0 0 0 0 0 0 0 CD N N 01 N O O N CA O O N O O V N M N CO N 6 U) O O CO Ca CO O N CD O N O O M 7 0) CO ED r CO CO N N M C° CO 7 0 CO M CO O) CO M O N N CO CO 0 n CO N. O CD N O O 7 V_ CO 7 O) O) V N U) O 0 V Ch M V O) CO M CO O 7 0 CI0 V CI CO 7- 01 O 6 N CO C0 M V 7O 7 CO Cr CO ,- CO fA Ge Vf CO_M ao RJ C0 N V O N N N N n N O 7 CA E9 N EA 7 7 7 7 V) 7 EA 7 E9 Vi CA M I, O CO O 69 0 N (D 0 CD M M EA 19 Vi V) EA E9 EA 69 V! EA V>69 M N EA V) EA M 7 0 VI w V- N O 0 0 0 CO N N N N N N 0 0 0 O 0 0 N M CD O) N 0 0 0 I,- O 0 O 0 0 0 N 0 0 0 0 M M O I� 4 N CO VI N CO 7 7 N O O O CD O O N O O O O co O aO (O N N N CO N r N W CO O aO O CD O O O N O O 0) CD 0) V V V V 0 0 U) 7 O) aO N N M EA EA 0 M N CO 0 I,- aO 0) N 0 7 V EA N N N- N 0 0 CO U) V M V!EA U) Vi 7 M 0 O) M 0 O (D O 6 V)N V)Vi V) Vf (O E9 Vi EA N V O Vi N N Vi Vi EA E9 V) 03 CA 0 NN 69 VI aO M CO M M N N 7 M C) CD 7 CO 0 V M CO CO CO 0 N 0 0 0) 0 0 00000111 0 0 M. r CD 0 CO U) V; V C) 7 U) CD N. ao N N N CO N N 0 V 0 °) V CT N O CD O O Cn M CO co 6 O) ..a: r O O 6O) CO N M 01ao N 01 N V CO N N O O O O N- I• N CD try CO N to U) N CD N N M O U) V N U) 0 0 LI, aO CO 0) CD N 0 M 0 0) (A V) N CD (D O N 7 N 7 n aO O CD M 0 D) 0 Cn N M V C) V CO 7 CO M I- 0 0 0 CD n a) OD N N r M 00 r M ,- Oi O O N CO O I, 69 Vf V)69 C9 m N m V Ni O O V 0) EA n .- Vi V! N 69 7 to 069 CI) Vi VI NCO I- N EA 0 N N N w 69 w 0 CAA 49 CA V) VT(A Vf EA N N Vi CV O VI 69O h EA M M M Cl 0 N 0- C- N aO co 0 N O) CO M M V 7 0 0 M 0 0 0 C0 0 0 Cl M 0 CO C) 0) M N 01N N O V 7 N N N CO 01N 7 M V N 0 CD 0 0 O) O O) U) V V U) O) V M C0 10 O CO O C0 C0 I• O O O 0 (O O O N V C) C) 01 01 CO CD 0 N U) 0 N N m EA CA EA M N M 0 C) CA EA CO CD 7 N CO CD CO CO CO V V 0 V V M 69 a CA CA N 0 0 CD (O O I`M 0 E9 EA CA EA CA EA (D E9 EA E9 au V O O V) 64 EA(fl EA 0 EA N 0 N co al co CU m m m m (.. m m m m m m m m m m m m U y N U N N V) o N y 7 N 7 7 N 0 CO V U) M CD 7 N N 7 CO CO C0 CD N O M 7 7 7 7 .- M 7 N .- 7 7 r' N N 7 7 M M O N 0 N Lo O M)O CD N CO m a a (o U H !° a) m O c C) I- p U E to m d (n Y - a _ U E m U t0 CO 32 3 0 a P. -J CO OM 'O m N p. « c mC r rN $ L a >` C ° co L AO IL' m M TO ca NO � E n U o Hc 0 aw6 co N 0 �y O m aC9 E :2 E E M 20 COm c « o t13 (a G Cd a To LL U m g N a y c „I CO Ia CD tm Ym 'D (1 0- 0) Y 10 a T D' mO ,y J` m O1 2 0 E a d X _ m cd Dvm c 2 a o eO0 « 2U _. N « m aU to « WEp « O m >. m C 2 a = Lom y T E CVC C0 O .c co N m (/)O V U L d t '0 m p a D li CaCa CDol ` N a » L a ❑ yj m , L 0 mU .0Um ` C N C N (n 4- "c' mC -as • 0, m a u Op E Z.CO 0a ° C N ox amm ,_ m,_ o U m a) 1 a m c -0 0 3 mm j C E E d m m mrnw � • O ° m EcCt � 'mm C) p E m . O pt ❑ c c c m mtL (noO u U U . t DC , 0OJ`S d 0 2 Q D d > ) oct ❑ UmW > mcnmU1- H = 0) 0 O - U CC a N CO 7 N M V CO CO n CO O) .- 7 N Cl V U) CD N. CO m T- N M V aO > O) O) O) 0 0 0 0 0 0 0 0 0 0 0 �- O i. O O O O O O O O O . a m c o a m O RI To U Z..9 O rn 2 P.R.No.25273 11/08/2026 ca EXHIBIT "B" Rose Hill Park Hardscape & Landscape Improvements City of Port Arthur PORT ARTHUR,TEXAS PROJECT MANUAL Specifications Q�D�,p�NDSCgpF99. ��, .'„N 1992 4 O 07/14/2026 Burditt Land /Place. 310 Longmire Road Conroe, Texas 77304 July 2026 6.1494, CHARLOTTE M.MOSES,MAYOR 4a0 _^ RONALD BURTON,CPM THOMAS KINLAW,III City of '*,,"��.' CITY MANAGER MAYOR PRO TEM CHRISTE WHITLEY NED,TRMC COUNCIL MEMBERS: — CITY SECRETARY WILLIE BAE LEWIS,JR. n r t r i it Y CAL J.JONES ROXANN PAIS COTRONEO DONEANE BECKCOM Ie.�u's CITY ATTORNEY HAROLD L.DOUCET,SR., DONALD FRANK,SR. AUGUST 16, 2026 INVITATION TO BID ROSE HILL PARK HARDSCAPE &LANDSCAPE IMPROVEMENTS DEADLINE: Sealed Bid submittal must be received and time stamped by 3:00 p.m., Central Standard Time, Wednesday, September 2, 2026. (The clock located in the City Secretary's office will be the official time.) All bids received will be read aloud at 3:15 p.m. on Wednesday, September 2, 2026 in the City Council Chambers, City Hall, 5th Floor,Port Arthur, TX. You are invited to attend. MARK ENVELOPE:P26-054 DELIVERY ADDRESS: Please submit one(1)original and one(1) copy of your bid to: CITY OF PORT ARTHUR CITY OF PORT ARTHUR CITY SECRETARY or CITY SECRETARY P.O.BOX 1089 444 4TH STREET,4th Floor PORT ARTHUR, TEXAS 77641 PORT ARTHUR, TEXAS 77640 POINTS OF CONTACT: Questions concerning the Invitation to Bid or Scope of Work should be directed in writing to: City of Port Arthur, TX Clifton Williams,Purchasing Manager P.O. Box 1089 Port Arthur, TX 77641 clifton.williams@portarthurtx.gov Purchasing Division/Finance Department I Purchasing Manager,Clifton Williams P.O.Box 10891444 4th Street I Port Arthur,Texas 77641 1409.983.8160 I Fax 409.983.8291 Pr- The enclosed Invitation to Bid(ITB) and accompanying General Instructions,Conditions and Specifications are for your convenience in submitting bids for the enclosed referenced services for the City of Port Arthur. Bids must be signed by a person having authority to bind the firm in a contract. Bids shall be placed in a sealed envelope,with the Vendor's name and address in the upper left-hand corner of the envelope. ALL BIDS MUST BE RECEIVED IN THE CITY SECRETARY'S OFFICE BEFORE OPENING DATE AND TIME. It is the sole responsibility of the firm to ensure that the sealed ITB submittal arrives at the above location by specified deadline regardless of delivery method chosen by the firm. Faxed or electronically transmitted ITB submittals will not be accepted. Clifton Williams,CPPB Purchasing Manager NON-MANDATORY PRE-BID CONFERENCE A Non-Mandatory Pre-Bid Conference between Representatives of the City of Port Arthur, Texas and prospective bidders for Rose Hill Park Hardscape & Landscape Improvements will be held on Thursday,August 20,2026 at 10:00 a.m.at City Hall 5th Floor Council Chamber located at 444 4th Street, Port Arthur, Texas. The purpose of the Non-Mandatory Pre-Bid Conference is to make certain that the scope of work is fully understood, to answer any questions, to clarify the intent of the Contract Documents, and to resolve any problems that may affect the project construction. No addendum will be issued at this meeting, but subsequent thereto, the Purchasing Manager, if necessary, will issue an addendum(s)to clarify the intent of the Contract Documents. CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS For Construction of ROSE HILL PARK HARDSCAPE & LANDSCAPE To Serve The CITY OF PORT ARTHUR PORT ARTHUR,TEXAS P26-054 (Non-Federally Funded Project) TABLE OF CONTENTS A. CONSTRUCTION CONTRACT AGREEMENT B. ADVERTISEMENT FOR BIDS C. INFORMATION TO BIDDERS D. BID E. BID BOND F. GENERAL CONDITIONS G. SUPPLEMENTAL GENERAL CONDITIONS H. PAYMENT BOND I. PERFORMANCE BOND J. NOTICE OF AWARD K. NOTICE TO PROCEED L. INSURANCE M. QUALIFICATION STATEMENT N. NON-COLLUSION AFFIDAVIT O. AFFIDAVIT P. CONFLICT OF INTEREST Q. SB 252 CHAPTER 2252 CERTIFICATION R. HOUSE BILL 89 VERIFICATION S. TECHNICAL SPECIFICATIONS T. ADDENDUMS SECTION A CONSTRUCTION CONTRACT AGREEMENT CONSTRUCTION CONTRACT AGREEMENT [Non-Federally Funded Projects] THIS AGREEMENT, made this _day of , 2026 by and between the CITY OF PORT ARTHUR, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER", and N & T Construction, herein acting by and hereinafter called"CONTRACTOR". WITNESSETH: That for and in consideration of the payments, terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: . The CONTRACTOR will commence and complete the construction of Rose Hifi Park Hardscape & Landscape Improvements . The CONTRACTOR will furnish at his own expense all the materials, supplies, tools, equipment, labor and other services necessary for the construction and completion of the Project described herein. . The CONTRACTOR will commence the work required by the Contract Documents on or before a date to be specified in the Notice to Proceed and will complete the same within consecutive calendar days as specified in the Notice to Proceed, including,but not limited to, all Saturdays, Sundays and Federal, State, and City holidays unless the period for completion is extended otherwise by the Contract Documents. . The CONTRACTOR agrees to perform all the Work described in the Contract Documents and comply with the terms therein for the sum of$3,774,755.00, or as shown in the Bid Schedule. . The term"CONTRACT DOCUMENTS"means and includes the following: (A) Agreement (B) Advertisement for BIDS (C) Information to BIDDERS (D) BID (E) BID BOND (F) General Conditions (G) Supplemental General Conditions (H) Payment Bond (I) Performance Bond (J) Notice of Award (K) Notice to Proceed (L) Insurance (M) Qualification Statement (N) Non-Collusion Affidavit (0) Affidavit A-1 Conflict of Interest SB 252 Chapter 2252 Certification House Bill 89 Verification Preliminary Engineering Report prepared by Burditt Land Place 6. The OWNER will pay to the CONTRACTOR in the manner and at such times as set forth in the General Conditions such amounts as required by the Contract Documents. 7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. IN WITNESS WHEREOF, the Parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two (2) copies, each of which shall be deemed an original on the date first above written. APPROVED IN FORM: OWNER: CONTRACTOR: OWNER: N & T (T)NSTBUCTION CITY OF PORT ARTHUR BY BY NAME NAME ADDRESS TITLE Scope of Work prepared or issued by Burditt Land Place [CORPORATESEAL] [SEAL] ATTEST: ATTEST: NAME: NAME: A-2 SECTION B ADVERTISEMENT FOR BIDS CITY OF PORT ARTHUR Request for Qualifications Rose Hill Park Hardscape & Landscape Improvements August 12, 2026 August 19, 2026 PUBLIC NOTICE CITY OF INVITATION TEXAS ION TO BID )TICE IS HEREBY GIVEN THAT sealed Bids,addressed to the City of Port Arthur,will be received he Office of the City Secretary,City Hall 444 4th Street or P.O.Box 1089.Port Arthur,Texas 77641 e read aloud glater than 3:00 P.inning at 3:15 P.M,Wednesday,September2,2026 onr 2, this 6.Applicant City Coun names will bcil Chambers. ,y Hall.5th Floor for certain services briefly described as ROSE HILL PARK HARDSCAPE&LANDSCAPE IMPROVEMENTS ds received after the deadline stated above.regardless of method of delivery.will not be considered id returned unopened. d other ents are on file in the Purchasing ce, h444 Street,City of Port tArthur,nand areContract ies of the open for publicl inspection without charge They caan�also be itrieved from the City's website at www.portarthurtx.govibids.aspx or www.publicpurchase.com. ON-MANDATORY 0 PRE-B1D MEETING IS CHEDULED FOR 10:00 A.M. ON THURSDAY GU T 2026 AT CITY HALL 5TH FLOOR COUNCIL CHAMBERS LOCATED AT 444 4T KTREET PORT ARTHUR TEXAS. 'he City of Port Arthur reserves the right to reject any and all bids and to waive informalities. 's Code of twa d apctont act ola company that is n arrears of the inits obligations Ordinance,to the Ci yi City Council shall not stClifto n Witl�ams 'urchasing Manager PUBLIC NOTICE CITY OF PORT ARTHUR,TEXAS INVITATION TO BID NOTICE IS HEREBY GIVEN THAT sealed Bids,addressed to the City of Port Arthur,will be receive( at the Office of the City Secretary,City Hall 444 4th Street or P.O.Box 1089,Port Arthur,Texas 7764' no later than 3:00 P. M.,Wednesday, September 2,2026.Applicant names will be read aloui beginning at :ooP.M.We certain services briefly described r , 6aon this date in the City Council Chambers C F for ROSE HILL PARK HARDSCAPE&LANDSCAPE IMPROVEMENTS Bids received after the deadline stated above,regardless of method of delivery.will not be considere and returned unopened. Copies of the Specifications and other Contract Documents are on file in the Purchasing Office,44 retrieved fromet, bthe C of ity's website at www.portarth rt Arthur,and are open for public gov bidsiaspxon ior uwww.pubt licpuchase.com.can also e NON-MANDATORY PRE-BID MEETING IS SCHEDULED FOR 10:00 A.M. ON THURSDA AUGUST 20. 2026,AT CITY HALL 5TH FLOOR COUNCIL CHAMBERS LOCATED AT 444 4 STREET,PORT ARTHUR,TEXAS. 'The City of Port Arthur reserves the right to reject any and all bids and to waive informalitie Per Chapter 2 Article VI Sec. 2-262(C)of the City's Code of Ordinance,the City Council shalt r award a contract to a company that is in arrears in its obligations to the City. s/Clifton Williams Purchasing Manager CITY OF PORT ARTHUR,TEXAS INVITATION TO BID NOTICE IS HEREBY GIVEN THAT sealed Bids, addressed to the City of Port Arthur,will be received at the Office of the City Secretary,City Hall 444 4th Street or P.O.Box 1089,Port Arthur, Texas 77641 no later than 3:00 P.M.,Wednesday,September 2,2026. Applicant names will be read aloud beginning at 3:15 P.M., Wednesday, September 2, 2026 on this date in the City Council Chambers, City Hall, 5th Floor for certain services briefly described as: ROSE HILL PARK HARDSCAPE &LANDSCAPE IMPROVEMENTS Bids received after the deadline stated above, regardless of method of delivery, will not be considered and returned unopened. Copies of the Specifications and other Contract Documents are on file in the Purchasing Office, 444 4th Street, City of Port Arthur, and are open for public inspection without charge. They can also be retrieved from the City's website at www.portarthurtx.gov/bids.aspx or www.publicpurchase.com. NON-MANDATORY PRE-BID MEETING IS SCHEDULED FOR 10:00 A.M. ON THURSDAY, AUGUST 20, 2026, AT CITY HALL 5TH FLOOR COUNCIL CHAMBERS LOCATED AT 444 4T STREET,PORT ARTHUR, TEXAS. The City of Port Arthur reserves the right to reject any and all bids and to waive informalities. Per Chapter 2 Article VI Sec. 2-262(C) of the City's Code of Ordinance, the City Council shall not award a contract to a company that is in arrears in its obligations to the City. ��I TwrLGt)dgl:1atd- Clif n Williams Purchasing Manager FIRST PUBLICATION: AUGUST 12,2026 SECOND PUBLICATION: AUGUST 19,2026 SECTION C INFORMATION TO BIDDERS INFORMATION TO BIDDERS The following instructions are applicable to the Contract, in addition to the requirements set forth in the ADVERTISEMENT FOR BIDS. 1. BID PROCEDURE Bids must be submitted in DUPLICATE upon the prescribed forms, or copies thereof, in sealed envelopes plainly marked. Bids shall be prepared in compliance with the requirements of the ADVERTISEMENT FOR BIDS, these instructions and the instructions printed on the prescribed forms. All blank places on the Proposal form must be filled in as noted, in ink, in both words and figures, with amounts extended and totaled, and no changes shall be made in the phraseology of the forms or of the items mentioned therein. In case of any discrepancy between the written amounts and the figures, the written amounts shall govern. If the Bidder does not bid on optional items (if shown in the Proposal form), "No Bid" shall be entered in the blank spaces therefore. Any bid may be deemed irregular which contains any omission, erasure, alteration, addition, irregularity of any kind or item not called for, or which does not contain prices set opposite to each of the several items in the Proposal form, or in which any of the prices are obviously unbalanced, or which shall in any manner fail to conform to the conditions of the published ADVERTISEMENT FOR BID. The Bidder shall sign his Proposal in the blank area provided therefore. If the bid is made by a partnership or corporation, the name and address of the partnership or corporation shall be shown,together with the name and address of the partners or officers. If the bid is made by a partnership, it must be acknowledged by one of the partners; if made by a corporation, by one of the officers thereof accompanied by Corporate Seal. In order to ensure consideration, the Proposal must be enclosed in a sealed envelope plainly identified by the name of the project and the Contract number, and addressed to the OWNER as prescribed in the Invitation to Bidders. Withdrawal or modifications to bids are effective only if written notice thereof is filed prior to time of bid opening and at the place specified in the Notice to Bidders. A notice of withdrawal or modifications to a bid must be signed by the CONTRACTOR or his designated representative. No withdrawal or modifications shall be accepted after the time for opening of proposals. 2. BID SECURITY AND LIQUIDATED DAMAGES Bids shall be accompanied by a bid guarantee of not less than five percent ( 5%) Check or Cashier's Check payable without recourse to the CITY OF PORT ARTHUR, or a bid bond with corporate surety authorized to conduct business in Texas. Said security shall be submitted with the understanding that it shall guarantee that the Bidder will not withdraw his bid within sixty (60) days after the date of the opening of the bids; that if a bid is accepted, the Bidder will enter into a formal Contract with the OWNER, furnish bonds and insurance as may be required and commence work at the specified time, and that in the event of the withdrawal of said bid within said period, or the failure to enter into said Contract, furnish said bonds and insurance and commence work within the time specified, the Bidder shall be liable to the OWNER for the difference C-1 between the amount specified in the bid in the amount for which the OWNER may otherwise procure the required work. Checks of all except the three lowest responsible Bidders will be returned when award is made; when the Contract is executed, the checks of the two (2) remaining unsuccessful Bidders will be returned; that of the successful Bidder will be returned when formal Contract, bonds and insurance are approved, and work has commenced within the time specified. The Bidder to whom the award is made shall execute and return the formal Contract with the OWNER and furnish Performance and Payment Bonds and required insurance Documents within ten (10) days after the prescribed forms are presented to him for signature. Said period will be extended only upon written presentation to the OWNER, within said period, of reasons which, in the sole discretion of the OWNER, justify an extension. If said Contract, bonds and insurance Documents are not received by the OWNER within said period or if work has not been commenced within the time specified, the OWNER may proceed to have the work required by the Plans and Specifications performed by any means at its command, and the Bidder shall be liable to the CITY OF PORT ARTHUR,for any excess cost to the OWNER over his bid amount. Further,the bid guarantee shall be forfeited to the CITY OF PORT ARTHUR, as liquidated damages and Bidder shall be liable to the CITY OF PORT ARTHUR, for an additional amount of five percent (5%) of the bid amount as liquidated damages without limitation. The OWNER, within ten (10) days of receipt of acceptable Performance and Payment Bonds, Insurance Documents and Contract signed by Bidder to whom Contract was awarded, shall sign and return executed duplicate of the Contract to said party. Should OWNER not execute the Contract within such period, the Bidder may, by written Notice to OWNER,withdraw his signed Agreement. 3. BONDS The following bonds, each in the amount of one hundred percent (100%) of the Contract price, will be required in accordance with State law as follows: a (1) PAYMENT BOND for any contract in excess of Fifty Thousand Dollars ($50,000.00); and (2) a PERFORMANCE BOND for any contract in excess of One Hundred Thousand Dollars ($100,000.00). 4. NOTICE TO PROCEED Notice to Proceed shall be issued within ten (10) days of the execution of the Contract by OWNER. Should there be any reason(s) why Notice to Proceed cannot be issued within such period, the time may be extended by mutual agreement between OWNER and CONTRACTOR. If Notice to Proceed has not been issued within the ten (10) day period or a period mutually agreed upon, CONTRACTOR may terminate the Contract without liability on the part of either party. C-2 5. INSURANCE All insurance must be written by an insurer licensed to conduct business in the State of Texas, unless otherwise permitted by OWNER. The CONTRACTOR shall, at his own expense, purchase, maintain and keep in force insurance that will protect against injury and/or damages which may arise out of or result from operations under this Contract, whether the operations be himself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable of the following types and limits (No insurance policy or Certificate of Insurance required below shall contain any aggregate policy year limit unless a specific dollar amount[or specific formula for determining a specific dollar amount] aggregate policy year limit is expressly provided in the specification below which covers the particular insurance policy or Certificate of Insurance). 1. Standard Worker's Compensation Insurance (with waiver of subrogation in favor of the CITY OF PORT ARTHUR, Arceneaux Wilson & Cole LLC, its Officers, Agents & Employees). (City and Contractor and all persons providing services shall comply with the workers compensation insurance requirements of Section 406.096 of the Texas Labor Code and 28 TAC Section 110.110, a copy of which is attached hereto and is hereby incorporated by reference.) 2. Commercial General Liability occurrence type insurance. No. "XCU" RESTRICTIONS SHALL BE APPLICABLE. Products/completed operations coverage must be included, and CITY OF PORT ARTHUR and Arceneaux Wilson & Cole LLC, its Officers, Agents, and Employees must be named as an additional Insured. a. Bodily Injury $500,000 single limit per occurrence, or $500,000 each person/$500,000 per occurrence for contracts of $100,000 or less; or, b. Bodily Injury $1,000,000 single limit per occurrence or $1,000,000 each person/$1,000,000 per occurrence for contracts in excess of$100,000; and, c. Property Damage $100,000 per occurrence regardless of Contract amount; and, d. Minimum aggregate policy year limit of $1,000,000 for contracts of$100,000 or less; or, e. Minimum aggregate policy year limit of $2,000,000 for contracts in excess of$100,000. 3. Comprehensive Automobile Liability(including owned, non- owned and hired vehicles coverage). a. Minimum combined single limit of$500,000 per occurrence for bodily injury and property damage. C-3 b. If individual limits are provided, minimum limits are $300,000 per person,$500,000 per occurrence for bodily injury, and $100,000 per occurrence for property damage. C-4 PREAMBLE TO RULE 110.110 The Texas Worker's Compensation Commission adopts new § 110.10, concerning requirements for governmental entities awarding a contract for a building or construction project, and for persons providing services on a building or construction project for a governmental entity. The new rule is adopted with changes to the proposed text published in the April 26, 1994 issue of the Texas Register (19 TexReg 3131). Subsection (a)(7) and (c)(7) were amended by adding language to further clarify who is covered by the rule. Subsections (c)(7)(F) and (c)(3) were added to clarify that a contractor or subcontractor is representing to the governmental entity that workers' compensation coverage is provided. Subsections (d)(8)(C) and (c)(8)(C) were added to require specific language regarding representations of coverage to be added to contracts to provide services on the project. Subsections (c)(7)(F), and (c)(7)(I)(5), (d)(5), (d)(8)(F), (c)(6), and (c)(8)(F) were amended to reduce the retention period for contractors and other persons providing services on the project from three years to one year. Subsection (g)was changed to state that this rule applies to contract advertised for bid after September 1,1994, rather than awarded after September 1,1994. The Texas Labor Code, §406.096, requires workers' compensation insurance coverage for all persons providing services on a building or construction project for a governmental entity. The commission is aware that this statutory requirement is not being met, and this rule is designed to achieve compliance and to implement a record keeping process which will enable oversight of compliance. The rule does this by placing requirements on the governmental entity and on contractors and other persons providing services on a project. These requirements include coverage, certificates of coverage, posted notices of coverage, and notification of changes in coverage status. The rule does not create any duty or burden on anyone which the law does not establish. The rules defines terms which apply to governmental entity building or construction projects and sets up a clear procedure for governmental entities and contractors that bid for building land construction projects to follow in complying with the requirements of the Texas Labor Code, §406.096. It also defines persons who provide services on a project who are subject to the statutory requirement of coverage, and sets forth their requirements to comply with the statute and the rule. It specifically excludes persons such as food/beverage vendors whose deliveries and labor are not permanently incorporated into the project. The rule puts persons on notice that providing false or misleading certificates of coverage,or failing to provide or maintain required coverage,or failing to report any change that materially affects the provision of coverage may subject the contractor or other persons providing services on the project to administrative penalties,civil penalties,or other civil actions. The rule requires a governmental entity to timely obtain certificates of coverage, retain them for the duration of the project plus three years, and provide them to the commission upon request and to others entitled to them by law. It also requires the governmental entity as a prerequisite to awarding a contract, and as part of the contract, to require that the contractor provide coverage and certificates of coverage for the contractor's employees; timely obtain and provide the governmental entity all required certificates of coverage for all persons providing services on the project; retain certificates of coverage on file for the duration of the project and for one year thereafter; notify the governmental entity in writing by certified mail or personal delivery, within 10 C-5 days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; post notices on each project site; and contractually require persons with whom it contracts to do the same, with the certificates of coverage to be provided to the person for whom they are providing services. The rule also sets out the language to be included in bid specifications and in contracts awarded by a governmental entity and the information required to be in the posted notice to employees. It further establishes a method for obtaining the certificates from persons providing services on the project and providing them to the governmental entity. It requires a contractor awarded a building or construction contract to provide workers' compensation coverage to the contractor's employees for the duration of the project;file a certificate of coverage of the contractor's employees with the governmental entity prior to being awarded a contract; obtain and provide to the governmental entity, certificates of coverage from each other person with whom it has contract to provide services on the project, prior to that person beginning work on the project; obtain and provide new certificates of coverage shown on the current certificate ends during the duration of the project; retain all certificates of coverage for the duration of the project and for one year thereafter, notify the governmental entity of material changes in coverage; contractually require each other person with whom it contracts to provide a certificate of coverage;and post notices on each project site. All other persons providing services on a project have the same requirements as a contractor, with the exception of posting notices and with the exception that the certificate of coverage is given to the person for whom they contracted to provide services on the project. The rule uses the term "persons providing services on the project; in lieu of the statutory term "subcontractor because the term "subcontractor" as used in the statue (§406.096) and in this rule is broader than standard industry usage. The use of the different terminology will prevent confusion. The rule does not create any duty or burden on anyone which the law does not establish. The new rule is adopted under the Texas Labor Code, §402.061, which authorizes the commission to adopt rules necessary to administer the Act, and Texas Labor Code, §406.096, which establishes requirements for governmental entities, contractors, and subcontractors ("persons providing services on the project") regarding workers' compensation coverage for workers on public building or construction projects. Rule 110.110 Reporting Requirements for Building or Construction Projects for Governmental Entities. (a) The following words and terms, when used in this rule, shall have the following meanings, unless the context clearly indicates otherwise. Terms not defined in this rule shall have the meaning defined the Texas Labor Code, if so defined. (1) Certificate of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure statutory workers' compensation insurance coverage for the person's or entity's employees (including those subject to a coverage agreement) providing services on a project, for the duration of the project. C-6 (2) Building or construction - has the meaning defined in the Texas Labor Code, §406.096(e)(I). (3) Contractor - A person bidding for or awarded a building or construction project by a governmental entity. (4) Coverage - Worker's compensation insurance meeting the statutory requirements of the Texas Labor Code, §401.011(44). (5) Coverage agreement - A written agreement on form TWCC-81, form TWCC-82,form TWCC083, or form TWCC-84, filed with the Texas Workers' Compensation Commission with establishes a relationship between the parties for purposes of the Workers' Compensation Act, pursuant to the Texas Labor Code, Chapter 406, Subchapters F and G as one of employer/employee and establishes who will be responsible for providing workers' compensation coverage for persons providing services on the project. (6) Duration of the project - Includes the time from the beginning of work on the project until the work on the project has been completed and accepted by the governmental entity. (7) Persons providing services on the project ("subcontractor" In §406.096 of the Act) - Includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes but is not limited to independent contractors, subcontractors, leasing companies, motor carriers,owner-operators,employees of any such entity, or employees of any entity furnishing persons to perform services on the project. "Services" includes but is not to providing, hauling, or delivering equipment or materials, or providing labor,transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. (8) Project - Includes the provision of all services related to a building or construction contract for a governmental entity. (b) Providing or causing to be provided a certificate of coverage pursuant to this rule is a representation by the insured that all employees of the Insured who are providing services on the project are covered by workers' compensation coverage, that the coverage if based on proper reporting of classification codes and payroll amounts, and that all coverage agreements have been filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading certificates of coverage, or failing to provide or maintain required coverage, or failing to report any change that materially affects the provision of coverage may subject the contractor or other person providing services on the project to administrative penalties, criminal penalties,civil penalties, or other civil actions. C-7 (c) A governmental entity that enters into a building or construction contract on a project shall: (1) Include in the bid specifications, all the provisions of subsection (d) of this rule,using the language required by paragraph (7) of this subsection; (2) As part of the contracts, using the language required by paragraph (7) of this subsection, require the contractor to perform as required in subsection (d) of this rule; (3) Obtain from the contractor a certificate of coverage for each person providing services of the project, prior to that person beginning work on the project; (4) Obtain from the contractor a new certificate of coverage showing extension of coverage; (A) Before the end of the current coverage period, if the contractor's current certificate of coverage shows that the coverage period ends during the duration of the project, and (B) No later than seven days after the expiration of the coverage for each other person providing services on the project whose current certificate shows that the coverage period ends during the duration of the project; (5) Retain certificates of coverage on file for the duration of the project and for three years thereafter; (6) Provide a copy of the certificates of coverage to the commission upon request and to any person entitle to them by law; and, (7) Use the following language for bid specifications and contracts,without any additional works or changes, except those required to accommodate the specific document in which they are contained or to impose stricter standards of documentation in Figure 1: (Figures 1) Article . Worker's Compensation Insurance Coverage. A. Definitions: Certificate of coverage ("certificate'). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC- 83, or TWCC-84),showing statutory workers'compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. C-8 Duration of the project-includes the time from the beginning of the work on the project until the contractors/persons work on the project has been completed and accepted by the governmental entity. Persons providing services on the project("subcontractor"in §406.095)includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors,subcontractors, leasing companies, motor carriers, owner-operators employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. 'Services"include, without limitation,providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. 'Services"does not include activities unrelated to the project,such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401011(44) for all employees of the contractor providing services on the project, for the duration of the project C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must,prior to the end of the coverage period file a new certificate of coverage with the governmental entity showing that coverage has been extended E. The contractor shall obtain from each person providing services on a project, and provide to the governmental entity. (1) a certificate of coverage,prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project;and, (2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage (if the coverage period shown on the current certificate of coverage ends during the duration of the project C-9 F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. The contractor shall contractually required each person with whom it contracts to provide services on a project, to: (9) Provide coverage, based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements, which means the statutory requirements of Texas Labor Code,Section 401.011(44)for all of its employees providing services on the project, for the duration of the project; (2) Provide to the contractor,prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for they duration of the project; (3) Provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage,(if the coverage period shown on the current certificate of coverage and during the duration of the project (4) Obtain from each other person with whom it contracts, and provide to the contractor: (a) a certificate of coverage, prior to the other person beginning work on the project;and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period If the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter; C-10 (6) Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project;and (7) Contractually require each person with whom it contracts, to perform as required by paragraphs (9) - (7), with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or,in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental (d) A contractor shall. (9) Provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements; (2) Provide a certificate of coverage showing workers'compensation coverage to the governmental entity prior to beginning work on the project; (3) Provide the governmental entity,prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (4) Obtain from each person providing services on a project,and provide to the governmental entity. (A) a certificate of coverage,prior to that person beginning work on the project, so the governmental entity will have on file certificates of C-11 I coverage showing coverage for all persons providing services on the project;and, (B) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage code during the duration of the project; (5) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (6) Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (7) Post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text in Figure 2 provided by the commission on the sample notice, without any additional works or changes' (Figure 2) REQUIRED WORKER'S COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by worker's compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identify of their employer or status as an employee." "Call the Texas Worker's Compensation Commission at 512-440-3789 to received information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage."and (8) Contractually require each person with whom it contracts to provide services on a project, to: (A) Provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; C-12 (B) Provide a certificate of coverage to the contractor prior to that person beginning work on the project; (C) Include in all contracts to provide services on the project the language in subsection(o)(3)of this rule; (D) Provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) Obtain from each other person with whom it contracts, and provide to the contractor; (I) a certificate of coverage, prior to the other person beginning work on the project;and (II) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. (F) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (G) Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project;and, (H) Contractually require each person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services. (e) A person providing services on a project, other than a contractor,shall: (i) Provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements; (2) Provide a certificate of coverage as required by its contract to provide services on the project,prior to beginning work on the project; (3) Have the following language in its contract to provide services on the project "By signing this contract or providing or causing to be provided a certificate of coverage, the person signing this contract is representing to the C-13 governmental entity that all employees of the person signing this contract who will provide services on the project will be covered by workers' compensation coverage for the duration of the project that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. (4) Provide the person for whom it is providing services on the project, prior to the end of the coverage period shown on its current certificate of coverage, a new certificate showing extension of coverage, if the coverage period shown on the certificate of coverage ends during the duration of the project: (5) Obtain from each person providing services on a project under contract to it, and provide as required by its contract (A) A certificate of coverage,prior to the other person beginning work on the project;and (B) Prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (6) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (7) Notify the governmental entity in writing by certified mail or personal delivery, of any change that materially affects the provisions of coverage of any person providing services on the project and sent the notice within 10 days after the person knew or should have known of the change;and (8) Contractually require each other person with whom it contracts to: (A) Provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (B) Provide a certificate of coverage to it prior to that other person beginning work on the project; (C) Include in all contracts to provide services on the project the language in subsection(e)(3)of this rule; (D) Provide, prior to the end of coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage C-14 period shown on the current certificate of coverage ends during the duration of the project (E) Obtain from each other person under contract to it to provide services on the project,and provide as required by its contract (i) a certificate of coverage, prior to the other person beginning work on the project;and (ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the contract; (F) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (G) Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project;and (H) Contractually require each person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to the provided to the person for whom they are providing services. (f) If any provision of this rule or its application to any person or circumstance is held invalid, the invalidity does not affect other provisions or applications of this rule that can be given effect without the invalid provision or application, and to this end the provisions of this rule are declared to be sever able. (g) This rule is applicable for building or construction contracts advertised for bid by a governmental entity on or after September 1, 1994. Effective Date:September 1, 1994 C-15 4. Contractual Liability Insurance covering the indemnity provision of this Contract in the same amount and coverage as provided for Commercial General Liability Policy, specifically referring to this Contract by date,job number and location; 5. All-Risk Builder's Risk of the non-reporting type(NOT REQUIRED for paving projects, water and sewer line projects or projects involving lump sum payments). CONTRACTOR shall cause CONTRACTOR'S insurance company or insurance agent to fill in all information required (including names of insurance agency, CONTRACTOR and insurance companies, and policy numbers, effective dates and expiration dates) and to date and sign and do all other things necessary to complete and make into a valid Certificate of Insurance the CERTIFICATE OF INSURANCE form attached to and made a part of the Information To Bidders, and pertaining to the above listed Items 1, 2, 3 and 4; and before commencing any of the work and within the time otherwise specified. CONTRACTOR shall file said completed form with the OWNER. None of the provisions in said Form shall be altered or modified in any respect except as herein expressly authorized. Said CERTIFICATE OF INSURANCE Form contains a provision that coverages afforded under the policies will not be altered, modified or cancelled unless at least fifteen (15) days prior written notice has been given to the OWNER. CONTRACTOR shall also file with the OWNER valid CERTIFICATE(s) OF INSURANCE on like form from or for all Subcontractors and showing the Subcontractor(s) as the Insured. Said completed CERTIFICATE OF INSURANCE Form(s) shall in any event be filed with OWNER not more than ten (10) days after execution of this Contract. The original Builder's Risk policy (if required) shall provide for fifteen (15) days written notice of alteration, modification or cancellation and shall be furnished to OWNER. Provided, however, until the Original Policy is issued and furnished to the OWNER a Certified Insurance Binder with the identical notice will be acceptable in place of the original policy, which original policy must be received by the OWNER not later than thirty (30) days after issuance of the Notice to Proceed for the project. Notwithstanding any other provision in the Contract Documents, it is further mutually understood and agreed that no payment will be due and owing or made to the CONTRACTOR for any work performed under the Contract until all of the required insurance documentation, including the original policy specified above, are received by the OWNER. 6. JOB EXAMINATION Bidder should carefully examine and be familiar with the Plans, Specifications and other Documents and other conditions and matters which can in any way affect the work or the cost thereof. By submitting a bid, the CONTRACTOR acknowledges that he or his qualified representative has visited the job site and investigated and satisfied himself as to: (a) the conditions affecting the work including but not limited of the physical conditions of the site which may bear upon site access, handling and storage of tools and materials, access to water, electric or other utilities or otherwise affect performance of required activities; C-16 (b) the character and quantity of all surface and subsurface materials or obstacles to be encountered in so far as this information is reasonably ascertainable from inspection of the site, including exploratory work done by the OWNER or a designated consultant. Failure to do all of he above will not relieve a successful Bidder of the obligation to furnish all material and labor necessary to carry out the provisions of the Contract Documents and to complete the contemplated work for the considerations set forth in the bid. Any information shown in the specifications or on the Plans in regard to subsurface data, test borings and similar conditions is to be considered approximate and does not relive the Bidder of the responsibility for its verification. OWNER is not responsible for any failure by the CONTRACTOR to acquaint himself with available information for estimating properly the difficulty or cost of successfully performing the work. The OWNER is not responsible for any conclusions or interpretations made by the CONTRACTOR on the basis of the information made available by the OWNER. In conformity with applicable statutes, the OWNER has adopted a labor classification and a minimum wage scale, which is included preceding the Specifications. 7. SALES TAX This Contract is issued by an organization which qualifies for exemption pursuant to the provisions of Section 151.209 of the Texas Limited Sales, Excise and Use Tax Act as codified in Chapter 151 of the Texas Tax Code. The CONTRACTOR'S attention is directed to the State of Texas Comptroller of Public Accounts Limited Sales, Excise and Use Tax rules and regulations Rulings regarding Repairmen and Contractors - Reference: Section 151.056 Texas Tax Code which, upon compliance with certain conditions, provides for exemption from this tax of non-consumable materials and equipment permanently incorporated into work done for an exempt organization, and to House Bill 11 amendments to Section 151.311 of the Tax Code (Vernon Supp. 1992) as they relate to separated contracts/bids in order for non-consumable materials and equipment to qualify for resale to the CITY OF PORT ARTHUR, and be exempt from sales tax. Any Bidder may elect to exclude this sales tax from his bid. The bid and contract, however, must separately identify the charges for: (1) non-consumable materials and equipment that are permanently incorporated into the project; and, (2) charges for skill, labor and consumable materials, tools and equipment which are not permanently incorporated into the project. This statement shall be included in and made part of the Contract. CONTRACTORS are required to have a sales tax permit issued by the Comptroller of the State of Texas in order to qualify under the exemption provisions and the separated Contract procedure. The City will issue a specific exemption certificate for a separated Contract to the CONTRACTOR in order that he does not have to pay taxes on qualifying materials and equipment purchased for and permanently incorporated into the CITY OF PORT ARTHUR, project. The CONTRACTOR performing this Contract must issue to his suppliers an exemption certificate in lieu of the tax, said exemption certificate complying with all applicable State Comptroller's rulings, along with a copy of the certificate issued to him by the CITY OF PORT ARTHUR,. C-17 The OWNER will make no further allowance for and will make no price adjustment above or below the originally bid unit prices on account of this tax. It shall be the CONTRACTOR'S sole responsibility, if CONTRACTOR has elected to exclude the sales tax from the bid, to comply with the aforementioned Rulings and with any other applicable rules, regulations or laws pertaining to the Texas Limited Sales, Excise and Use Tax which may now or at any time during the performance of this Contract be in effect, and the OWNER shall have no responsibility for any sales or use tax which the CONTRACTOR may be required to pay as a result of CONTRACTOR'S failure or the OWNER'S failure to comply with said rules, regulations or laws, or as the result of the performance of the Contract or any part hereof by the CONTRACTOR. Bidders are cautioned that materials which are not permanently incorporated into the work (Example: Fuel, lubricants, tools, forming materials, etc.) are not eligible for exemption and are not to be included in the statement as "Non- Consumable Materials and Equipment". 8. FINANCIAL STATEMENT AND EXPERIENCE RECORD The Bidder will, upon request by the OWNER, furnish such information and data as OWNER may request to determine ability of the Bidder to perform the work, including, without limitation, a list of all jobs completed in the last 24 months giving name of OWNER, amount of Contract, description of the job, and name of OWNER'S representative who is familiar with the work performed by the CONTRACTOR. 9. INTERPRETATION OF PLANS AND SPECIFICATIONS Bidders desiring further information or further interpretation of the Plans and Specifications must make request for such information in writing to the Architect/Engineer, not later than 96 hours before the bid opening. Answers to all such requests will be given in writing to all qualified Bidders, in Addendum form, and all addenda will be bound and made a part of the Contract Documents. No other explanation or interpretation will be considered official or binding. Should a Bidder find discrepancies in, or omissions from, the Plans, Specifications or other Contract Documents, or should a Bidder be in doubt as to their meaning, the Bidder should, no later than 96 hours prior to the bid opening, notify the Architect/Engineer in order that a written Addendum if necessary, may be sent to all Bidders prior to submission of the bids. Failure to request such clarification is a waiver to any claim by the Bidder for expense made necessary by reason of later interpretation of the Contract Documents by the OWNER. 10. AWARD OF CONTRACT Unless it elects to reject all bids,the OWNER will award the Contract as promptly as possible consistent with the time required for a thorough analysis of bids submitted. Award will be made on the basis of the greatest advantage to the OWNER,considering all elements of the bid. The right is reserved to reject any or all Proposals and to waive technical defects, as the interest of the OWNER may require. C-18 A Bidder may withdraw his Proposal before the expiration of the time during which a Proposal may be submitted,without prejudice to himself, by submitting a written request for its withdrawal to the officer who holds it. 11. TIME OF COMPLETION Attention is directed to the requirement that each Bidder specify in his Proposal the time in which he will agree to complete the work. The time required for completion of the work will be a consideration in the determination of the successful Bidder. Unless otherwise specified, Bidder must state time in consecutive calendar days, including, but not limited to, all Saturdays, Sundays, and Federal, State and City holidays. 12. SUBSTITUTIONS Where materials or equipment are specified by a trade or brand name, it is not the intention of the OWNER to discriminate against an equal product of another manufacturer, but rather to set a definite standard of quality or performance, and to establish an equal basis for the evaluation of bids. 13. LAWS All applicable laws, ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract throughout. 14. EQUAL OPPORTUNITY Bidder agrees to abide by the requirement under Executive Order No. 11246, as amended, including specifically the provisions of the equal opportunity clause set forth in the General Conditions. 15. MATERIAL SUPPLIERS AND SUBCONTRACTORS Low bidder shall supply the names and addresses of major material suppliers and Subcontractors when requested to do so by OWNER. 16. RETAINAGE Ten percent (10%) {five percent (5%) if the total contract exceeds Twenty-five Thousand Dollars [$25,000]) of the amount of each periodic progress payment shall be retained by OWNER until final completion and acceptance of all work under the CONTRACT. 17. UNIT PRICES If the Contract may be let on a unit price basis, the Specifications furnished to bidders shall contain approximate quantities estimated upon the best available C-19 information, but the compensation to be paid to the CONTRACTOR shall be based upon the actual quantities constructed or supplied. 18. PRE-BID CONFERENCE A NON MANDATORY PRE-BID CONFERENCE between the Engineer, Representatives of the CITY OF PORT ARTHUR, Texas and prospective bidders will be held on August 20, 2026 at, 10:00 AM, at 5th Floor Council Chambers, 444 4th Street, Port Arthur, Texas. The purpose of the ANDATORY PRE-BID CONFERENCE is to make certain that the scope of work is fully understood, to answer any questions, to clarify the intent of the Contract Documents, and to resolve any problems that may affect the project construction. No addendum will be issued at this meeting, but subsequent thereto, the Engineer, if necessary, will issue an addendum(s) to clarify the intent of the Contract Documents C-20 SECTION D LBID CITY OF PORT ARTHUR, TEXAS BID SHEET BID FOR: ROSE HILL PARK HARDSCAPE &LANDSCAPE IMPROVEMENTS BID DUE DATE: SEPTEMBER 2, 2026 ITEM# DESCRIPTION DAYS TOTAL COST ROSE HILL PARK HARDSCAPE & ,,'.�o,n�Qil 1 LANDSCAPE IMPROVEMENTS "" $ 3 1/74 !--is 5 N#T Corrs-tuu ;ovl Co., Inc. 1371, L&u ret ive C PANY ME STREET ADDRESS Cal;t4 S ATURE F BIDDER P.O. BOX LAAAMAri WtiU&n4c BeawNyN 1`hC 7T70 PRINT OR TYPE NAME CITY STATE ZIP V4Ili)* 4o - j3 ' z TITLE AREA CODE TELEPHONE NO LWiilfctims(zr, i-foonstty-im — EMAIL FAX NO. Rose Hill Park `li_FI Unit Prices For Base Bid Items Note. Approximate quantities provided by the contractor in this form are for reference only. The contractor shall be responsible for supplying all materials required for the construction of all items as specified in the construction drawings and specifications. The contractor shall use the unit price given as add or deduct for supplemental items requested by the owner. Approximate Unit Total Item/Description Quantity Unit Price Item Amount ' 0 General Conditions 0.1 General Requirements 1 Is $ - $ 136113 50. OG 0.2 Mobilization 1 Is $ 25,000.00 $ 25,000.00 0.3 Payment and Performance Bonds,Insurance 1 Is $ 45,000.00 $ 45,000.00 General Conditions Lump Sum Total $ 70,000.00 , 1 ADA-routes 1.1 Ramps 6 ea $ 1,000.00 $ 6,000.00 1.2 Painting at parking stall 4 Is $ 650.00 $ 2,600.00 1.3 Signage at parking 3 ea $ 800.00 $ 2,400.00 1.4 Concrete wheel stops 2 ea $ 175.00 $ 350.00 ADA Routes Lump Sum Total $ 11,350.00 2 Demolition/Preservation 2.1 Demolition,Clearing&Tree Removal 1 Is $ 35,000.00 $ 35,000.00 2.2 SWPPP,Silt Fence 3020 If $ 2.50 $ 7,550.00 2.3 Tree Preservation Fencing 500 If $ 9.00 $ 4,500.00 2.4 Existing Sabal Palm extraction and Healing in on site 1 ea $ 2,500.00 $ 2,500.00 2.5 Demolish asphalt driveway 1 Is $ 27,000.00 $ 27,000.00 2.6 Demolish Concrete slab 1 Is $ 21,000.00 $ 21,000.00 2.7 Demolish Concrete Sidewalks 1 Is $ 15,000.00 $ 15,000.00 2.8 Site Demolition Remaining Items 1 Is $ 30,000.00 $ 30,000.00 Demolition/Preservation Lump Sum Total $ 142,550.00 3 Grading Drainage&Utilities 3.1 Mass Grading,Site Work(Top soil at turf areas listed separately Item 10.18) Is $ 240,000.00 $ 240,000.00 3.2 Storm Sewer system 1 Is $ 375,000.00 $ 375,000.00 3.3 Water Infrastructure(domestic and waste) 1 Is $ 70,000.00 $ 70,000.00 Grading Drainage and Utilities Lump Sum Total $ 685,000.00 4 Pedestrian Paving 4.1 10'Concrete Sidewalks 3,372 sf $ 10.25 $ 34,563.00 4.2 7'Concrete Sidewalks 7,855 sf $ 10.25 $ 80,513.75 4.3 6'Concrete Sidewalks 16,551 sf $ 10.25 $ 169,647.75 4.4 Concrete special paving Nodes 3,318 sf $ 11.00 $ 36,498.00 4.5 Artificial Turf 1,584 sf $ 16.00 $ 25,344.00 4.6 Concrete Edge at Artificial Turf 171 If $ 15.00 $ 2,565.00 4.7 Concrete Edge at Fitness Area 156 If $ 15.00 $ 2,340.00 4.8 Decomposed Granite Paving 20,531 sf $ 3.10 $ 63,646.10 4.9 Concrete Paving at new Exercise Equipment 1,497 sf $ 6.00 $ 8,982.00 4.10 Slab at pavilion 1,394 sf $ 20.00 $ 27,880.00 4.11 Raised slab at stage 600 sf $ 20.00 $ 12,000.00 4.12 12"deep Engineered wood fiber at Relocated Existing Exercise Area 57 cy $ 55.00 $ 3,135.00 Pedestrian Paving Lump Sum Total $ 467,114.60 5 Vehicular Paving 5.1 Concrete Parking Lot 20,195 sf $ 10.00 $ 201,950.00 5.2 Concrete Driveway 9,037 sf $ 10.00 $ 90,370.00 5.3 Concrete Curbs 1,644 If $ 7.00 $ 11,508.00 Vehicular Paving Lump Sum Total $ 303,828.00 ' 6 Site Lighting and Electrical 6.1 Omni Stage Ribbon Lighting 75 If $ 100.00 $ 7,500.00 6.2 BK Lighting Multihead Stage Lighting on Pole 2 ea $ 2,100.00 $ 4,200.00 6.3 FLT Trail Lighting on Pole 46 ea $ 6,350.00 $ 292,100.00 6.4 NLS Parking Lot Lighting on Pole 4 ea $ 7,092.00 $ 28,368.00 6.5 NLS Security Lighting Single on Pole 3 ea $ 5,530.00 $ 16,590.00 6.6 NLS Security Lighting Double on Pole 7 ea $ 7,091.00 $ 49,637.00 6.7 NLS Security Lighting Wall Mount 5 ea $ 874.00 $ 4,370.00 6.8 NLS Traditional Acorn Lighting and Pole 8 ea $ 3,788.00 $ 30,304.00 6.9 Café Lighting and Poles 297 If $ 77.00 $ 22,869.00 6.1 Omni Pavilion Ribbon Lighting 168 If $ 90.00 $ 15,120.00 6.11 Pavilion mounted BK Lighting 6 ea $ 7,685.00 $ 46,110.00 6.12 NLS Multi-use Field Lighting Single Sided on Pole 16 ea $ 6,176.00 $ 98,816.00 6.13 NLS Multi-use Field Lighting Duel Sided on Pole 16 ea $ 6,070.00 $ 97,120.00 6.14 BK Palm Tree Ring Light 2 ea $ 5,641.00 $ 11,282.00 6.15 GFCI Outlets 9 ea $ 1,200.00 $ 10,800.00 6.16 Site Lighting Controls 1 Is $ 20,653.00 $ 20,653.00 6.17 Site Electrical Service 1 Is $ 400,000.00 $ 400,000.00 Site Lighting and Electrical Lump Sum Total $ 1,155,839.00 7 Structures 7.1 Pavilion Brick Columns 6 ea $ 1,200.00 $ 7,200.00 7.2 Stage Brick Columns 4 ea $ 1,200.00 $ 4,800.00 7.3 Park Entry Portals w/Lights 1 Is $ 38,000.00 $ 38,000.00 7.4 Aluminum Park fence at Rose Hill Manor 773 If $ 75.00 $ 57,975.00 7.5 Fence rail at Back of Stage and Ramp 21 If $ 900.00 $ 18,900.00 7.6 Wooden Park Fence at residential Lots 790 If $ 31.00 $ 24,490.00 Structures Lump Sum Total $ 151,365.00 8 Site Furnishings 8.1 Seat wall 86 If $ 350.00 $ 30,100.00 8.2 Exercise Station relocation,801 sf x 12"deep excavation,Fibar surfacing and 9"NDS 970's area 1 Is $ 23,638.00 $ 23,638.00 drain with connection to storm sewer(Addendum#4) 8.3 Big ass fan 1 ea $ 6,000.00 $ 6,000.00 8.4 Haddenstone obelisk 1 ea $ 5,000.00 $ 5,000.00 Site Furnishings Lump Sum Total $ 64,738.00 9 Outdoor Play Area Furnishings 9.1 Doty and Sons Ping Pong Table 2 ea $ 7,000.00 $ 14,000.00 9.2 Mega Chess Game 1 ea $ 850.00 $ 850.00 9.3 Anova Chess Game Table 1 ea $ 3,000.00 $ 3,000.00 Outdoor Play Area Furnishings Lump Sum Total $ 17,850.00 10 Softcape(Planting of Trees and Shrubs price shall include specified bark mulch) 10.1 Planting Soil Mix 12 cy $ 90.00 $ 1,080.00 10.2 Live Oak,45 Gal 20 ea $ 685.00 $ 13,700.00 10.3 Shumard Oak,45 Gal. 16 ea $ 685.00 $ 10,960.00 10.4 Swamp Chestnut Oak,45 Gal. 14 ea $ 685.00 $ 9,590.00 10.5 Chinese Pistache,45 Gal. 15 ea $ 685.00 $ 10,275.00 10.6 River Birch,30 Gal 13 ea $ 460.00 $ 5,980.00 10.7 Drummond Red Maple,30 Gal. 28 ea $ 460.00 $ 12,880.00 10.8 Canary Island Date Palm, B&B 1 ea $ 6,000.00 $ 6,000.00 10.9 China Snow Chinese Fringe Tree,30 Gal 22 ea $ 475.00 $ 10,450.00 10.10 Basham's Party Pink Crepe Myrtle,30 Gal 17 ea $ 450.00 $ 7,650.00 10.11 Existing Saba!Palm Relocation 1 ea $ 350.00 $ 350.00 10.12 Variegated Flax Lily,5 Gal 16 ea $ 25.00 $ 400.00 10.13 Big Blue Lilyturf,5 Gal 36 ea $ 25.00 $ 900.00 10.14 Shredded Bark Mulch 5 cy $ 90.00 $ 450.00 10.15 Benda Board Edging 583.6 If $ 6.25 $ 3,647.50 10.16 Common Bermuda grass Hydroseed 195,817 sf $ 0.15 $ 29,372.55 10.17 Tif 419 Bermuda grass(Solid Sod) 66,270 sf $ 0.89 $ 58,980.30 10.18 Topsoil at Sod and Hydromulch 2,303 cy $ 35.00 $ 80,605.00 10.19 Irrigation System Complete 1 Is $ 85,000.00 $ 78,000.00 Softscape Lump Sum Total $ 341,270.35 11 Miscellaneous 11.1 90 Days Maintenance 1 Is $ 6,000.00 $ 6,000.00 11.2 Contingency 1 Is $ 200,000.00 $ 200,000.00 11.3 Brick and stone caps at lower Stage surrounds 1 Is $ 12,000.00 $ 12,000.00 11.4 Mega chess payers&leveling bed 1 Is $ 6,500.00 $ 6,500.00 11.5 1 Is $ - $ Miscellaneous Lump Sum Total $ 224,500.00 TOTAL OF ABOVE ITEMS AND LUMP SUM BASE BID $3/7 74/ 75500 0 CALENDER DAYS The Bidder agrees that the work will be substantially complete and ready for final payment in accordance with The General Conditions and Contract Documents within 210 calendar days: LIST OF PROPOSED SUBCONTRACTORS: If awarded the Contract for this project,the undersigned proposes to employ the following firms for The principal parts of the Work as noted in each category:Contractor shall notify Owne Propose another to whom Owner has no objection. Subcontract Work: 1. Landscaping&Irrigation-Landscapes Unlimited 2. Metal Portal Supplier-Kiecshnick 3. Brick Supplier-Corbell Masonry 4. Hardscape-JJ&D 5. Electrical-Newtron SHOP DRAWINGS Contractor is responsible for submit Shop Drawings and Manufacturer's Cutsheets for Landscape Architect's approval prior to any fabrication as indicated in the Construction Documents (If required by Owner or Architects) Type of Bidder's Organization: Corporation State of Incorporation: Texas f rporation) Submitted on Se tember 23 2026 (Date) By NT Construction Co.,Inc. (Firm name) (Seal,if by Corporation) (Name of Person Authorized to Sign):Vince Jabbia,Vice President Business Address:1376 Laurel Ave.,Beaumont,Texas 77701 (Phone Number):409-781-5306 cell END OF SECTION SECTION E BID BOND BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, the Undersigned, N&T Construction Company, Inc. as Principal, and Nationwide Mutual Insurance Company as Surety, are hereby held and firmly bound unto City of Port Arthur as OWNER in the penal sum of Five percent of amount bid --5%-- for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Signed, this 2nd day of September , 20 26 . The Condition of the above obligation is such that whereas the Principal has submitted to City of Port Arthur a certain BID, attached hereto and hereby made a part hereof to enter into a Contract in writing, for the Rose Hill Park Renovation NOW,THEREFORE, (a) If said BID shall be rejected, or (b) If said BID shall be accepted and the Principal shall execute and deliver a Contract in the Form of Contract attached hereto (properly completed in accordance with said BID) and shall furnish a BOND for his faithful performance of said Contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said BID, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as here in stated. E-1 The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper Officers, the day and year first set forth above. N&T Construction Company, I c. (L.S.) PRINCIPAL Natio id Ilns -ompany SURETY BY: Ashlyn Armentor, Attorney-in-Fact IMPORTANT - Surety companies executing BONDS must appear on the Treasury Departments most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. E-2 SECTION F GENERAL CONDITIONS GENERAL CONDITIONS CONTRACT AND CONTRACT DOCUMENTS The Plans, Specifications and Addenda, enumerated in the Agreement and Paragraph 1 of the Supplemental General Conditions, shall form part of this Contract, and the provisions thereof shall be as binding upon the parties heretes if they were herein fully set forth. The Table of Contents, titles, headings, running headlines and marginal notes contained herein and in said Documents are solely to facilitate reference to various provisions of the Contract Documents and in no way affect, limit, or cast light on the interpretation of the provisions to which they refer. DEFINITIONS The following terms, as used in this Contract, are respectively defined as follows: . "CONTRACTOR": A person, firm or corporation with whom the Contract is made with the OWNER or CITY OF PORT ARTHUR. . "Subcontractor": A person, firm or corporation supplying labor and materialar only labor for work at the site of the project for, and under separate Contract or agreement with,the CONTRACTOR. . "Work on (at) the Project": Work to be performed at the location of the project, including the transportation of materials and supplies to or from the location of the project by employees of the CONTRACTOR and any Subcontractor. . "OWNER": Refers to the CITY OF PORT ARTHUR. . "CITY": Refers to the CITY OF PORT ARTHUR. . "ENGINEER": C TERMINATION OF CONTRACT FOR CAUSE If, through any cause, the CONTRACTOR shall fail to fulfill in timely and proper manner his obligations under this Contract, or if the CONTRACTOR shall violate any of the covenants, agreements or stipulations of this Contract, the CITY OF PORT ARTHUR, shall thereupon have the right to terminate this Contract by giving written notice to the CONTRACTOR of such termination and specifying the effective date thereof, at least ten (10) days before the effective date of such termination. In such event, all finished or unfinished Documents, data, studies, surveys, drawings, maps, models, photographs and reports prepared by the CONTRACTOR under this Contract shall, at the option of the CITY OF PORT ARTHUR, become its property and the CONTRACTOR shall be entitled to receive just and equitable compensation for any work satisfactorily completed hereunder. Notwithstanding the above, the CONTRACTOR shall not be relieved liability to the for damages sustained by the CITY OF PORT ARTHUR by virtue F-I of any breach of the Contract by the CONTRACTOR, and the CITY OF PORT ARTHUR may withhold any payments to the CONTRACTOR for the purpose of set-off until such time as the exact amount of damages due the CITY OF PORT ARTHUR from the CONTRACTOR is determined. 4. PERSONNEL a. The CONTRACTOR represents that he has, or will secure at his own expense, all personnel required in performing the work under this Contract. Such personnel shall not be employees of, or have any contractual relationship with,the CITY OF PORT ARTHUR. b. All of the work required hereunder will be performed by the CONTRACTOR, or under his supervision, and all personnel engaged in the work shall be fully qualified and shall be authorized or permitted under State and local law to perform such services. c. None of the work covered by this Contract shall be subcontracted without the prior written approval of the CITY OF PORT ARTHUR. Any work or services subcontracted hereunder shall be specified by written Contract or agreement and shall be subject to each provision of this Contract. 5. REPORTS AND INFORMATION The CONTRACTOR, at such times and in such forms as the CITY OF PORT ARTHUR may require, shall furnish the CITY OF PORT ARTHUR such periodic reports as it may request pertaining to the work or services undertaken pursuant to this Contract, the costs and obligations incurred or to be incurred in connection therewith, and any other matters covered by this Contract. 6. RECORDS AND AUDITS The CONTRACTOR shall maintain accounts and records, including personnel, property and financial records, adequate to identify and account for all costs pertaining to the Contract and such other records as may be deemed necessary by the CITY OF PORT ARTHUR to assure proper accounting for all project funds, both federal and non-federal shares. These records will be made available for audit purposes to the CITY OF PORT ARTHUR or any authorized representative and will be retained for three (3) years after the expiration of this Contract, unless permission to destroy them is granted by the CITY OF PORT ARTHUR. 7. FINDINGS CONFIDENTIAL All of the reports, information, data, etc., prepared or assembled by the CONTRACTOR under this Contract are confidential, and CONTRACTOR agrees that they shall not be made available to any individual or organization without the prior written approval of the CITY OF PORT ARTHUR. F-2 8. COPYRIGHT No report, maps or other Documents produced in whole or in part under this Contract shall be the subject of an application for copyright by or on behalf of the CONTRACTOR. 9. COMPLIANCE WITH LAWS The CONTRACTOR shall comply with all applicable laws, ordinances, rules, orders, regulations and codes of the Federal, State and local governments relating to performance of the work herein, the protection of adjacent property and the maintenance of passageways, guard fences or other protective facilities. 10. INTEREST OF MEMBERS OF CITY No member of the governing body of the CITY OF PORT ARTHUR, and no other Officer, Employee or Agent of the CITY OF PORT ARTHUR, who exercises any functions or responsibilities in connection with the planning and carrying out of the program, shall have any personal financial interest, direct or indirect, in this Contract; and, the CONTRACTOR shall take appropriate steps to assure compliance. 11. INTEREST OF OTHER LOCAL PUBLIC OFFICIALS No member of the governing body of the locality and no other public official of such locality, who exercises any functions or responsibilities in connection with the planning and carrying out of the program, shall have any personal financial interest, direct or indirect, in this Contract; and, the CONTRACTOR shall take appropriate steps to assure compliance. 12. INTEREST OF CONTRACTOR AND EMPLOYEES The CONTRACTOR covenants that he presently has no interest and shall not acquire any interest, direct or indirect, in the study area or any parcels therein or any other interest which would conflict in any manner or degree with the performance of his services hereunder. The CONTRACTOR further covenants that in the performance of this Contract, no person having any such interest shall be employed. 13. INCORPORATION OF PROVISIONS REQUIRED BY LAW Each provision and clause required by law to be inserted into the Contract shall be deemed to be enacted herein and the Contract shall be read and enforced as though each were included herein. If, through mistake or otherwise, any such provision is not inserted or is not correctly inserted, the Contract shall be amended to make such insertion on application by either party. 14. CERTIFICATES AND PERMITS F-3 Except for required permits issued by OWNER,which shall be issued at no cost to CONTRACTOR, CONTRACTOR shall secure at his own expense from other public authorities all necessary certificates, licenses, approvals and permits required in connection with the work of this Contract or any part thereof, and shall give all notices required by law, ordinance or regulation. CONTRACTOR shall pay all fees and charges incident to the due and lawful prosecution of the work of this Contract, and any extra work performed by him. 15. GUARANTEE OF WORK a. Neither the final certificate of payment, nor any provision in the Contract Documents, nor partial or entire occupancy of the premises by the OWNER shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the CONTRACTOR of liability in respect to any warranties or responsibility for faulty materials or workmanship. The CONTRACTOR guarantees and warrants that all materials and equipment which are to become part of the work shall be new unless otherwise specified, and that all work will be of good quality and free from faults or defects and in accordance with the Contract Documents and of any inspections, tests or approvals required by the Contract Documents, law, ordinance, rules, regulations or orders of any public authority having jurisdiction. The OWNER will give notice of observed defects with reasonable promptness. b. Neither observations by Architect or Engineer nor inspections, tests or approvals by persons other than CONTRACTOR shall relieve CONTRACTOR from his obligations to perform the work in accordance with the requirements of the Contract. c. The provisions of this Paragraph shall be cumulative of, and not in limitation of,the responsibility of CONTRACTOR for defects in the work or materials or damages resulting therefrom as otherwise provided by the law of the State of Texas or this Contract, including, without limitation, the implied warranty of fitness of the work and the implied obligation to perform the work in a good and workmanlike manner. 16. ADDITIONAL INSTRUCTIONS AND DETAIL DRAWINGS The CONTRACTOR will be furnished additional instructions and detail drawings as necessary to carry out the work included in the Contract. The additional drawings and instructions thus supplied to the CONTRACTOR will coordinate with the Contract Documents and will be so prepared that they can be reasonably interpreted as part thereof. The CONTRACTOR shall carry out the work in accordance with the additional detail drawings and instructions. The CONTRACTOR and the Architect/Engineer will prepare jointly: (a) a schedule, fixing the dates at which special detail drawings will be required, such drawings, if any, to be furnished by the Architect/Engineer in accordance with said schedule; and, (b) a schedule fixing the respective dates for the submission of shop drawings, the beginning of manufacture, testing and installation of materials, supplies and equipment, and the completion of the various parts of the work; F-4 each such schedule to be subject to change from time to time in accordance with the progress of the work. 17. SHOP OR SETTING DRAWINGS The CONTRACTOR shall submit promptly to the Architect/Engineer two (2) copies of each shop or setting drawing prepared in accordance with the schedule predetermined as aforesaid. After examination of such drawings by the Architect/Engineer and the return thereof, the CONTRACTOR shall make such corrections to the drawings as have been indicated and shall furnish the Architect/Engineer with two (2) corrected copies. If requested by the Architect/Engineer, the CONTRACTOR must furnish additional copies. Regardless of corrections made in, or approval given to, such drawings by the Architect/Engineer, the CONTRACTOR will nevertheless be responsible for the accuracy of such drawings and for their conformity to the Plans and Specifications, unless he notifies the Architect/Engineer in writing of any deviations at the time he furnishes such drawings. 18. MATERIALS, SERVICES AND FACILITIES a. It is understood that, except as otherwise specifically stated in the Contract Documents, the CONTRACTOR shall provide and pay for all materials, labor, tools, equipment, water, light, power, transportation, superintendents, temporary construction of every nature, and all other services and facilities of every nature whatsoever necessary to execute, complete and deliver the work within the specified time. b. Any work necessary to be performed after regular working hours,on Sundays or Legal Holidays, shall be performed without additional expense to the OWNER. 19. CONTRACTOR'S TITLE TO MATERIALS No materials or supplies for the work shall be purchased by the CONTRACTOR or by any Subcontractor subject to any chattel mortgage or under a conditional sale Contract or other agreement by which an interest is retained by the seller. The CONTRACTOR warrants that he has good title to all materials and supplies used by him in the work,free from all liens, claims or encumbrances. 20. INSPECTION AND TESTING OF MATERIALS All materials, equipment, etc., used in the construction of the project shall be subject to adequate inspection and testing in accordance with accepted standards and frequency, or as required by the contract documents. The CONTRACTOR shall make all arrangements for such tests and inspections with a local independent testing laboratory acceptable to the OWNER, and the CONTRACTOR shall bear all related costs of tests and inspections. If such procedures for testing and inspection reveal failure to comply with accepted standards or with requirements established by the contract documents, all re- F-5 testing and re-inspection costs made necessary by such failure, including those of related procedures, shall also be at CONTRACTOR'S expense. If the ENGINEER and/or OWNER determines that portions of the project requires additional testing or inspection not included in CONTRACTOR'S original bid, the ENGINEER shall, upon written authorization from the OWNER, instruct the CONTRACTOR to make arrangements for additional testing and inspection. The costs for such additional testing and inspection shall be at OWNER'S expense. The CONTRACTOR'S independent testing laboratory shall give timely notice to the CONTRACTOR and the ENGINEER of when and where tests and inspections are to be made so that the CONTRACTOR and the ENGINEER may be present for such procedures. If the ENGINEER is to observe tests and inspections, the ENGINEER will do so promptly and, where practical, at the normal pace of testing. Tests and inspections shall be made promptly to avoid unreasonable delays on the project. Required certificates and/or reports of all test and inspections shall, unless otherwise required by the contract documents, be promptly delivered by the independent testing laboratory to the CONTRACTOR, the ENGINEER, and the OWNER. 21. "OR EQUAL" CLAUSE Whenever a material, article or piece of equipment is identified on the Plans or in the Specifications by reference to manufacturers' or vendors' names, trade names, catalogue numbers, etc., it is intended merely to establish a standard; and, any material, article or equipment of other manufacturers and vendors which will perform adequately the duties imposed by the general design will be considered equally acceptable provided the material, article or equipment so proposed is, in the opinion of the Architect/Engineer, of equal substance and function. It shall not be purchased or installed by the CONTRACTOR without the Architect/Engineer's written approval. 22. PATENTS a. The CONTRACTOR shall hold and save the OWNER and its Officers, Agents, Servants and Employees harmless from liability of any nature or kind, including cost and expenses for, or on account of, any patented or unpatented invention, process, article or appliance manufactured or used in the performance of the Contract, including its use by the OWNER, unless otherwise specifically stipulated in the Contract Documents. b. License or Royalty Fees: License and/or royalty fees for the use of a process which is authorized by the OWNER of the project must be reasonable and paid to the holder of the patent, or his authorized licensee, direct by the OWNER and not by or through the CONTRACTOR. F-6 c. If the CONTRACTOR uses any design, device or materials covered by letters patent or copyright, he shall provide for such use by suitable agreement with the OWNER of such patented or copyrighted design, device or material. It is mutually agreed and understood that, without exception, the Contract prices shall include all royalties or costs arising from the use of such design, device or materials in any way involved in the work. The CONTRACTOR and/or his Sureties shall indemnify and save harmless the OWNER of the project from any and all claims for infringement by reason of the use of such patented or copyrighted design, device or materials or any trademark or copyright in connection with work agreed to be performed under this Contract, and shall indemnify the OWNER for any cost, expense or damage which it may be obliged to pay by reason of such infringement at any time during the prosecution of the work or after completion of the work. 23. SURVEYS Unless otherwise expressly provided for in the Specifications, the OWNER will furnish to the CONTRACTOR all surveys necessary for the execution of the work. 24. CONTRACTOR'S OBLIGATIONS The CONTRACTOR shall and will, in good workmanlike manner, do and perform all work and furnish all supplies and materials, machinery, equipment, facilities and means, except as herein otherwise expressly specified, necessary or proper to perform and complete all the work required by this Contract, within the time herein specified, in accordance with the provisions of this Contract and said Specifications and in accordance with the Plans and drawings covered by this Contract and any and all supplemental Plans and drawings, and in accordance with the directions of the Architect/Engineer as given from time to time during the progress of the work. He shall furnish, erect, maintain and remove such construction plant and such temporary works as may be required. The CONTRACTOR shall observe, comply with and be subject to all terms, conditions, requirements and limitations of the Contract and Specifications, and shall do, carry on and complete the entire work to the satisfaction of the Architect/Engineer and the OWNER. 25. INSURANCE The CONTRACTOR shall not commence work under this Contract until he has obtained all the insurance required herein and such insurance has been approved by the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence work on this Subcontract until the insurance required of the Subcontractor has been so obtained and approved. (See information to Bidders, Paragraph 5.) 26. SPECIAL CONDITIONS PERTAINING TO HAZARDS, SAFETY STANDARDS,AND ACCIDENT PREVENTION (a) Danger Signals and Safety Devices (Modify as Required): F-7 The CONTRACTOR shall make all necessary precautions to guard against damages to property and injury to persons. He shall put up and maintain in good condition, sufficient red or warning lights at night, suitable barricades and other devices necessary to protect the public. In case the CONTRACTOR fails or neglects to take such precautions, the OWNER may have such lights and barricades installed and charge the cost of this work to the CONTRACTOR. Such action by the OWNER does not relieve the CONTRACTOR of any liability incurred under these Specifications or Contract. (b) Use of Explosives: When the use of explosives is necessary for the prosecution of the work, the CONTRACTOR shall observe all local, State and Federal laws in purchasing and handling explosives. The CONTRACTOR shall take all necessary precautions to protect completed work, neighboring property, water lines or other underground structures. Where there is danger to structures or property from blasting, the charges shall be reduced and the material shall be covered with suitable timber,steel or rope mats. The CONTRACTOR shall notify all OWNER'S of public utility property of the intention to use explosives at least eight (8) hours before blasting is done, close to such property. Any supervision or direction of use of explosives by the Engineer does not in any way reduce the responsibility of the CONTRACTOR or his Surety for damages that may be caused by such use. 27. SUSPENSION OF WORK Should the OWNER be prevented or enjoined from proceeding with work or from authorizing its prosecution either before or after its prosecution, by reason of any litigation,the CONTRACTOR shall not be entitled to make or assert claim for damage by reason of said delay, but time for completion of the work will be extended to such reasonable time as the OWNER may determine will compensate for time lost by such delay with such determination to be set forth in writing. 28. SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION In order to protect the lives and health of his Employees under the Contract, the CONTRACTOR shall comply with all pertinent provisions of the Contract Work Hours and Safety Standards Act, as amended, commonly known as the Construction Safety Act as pertains to health and safety standards; and shall maintain an accurate record of all cases of death, occupational disease and injury requiring medical attention or causing loss of time from work, arising out of and in the course of employment on work under the Contract. The CONTRACTOR alone shall be responsible for the safety, efficiency and adequacy of his plant, appliances and methods, and for any damage which may result from their failure or their improper construction, maintenance or operation. F-8 29. USE AND OCCUPANCY PRIOR TO ACCEPTANCE BY OWNER The CONTRACTOR agrees to the use and occupancy of a portion or unit of the project before formal acceptance by the OWNER, provided the OWNER: a. Secures written consent of the CONTRACTOR except in the event, in the opinion of the Architect/Engineer, the CONTRACTOR is chargeable with unwarranted delay in completing the contract requirements; b. Secures consent of the Surety; c. Secures endorsement from the insurance carrier(s) permitting occupancy of the building or use of the project during the remaining period of construction; or, d. When the project consists of more than one (1) building and one of the buildings is occupied, secures permanent fire and extended coverage insurance, including a permit from the insurance carrier to complete construction. 30. USE OF PREMISES AND REMOVAL OF DEBRIS The CONTRACTOR expressly undertakes at his own expense: a. To take every precaution against injuries to persons or damage to property; b. To store his apparatus, materials, supplies and equipment in such orderly fashion at the site of the work as will not unduly interfere with the progress of his work or the work of any other CONTRACTOR'S; c. To place upon the work or any part thereof only such loads as are consistent with the safety of that portion of the work; d. To clean up frequently all refuse, rubbish, scrap materials and debris caused by his operations, to the end that at all times the site of the work shall present a neat,orderly and workmanlike appearance; e. Before final payment to remove all surplus material, false work, temporary structures, including foundations thereof, plant of any description and debris of every nature resulting from his operations, and to put the site in a neat, orderly condition; f. To effect all cutting, fitting or patching of his work required to make the same to conform to the Plans and Specifications and, except with the consent of the Architect/Engineer, not to cut or otherwise alter the work of any other CONTRACTOR. 31. QUANTITIES OF ESTIMATE F-9 Wherever the estimated quantities of work to be done and materials to be furnished under this Contract are shown in any of the documents including the proposal, they are given for use in comparing bids and the right is especially reserved, except as herein otherwise specifically limited, to increase or diminish them as may be deemed reasonably necessary or desirable by the OWNER to complete the work contemplated by the Contract, and such increase or diminution shall in no way vitiate this Contract, nor shall any such increase or diminution give cause for claims or liability for damages. 32. LANDS AND RIGHTS-OF-WAY Prior to the start of construction,the OWNER shall obtain all lands and rights-of- way necessary for the carrying out and completion of work to be performed under this CONTRACT. 33. NOTICE AND SERVICE THEREOF Any notice to any CONTRACTOR from the OWNER relative to any part of this Contract shall be in writing and considered delivered and the service thereof completed when said notice is posted, by certified or registered mail, to the said CONTRACTOR at his last given address, or delivered in person to the said CONTRACTOR or his authorized representative on the work. 34. SEPARATE CONTRACT The CONTRACTOR shall coordinate his operations with those of other CONTRACTORS. Cooperation will be required in the arrangement for the storage of materials and in the detailed execution of the work. The CONTRACTOR, including his Subcontractors, shall keep informed of the progress and the detail work of other CONTRACTORS and shall notify the Architect/Engineer immediately of lack of progress or effective workmanship on the part of other CONTRACTORS. Failure of a CONTRACTOR to keep informed of the work progressing on the site and failure to give notice of lack of progress or defective workmanship by others shall be construed as acceptance by him of the status of the work as being satisfactory for proper coordination with his own work. 35. SUBCONTRACTING a. The CONTRACTOR may utilize the services of specialty Subcontractors on those parts of work which, under normal contracting practices, are performed by specialty Subcontractors. b. The CONTRACTOR shall not award any work to any Subcontractor without prior written approval of the OWNER, which approval will not be given until the CONTRACTOR submits to the OWNER a written statement concerning the proposed award to the Subcontractor, which statement shall contain such information as the OWNER may require. F-10 c. The CONTRACTOR shall be as fully responsible to the OWNER for the acts or omissions of his Subcontractors, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him. d. The CONTRACTOR shall cause appropriate provisions to be inserted in all Subcontracts relative to the work to bind Subcontractors to the CONTRACTOR by the terms of the General Conditions and other Contract Documents insofar as applicable to the work of Subcontractors, and to give the CONTRACTOR the same power as regards terminating any Subcontract that the OWNER may exercise over the CONTRACTOR under any provision of the Contract Documents. e. Nothing contained in this Contract shall create any contractual relation between any Subcontractor and the OWNER. 36. ARCHITECT/ENGINEER'S AUTHORITY The Architect/Engineer shall give all orders and directions contemplated under this Contract and Specifications, relative to the execution of the work. The Architect/Engineer shall determine the amount, quality, acceptability and fitness of the several kinds of work and materials which are to be paid for under this Contract, and shall decide all questions which may arise in relation to said work and the construction thereof. The Architect/Engineers estimates and decisions shall be final and conclusive, except as herein otherwise expressly provided. In case any question shall arise between the parties hereto relative to said Contract or Specifications, the determination or decision of the Architect/Engineer shall be a condition precedent to the right of the CONTRACTOR to receive any money or payment for work under this Contract affected in any manner or to any extent by such question. 37. MEANING OF INTENT The Architect/Engineer shall decide the meaning and intent of any portion of the Specifications and of any Plans or drawings where the same may be found obscure or be in dispute. Any differences or conflicts in regard to their work which may arise between the CONTRACTOR, under this Contract and other CONTRACTOR'S, performing work for the OWNER, shall be adjusted and determined by the Architect/Engineer. 38. CONTRACT SECURITY If the Contract amount exceeds Fifty Thousand Dollars [$50,000.00], a Payment Bond shall be furnished, and if the contract exceeds One Hundred Thousand Dollars [$100,000.00], a Performance Bond also shall be furnished, on prescribed forms in the amount of one hundred percent (100%) of the Contract price or in a penal sum not less than that prescribed by State, territorial or local law, as security for the payment of all persons performing labor on the project under this Contract and furnishing materials in connection with this Contract and as security for the faithful performance of this Contract. F-11 39. ADDITIONAL OR SUBSTITUTE BOND If at any time the OWNER, for justifiable cause, shall be or become dissatisfied with any Surety or Sureties for the Performance and/or Payment Bonds, the CONTRACTOR shall, within five (5) days after notice from the OWNER to do so, substitute an acceptable bond (or bonds) in such form and sum and signed by such other Surety or Sureties as may be satisfactory to the OWNER. The premiums on such bond shall be paid by the CONTRACTOR. No further payments shall be deemed due nor shall be made until the new Surety and Sureties shall have furnished such an acceptable bond to the OWNER. 40. ASSIGNMENTS The CONTRACTOR shall not assign the whole or any part of this Contract or any monies due or to become due hereunder without written consent of the OWNER. In case the CONTRACTOR assigns all or any part of any monies due or to become due under this Contract,the instrument of assignment shall contain a clause substantially to the effect that it is agreed that the right of the assignee in and to any monies due or to become due to the CONTRACTOR shall be subject to prior claims of all persons, firms and corporations of services rendered or materials supplied for the performance of the work called for in this Contract. 41. MUTUAL RESPONSIBILITY OF CONTRACTORS If, through acts of neglect on the part of the CONTRACTOR, any other CONTRACTOR or any Subcontractor shall suffer loss or damage on the work, the CONTRACTOR agrees to settle with such other CONTRACTOR or Subcontractor by agreement or arbitration if such other CONTRACTOR or Subcontractor will so settle. If such other CONTRACTOR or Subcontractor shall assert any claim against the OWNER on account of any damage alleged to have been sustained, the OWNER shall notify the CONTRACTOR, who shall indemnify and safe harmless the OWNER against any such claim. 42. ACCEPTANCE OF FINAL PAYMENT CONSTITUTES RELEASE The Acceptance by the CONTRACTOR of final payment shall be and shall operate as a release to the OWNER of all claims and all liability to the CONTRACTOR for all things done or furnished in connection with this work and for every act and neglect of the OWNER and others relating to or arising out of this work. No payment, however, final or otherwise, shall operate to release the CONTRACTOR or his Sureties from any obligations under this Contract or the Performance and Payment Bonds. 43. PAYMENTS BY CONTRACTOR The CONTRACTOR shall pay (a) for all transportation and utility services no later than the thirty(30) calendar days from the date of submission to the City of Port Arthur, (b) for all materials, tools and other expendable equipment to the extent of ninety percent (90%0) cost thereof, no later than the 20th day of the F-12 calendar month following that in which such materials, tools and equipment are delivered at the site of the project, and the balance of the cost thereof, no later than the 30th day following the completion of that part of the work in or on which such materials, tools and equipment are incorporated or used; and (c) to each of his Subcontractors, no later than the 5th day following each payment to the CONTRACTOR, the respective amounts allowed the CONTRACTOR on account of the work performed by his Subcontractors to the extent of each Subcontractors' interest therein. 44. CONSTRUCTION SCHEDULE AND PERIODIC ESTIMATES Immediately after execution and delivery of the Contract, and before the first partial payment is made, the CONTRACTOR shall deliver to the OWNER an estimated construction progress schedule in form satisfactory to the OWNER, showing the proposed dates of commencement and completion of each of the various subdivisions of work required under the Contract Documents and the anticipated amount of each monthly payment that will become due the CONTRACTOR in accordance with the progress schedule. The CONTRACTOR shall also furnish on forms to be supplied by the OWNER: (a) a detailed estimate giving a complete breakdown of the Contract price; and (b) periodic itemized estimates of work done for the purpose of making partial payments thereon. The costs employed in making up any of these schedules will be used only for determining the basis of partial payments and will not be considered as fixing a basis for additions to or deductions from the Contract price. 45. PAYMENTS TO CONTRACTOR a. Not later than the thirty (30) calendar days from the date of submission to the CITY OF PORT ARTHUR, the OWNER shall make a progress payment to the CONTRACTOR on the basis of a duly certified and approved estimate of the work performed during the preceding calendar month under this Contract, but to insure the proper performance of the Contract, the OWNER shall retain Ten percent (10%) [five percent {5%} if the total contract price exceeds $25,000] of the amount of each estimate until final completion and acceptance of all work covered by this Contract; Provided, that the CONTRACTOR shall submit his estimate no later than the fifth (5th) day of the month. Provided further, that on completion and acceptance of each separate building, public work or other division of the Contract on which the price is stated separately in the Contract, payment may be made in full, including retained percentages thereon, less authorized deductions. The CONTRACTOR is advised that the payment schedule noted in the paragraph is subject to fluctuation due to the City Council's regular schedule of meeting on the second and forth Mondays of each month. The CONTRACTOR may alter his estimate period such as to give the Engineer ten (10) working days prior to the next scheduled City Council meeting to prepare an estimate of the work completed and submit said estimate for the OWNERS action. b. In preparing estimates, the material delivered on the site and preparatory work done may be taken into consideration. F-13 c. All material and work covered by partial payments made shall thereupon become the sole property of the OWNER, but this provision shall not be construed as relieving the CONTRACTOR from the sole responsibility for the care and protection of materials and work upon which payments have been made or the restoration of any damaged work or as a waiver of the right of the OWNER to require the fulfillment of all of the terms of the Contract. d. OWNER'S Right to Withhold Certain Amounts and Make Application Thereof: The CONTRACTOR agrees that he will indemnify and save the OWNER harmless from all claims growing out of the lawful demands of Subcontractors, laborers, workmen, mechanics, materialmen and furnishers of machinery and parts thereof, equipment, power tools and all supplies, including commissary, incurred in the furtherance of the performance of this Contract. The CONTRACTOR shall, at the OWNER'S request, furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If the CONTRACTOR fails to do so, then the OWNER may, after having served written notice on the said CONTRACTOR, either pay unpaid bills, of which the OWNER has written notice, direct, or withhold from the CONTRACTOR'S unpaid compensation a sum of money deemed reasonably sufficient to pay any and all such lawful claims until satisfactory evidence is furnished that all liabilities have been fully discharged whereupon payment to the CONTRACTOR shall be resumed, in accordance with the terms of this Contract, but in no event shall the provisions of this sentence be construed to impose any obligations upon the OWNER to either the CONTRACTOR or his Surety. In paying any unpaid bills of the CONTRACTOR, the OWNER shall be deemed the agent of the CONTRACTOR, and any payment so made by the OWNER shall be considered as a payment made under Contract by the OWNER to the CONTRACTOR and the OWNER shall not be liable to the CONTRACTOR for any such payments made in good faith. This provision shall not be construed to give rise to any third party beneficiary rights in claimants. 46. CORRECTION OF WORK All work, all materials, whether incorporated in the work or not, all processes of manufacture and all methods of construction shall be at all times and places subject to the inspection of the Architect/Engineer who shall be the final judge of the quality and suitability of the work, materials, processes of manufacture and methods of construction for the purposes for which they are used. Should they fail to meet his approval, they shall be forthwith reconstructed, made good, replaced and/or corrected, as the case may be, by the CONTRACTOR at his own expense. Rejected material shall immediately be removed from the site. If, in the opinion of the Architect/Engineer, it is undesirable to replace any defective or damaged materials or to reconstruct or correct any portion of the work injured or not performed in accordance with the Contract Documents, the compensation to be paid to the CONTRACTOR hereunder shall be reduced by such amount as in the judgement of the Architect/Engineer shall be equitable. 47. SUBSURFACE CONDITIONS FOUND DIFFERENT F-14 Should the CONTRACTOR encounter subsurface and/or latent conditions at the site materially differing from those shown on the Plans or indicated in the Specifications, he shall immediately give notice to the Architect/Engineer of such conditions before they are disturbed. The Architect/Engineer will thereupon promptly investigate the conditions and, if he finds that they materially differ from those shown on the Plans or indicated in the Specifications, he will at once make such changes in the Plans and/or Specifications as he may find necessary, any increase or decrease of cost resulting from such changes to be adjusted in the manner provided in Paragraph 49 of the General Conditions. 48. CLAIMS FOR EXTRA COST No claim for extra work or cost shall be allowed unless the same was done pursuant to a written order of the Architect/Engineer approved by the OWNER, as aforesaid, and the claim presented with the first estimate after the changed or extra work is done. When work is performed under the terms of Subparagraph 49(c) of the General Conditions,the CONTRACTOR shall furnish satisfactory bills, payrolls and vouchers covering all items of cost and when requested by the OWNER,give the OWNER access to accounts relating thereto. 49. CHANGES IN WORK No changes in the work covered by the approved Contract Documents shall be made without having prior written approval of the OWNER. Charges or credit for the work covered by the approved change shall be determined by one or more, or a combination of the following methods: a. Unit bid prices previously approved. b. An agreed lump sum. c. The actual cost of: (1) Labor, including foreman; (2) Materials entering permanently into the work; (3) The ownership or rental cost of construction plant and equipment during the time of use on the extra work; (4) Power and consumable supplies for the operation of power equipment; (5) Insurance; (6) Social Security and old age unemployment contributions. To the cost under (c.)there shall be added a fixed fee to be agreed upon but not to exceed fifteen percent (15%) of the work. The fee shall be compensation to cover the cost of supervision, overhead, bond, profit and any other general expenses. 50. EXTRAS Without invalidating the Contract, the OWNER may order extra work or make changes by altering, adding to or deducting from the work, the Contract sum being adjusted accordingly, and the consent of the Surety being first obtained F-15 where necessary or desirable. All the work of the kind bid upon shall be paid for at the price stipulated in the proposal, and no claims for any extra work or materials shall be allowed unless the work is ordered in writing by the OWNER or its Architect/Engineer, acting officially for the OWNER, and the price is stated in such order. 51. TIME FOR COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed, by and between the CONTRACTOR and the OWNER, that the date of beginning and the time for completion as specified in the Contract of the work to be done hereunder are ESSENTIAL CONDITIONS of this Contract; and it is further mutually understood and agreed that the work embraced in this Contract shall be commenced on a date to be specified in the "Notice to Proceed". The CONTRACTOR agrees that said work shall be prosecuted regularly, diligently and without interruption at such rate of progress as will ensure full completion thereof within the time specified. It is expressly understood and agreed, by and between the CONTRACTOR and the OWNER, that the time for the completion of the work described herein is a reasonable time for the completion of same, taking into consideration the average climatic range and usual industrial conditions prevailing in this locality. If the said CONTRACTOR shall neglect, fail or refuse to complete the work within the time herein specified, or any proper extension thereof granted by the OWNER, then the CONTRACTOR does hereby agree, as a part consideration for the awarding of this Contract, to pay to the OWNER the amount specified in the Contract, not as a penalty, but as liquidated damages for such breach of Contract as hereinafter set forth, for each and every consecutive calendar day, including, but not limited to, all Saturdays, Sundays, and Federal, State, and City holidays and that the CONTRACTOR shall be in default after the time stipulated in the Contract for completing the work. The said amount is fixed and agreed upon by and between the CONTRACTOR and the OWNER because of the impracticability and extreme difficulty of fixing and ascertaining the actual damages the OWNER would in such event sustain, and said amount is agreed to be the amount of damages which the OWNER would sustain and said amount shall be retained from time to time by the OWNER from current periodical estimates. It is further agreed that time is of the essence of each and every portion of this Contract and of the Specifications wherein a definite and certain length of time is fixed for the performance of any act whatsoever; and where under the Contract an additional time is allowed for the completion of any work, the new time limit fixed by such extension shall be of the essence of this Contract. Provided,that the CONTRACTOR shall not be charged with any part of liquidated damages or any excess cost when the OWNER determines that any part of liquidated damages was not the fault of the CONTRACTOR and the OWNER determines that the request for extension by the CONTRACTOR is justified and due to: F-16 a. Any preference, priority or allocation order duly issued by the government; b. The following unforeseeable causes, namely: acts of the public enemy, acts of the OWNER, acts of another CONTRACTOR in the performance of a Contract with the OWNER, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, earthquakes, hurricanes and tornadoes; and rainy days claimed by the CONTRACTOR; however, rainy days shall be considered only if the CONTRACTOR notifies the Engineer or OWNER on the day the CONTRACTOR claims he cannot work because of rainy weather that day. Failure to so report will eliminate any claim for time extension because of rainy weather on that day. c. Rainy weather when 60 percent of his work force cannot work for seven (7) hours or more that day because of rainy weather and providing that he has complied with the condition under 51(b). d. Any delays of Subcontractors or suppliers occasioned by any of the causes specified in Subsections (a.) and (b.) of this Article. It is also agreed that for each five (5) regular days of work lost due to any of the foregoing reasons, seven (7) calendar days will be added to the contract time (or 1.4 calendar days added for each one (1) regular day of work lost). Fractional calendar days will be rounded to the nearest whole number of days. Provided, further, that the CONTRACTOR shall, within ten (10) days from the beginning of such delay, unless the OWNER shall grant a further period of time prior to the date of final settlement of the Contract, notify the OWNER, in writing, of the causes of delay, who shall ascertain the facts and extent of the delay and notify the CONTRACTOR within reasonable time of its decision in the matter. Provided, that this provision for liquidated damages shall be cumulative of and not in limitation of any other remedy available to OWNER, including, without limitation, the right to terminate as provided in Paragraph 3 and to recover additional damages for any excess cost in otherwise completing the work. 52. WEATHER CONDITIONS In the event of temporary suspension of work, or during inclement weather, or whenever the Architect/Engineer shall direct, the CONTRACTOR will, and will cause his Subcontractors to, protect carefully his, and their, work and materials against damage or injury from the weather. If, in the opinion of the Architect/Engineer, any work or materials shall have been damaged or injured by reason of failure on the part of the CONTRACTOR or any of his Subcontractors so to protect his work,such materials shall be removed and replaced at the expense of the CONTRACTOR. 53. PROTECTION OF WORK AND PROPERTY- EMERGENCY F-17 The CONTRACTOR shall at all times safely guard the OWNER'S property from injury or loss in connection with this Contract. He shall at all times safely guard and protect his own work, and that of adjacent property, from damage. The CONTRACTOR shall replace or make good any such damage, loss or injury unless such be caused directly by errors contained in the Contract or by the OWNER, or his duly authorized representatives. In case of an emergency which threatens loss or injury of property and/or safety of life, the CONTRACTOR will be allowed to act, without previous instructions from the Architect/Engineer, in a diligent manner. He shall notify the Architect/Engineer immediately thereafter. Any claim for compensation by the CONTRACTOR due to such extra work shall be promptly submitted to the Architect/Engineer for approval. Where the CONTRACTOR has not taken action but has notified the Architect/Engineer of an emergency threatening injury to persons or damage to the work or any adjoining property, he shall act as instructed or authorized by the Architect/Engineer. The amount of reimbursement claimed by the CONTRACTOR on account of any emergency action shall be determined in the manner provided in Paragraph 49 of the General Conditions. 54. INSPECTION The authorized representatives and agents of the OWNER shall be permitted to inspect all work, materials, payrolls, records of personnel, invoices of materials and other relevant data and records. 55. SUPERINTENDENCE BY CONTRACTOR At the site of the work, the CONTRACTOR shall employ a construction superintendent or foreman who shall have full authority to act for the CONTRACTOR. It is understood that such representative shall be acceptable to the Architect/Engineer and shall be one who can be continued in the capacity for the particular job involved unless he ceases to be on the CONTRACTOR'S payroll. 56. UNDERPAYMENTS OF WAGES OR SALARIES In case of underpayment of wages by the CONTRACTOR or by any Subcontractor to laborers or mechanics employed by the CONTRACTOR or Subcontractor upon the work covered by the Contract, the OWNER, in addition to such other rights as may be afforded it under this Contract, shall withhold from the CONTRACTOR, out of any payments due the CONTRACTOR, so much thereof as the OWNER may consider necessary to pay such laborers or mechanics the full amount of wages required by this Contract. The amount so withheld may be disbursed by the OWNER for and on account of the CONTRACTOR or the Subcontractor (as may be appropriate), to the respective laborers or mechanics to whom the same is due or on their behalf to Plans, funds F-18 or programs for any type of fringe benefit prescribed in the applicable wage determination. 57. EMPLOYMENT OF CERTAIN PERSONS PROHIBITED No person under the age of sixteen (16) years and no person who, at the time, is serving sentence in a penal or correctional institution shall be employed on the work covered by this Contract. 58. EMPLOYMENT OF LABORERS OR MECHANICS NOT LISTED IN AFORESAID WAGE DETERMINATION DECISION Any class of laborers or mechanics which is not listed in the wage determination, and which is to be employed under the Contract will be classified or reclassified conformably to the wage determination by the OWNER. 59. FRINGE BENEFITS NOT EXPRESSED AS HOURLY WAGE RATES The OWNER shall require, whenever the minimum wage rate prescribed in the Contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly wage rate and the CONTRACTOR is obligated to pay cash equivalent of such a fringe benefit, an hourly cash equivalent thereof to be established. 60. POSTING WAGE DETERMINATION DECISIONS AND AUTHORIZED WAGE DEDUCTIONS The applicable wage poster and the applicable wage determination decisions, with respect to the various classification of laborers and mechanics employed and to be employed upon the work covered by this Contract, and a statement showing all deductions, if any, in accordance with the provisions of this Contract, to be made from wages actually earned by persons so employed or to be employed in such classifications, shall be posted at appropriate conspicuous points at the site of the work. 61. COMPLAINTS, PROCEEDINGS OR TESTIMONY BY EMPLOYEES No laborer or mechanic to whom the wage, salary or other labor standards provisions of this Contract are applicable shall be discharged or in any other manner discriminated against by the CONTRACTOR or any Subcontractor because such employee has filed any complaint or instituted or caused to be instituted any proceeding or has testified or is about to testify in any proceeding under or relating to the labor standards applicable under this Contract to his employer. 62. CLAIMS AND DISPUTES PERTAINING TO WAGE RATES Claims and disputes pertaining to wage rates or to classifications of laborers and mechanics employed upon the work covered by this Contract shall be promptly reported by the CONTRACTOR in writing to the OWNER for referral by the latter. F-19 63. PAYROLLS AND BASIC PAYROLL RECORDS OF CONTRACTOR AND SUBCONTRACTORS The CONTRACTOR and each Subcontractor shall prepare his payrolls on forms satisfactory to and in accordance with instructions to be furnished by the OWNER. The payrolls and basic payroll records of the CONTRACTOR and each Subcontractor covering all laborers and mechanics employed upon the work covered by this Contract shall be maintained during the course of the work and preserved for a period of three (3) years thereafter. Such payrolls and basic payroll records shall contain the name and address of each employee, his correct classification, rate of pay (including rates of contributions or costs anticipated of the types described in Section 1 (b) (2) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. The CONTRACTOR and each Subcontractor shall make his employment records, with respect to persons employed by him upon the work covered by this Contract, available for inspection by authorized representatives of the OWNER. Such representative shall be permitted to interview employees of the CONTRACTOR of any Subcontractors during working hours on the job. 64. SPECIFIC COVERAGE OF CERTAIN TYPES OF WORK BY EMPLOYEES The transporting of material and supplies to or from the site of the project or program to which the Contract pertains by the employees of the CONTRACTOR or of any Subcontractor and the manufacturing or furnishing of materials, articles,supplies or equipment on the site of the project or program to which this Contract pertains by persons employed by the CONTRACTOR or by an Subcontractor, shall, for the purposes of this Contract, and without limiting the generality of the foregoing provisions of this Contract, shall be deemed to be work to which the wage provisions of this Contract are applicable. 65. INELIGIBLE SUBCONTRACTORS The CONTRACTOR shall not subcontract any part of the work covered by this Contract or permit subcontracted work to be further subcontracted without the OWNER'S prior written approval of the Subcontractor. 66. PROVISIONS TO BE INCLUDED IN CERTAIN SUBCONTRACTS The CONTRACTOR shall include or cause to be included in each subcontract covering any of the work covered by this Contract, provisions which are consistent with these wage provisions and also a clause requiring the Subcontractors to include such provisions in any lower tier Subcontractors which they may enter into,together with a clause requiring such insertion in any further Subcontracts that may in turn be made. 67. BREACH OF FOREGOING WAGE STANDARDS AND RATES PROVISIONS In addition to the causes for termination of this Contract as herein elsewhere set forth, the OWNER reserves the right to terminate this Contract if the CONTRACTOR or any Subcontractor, whose Subcontractor covers any of the F-20 work covered by this Contract, shall breach any of these wage standards and rates provisions. 68. EQUAL EMPLOYMENT OPPORTUNITY During the performance of this Contract,the CONTRACTOR agrees as follows: (a) The CONTRACTOR shall not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin. The CONTRACTOR shall take affirmative action to ensure that applicants for employment are employed and that employees are treated during employment without regard to their race, color, religion, sex or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The CONTRACTOR agrees to post in conspicuous places available to employees and applicant for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (b) The CONTRACTOR will, in all solicitations or advertisements for employees placed by or on behalf of the CONTRACTOR, state that all qualified applicants will receive consideration for employment without regard to race, religion,sex,color or national origin. (c) The CONTRACTOR will send to each labor union or representative of workers with which he has a collective bargaining agreement or other Contract or understanding, a notice to be provided advising the labor union or workers representative of the CONTRACTOR'S commitments under Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (d) The CONTRACTOR will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules and regulations and relevant orders of the Secretary of Labor. (e) The CONTRACTOR will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the Department of Housing and Urban Development and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations and orders. (f) In the event of the CONTRACTOR'S noncompliance with the nondiscrimination clauses of this Contract or with any of such rules, regulations or orders, this Contract may be cancelled, terminated or suspended in whole or in part, and the CONTRACTOR may be declared ineligible for further government Contracts or federally-assisted construction Contracts, in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order No. F-2 1 11246 of September 24, 1965, or by rule, regulation or order of the Secretary of Labor or as otherwise provided by law. (g) The CONTRACTOR will include the provisions or Paragraphs (a) through (g) in every Subcontract or purchase order unless exempted by rules, regulations or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order No. 11246 of September 24, 1965, so that such provisions will be binding upon each Subcontractor or purchase order as the Department of Housing and Urban Development may direct as a means of enforcing such provisions, including sanctions for non-compliance: provided, however, that in the event the CONTRACTOR becomes involved in, or is threatened with, litigation with a Subcontractor or vendor as a result of such direction by the Department of Housing and Urban Development, the CONTRACTOR may request the United States to enter into litigation to protect the interests of the United States. 69. CIVIL RIGHTS ACT OF 1964 Under Chapter 106 of the Civil Practice & Remedies Code of the Revised Civil Statues of Texas, no person shall,on the ground of race, color, national origin,sex, age or handicap, be excluded from participation in, be denied the benefits of or be subjected to discrimination under any program or activity of the City. 70. CONFLICTING CONDITIONS IN CONTRACT DOCUMENTS The Contract Documents are complementary and what is called for by one shall be as binding as if called for by all. In case of a conflict between any of the Contract Documents, priority of interpretation shall be in the following order: Signed Agreement (including General Conditions), Performance Bond, Payment Bond, special Bonds (if any), Proposal, Special Conditions (including Information to Bidders), Advertisements for Bids, Detailed Drawings, Technical Specifications, General Drawings (Plans) and Supplemental General Conditions. 71. INDEMNIFICATION The CONTRACTOR shall defend, indemnify, and hold harmless the OWNER and the Engineer and their respective officers, agents, and employees, from and against all damages, claims, losses, demands, suits, judgements, and costs, including reasonable attorney's fees and expenses arising out of or resulting from the performance of the work, provided that any such damages, claim, loss, demand,suit,judgement,cost or expense: (a) Is attributable to bodily injury, sickness, disease, or death or to injury to or destruction of tangible property (other than the work itself) including the loss of use resulting therefrom; and, (b) Is caused in whole or in part by any negligent act or omission of the CONTRACTOR, or Subcontractor, anyone directly or indirectly employed by anyone of them for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder. F-22 The obligation of the CONTRACTOR under this Paragraph shall not extend to the liability of the Engineer, his agents or employees arising out of the preparation or approval of maps, drawings, reports, surveys, Change Orders, designs or Specifications, or the giving of or the failure to give directions or instructions by the Engineer, his agents or employees, provided such giving or failure to give is the primary cause of the injury or damage. 72. A.I.A. GENERAL CONDITIONS The General Conditions of the Contract for Construction, A.I.A. Document A201, 1987 Edition, as amended by current edition, of the American Institute of Architects, consisting of fourteen (14) Articles, Pages numbered 1 through 19, is hereby made a part of the Contract Documents of this project. Such A.I.A. General Conditions are cumulative to these General Conditions, but where any provision of said A.I.A. General Conditions are inconsistent or in conflict with these General Conditions, then these General Conditions shall prevail. All references to arbitration in said A.I.A. General Conditions are deleted and of no force and effect for purposes of this Contract. Further, Subdivisions 2.2.3 and 2.2.4 of said A.I.A. General Conditions are deleted and of no force and effect for purposes of this Contract. Article 1.3 (Ownership and Use of Documents) of the A.I.A. General Conditions is hereby deleted. 73. DELAYS The CONTRACTOR shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the CONTRACTOR is caused by the failure of the CITY to provide information or material, if any,which is to be furnished by the CITY OF PORT ARTHUR,When such extra compensation is claimed, a written statement thereof shall be presented by the CONTRACTOR to the Engineer and, if by him found correct, shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the CITY OF PORT ARTHUR, to provide material or necessary instructions for carrying on the work, then such delay will entitle the CONTRACTOR to an equivalent extension of time, his application for which shall, however, be subject to the approval of the CITY OF PORT ARTHUR; and no such extension of time shall release the CONTRACTOR or the Surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the Contract. 74. MAINTENANCE OF WORK If, after approval of final payment and prior to expiration of one (1) year after date of Substantial Completion or such longer period as may be prescribed by F-23 law or by any applicable special guarantee required by the Contract Documents, and work is found to be defective, CONTRACTOR shall promptly,without cost to OWNER and in accordance with the OWNER'S written instructions, correct such defective work. If CONTRACTOR does not promptly comply with such instructions, OWNER may have such defective work corrected and all direct and indirect costs of such removal and replacement, including compensation for additional professional services,shall be paid by CONTRACTOR. The provisions of this paragraph shall not limit the obligation of CONTRACTOR under Paragraph 15 (Guarantee of Work) in any respect whatsoever, including the time period of such Guarantee of Work provision in Paragraph 15 as will arise under the laws of the State of Texas and such Paragraph 15 and without regard to the provisions of this Paragraph (Maintenance of Work), nor shall this Paragraph (Maintenance of Work) be construed to establish any period of limitations for any cause of action against CONTRACTOR under the obligations of Paragraph 15. 75. ANTITRUST CONTRACTOR hereby assigns to OWNER any and all claims for overcharges associated with this Contract which arises under the antitrust laws of the United States,15 U.S.C.A. Sec.1,et seq. (1973). F-24 SECTION G SUPPLEMENTAL GENERAL CONDITIONS SUPPLEMENTAL GENERAL CONDITIONS - PART A A. NAME AND LOCATION OF PROJECT. Work covered by these TECHNICAL SPECIFICATIONS is entitled: SE H H DSC E DSC E E E S B. DESCRIPTIONOF WORK Contractor shall furnish all materials, appliances, tools, equipment, transportation,services, and all labor and superintendence necessary for the construction of work as described in these TECHNICAL SPECIFICATIONS, and as shown on the PLANS.Work, in general, consists of construction of a PLEASURE ISLAND MARINA REPAIRS. The completed installation shall not lack any part which can be reasonably implied as necessary to its proper functioning or any subsidiary item which is customarily furnished, and the Contractor shall deliver the installation to the OWNER in operating condition. C. PLANS. See Scope of Work- Section "S"and attached drawing D. BASIS OF PAYMENT. All work outlined in Paragraph B. above, and shown on PLANS listed in Paragraph C. above, is included in items of BID for which unit prices are shown,and these prices shall be basis of payment. E. OTHER CONTRACTS. Other construction may be underway concurrently in this area. Contractor shall afford utility companies and other Contractors reasonable opportunity for introduction and storage of their material and execution of their work. All work under this Contract must be properly connected and coordinated with that constructed by others. F. SEQUENCE OF WORK. CITY OF PORT ARTHUR reserves the right to schedule sequence of construction. G. SPECIAL PROVISIONS. Basic TECHNICAL SPECIFICATIONS Items which follow describe general requirements. When necessary, Special Provisions are inserted to describe additional requirements applicable to this Contract. Special Provisions are to be used in conjunction with basic TECHNICAL SPECIFICATION Items. In event of conflict between requirements of the Special Provisions and the basic TECHNICAL SPECIFICATION Item, the requirements as set forth in the Special Provisions shall govern. H. SUPPLEMENTAL PAY ITEMS. Approximate Quantity and a minimum Unit Price have been established for Supplemental Items shown in SECTION D - BID.The Contractor may not bid a unit price less than the minimum value; however, he may increase the minimum unit price. If no entry is made in the spaces provided, the minimum unit prices shown shall apply. These items are included to facilitate payment for charges and alterations that may be required to complete work. The G-1A actual work as provided by the GENERAL and SPECIAL CONDITIONS OF THE AGREEMENT and TECHNICAL SPECIFICATIONS and shown on PLANS is described in BID items other than Supplemental Pay Items. When work covered by Supplemental Items is requested by the Contractor and approved by the Engineer, payment will be based on the quantity actually constructed and Unit Prices bid in BID. I. AS-BUILT DIMENSIONS. Contractor to make daily measurements of facilities constructed and keep accurate records of location (horizontal and vertical) of all facilities. On completion of job, Contractor to furnish Owner with one (1) set of direct prints marked with red pencil to show as-built dimensions and location of all work constructed. J. SURVEY MONUMENTS. Contractor is to protect existing survey monuments consisting of right-of-way markers and horizontal and vertical control monuments in the vicinity of the project. All monuments destroyed during construction shall be replaced by the Owner and the Contractor shall pay all costs involved in restaking. G-2A SUPPLEMENTAL GENERAL CONDITIONS - PART B A. TECHNICAL SPECIFICATIONS 1. TECHNICAL SPECIFICATIONS are of the abbreviated, simplified, or streamlined type and include incomplete sentences. The omission of words or phrases such as "Contractor shall", "in conformity therewith", "shall be", "as noted on PLANS", "according to PLANS", "a", "an", "the", and "all", are intentional. Omitted words or phrases shall be supplied by inference in same matter as they are when a "note" occurs on PLANS. 2. The TECHNICAL SPECIFICATIONS are interpreted to require that Contractor shall provide all items, articles, materials, operation or methods listed, mentioned, or scheduled either on PLANS or specified herein,or both, including all labor, materials, equipment, and incidentals necessary or required for their completion. 3. Whenever the words "approved", "satisfactory", "designated", "submitted", "observed", or similar words or phrases are used, it shall be assumed that the word "Engineer" follows the verb as the object of the clause, such as "approved by Engineer". 4. All references to standard TECHNICAL SPECIFICATIONS or manufacturer's installation directions shall mean the latest edition thereof. 5. Referenced to technical society, organization, or body is made in TECHNICAL SPECIFICATIONS in accordance with following abbreviations: AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute ASTM American Society for Testing and Materials AWWA American Waterworks Association FS Federal Specifications PCA Portland Cement Association IEEE Institute of Electrical and Electronic Engineers NEC National Electric Code UL Underwriters' Laboratories A/SI American Iron and Steel Institute API American Petroleum Institute IPCEA Insulated Power Cable Engineers Association NEMA National Electrical Manufacturers Association AWS American Welding Society PCI Prestressed Concrete Institute A/SC American Institute of Steel Construction ANSI American National Standards Institute (Formerly ASA) 6. Some TECHNICAL SPECIFICATIONS items cover construction requirements and materials in comprehensive manner, and only pertinent portions of these items apply. G-1B B. LANDS FOR WORK. Owner provides, as indicated on PLANS, land upon which work is to be done, rights-of-way for access to same, and such other lands which are designated for use by Contractor. Contractor provides, at his expense and without liability of Owner, any additional land and access thereto that may be required for his construction operations, temporary construction facilities, or for storage of materials. C. LINES AND GRADES. From benchmarks and horizontal control references established by Engineer, stake out work, establish elevations, and assume responsibility for correctness of installation as to location and grade. Engineer will establish benchmarks and references for horizontal control on various projects as follows: 1. One Structure at Site. Benchmark and reference hubs at two corners of structure. 2. Two or More Structures. Benchmark and base line at site. 3. Sewer Lines. Benchmarks at intervals not exceeding 2,000 feet and reference hubs at manholes and on line at intervals not exceeding 200 feet. 4. Waterlines. Reference hubs at turns in line, valves, and fire hydrants, and benchmarks at intervals not exceeding 2,000 feet. 5. Pavements and Ditches. Reference hubs on centerline or one right-of-way line at the P.C., P.I., and P.T. of curves and on tangents at intervals not exceeding 200 feet. Benchmarks at intervals not exceeding 2,000 feet. 6. Engineer will set stakes one time only. Contractor must satisfy himself, before commencing work, as to meaning or correctness of all stakes or marks, and no claim will be entertained for or on account of any alleged inaccuracies, or for alterations subsequently rendered necessary on account of such alleged inaccuracies, unless Contractor notifies Engineer in writing before commencing to work thereon. Contractor is to protect stakes and pay all costs involved in any restaking. Stakes, as described above, will be furnished as required by Contractor within 48 hours after written notification to Engineer by Contractor on stake-out request forms provided by Engineer. Contractor to have a representative on job at time field party begins work. D. UTILITY SERVICES FOR CONSTRUCTION. Contractor will provide all utilities necessary for construction at no additional cost to Owner unless otherwise specified in preceding Special Provision. E. MATERIALS TESTING. All materials, equipment, etc., per scope of work, used in the construction of the project shall be subject to adequate inspection and testing in accordance with accepted standards and frequency, or as required by the contract documents. G-2B The CONTRACTOR shall make all arrangements for such tests and inspections with a local independent testing laboratory acceptable to the OWNER, and the CONTRACTOR shall bear all related costs of tests and inspections. If such procedures for testing and inspection reveal failure to comply with accepted standards or with requirements established by the contract documents, all re- testing and re-inspection costs made necessary by such failure, including those of related procedures,shall also be at CONTRACTOR'S expense. If the ENGINEER and/or OWNER determines that portions of the project requires additional testing or inspection not included in CONTRACTOR'S original bid, the ENGINEER shall, upon written authorization from the OWNER, instruct the CONTRACTOR to make arrangements for additional testing and inspection. The costs for such additional testing and inspection shall be at OWNER'S expense. The CONTRACTOR'S independent testing laboratory shall give timely notice to the CONTRACTOR and the ENGINEER of when and where tests and inspections are to be made so that the CONTRACTOR and the ENGINEER may be present for such procedures. If the ENGINEER is to observe tests and inspections, the ENGINEER will do so promptly and, where practical, at the normal pace of testing. Tests and inspections shall be made promptly to avoid unreasonable delays on the project. Required certificates and/or reports of all test and inspections shall, unless otherwise required by the contract documents, be promptly delivered by the independent testing laboratory to the CONTRACTOR, the ENGINEER, and the OWNER. F. VARIATIONS DUE TO EQUIPMENT. Foundations, structural supports, electrical work, and piping shown on PLANS for items of equipment may be changed if necessary to accommodate equipment furnished. Every effort has been made to design foundations, structural supports, electrical work, and piping to that no changes will be necessary; however, exact dimensions and size of subject foundations and structural supports and exact electrical and piping installations cannot be finally determined until various items of equipment are purchased and manufacturer's certified shop drawings are secured. Make changes, after prior consultation with Engineer, at no cost to Owner. If substitute items of equipment are authorized which vary materially from those shown on PLANS, prepare equipment data and detailed drawings covering necessary modifications and submit to Engineer for approval. Make drawings same size as Contract PLANS and of comparable quality. Make payment of charges resulting from modifications, including engineering charges for checking modifications. G. ALTERNATE DESIGNS. If alternate design features are proposed for convenience of Contractor, submit design calculations and detail drawings covering proposed changes and related modifications of Contract PLANS to Engineer for review. Make drawings same size as Contract PLANS and of G-3B comparable quality. Make payment of charges resulting from modifications, including engineering charges for checking such designs. H. SHOP DRAWINGS. Furnish engineer six (6) copies of shop and erection drawings, schedules, and data sheets covering items of construction and equipment listed below: 1. Structural and miscellaneous steel and steel tanks. 2. Architectural products. 3. Reinforcing steel 4. Prestressed reinforced concrete members. 5. Reinforced concrete pressure pipe. 6. Mechanical equipment, including valves and sluice gates. 7. Electrical equipment, including instruments. 8. Special items,as directed. Contractor will check and approve shop drawings for compliance with requirements of Contract and will so certify by stamp on each drawing prior to submittal to Engineer. Any drawings submitted without Contractor's stamp of approval will not be considered and will be returned to him for proper submission. Engineer will pass promptly upon drawings submitted, noting necessary corrections or revisions. If Engineer rejects drawings, resubmit corrected drawings until drawings are acceptable to Engineer as being in conformance with design concept of project and for compliance with information given in the Contract Documents. Such procedure shall not be considered cause for delay. Acceptance of drawings by Engineer does not relieve Contractor of any requirements of terms of Contract. OPERATION AND MAINTENANCE MANUALS. Operation and maintenance manuals are to be provided where required by Specification Item. 1. Contractor to be responsible for obtaining installation, operation, and maintenance manuals from manufacturers and suppliers for equipment furnished under the contract. Submit three (3) copies of each complete manual to the Engineer within ninety (90) days after approval of shop drawings, product data, and samples, and not later than the date of shipment of each item of equipment to the project site or storage location. 2. Operations and maintenance manuals specified hereinafter are in addition to any operation, maintenance, or installation instructions required by the Contractor to install,test, and start up equipment. 3. Each manual to be bound in a folder and labeled to identify the contents and project to which it applies. G-4B 4. The manual is to contain the following: (a) An 81-inch x 11-inch typewritten sheet listing the manufacturer's identification, including order number, model, and serial number and location of parts and service centers. (b) A separate 8' -inch x 11-inch typewritten list of recommended stock of parts, including part number and quantity. (c) Complete replacement parts list. (d) Performance data and rating tables. (e) Specific instructions for installation, operation, adjustment, and maintenance. J. COST BREAKDOWN. Within fifteen (15) days after execution of Contract, submit, in acceptable form,schedule showing subdivision of Contract into various items of permanent construction, stating quantities and prices, as basis for computing value to Owner of permanent usable parts of facility to be paid for on monthly estimates. No payment will be made to Contractor until such schedule has been submitted and approved. K. PROGRESS SCHEDULE. Within fifteen (15) days after execution of Contract, submit in acceptable form, anticipated progress schedule covering work to be performed. L. GUARANTEES. Guarantee work, including equipment installed, to be free from defects due to faulty workmanship or materials for period of one year from date of issue of Certificate of Acceptance. Upon notice from Owner, repair defects in all construction which develop during specified period at no cost to Owner. Neither final acceptance nor final payment nor any provision in Contract Documents relieves Contractor of above guarantee. Notice of observed defects will be given with reasonable promptness. Failure to repair or replace defect upon notice entitles Owner to repair or replace same and recover reasonable cost thereof from Contractor and/or his Surety. M. SITE MAINTENANCE AND CLEAN-UP. Maintain sites of work during construction to keep them reasonably neat and free of trash, rubbish, and other debris. In clean-up operations, remove from sites of work and from public and private property, temporary structures, rubbish, and waste materials. Dispose of excavated materials beyond that needed to bring site to elevations shown. During final clean-up, any road constructed by Contractor for access to construction site to be leveled and ruts filled so that natural surface drainage is not hindered. N. MATERIALS AND EQUIPMENT. Incorporate into work only new materials and equipment of domestic manufacture unless otherwise designated. Store these materials and equipment in manner to protect them from damages. Manner of protection subject to specific approval of Engineer. Pipe, fittings, equipment, and other serviceable materials found on site of work, or dismantled by reason of G-5B construction, remain property of Owner. Remove and deliver materials to Owner at designated points. Pay, at prevailing market price, for usable materials that are damaged through negligence. O. SUBSURFACE EXPLORATION. It is not represented that PLANS show all existing storm sewer, sanitary sewer, water, gas, telephone, and electrical facilities, and other underground structures. Determine location of these installations in way of construction by referring to available records, consulting appropriate municipal departments and utility owners, and by making necessary exploration and excavations. P. DEVIATIONS OCCASIONED BY UTILITY STRUCTURES. Whenever existing utilities, not indicated on PLANS, present obstructions to grade and alignment of pipe, immediately notify Engineer, who without delay, will determine whenever existing improvements are to be relocated, or grade and alignment of pipe changed. Where necessary to move services, poles, guy wires, pipelines, or other obstructions, make arrangements with owners of utilities. Owner will not be liable for damages on account of delays due to changes made by owners of privately owned utilities which hinder progress of work. Q. PROTECTION AND REPLACEMENT OF PROPERTY. Where necessary to take down fences, signs, or other obstructions, replace in their original condition and restore damaged property or make satisfactory restitution, at no cost to Owner. R. INTERRUPTION OF UTILITY SERVICES. Operate no valve or other control on existing systems. Exercise care in performing work so as not to interrupt service. Locate and uncover existing utilities ahead of heavy excavation equipment. At house connections, either lift trenching machine over lines or cut and reconnect with minimum interruption of service, as approved. S. PROTECTIVE MEASURES. Where construction creates hazard to traffic or public safety, furnish and maintain suitable barricades, warning signs, and lights. Remove same when no longer necessary. T. USE OF STREETS. 1. Remove, as soon as practicable, accumulated rubbish and open each block for public use. Use of any portion of street shall not constitute acceptance of any portion of work. Backfill and shape trenches across street intersections or driveways for safe traffic at night or, where permitted, span open trenches with wooden mats or bridges to permit traffic flow. When driveways are cut, immediate placement of mats for ingress or egress of vehicles may be directed if undue hardship to property owner would otherwise result. 2. Except where approved otherwise, do not hinder or inconvenience travel on streets or intersecting alleys for more than two blocks at any one time. Whenever street is closed, place properly worded sign announcing fact to G-6B public, with proper barricades at nearest street corners, on both sides of obstruction. Leave no street or driveway blocked at night. 3. When street is closed, notify Fire Department and Police Department 4. Do not block ditches, inlets, fire hydrants, etc., and,where necessary, provide temporary drainage. G-7B SECTION H PAYMENT BOND PAYMENT BOND STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF JEFFERSON THAT we , of the of County of , and State of , as Principal, and , as Surety, authorized under the laws of the State of Texas to act as Surety on bonds for principals are held and firmly bound unto the CITY OF PORT ARTHUR, Texas, and to all Subcontractors,workmen, laborers, mechanics and furnishers of material, and any other claimant, as their interest may appear, all of whom shall have the right to sue upon their bond, in the penal sum of Dollars ($ ), lawful currency of the United States of America, for the payment of which, well and truly to be made, we do hereby bind ourselves, our heirs, executors, administrators and successors, jointly and severally and firmly by these presents: The condition of this Bond is such that, whereas, the above bounden Principal as prime contractor has on the day of , 20_, entered into a formal contract with the CITY OF PORT ARTHUR for , 20 which is hereby referred to and made part hereof as if fully written herein. NOW, THEREFORE, if the above bounden Principal shall protect all claimants supplying labor and material as provided for in Section 1 of Chapter 93 of the Acts of the 56th Regular Session of the Legislature of Texas (compiled as Article 5160 of Vernon's Texas Civil Statutes, as amended) and shall pay and perform any and every obligation that of such principal is required or provided for in such law, this bond being solely for the protection of all such claimants and being for the use of each such claimant, then this obligation shall be null and void, otherwise it shall remain in full force and effect. It is stipulated and agreed that no change, extension of time, addition to or modification of the Contract or work performed thereunder, shall in anywise affect the obligation of this bond, and surety expressly waives notice of any such change, extension of time, addition or modification. I-I IN WITNESS WHEREOF, the said Principal has caused these presents to be executed, and the said surety has caused these presents to be executed, each by its duly authorized agent and officer, and its corporate seal to be affixed at on this the day of ,A.D., 20 . CONTRACTOR ATTEST: BY: TITLE: SURETY ATTEST: BY: TITLE: NOTE: Date of Bond must not be prior to date of Contract. If CONTRACTOR is Partnership, all partners shall execute Bond. Surety companies executing bonds must appear on Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in Texas. I-2 SECTION I PERFORMANCE BOND PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS: THAT (Name of Contractor) (Address of Contractor) a , hereinafter called Principal, and (Name of Surety) (Address of Surety) hereinafter called Surety, are held and firmly bound unto (Name of Owner) (Address of Owner) hereinafter called OWNER, in the penal sum of Dollars, $( ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain Contract with the OWNER, dated the day of , 2000, a copy of which is hereto attached and made a part hereof for the construction of: NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of said contract during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without notice to the Surety and during the one year guaranty period, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the OWNER from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this J-1 obligation shall be void; otherwise to remain in full force and effect. Provided, that this bond is executed pursuant to Article 5160 of the Revised Civil Statutes of Texas as amended and all liabilities on this bond shall be determined in accordance therewith. PROVIDED, FURTHER, that the said surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the WORK or the SPECIFICATIONS. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder,whose claim may be unsatisfied. IN WITNESS WHEREOF, this instrument is executed in counterparts, each one of which shall be deemed an original, this the day of , 20 . ATTEST: Principal BY: (s) (Principal) Secretary [SEAL] (Witness as to Principal) (Address) Address Surety ATTEST: BY: Witness as to Surety Attorney-in-Fact Address Address NOTE: DATE OF BOND must not be prior to date of Contract. IF CONTRACTOR is Partnership, all partners should execute BOND. J-2 IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the PROJECT is located. J-3 SECTION J NOTICE OF AWARD CHARLOTTE M.MOSES,MAYOR RONALD BURTON,CPM THOMAS KINLAW,III City of CITY MANAGER MAYOR PRO TEM / CHRISTE WHITLEY NED,TRMC COUNCIL MEMBERS: �4rt It t1 CITY SECRETARY WILLIE BAE LEWIS,JR. CAL J.JONES Tf r ROXANN PAIS COTRONEO DONEANE BECKCOM CITY ATTORNEY HAROLD L.DOUCET,SR., DONALD FRANK,SR. Date Contractor Name Attn: Address City, State Zip Re: You are notified that on , 2026,the City of Port Arthur City Council awarded above referenced contract. Within ten (10) days after you comply with the conditions listed below, the Purchasing Manager will issue to you a written Notice to Proceed and Purchase Order. Work must not begin until these documents have been issued to you. Two (2) original Contract Documents and one (1) copy of Resolution No. accompany this Notice of Award. You must comply with the following conditions precedent within ten(10) days of the date of this Notice of Award that is by or by the first working day thereafter. You must deliver to the Purchasing Manager: 1. One (1) fully executed Contract. 2. One (1) signed, original Notice of Award. 3. One (1) original Certificate of Insurance, naming the Owner (City of Port Arthur) and their respective agents and employees, to be expressly named as additional insurers, in accordance with the General Conditions. 4. One (1) HB 1295 Form filled out completely. For more information go to the following website. https://www.ethics.state.tx.us/whatsnew/elf info form1295.htm. 5. Payment and Performance Bonds. Please return all requested documents to: City of Port Arthur, TX • Attn: Clifton Williams, Purchasing Manager P.O. Box 1089 Port Arthur, TX 77641 Page 1 of 2 Purchasing Division/Finance Department I Purchasing Manager,Clifton Williams P.O.Box 1089 1 144 4th Street I Port Arthur,Texas 77641 1409.983.8160 I Fax 409.983.8291 OF CHARLOTTE M.MOSES,MAYOR RONALD BURTON,CPM THOMAS KINLAW,HI City of �' s, �r CITY MANAGER MAYOR PRO TEM CHRISTE WHITLEY NED,TRMC COUNCIL MEMBERS: — CITY SECRETARY WILLIE BAE LEWIS,JR r,i t ►-/!► rr t' CAL J.JONES 7�,,r! ROXANN PAIS COTRONEO DONEANE BECKCOM CITY ATTORNEY HAROLD L.DOUCET,SR., DONALD FRANK,SR. NOTICE OF AWARD Contractor Name Date Page 2 Failure to comply with these conditions within the time specified will entitle Owner to consider your bid in default and to annul this Notice of Award. OWNER: CITY OF PORT ARTHUR,TEXAS BY: Clifton Williams, Purchasing Manager ACCEPTANCE OF A WARD: Contractor: Signature: Print: Title: Date: CC: Page 2 of 2 Purchasing Division/Finance Department I Purchasing Manager,Clifton Williams P.O.Box 10891444 4th Street' Port Arthur,Texas 776411 409.983.8160 1 Fax 409.983.8291 SECTION K NOTICE TO PROCEED CHARLOTTE M.MOSES,MAYOR RONALD BURTON,CPM s THOMAS KINLAW,III City of , 1 " CITY MANAGER MAYOR PRO TEM 4l/I V�` CHRISTE WIIITLEY NED,TRMC COUNCIL MEMBERS: CITY SECRETARY WILLIE BAE LEWIS,JR r, r t r t{r rr r CAL J.JONES I .�crs ROXANN PAIS COTRONEO DONEANE BECKCOM CITY ATTORNEY HAROLD L.DOUCET,SR., DONALD FRANK,SR NOTICE TO PROCEED Date Contractor Name Attn: Address City, State Zip Re: You are notified that the Contract Times under the above contract will begin to run on by that date,you are to start performing your obligations under the Contract Documents The date of Contract Termination will be . It is the responsibility of the contractor to meet the schedule as set forth and in accordance with the terms and conditions of the contract. Before you may start any work, you must deliver to the Purchasing Manager all required documents as listed in your Notice of Award and a signed original of this Notice to Proceed. Invoices for payment must be submitted to PO Box 1089, Attn: Accounting, Port Arthur, TX 77641. Contract# must appear on all related invoices. Should you have any questions regarding this project, you may contact me at 409.983.8160 or thank you for partnering with the City of Port Arthur. Respectfully, ACCEPTANCE OF NOTICE TO PROCEED Company: Clifton Williams Signature: Purchasing Manager Print: Title: Date: CC: Purchasing Division/Finance Department I Purchasing Manager,Clifton Williams P.O.Box 10891444 4th Street' Port Arthur,Texas 776411 409.983.8160 I Fax 409.983.8291 SECTION L INSURANCE ACC CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDD/YYY1) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: PHONE FAX(AIC, INC.No.Ext): Nol: E-MAIL ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC R - INSURER A: INSURED INSURER B: INSURER C: INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDLSUBR POLICY NUMBER (MMIDDIIYYYY) (MMM/DD/YYYY) LIMITS POLICY EFF POLICY EXP LTR INSR WVD GENERAL LIABILITY EACH OCCURRENCED $ COMMERCIAL GENERAL LIABILITY PREMISESRERENTEDGE TO(Ea occurrence) $ CLAIMS-MADE I I OCCUR MED EXP(Any one person) $ PERSONAL 8 ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 7 POLICY JF LOC $ AUTOMOBILE UABIUTY COMBINED SINGLE LIMIT (Ea accident) $ ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULE AUTOS D AUTOS BODILY INJURY(Per accident) $ ROPERTY HIRED AUTOS NON-OWNED (Perr accident)DAMAGE AUTOS UMBRELLALIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION WC STATU- OTH- AND EMPLOYERS'LIABILITY Y/N TORY LIMITS ER ANY PROPRIETOR/PARTNER/EXECUTIVE N/A E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD SECTION M QUALIFICATION STATEMENT QUALIFICATION STATEMENT SUBMITTED TO City of Port Arthur BY N&T Construction Co., Inc. [Corporation,Co-Partnership,An Individual] PRINCIPAL OFFICE 1376 Laurel Ave. Beaumont, Texas 77701 The signatory of this questionnaire guarantees the truth and accuracy of all statements and of all answers to interrogatories hereinafter made. 1. How many years has your organization been in business as a general contractor under your present business name: 33 years 2. How many years' experience in this type of construction work has your organization had? (a) As a general contractor 33 years (b) As a sub-contractor 3. What projects has your organization completed? Contract Class of When Name and Address Amount Work Completed of Owner See attached "Completed Project List" 0-1 4. Have you ever failed to complete any work awarded to you? No If so, where and why? 5. In what manner have you inspected this proposed work? Explain in detail. We have made several site visits to the project site to verify existing conditions and site logistics along with a detailed plan review that has resulted in several pre-bid questions. We have also completed quantity take-offs of each discipline and have a very good understanding of how to construct the project in a timely manner. b. Explain your plan or layout for performing the proposed work: Our initial plan for the the project is complete the site demolition activities, storm drainage, and complete the paving and drive as early as possible to enhance the access to the project. The sidewalks and nodes will start after the storm drainage and site utilities are complete and irrigation will follow. The coordination and long lead items with the Buy Board vendors will be critical to the overall completion of the project. And since this project is weather dependent, we need to do a good job of keeping the site graded and sloped to drainage so work can continue as soon as practical after a rain event. 7. The work, if awarded to you, will have the personal supervision of whom? (a) For administrative management? Lauren Williams - Admin & Vince Jabbia - PM (b) For resident construction superintendence? Joel Flores (c) What experience in this type of work is enjoyed by the superintendent designated under (b) above? 0-2 8. What portions of the work do you intend to sub-let? N&T Construction intends to sublet all portions of the work except minor carpentry work and Division 10 specialties installation. 9. What equipment do you own that is available for the proposed work? Description,Size Years of Present Qty. Item Capacity,Etc. Condition Service Location N&T does not own any equipment. 10. Have you received firm offers for all major items of equipment within prices used in preparing your proposal? Yes 0-3 11. List the construction projects your organization has underway on this date: Contract Class of Percent Name and Address of Owner Amount Work Complete or Contracting Officer See attached "Current Project List" Dated at this 23rd day of September 2026. BY: Lauren Williams TITLE: V.P. 0-4 SECTION N NON-COLLUSION AFFIDAVIT NON-COLLUSION AFFIDAVIT CITY OF PORT ARTHUR § STATE OF TEXAS By the signature below, the signatory for the bidder certifies that neither he nor the firm, corporation, partnership or institution represented by the signatory or anyone acting for the firm bidding on this project has violated the antitrust laws of this State, codified in Section 15.01, et seq., Texas Business and Commerce Code, or the Federal antitrust laws, nor communicated directly or indirectly the bid made to any competitor or any other person engaged in the same line of business, nor has the signatory or anyone acting for the firm, corporation or institution submitting a bid committed any other act of collusion related to the develo," ent an ubmission of this bid proposal. Signature: kaAAA Printed Name: Printed La1aM,n Wait/IA/MS' Name: Title: v, P. Company: N, 4 r Cons-hu cm co) l yi . Date: q,,.97 /> SUBSCRIBED and sworn to before me the undersigne uthority by the p7 of, ?D7'tron behalf of the said bidder. ,r7 P1,riii A ELAINE ZE;14 NotaryPubric�t� an r the 6 ?-1 ID#126080088�% YJty Commission Expires State of Texas April 17,2027 Y VrV..c7.mn.nv........ My commission expires: )17 1,7 SECTION 0 AFFIDAVIT AFFIDAVIT All pages in Offeror's Responses containing statements, letters, etc., shall be signed by a duly authorized officer of the company whose signature is binding. The undersigned offers and agrees to one of the following: VIhereby certify that I do not have outstanding debts with the City of Port Arthur. I further agree to pay succeeding debts as they become due. I hereby certify that I do have outstanding debts with the City of Port Arthur and agree to pay said debts prior to the execution of this agreement. I further agree to pay succeeding debts as they become due. I hereby certify that I do have outstanding debts with the City of Port Arthur and agree to enter into an agreement for the payment of said debts. I further agree to pay succeeding debts as they become due. T 0 s-r c5hm Co Inc, cg ) a7 f -cf Fir ame Date A ailtvlI) 0 ,p. Au rized Signature Title LCAAbn VviAki c hrls L-10 q-go-g5�J 2 Name (please print) Telephone LwUcuice Notdretonstwof-w •coyyt, Email STATE: COUNTY: likeirS 0/1 SUBSCRIBED AND SWORN to before me by the above-named WIUI(tfka on this the g-1 day of - St-, 20 al, . I �A�Y pGB/ PATRICIA EIAINE JAI3BIF,' �2j,� ID#126080088 NotaryPublic � ', My Commission Expires April 17,2027 RETURN THIS AFFIDAVIT AS PART OF THE BID PROPOSAL SECTION P CONFLICT OF INTEREST CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ For Vendor or other person doing business with local governmental entity This questionnaire reflects changes made to the law by H.B. 1491, 80'Leg.,Regular Session. This questionnaire is being filed in accordance with Chapter 176,Local Government Code by a person who has a business relationship as defined by Section 176.001 (1-a)with a local governmental entity and the person meets requirements under Section 176.006 (a). By law this questionnaire must be filed with the records administrator of the local governmental entity not later than the 7"business day after the date the person becomes aware of facts that require the statement to be filed. See Section 176.006,Local Government Code. A person commits an offense if the person knowingly violates Section 176.006,Local Government Code.An offense under this section is a Class C misdemeanor. 1.Name of person who has a business relationship with local governmental entity. 2. Check this box if you are filing an update to a previously filed questionnaire. (The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than 7"business day after the date the originally filed questionnaire becomes incomplete or inaccurate.) 3.Name of a local government officer with whom filer has employment or business relationship. IV Name of fficer This section(item 3 including subparts A,B,C,&D)must be completed for each officer with whom the filer has an employment or other business relationship as defined by Section 176.001 (1-a),Local Government Code.Attach additional pages to this Form CIQ as necessary. A. Is the local government officer named in this section receiving or likely to receive taxable income,other than investment income,from the filer of the questionnaire? Yes No B. Is the filer of the questionnaire receiving or likely to receive taxable income,other than investment income,from or at the direction of the local government officer named in this section AND the taxable income is not received from the local governmental entity? Yes No C. Is the filer of this questionnaire employed by a corporation or other business entity with respect to which the local government Officer serves as an officer or director,or holds an ownership of 10 percent or more? ,No D. Describ- - h emplo rt or business relationship with the local government officer named in this section. 4. Oafru Signatur. - .erson doing business with the governmental entity Dat SECTION Q SB 252 CHAPTER 2252 CERTIFICATION SB 252 CHAPTER 2252 CERTIFICATION I, AAA 1 r ► t V�1/1/ C/V I/ V J ,the undersigned and representative of N 41 CAA%- v oti on Co) Inc. (Company or Business Name) being an adult over the age of eighteen (18) years of age, pursuant to Texas Government Code, Chapter 2252,Section 2252.152 and Section 2252.153,certify that the company named above is not listed on the website of the Comptroller of the State of Texas concerning the listing of companies that are identified under Section 806.051,Section 807.051 or Section 2253.153.I further certify that should the above-named company enter into a contract that is on said listing of companies on the website of the Comptroller of the State of Texas which do business with Iran, Sudan or any Foreign Terrorist Organization, I will immediately notify the City of Port Arthur Purchasing Department. Na of Com Representative (Print) Si ture of Company Representative g in Date SECTION R HOUSE BILL 89 VERIFICATION House Bill 89 Verification ►, VV'VN A/Of (Person name), the undersigned representative (hereafter referred to as "Representative") of 1\1 T CtnAc'i- on Co. 1 ne- - (company or business name, hereafter referred to as "Business Entity"), being an adult over the age of eighteen (18) years of age, after being duly sworn by the undersigned notary, do hereby depose and affirm the following: 1. That Representative is authorized to execute this verification on behalf of Business Entity; 2. That Business Entity does not boycott Israel and will not boycott Israel during the term of any contract that will be entered into between Business Entity and the City of Port Arthur; and 3. That Representative understands that the term "boycott Israel" is defined by Texas Government Code Section 2270.001 to mean refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes. • SIGNATURE OF REPRESENTATIVE SUBSCRIBED AND SWORN TO BEFORE ME, the undersigned authority, on this 77 day of aiA fr , 20 2G �......•........---•-•...•--•.• •u+•uu .z os,aY PO4I PATRICIA ELAINE JABBIA �l—6 ID#126080088 g. �\"5 My Commission Expires t � o' April 17,2027 aary Plic 46 of 60 Exhibits Are Available For Review In The City Secretary's Office Or Online Please visit our website: http://www.portarthurtx.gov > AGENDAS &, M I N UTES> Agendas> 2026 Agendas> City Secretary page: http://www.portarthurtx.gov > City Government> City Secretary Office Number: (409) 983-8115 Email: citysecretary@portarthurtx.gov SECTION S TECHNICAL SPECIFCATIONS TECHNICAL SPECIFICATIONS For Construction of ROSE HILL PARK RENOVATION To Serve The CITY OF PORT ARTHUR Project No. BUR-010 CITY OF PORT ARTHUR JEFFERSON COUNTY, TEXAS JULY 2026 ��P� ; • OF ' 911 .�• 4 ;r 1 i*.• )\ .*•*#0 KEESTAN X. COLE /0l�;o4.R11422�o.;.h4 1 tc•.c/STER. .—11i/ • Ai.eaG- 07/09/2026 TEXAS * REGISTERED ENGINEERING FIRM F-16194 ARCENEAUX WILSON &COLE LLC Engineering * Surveying * Planning PORT ARTHUR, TEXAS TABLE OF CONTENTS Section Section Title 14219 Reference Standards 02110 Tree & Plant Protection A2001 Clearing and Grubbing A2002 Site Grading 02220 Excavation&Back Filling 02228 Trench Safety A3002 Compacted Sand Fill Under Structures A3007 Removing Old Structures A3030 Hydromulch Seeding A3034 Storm Water Pollution Prevention Plan (SW3P) B1001 Concrete B2001 Concrete Structures B3001 Reinforcing Steel B3005 Concrete Construction H1001 Ductile Iron Pipe and Fittings J1002 Polyvinyl Chloride (PVC) Sewer Pipe and Fittings J1003 Polyvinyl Chloride (PVC) Waterline Pipe (4"-12") J1015 Corrugated Polyethylene Pipe J2001 Construction of Underground Lines J3001b Storm Sewer Manholes J3016 Inlets J3017 Fire Hydrants J3022 Resilient Seated Gate Valves-4"-12" for water distribution Systems K3003 Lime stabilized Subgrade K3007 Removal of Existing Paving and Curbs K3101 Concrete Pavement K3109 Traffic and Zone Marking Paint 02810 Irrigation System 02900 Planting Media 02910 Mechanical Transplanting/Containerization 02930 Lawns & Grasses 02950 Planting 02970 Landscaped Grounds Maintenance 260200 Basic Materials and Methods 260500 Common Work Results For Electrical 260519 Low Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533.13 Conduit for Electrical Systems 260533.16 Boxes for Electrical Systems 260533.23 Surface Raceways for Electrical Systems 260553 Identification for Electrical Systems 262416 Panelboards 262726 Wiring Devices 262816.13 Enclosed Circuit Breakers 262816.16 Enclosed Switches 264300 Surge Protective Devices 265600 Exterior Lighting 047100 Manufactured Brick Masonry SECTION 014219 REFERENCE STANDARDS PART 1 GENERAL 1.01 SECTION INCLUDES 1.02 QUALITY ASSURANCE A. For products or workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B. Should specified reference standards conflict with Contract Documents, request clarification from the Architect before proceeding. C. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of the Architect shall be altered by Contract Documents by mention or inference otherwise in any reference document. PART 2 CONSTRUCTION INDUSTRY ORGANIZATION DOCUMENTS 2.01 AA --ALUMINUM ASSOCIATION, INC. 2.02 AAMA--AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION 2.03 AASHTO --AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS 2.04 ACA--AMERICAN COATINGS ASSOCIATION 2.05 AEIC --ASSOCIATION OF EDISON ILLUMINATING COMPANIES 2.06 AGA --AMERICAN GALVANIZERS ASSOCIATION, INC. 2.07 AIA --THE AMERICAN INSTITUTE OF ARCHITECTS 2.08 AITC --AMERICAN INSTITUTE OF TIMBER CONSTRUCTION 2.09 ALSC --AMERICAN LUMBER STANDARDS COMMITTEE 2.10 ANSI --AMERICAN NATIONAL STANDARDS INSTITUTE 2.11 AOSA--ASSOCIATION OF OFFICIAL SEED ANALYSTS 2.12 APA --APA-THE ENGINEERED WOOD ASSOCIATION 2.13 APHA--AMERICAN PUBLIC HEALTH ASSOCIATION 2.14 API --AMERICAN PETROLEUM INSTITUTE 2.15 ASCE --AMERICAN SOCIETY OF CIVIL ENGINEERS 2.16 ASME --THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 2.17 ASPA --AMERICAN SOD PRODUCERS ASSOCIATION (SEE TURFGRASS PRODUCERS INTERNATIONAL) 2.18 ASPE --AMERICAN SOCIETY OF PLUMBING ENGINEERS 2.19 ASSE --AMERICAN SOCIETY OF SANITARY ENGINEERING 2.20 ASTM A SERIES --ASTM INTERNATIONAL 2.21 ASTM B SERIES --ASTM INTERNATIONAL 2.22 ASTM C SERIES --ASTM INTERNATIONAL A. ASTM C1670/C1670M - Standard Specification for Adhered Manufactured Stone Masonry Veneer Units; 2024a. 2.23 ASTM D SERIES --ASTM INTERNATIONAL 2.24 ASTM E SERIES --ASTM INTERNATIONAL Rose Hill Park 014219 - 1 Reference Standards 2.25 ASTM F SERIES --ASTM INTERNATIONAL 2.26 ASTM G SERIES --ASTM INTERNATIONAL 2.27 BIA--BRICK INDUSTRY ASSOCIATION 2.28 ICC-ES --ICC EVALUATION SERVICE, INC. A. ICC-ES AC51 -Acceptance Criteria for Adhered Manufactured Stone Masonry Veneer; 2018, with Editorial Revision (2021). END OF SECTION Rose Hill Park 014219-2 Reference Standards SECTION 02115 TREE AND PLANT PROTECTION PART 1 GENERAL 1.1 SECTION INCLUDES 1. Tree and plant protection. 1.2 PROJECT CONDITIONS 1. Preserve and protect existing trees and plants to remain from foliage,branch,trunk, or root damage that could result from construction operations. 2. Prevent following types of damage: 1. Compaction of root zone by foot or vehicular traffic, or material storage. 2. Trunk damage from equipment operations,material storage,or from nailing or bolting. 3. Trunk and branch damage caused by ropes or guy wires. 4. Root poisoning from spilled solvents,gasoline,paint,and other noxious materials. 5. Branch damage due to improper pruning or trimming. 6. Damage from lack of water due to failure to provide adequate watering. 7. Damage from alteration of soil pH factor caused by depositing lime,concrete, plaster,or other base materials near roots. 8. Cutting of roots larger than 1-1/2 inches in diameter. 1.3 DAMAGE ASSESSMENT 1. When trees other than those designated for removal are destroyed or badly damaged as a result of construction operations,remove and replace with same size,species, and variety up to and including 8 inches in trunk diameter. Tree larger than 8 inches in diameter shall be replaced with an 8-inch diameter tree of the same species. 2.0 PRODUCTS 2.1 MATERIALS 1. Asphalt paint: Emulsified asphalt or other adhesive,elastic,antiseptic coating formulated for horticultural use on cut or injured plant tissue,free from kerosene and coal creosote. 2. Burlap: Suitable for use as tree wrapping. 3. Fertilizer: Liquid containing 20 percent nitrogen, 10 percent phosphorus,and 5 percent potash. 4. All necessary tree replacements shall be as approved by Owner. 3.0 EXECUTION Section 02115.1 Tree and Plant Protection 3.1 Protection and Maintenance of Existing Trees and Shrubs 1. Except for trees and shrubs shown on Drawings to be removed,all trees and shrubs within the project area are to remain and be protected from damage. 2. For trees or shrubs to remain,perform the following: 1. Trimming of trees and shrubs to remain shall be done only under extreme care. 1. Trees and shrubs requiring pruning for construction should also be pruned for balance as well as to maintain proper form and branching habit. 2. Cut limbs at branch collar. No stubs should remain on trees. Branch cuts should not gouge outer layer of tree structure or trunk. 2. Use extreme care to prevent excessive damage to root systems. 1. Roots in construction areas will be cut smoothly with a trencher before excavation begins. Do not allow ripping of roots with a backhoe or other equipment. 2. Temporarily cover exposed roots with wet burlap to prevent roots from drying out. 3. Cover exposed roots with soil as soon as possible. 3. Prevent damage or compaction of root zone(area below dripline)by construction activities. 1. Do not allow scarring of trunks or limbs by equipment or other means. 2. Do not store construction materials,vehicles,or excavated material under dripline of trees. 3. Do not pour liquid materials under dripline. 4. Water and fertilize trees and shrubs that will remain to maintain their health during construction period. 1. Supplemental watering of landscaping during construction should be done once every 7 days in cold months and once every 4 days in hotter months. 2. This watering shall consist of saturating soils at least 6 to 8 inches beneath surface. 5. Water areas currently being served by private sprinkler systems while systems are temporarily taken out of service to maintain health of existing landscapes. Section 02115.2 Tree and Plant Protection 6. At option of the Contractor and with the City Engineer's permission,trees and shrubs to remain may be temporarily transplanted and returned to original positions under supervision of professional horticulturist. 4.0 PROTECTION 1. Protection of Trees or Shrubs in Open Area: 1. Install steel drive-in fence posts in protective circle,approximately 8 feet on center,not closer than 4 feet to trunk of trees or stems of shrubs. 2. Drive steel drive-in fence posts 3 feet minimum into ground,leaving 5 feet minimum above ground. 3. Wrap trunk with layer of burlap. 4. Install 2 x 4's or 2 x 5's(5-foot to 6-foot lengths)vertically,spaced 3 inches to 5 inches apart around circumference of tree trunk. 5. Tie in place with 12 to 9 gage steel wire. 4.1 MAINTENANCE OF NEWLY PLANTED TREES 1. Show proof of capacity to water during dry periods. 2. The Contractor guarantees that trees planted for this Project shall remain alive and healthy at least until the end of a one-year warranty period and the additional one year period required by the Surface Restoration Bond. 1. Within four weeks of notice from Owner,Contractor shall replace,at his expense,any dead trees or any trees that in the opinion of Owner,have become unhealthy or unsightly or have lost their natural shape as a result of additional growth,improper pruning or maintenance,or weather conditions. 2. When tree must be replaced,the guarantee period for that tree shall begin on date of replacement of tree,subject to the Owner or Landscape Architect's inspection,for no less than one year. 3. Straighten leaning trees and bear entire cost. 4. Dispose of trees rejected at any time by Owner at Contractor's expense. END OF SECTION Section 02115.3 Tree and Plant Protection f` 10/13/2005 ITEM NO. A2001 —CLEARING AND GRUBBING PART 1 -GENERAL 1.01 DESCRIPTION A. Scope: Remove and dispose of trees, stumps,brush,roots, logs,vegetation, rubbish, and other objectionable matter from project area. Project area is defined as all easements and that portion of street rights-of-way necessary to allow construction of the facilities proposed in this Contract, including those areas needed for disposal of excess excavated material. B. Related work as called for on PLANS or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. PART 2 -PRODUCTS 2.01 MATERIALS Not required for this Item. PART 3 -EXECUTION 3.01 CONSTRUCTION METHODS A. Clear and grub trees, stumps,brush,roots, logs,vegetation, and rubbish within project area except trees, shrubs, and other landscape features designated to remain, and protect same against damage and trim when necessary. Clear stump holes of refuse and loose earth;backfill and compact to density of surrounding ground. B. On embankment areas,remove stumps,roots, and objectionable materials to a depth of one foot below existing natural ground surface. C. Dispose of all refuse from clearing operation off site. Obtain required permits from various governmental agencies involved. Bury no refuse on Owner's property. On areas other than embankment,remove stumps and roots to depth of two feet below natural ground. D. For pavement construction, strip grasses to a depth 2-inches below existing grade and spoil off site. 3.02 MEASUREMENT AND PAYMENT A. No separate pay for work performed under this Item except as indicated below. A2002 - 1/2 10/13/2005 Include cost of same in Contract price bid for work of which this is a component part. B. Proposal will indicate if clearing and grubbing is a pay item. If so, measure by acre or lump sum as indicated in PROPOSAL. C. Pay for"Clearing and Grubbing"at Contract price bid as measured. Such payment to be full compensation for work as described herein. A2002 - 2/2 8/03/2004 ITEM NO. A2002 - SITE GRADING PART 1 -GENERAL 1.01 DESCRIPTION A. Scope: Within the limits indicated, or in areas where existing grade is altered, strip existing topsoil to 6-inch depth and stockpile in approved areas for subsequent replacement. Remove and dispose of all vegetation,roots, and waste material. B. Related work as called for on PLANS or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. PART 2-PRODUCTS 2.01 MATERIALS Fill: Use approved excess excavation or borrow material. Borrow from approved source, excavate, and clean up borrow area. Reuse of material stripped from borrow site is not allowed unless specifically indicated on PLANS. PART 3 -EXECUTION 3.01 GENERAL Maintain surface drainage on site during construction. 3.02 CONSTRUCTION A. Fill Under Structures and Roads: Place dirt fill in 8-inch maximum layers (loose measure) and compact at or near optimum moisture to at least 95 percent AASHTO Standard T-99-74 density. Place fill to subgrade elevation without addition of topsoil. Where fill to subgrade elevation is less than 6 inches, scarify existing ground to a depth of 6 inches and compact as specified herein. B. Site Fill: Place approved fill within 4 inches of fmish grade shown on all areas not covered by structures or roads. Fill in 10-inch maximum layers (loose measured) and compact at or near optimum moisture to at least 90 percent AASHTO Standard T-99-74 density,unless otherwise shown on PLANS. A2002 - 1/2 8/03/2004 C. Topsoil: Place topsoil over areas within limits shown on PLANS. After substantial completion of construction, grade site 4 inches lower than finished grade on all unpaved areas. Clear ground surface of all foreign materials, then place 4 inches of topsoil to bring site to smooth finished grade indicated. D. Waste: Waste stripped materials from within limits indicated. Spread waste material over designated area, dress by blading, and slope to provide drainage. E. Final Cleanup: Level washes, ruts, depressions, and mounds to give areas smooth finish. 3.03 MEASUREMENT AND PAYMENT No separate payment for work performed under this Item. Include cost of same in Contract price bid for work of which this is a component part. A2002 - 2/2 SECTION 02220 EXCAVATION AND BACKFILLING 1.00 GENERAL 1.01 Work Included A. Work in this Section shall include,but not be limited to,the following: 1. Excavation 2. Hauling of Required Materials 3. Fill and Backfill 4. Disposition of Deleterious Material 5. Rough Grading 7. Compaction 9. Rough Grading 1.02 Related Work in Other Sections A. The following items of associated work are included in other Sections of these Specifications: 1. Site Grading: Section A2002 1.03 Plan of Operations A. Before commencing the work,the Contractor shall submit for the approval of the Landscape Architect,drawings and/or a description of the plan of operation that the Contractor proposes to use. No work under this Section shall be commenced prior to approval by the Landscape Architect and Owner. However,such approval will not relieve the Contractor of full responsibility for adequacy and successful functioning of the works,unless otherwise specifically provided. 1.04 General Requirements A. During the bidding period,the Contractor shall verify all governing regulations and conditions at the site and shall examine the drawings and all adjoining work on which the work of this Contract is dependent. The submission of a proposal by the Contractor binds him to accept the site as it is and will be necessary for him to do all excavations,filling,backfilling,and grading required for the completion of the work as shown on the applicable drawings and described in this Section of the specifications. Section 02220.1 Excavation&Backfilling ipprsvwspwwwwwwr B. The Contractor shall inform and satisfy himself as to the character,quantity,and distribution of all material to be excavated. No payment will be made for any excavated material which is used for purposes other than those designated. All spoil areas,as designated by the Owner,shall be leveled to a uniform line and section,and shall present a neat appearance before Project acceptance. The surface elevation of spoil areas shall not extend above the surface elevation of adjacent or contiguous usable areas. 1.05 Classification A. All material excavated shall be defined as"Unclassified Excavation". 1.06 Rough Excavation A. Rough excavation shall be carried to the necessary depth to obtain the specified depth of subgrade density shown on the plans. B. Should the Contractor excavate below the designated lines,he shall replace the excava- tion with approved materials,in an approved manner and condition,at his own expense. The Owner shall have complete control over the excavation,moving,placing and disposition of all material,and shall determine the suitability of material to be placed in terms. All material determined to be unsuitable shall be disposed of in waste areas or as directed. 1.07 On-Site Drainage Problems A. The Contractor should consider on-site drainage problems and subsurface water conditions in his bid. All required temporary drainage construction,including mechanical pumping and well point structures will be part of this Contract. 1.08 Those areas outside of the pavement areas in which the top layer of soil material becomes compacted due to hauling or to any other activity,the Contractor shall be scarified to a depth of four inches(4"),to loosen and pulverize the soil. If it is necessary to interrupt existing surface drainage,sewers,or under-drainage,conduits, utilities,or similar underground structures,or parts thereof,the Contractor shall be responsible for and shall take all necessary precautions to protect and preserve or provide temporary services. When such facilities are encountered,the Contractor shall notify the applicable utilities and the Owner,who shall contact the affected agencies. The Contractor shall,at his own expense, satisfactorily repair all damage to such facilities or structures which may result from any of his operation during the period of the Contract. 1.09 All work shall comply with the rules and regulations of the Division of Industrial Safety and all other local and State agencies having jurisdiction. Nothing contained herein shall be construed as permitting work that is contrary to such rules,regulations and codes. 1.10 All work in public property shall conform to applicable rules and regulations of the State Highway Dept.,the Dept.of Public Safety,and any applicable city and/or county rules and regulations. Section 02220.2 Excavation&Backfilling 1.11 Protection A. Furnish,place and maintain all supports,shoring,and sheet piling which may be required for the sides of the excavation,or for protection of adjacent existing improvements. The adequacy of such systems shall be the complete responsibility of the Contractor. B. Maintain all benchmarks,monuments,and other reference points. If disturbed or destroyed,replace as directed. 1.12 Rough Grading A. Rough grading is defined as grading to the final grade of subgrade,which shall be as follows(to be used as general guidelines only): 1. Hydroseed Lawns: ±One and one-fourth inches(1 1/4")from finished grade elevation 2. Solid Sod: Two and one-half inches(2 1/2")below finished grade 3. Footings: ±Two inches(2")below bottom of footing elevation, where subgrade material is not required. 4. Pavement: ±One and one-half inches(1 1/2")below subgrade material 2.00 PRODUCTS 2.01 Fills A. All fill material shall be approved by the Landscape Architect and generally conform to the attached soil analysis. Material having a dimension greater than four inches (4")shall not be used in the upper six inches(6")of fill. B. Topsoil for the backfill shall be material used for landscape fill purposes. 3.00 EXECUTION 3.01 Excavation shall be performed as indicated on the Contract plans to the lines,grades and elevations when and where shown. The Contractor will be responsible for staking the excavation area in accordance with the plans. The Contractor shall stake all vertical structures and grades for approval by the Landscape Architect and Owner, prior to commencing any work upon this Section. All material encountered within the limits indicated shall be removed and disposed of, as directed. During the process of excavation,the grade shall be maintained so that it will always be well-drained. Temporary drains and drainage ditches shall be installed to intercept or divert surface water which may affect the work. Section 02220.3 Excavation&Backfilling If,at the time of excavation,it is not possible to place any material in its proper section of the permanent construction,it shall be stockpiled in approved areas for later use. Unsatisfactory materials shall be disposed of off-site or as directed by the Owner. 3.02 Trench excavation shall have banks as nearly vertical as practical and shall be extended sufficiently on each side of walls,footage,piers,etc.to permit setting of forms,installation of sheet piling or the safe sloping of banks. Excavation shall not be done below the grades indicated on the drawings unless so directed by the Landscape Architect,in writing. Should the Contractor,without authorization,excavate more than shown on the drawings or as specified,such excess excavation will not be paid for as extra work,and the Contractor shall refill said excavation with stone,concrete,or hard,compacted material,as directed by the Landscape Architect. Such fill shall be tested for compaction,as delineated in these Specifications. 3.03 Where unmarked utility lines or other underground obstructions or piping may be uncovered within the work area,notify the Agencies or the Owners,or service utility companies having jurisdiction thereof,and take necessary measures to prevent interruption of service(if live). Should such lines or services be damaged,broken,or interrupted through the Contractor's own negligence,those services shall be repaired immediately and restored by him at his own expense. Abandoned lines,meters and boxes,obstructions or piping,shall be removed,plugged,or capped,in accordance with the requirements and approval of the agencies affected. Coordinate all such work with applicable mechanical or electrical trade having responsibility. Remove all abandoned utility lines,pipes,conduits,etc.to a point five feet(5')outside new building lines,or at property lines,if closer. All caps shall be left open until approved by the Landscape Architect or Owner. Indicate all the above encounters on the Record Drawings. 3.04 Placement of Fill A. The placement of fill shall be done under the supervision of the Landscape Architect. B. All areas to receive fill shall be scarified to a depth of four inches(4")by discing a minimum of two(2)directions,as required to obtain the specified depth of loose soil. C. Fill material shall be spread in uniform lifts of not more than six inches(6")in non- compacted thickness. D. Disc the first lift deposited into existing soil,to provide a transition horizon. E. Prior to commencing compaction,fills shall be brought to water content that will permit proper compaction,by either aerating the material,if it is too wet,or spraying the material with water,if it is too dry. Thoroughly mix each lift before compaction,to assure uniform distribution of water content. Bring all fills to suitable elevations above grade,to provide for anticipated settlement and shrinkage thereof. Section 02220.4 Excavation&Backfilling 3.05 Compaction A. Compact each layer of fill and scarify subgrade for all pavement areas,to not less than ninety-eight percent(98%)maximum density. Compaction shall extend not less than five feet(5')beyond construction limit and pavement edges. B. Where fill is required for planting areas,compact each layer of fill and scarify subgrade to not less than eighty-five percent(85%)maximum density. C. All excavation,filling and compaction shall be subject to the approval of the Landscape Architect. D. Where fill,backfill,or in-place materials are required to be compacted to a specified density,the maximum density for control shall be determined by using ASTM D1557 or ASSHO T180 methods. The results of these tests shall be the basis upon which satisfactory completion of work will be judged. Any area or portion thereof that does not meet minimum density requirements shall be re-worked and re-compacted until it meets the project density requirements. E. No extra compensation will be made for suitable materials removed,manipulated and replaced,to obtain density. Any removal,manipulation,aeration, replacement,and re-compaction of suitable materials necessary to obtain the required density shall be considered as incidental to the excavation and embankment operations and shall be performed by the Contractor at no additional cost to the Owner. F. Stones or rock fragments larger than four inches(4")in their greatest dimension will not be permitted in the top six inches(6")of the subgrade. 3.06 Rough Grading A. All areas covered by the project,including excavated and filled areas and adjacent transition areas,shall be uniformly grades so that subgrade surfaces are at the elevations noted. The subgrade surface shall be below finished grade,as specified herein. B. Uniformly smooth grading for all areas,including excavated and fill sections and adjacent transition areas,shall be accomplished. The subgrade surface shall be reasonably smooth,compacted and free from irregular surface changes. C. The Contractor shall raise or lower all rims of existing utility structures where there is a grade change and construct them flush with the new finished grade or in accordance with applicable government agencies. D. Ditches and swales shall be finished to permit proper surface drainage. E. Take precautionary methods to reduce soil erosion on public streets and,where necessary,remove immediately. Section 02220.5 Excavation&Backfilling END OF SECTION Section 02220.6 Excavation&Backfilling SECTION 02228 TRENCH&EXCAVATION SAFETY 1.00 GENERAL A. This Section is intended to provide specifications for the minimum requirements for trench safety. The Contractor shall endeavor to ensure the safety of his employees working in and around trenches and other excavations in accordance with current OSHA standards. These specifications outline minimum standards of construction safety to be followed,but should not be construed as the means,methods and operations of construction. Where the Contractor deviates from these outlined minimum standards, the Contractor is required to submit for approval by the Owner or their Agent sealed engineering plans designated by a Registered Professional Engineer in the State of Texas showing the proposed method of trench and excavation protection. 1.01 Scope A. For all trenches and excavations in excess of five(5)feet of depth,the Contractor shall either lay back the sides of excavation,provide sheeting and shoring to hold the walls of the excavation in place,or use a trenching box meeting or exceeding the protection provided by the sheeting and shoring system. In all cases the method of trench wall protection shall be in conformance with the plans,details,and specifications,or an Owner or their Agent approved method designed and sealed by a Registered Professional Engineer. 1.02 Related Section 1. Excavation&Backfilling: Section 02220 2.00 MATERIALS A. Materials used for sheeting,sheet piling,cribbing,bracing,shoring,underpinning,and other structural retaining systems shall be in good serviceable condition,of good quality, of a suitable condition and grade to perform the intended use. Wood shall be sound,free from large or loose knots,and of the proper dimensions. The Contractor shall be responsible for maintaining the systems in a manner consistent with the intended design and in a manner that will prevent exposure of works to hazards. 3.00 TRENCH WALL LAYBACK 3.01 General A. In areas where no pavement of other structural elements is to be constructed,the sides of the trenches over five(5)feet deep may be sloped to provide protection from cave-ins. If written approval is given by the Owner or their Agent,trenches or excavation beneath pavement or other structures may also be laid back. Backfill for laid back trenches shall be provided as a vertical wall trench for the full width of the excavation. Section 02228.1 Trench&Excavation Safety 3.02 Layback Requirements A. The Contractor shall be responsible for providing the proper layback slopes for all soil conditions encountered. Where soils data is provided for the Contractor's use,that information is intended as a sampling of the types of soils materials that may be encountered;however,the Contractor shall be diligent in observing the actual soil conditions as his work proceeds and shall be responsible for providing a safety system adequate to meet the minimum standards for the actual types of soils encountered Special precautions shall be taken to monitor conditions when working in fill areas,areas subject to surcharge,and areas exposed to vibrations from nearby equipment and machinery. B. At the Contractors option where a layback trench system is approved for use,the Contractor may layback the sides of the trench at a slope of two(2)feet horizontal to one (1)foot vertically without testing for the soils stability. When this method is used,it does not preclude the removal of unsuitable materials encountered and replacement with suitable materials. This method shall not be used in unsuitable soils such as wet sand, silts,peat or in other areas which require special procedures,equipment and materials. C. The Contractor may engage a competent person in the means of soil classification to determine the soil classification as a means of reducing the trench wall slopes. Layback slopes may be sloped up to the minimum allowable slopes as follows for the given types of soil: MAXIMUM ALLOWABLE SLOPES Less Than More Than Soil Materials 72 Hours 72 Hours Slope H:V Stable Rock 0:1 (Vertical) 0:1 (Vertical) Type A-(12' depth max.) 1/2:1 3/4:1 Type B 3/4:1 1:1 Type C 1 1/2:1 2:1 Type A-(over 12'depth) 3/4:1 3/4:1 D. The types of soil given in paragraph 3.02 C are defined as follows: 1. Stable Rock-Rock that can be excavated with vertical sides and remain in tract while exposed. Section 02228.2 Trench&Excavation Safety 2. Type A-Cohesive soil with an unconfined compressive strength of 1.5 tons per square foot or greater,or cemented granular soil such as hardpan,till,or caliche. However,no soil shall be classified as Type A if: a. The soil has fissures. b. The soil is subject to vibration from heavy traffic,piling driving,or similar effects. c. The soil has been previously disturbed. d. The soil is part of a slope,layered system where the layers dip into the excavation on a slope of four horizontal to one vertical or greater. e. The soil is subject to other factors that would require it to be classified as a less stable material. 3. Type B-Soil that meets with the following: a. Cohesive soil with an unconfined compressive strength greater than 0.5 tons per square foot,but less than 1.5 tons per square foot. b. Granular soil that can stand on a slope of three horizontal to one vertical or greater without slumping. c. Soil that meets the unconfined compressive strength or cementation requirements for Type A,but is fissured,subject to vibration, or has previously been disturbed. d. Dry rock that is not stable. e. Material that is part of a sloped,layered system where the layers dip into the excavation on a slope less steep than four horizontals to one vertical,but otherwise only if the soil would otherwise be classified as a Type B. 4. Type C-Soil that meets one of the following: a. Cohesive soil with an unconfined compressive strength of 0.5 tons per square foot or less. b. Granular soil that cannot stand on a slope of three horizontal to one vertical without slumping. c. Saturated or submerged soil. d. Submerged rock that is not stable. e. Soil in a sloped,layered system where the layers dip into the excavation on a slope of four horizontal to one vertical or greater. Section 02228.3 Trench&Excavation Safety E. Unconfirmed compressible strength shall mean the load per unit area at which a soil will fail in compression. It can be determined by laboratory testing,estimated in the field using a pocket penetrometer,or other previously approved method. F. Wet soil shall mean soil that contains significantly more moisture than moist soil,but in such a range of values that cohesive material will slump or begin to flow when vibrated. Granular material that exhibits cohesive properties when moist will lose those cohesive properties when wet. G. Layered systems shall be classified in accordance with their weakest layer;however, each layer may be classified individually where a more stable layer lies under a less stable layer. H. Previously classified material whose properties,factors,or conditions affecting its classification change in any way shall be reclassified as necessary as changes to the trench shall be accomplished before continuing any work in or near the trench where there may be potential danger to workers due to trench failure. I. The slope of a laid-back trench wall shall be less steep than the maximum allowable slope when there are signs of distress. The maximum allowable slope for a material in distress shall be 1/2 horizontal to one vertically less steep than the maximum allowable slope for the material in a non-distressed condition. Distress shall mean a condition in which a cave-in is imminent or likely to occur. J. When surcharge loads from adjacent structures,stored material or equipment,operating equipment,or traffic are present,a competent person shall determine the degree to which the actual slope must be reduced below the maximum allowable slope and shall assure that such a reduction is achieved. K. An adequate means of exit such as a ladder or steps shall be provided and located so as to require no more than 25 feet of lateral travel. 4.00 TIMBER SHORING 4.01 General A. Timber shoring may be used as a means of trench protection from cave-ins in trenches that do not exceed 20 feet in depth. The timber shoring system may be used in lieu of sloping and benching systems,or in conjunction with those systems. Good judgment shall be use by the Contractor in selecting the proper system when alternative design is given. 4.02 Soil Classification A. The timber shoring systems designs are subject to soil classifications outlined in 3.02-D of this section. Classification shall be conducted by a competent person using the proper means and methods of classification described in this section. Section 02228.4 Trench&Excavation Safety 4.03 Basis and Limitations A. Dimension of Timber Members 1. The sizes of the timber members shown in the details are taken from the National Bureau of Standards(NBS)report,"Recommended Technical Provisions for Construction Practice in Shoring and Sloping of Trenches and Excavations." In addition,where NBS did not recommend specific sizes for members,member sizes are based upon an analysis of the sizes required for use by existing codes and empirical practice. 2. The required dimensions of the members listed in the tables refer to actual dimensions and not nominal dimensions of the timber. B. Limitation of Application 1. It is not intended that the timber shoring specification apply to every situation that may be experienced in the field. These data were developed to apply to situations that are anticipated to be present at the site. Where the system provided does not meet the requirement of the actual conditions in the field,the Contractor shall either notify the Owner or their Agent of the situation and present an engineered solution designed and sealed by the Registered Professional Engineer,or shall notify the Owner or their Agent of the unanticipated conditions and await instructions. 2. When any of the following conditions are present,the members specified and shown in the details are not considered adequate. a. When loads imposed by structures or by stored material adjacent to the trench weigh more than the load imposed by a two-foot soil surcharge. Adjacent shall mean the area within a horizontal distance from the edge of the trench equal to the depth of the trench. b. When vertical loads imposed on cross braces exceed a 240-pound gravity load distributed on a one-foot section of the center of the cross braces. c. When surcharge loads are present from equipment weighing more than 20,000 pounds. C. Cross braces or trench jacks shall be placed in true horizontal position,be spaced vertically,and be secured to prevent sliding,falling or kickouts. D. Backfilling and removal of trench supports shall progress together from the bottom of the trench. Jacks of braces shall be released slowly,and,in unstable soil,ropes shall be used to pull out the jacks or braces from above after employees have cleared the trench. E. An adequate means of exit shall be provided such as a ladder or steps and shall be located to require no more than 25 feet of lateral travel. Section 02228.5 Trench&Excavation Safety F. Where necessary,due to wet soil or other similar conditions,the shoring system shall use tight sheeting such that material is contained behind the sheeting. 5.00 ALTERNATIVE SHORING SYSTEMS 5.01 General A. Alternative shoring systems may be used when approved by the Owner or their Agent. Steel,aluminum or other approved materials may be used in lieu of wood for shoring where the system is designed,constructed and maintained in a manner that will give equal to or greater protection than the wood system. 5.02 Sheet Piling A. Sheet piling may be used when approved by the Owner or their Agent to shore the sides of the trench. Sheet piles shall be removed at the completion of the work unless otherwise directed by the Owner or their Agent. When piling is to remain,the piling shall be cut off at least three feet from the top of the excavation. The sheet piling system shall be designed by a Registered Professional Engineer and shall provide equal or greater protection than the specified wood shoring system. Materials for the piling shall be approved by the Owner or their Agent. 5.03 Trench Boxes A. Trench boxes that provide equal or greater protection as the specified wood shoring system may be used. The Contractor shall be responsible for ensuring the adequacy, maintenance,and design of the trench box used. The Contractor shall also be responsible for the proper use and operation of the trench box. 5.04 Shield Systems A. General 1. Shield systems shall not be subjected to loads exceeding those which the system was designed to withstand. 2. Shields should be installed in a manner to restrict lateral or other hazardous movement of the shield in the event of the application of sudden lateral loads. 3. Workers shall be protected from the hazard of cave-ins when entering or exiting the areas protected by shields. 4. Workers shall not be allowed in shields when shields are being installed, removed,or relocated. B. Excavations of earth material to a level not greater than two feet below the bottom of as shield shall be permitted,but only if the shield is designed to resist the forces calculated Section 02228.6 Trench&Excavation Safety for the full depth of the trench and there are no indications while the trench is open of a possible cave-in below the bottom of the shield. C. Use of shields shall be subject to approval by the Owner or their Agent. END OF SECTION Section 02228.7 Trench&Excavation Safety Std. 08/03/2004 ITEM NO. A3002—COMPACTED SAND FILL UNDER STRUCTURES PART 1 —GENERAL 1.01 DESCRIPTION A. Scope: Furnish, place, and compact sand fill under structures within limits shown on PLANS. PART 2—PRODUCTS 2.01 MATERIALS A. Clean sand or clean bank sand free from clay and clay lumps, shale, loam, organic matter, excessive amounts of salt, and other deleterious materials. Sand with maximum Plasticity Index of 7 and with not more than 40 percent passing a No. 200 sieve. Water, if used to aid compaction,to be clean and fresh. PART 3 —EXECUTION 3.01 INSTALLATION A. Construction: Excavate or strip to depth as indicated on PLANS or as directed by Engineer. Compact subgrade to minimum dry density of 95 percent of maximum in accordance with ASTM D698-78 by making several passes with flat-wheeled or vibratory roller to uniformly dense soils and to ensure that localized weak and compressible zones are not present. Shape surface to receive sand fill as shown on PLANS. Place in 8-inch maximum lifts, measured loose, and compact with pneumatic-tired or vibratory roller. In confined areas, compact with mechanical tamps. Compact soils at or near optimum moisture content to a minimum dry density of 95 percent of maximum in accordance with ASTM D698-78. "Waterflooding" to obtain required compaction not permitted. After compacting, shape surface area to grade indicated. Make at least one (1) density test per lift. 3.02 MEASUREMENT AND PAYMENT A. No separate payment for work performed under this Item, including density testing, except as indicated below. Include cost of same in Contract price bid for work of which this is a component part. B. "Extra Compacted Sand Fill", when authorized, to be measured by cross-section method in its compacted position and paid for at Contract unit price bid per cubic yard. Payment under this bid item is limited to compacted sand fill as may be required in excess of amount shown on PLANS. A3002 - 1/1 01/17/2011 ITEM NO. A3007 —REMOVING OLD STRUCTURES PART 1 —GENERAL 1.01 DESCRIPTION Remove and dispose of old structures, or portions of old structures, as shown on PLANS, and include all excavation and backfill to complete the removal hereinafter described. PART 2—PRODUCTS Not applicable to this Item. PART 3 —EXECUTION 3.01 METHOD OF REMOVAL A. Culverts or Sewers: Unless otherwise shown on PLANS, remove pipe and appurtenances by careful excavation of all dirt on top and sides in such a manner that pipe will not be damaged. B. Concrete Structures: Remove concrete structures or concrete portions of structures in sizes not larger than one cubic foot. 1. Concrete portions of structures below the permanent ground line, which will not interfere in any manner with the proposed construction, may be left in place, but removal to be carried at least 2-feet below the permanent ground line and nearly squared off. Cut off reinforcement close to the concrete. C. Steel Structures: Dismantle steel structures or steel portions of structures in sections as determined by Engineer. Sections to be of such weight and dimensions as to permit convenient handling, hauling, and storing if material is to be reused or salvaged. Remove rivets and bolts connecting steel railing members, steel beams of beam spans, and steel stringers of truss spans by cutting the heads with a "cold cut", and punching or drilling from the hole, or by such other method as will not injure members for reuse if material is to be reused or salvaged, and will meet approval of the Engineer. Removal of rivets and bolts from connections of truss members,bracing members, and other similar members in the structure not required unless specifically called for on the PLANS or Special Provisions, and Contractor to have the option of dismantling these members by flame-cutting the members immediately adjacent to the connections. Flame-cutting not permitted, however, when shown on PLANS or when Special Provision calls for the structure unit to be salvaged in such a manner as to permit re- A3007 - 1/3 01/17/2011 erection. In such case, carefully matchmark all members with paint in accordance with diagram furnished by Engineer prior to dismantling, and remove all rivets and bolts from the connections in the manner specified in the first portion of this paragraph. D. Timber Structures: Remove timber structures or timber portions of structures in such manner as to damage the timber as little as possible for further use. Remove all bolts and nails from such lumber as deemed salvable by Engineer. 1. Unless otherwise shown on PLANS, Contractor may remove entirely, or cut off timber piles at a point not less than 2-feet below ground line. E. Brick or Stone Structures: Remove brick or stone structures or stone portions of structures in sizes not larger than one cubic foot. 1. Portions of such structures below the permanent ground line, which will not in any manner interfere with the proposed construction, may be left in place, but removal to be carried at least 2-feet below the permanent ground line, and neatly squared off. F. Trees, Shrubs and Landscaping: Remove and dispose of all trees, shrubs and landscaping associated with site or as shown on plans. Trees, shrubs and landscaping to remain shall be protected during demolition. Trees, shrubs and landscaping shown to be relocated or to be removed shall be relocated or removed as directed on the plans. 3.02 SALVAGE A. All material such as pipe, timbers, railings, etc.,which the Engineer deems as salvable for reuse, and all structural steel to be carefully placed in neat piles at convenient loading points which will not interfere with traffic or construction. Unless designated points shown on PLANS, all other materials deemed salvable by the Owner to be removed by Contractor and neatly piled at convenient loading points on site at no cost to Owner. All of these materials to be the property of Owner. 1. I-beams, stringers, etc., specified to be dismantled without damage for reuse, and all steel members matchmarked and dismantled for reuse, to be blocked off the ground in an upright position to protect the members against further damage. 2. Materials, other than structural steel, deemed non-salvable become the property of the Contractor, to be moved off the site by Contractor, and disposed of in a satisfactory manner. 3. Where temporary structure is necessary for a detour adjacent to the present structure, Contractor will be permitted to use the material in the old structure for the detour structure, but he is to dismantle and stack, or dispose of material as required above,as soon as new structure is complete. 3.03 BACKFILL A3007 -2/3 01/17/2011 A. Backfill all excavation made in connection with this Item, and all openings below natural ground line caused by removal of old structures or portions thereof, to the level of original ground line,unless otherwise shown on PLANS. 1. Place that portion of the backfill which will support any portion of the structure, roadbed, or embankment as required for placing structural backfill and embankment. In places inaccessible to blading and rolling equipment, use mechanical or hand tamps, or rammers to obtain the required density comparable with adjacent undisturbed material. 3.04 MEASUREMENT AND PAYMENT Measurement and Payment: Work prescribed for in this item for culverts & sewers shall be on a linear foot basis. Any work involving structures shall be on a per each basis. A3007 - 3/3 01/17/2011 ITEM NO. A3030—HYDRO-MULCH SEEDING PART 1 —GENERAL 1.01 DESCRIPTION A. Scope: The work covered by this Item consists of furnishing all plant, labor, materials, equipment, supplies, supervision, and tools, and performing all work necessary for topsoiling, smoothing, seeding, fertilizing, watering, maintenance, and clean-up of all areas disturbed during construction, all in accordance with the drawings and TECHNICAL SPECIFICATIONS. B. General: The hydro-mulch seeding operations, together with all other necessary related work, to conform to the requirements specified in this Item. The area to be hydro- mulch seeded to be noted on PLANS. PART 2—PRODUCTS 2.01 MATERIALS A. Seed: All seed must meet the requirements of U.S. Department of Agriculture Rules and Regulations as set forth in Federal Seed Act and Texas Seed Law. Type of seed, purity and germination requirements, rate of application, and planting dates are as follows: APPLICATION RATE POUNDS TYPE PER ACRE PLANTING DATE 1. Hulled Common Bermuda Grass 98/88 40 Unhulled Common Bermuda Grass January 1 to April 15 98/88 40 Annual Rye Grass (Gulf) 50 2. Hulled Common Bermuda Grass 98/88 40 April 15 to October 1 3. Hulled Common Bermuda Grass 98/88 40 Unhulled Common Bermuda Grass October 1 to January 1 98/88 40 Annual Rye Grass (Gulf) 30 A3030 - 1/2 01/17/2011 B. Fertilizer: Fertilizer to be water soluble with analysis of 10 percent nitrogen, 20 percent phosphoric acid, and 10 percent potash. Rate of application to be 750 pounds per acre except during the periods of April 15 through September 1, when the rate to be reduced to 600 pounds per acre. C. Mulch: Mulch to be virgin wood cellulose fiber made from whole wood chips. Within the fiber mulch material, at least 20 percent of the fibers will be 10.7 mm in length and 0.27 mm in diameter. Rate of application to be 2,000 pounds per acre. Soil stabilizers such as Terra Type III(or approved equal)to be applied at a rate of 40 pounds per acre on side slopes and "Terra Tack I" (or approved equal) to be applied at a rate of 40 pounds per acre in the flatter,upper portions of channel areas. PART 3 —EXECUTION 3.01 MAINTENANCE The hydro-mulch seeding to be adequately watered until established. Any areas damaged by erosion or areas that do not have acceptable turfing to be reseeded. 3.02 MEASUREMENT AND PAYMENT Measure by acre as indicated in PROPOSAL. Payment for work under this Item will be made at Contract price for "Hydro-Mulch Seeding", which price to be full compensation for all fertilizer, seed, equipment, materials, and labor necessary for fertilizing and seeding. A3030 - 2/2 Std. 03/04/2009 ITEM NO. A3034- STORM WATER POLLUTION PREVENTION PLAN (SW3P) PART 1 -GENERAL 1.01 DESCRIPTION A. Section Includes: 1. A draft of the Storm Water Pollution Prevention Plan to use as a general guideline to meet new TCEQ Standards. 2. Specifications pertaining to the structural systems and pollution prevention systems to be used to meet the guidelines. 3. Details of the structural systems to be used to meet the TCEQ requirements. B. References 1. Clean Water Act of 1972 establishing the National Pollution Discharge Elimination System(NPDES). 2. Texas Commission Environmental Quality General Permit TXR150000. 3. Section 26.040,Texas Water Code- General Permits 4. 40 CFR 122.2 Federal Defmitions Applicable to NPDES Program. 5. 40 CFR 122.26 Federal Rules Applicable to Storm Water Permits. 6. 40 CFR 122.28 Federal Rules Applicable to State NPDES General Permits 7. Chapter 205, Title 30,Texas Administrative Code—General Permits for Waste Discharges. 8. Section 305.44, Title 30, Texas Administrative Code—Signatories to Reports, Application for Permit or Post-closure Order. 9. Section 305.128, Title 30, Texas Administrative Code—Signatories to Reports, Permit Characteristics and Conditions Rule. C. Related Work Specified Elsewhere 1. Embankment-Item No. A2004 2. Channel Excavation-Item No. A2009 1.02 QUALITY ASSURANCE/QUALIFICATIONS It is the intent of the information provided in this section to be used as the general guidelines of the storm water pollution prevention plan for this project to establish a minimum basis of compliance for bid purposes. However, it is the responsibility of the Contractor and all Subcontractors to meet all of the requirements of the law, regardless of the information provided herein. The plan to which the Contractor certifies compliance shall be the Contractor's plan and no responsibility for the information contained in this section or shown on the plans shall be construed as the Owner's or Engineer's responsibility. Contractor is responsible for filing Notice of Intent. A3034 - 1/2 Std. 03/04/2009 1.03 PLAN The Site Grading Plan supplements the information contained within this section. PART 2 - PRODUCTS Not required for this item. PART 3 - EXECUTION The following information is the basis for the Storm Water Pollution Prevention Plan: Storm Water Pollution Prevention Plan for Rose Hill Park Renovation A3034 -2/2 8/4/14 ITEM NO. B1001 - CONCRETE PART 1 - GENERAL 1.01 DESCRIPTION Scope: This Item governs for materials used; for storing and handling of materials; and for proportioning and mixing of concrete for reinforced concrete pavement, and all reinforced concrete precast and cast-in-place structures. 1. Contractor assumes responsibility for cost and design of proper concrete mixture. A. Related work as called for on PLANS or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. 1.02 QUALITY ASSURANCE A. Furnish laboratory reports showing proportions and materials selected will produce laboratory-mixed concrete of specified quality and having strengths 20 percent higher than 28-day strength specified, at maximum slump and maximum air content specified. B. Owner to select testing laboratory, conforming ASTM E329, to make tests throughout concrete operations. When requested by Owner, Engineer or his representative will monitor tests and review results. 1.03 SUBMITTALS A. Samples 1. Furnish material samples to approved testing laboratory for review and testing. 2. Provide sufficient quantities for testing and determining mixes to produce concrete class specified. B. Mix Designs 1. Submit mix designs for each different concrete strength and for each different aggregate. 2. Secure confirmation of laboratory tests on proposed mix designs prior to submittal. 3. Use only approved mix designs. 4. Make required tests of mix as called for elsewhere in this specification under "Tests." C. Reports: Provide certified mill reports on cement and sieve analysis on aggregate. D. Tests 1. Make moisture tests of aggregate to ensure proper batching and proportioning. 2. Provide and maintain curing facilities conforming to ASTM C31. 3. For Structural Concrete: B1001 - 1/8 8/4/14 a. Perform sufficient number of tests to maintain check on quality. b. Conduct tests as per test procedures (ASTM C31 and C39 for Compression Test). c. When Portland cement concrete other than high-early-strength concrete is used,test minimum of two(2) standard 6-inch by 12-inch cylinders at 7 days and minimum of two (2)6-inch by 12-inch cylinders at 28 days, for each 50 yards of concrete placed or each structure, whichever is less. d. When high-early-strength concrete is used,test minimum of two (2) standard 6-inch by 12-inch cylinders at 3 days and minimum of two (2)6- inch by 12-inch cylinders at 7 days for each 50 cubic yards of concrete placed or for each structure,whichever is less. Minimum strengths normally required at 7 and 28 days will be required at 3 and 7 days, respectively. 4. For paving concrete, test pavement work as required by PLANS and/or as follows: a. Make one beam for each 1,000 square yards of pavement, or part thereof, for each day's pour and/or one beam on each street. b. Size of beams as required by ASTM C31. c. Core sampling in accordance with requirements of Special Provision. d. If requirements not established by Special Provision,make one core for each 1,000 linear feet or pavement, or one core for each 2,500 square yards of pavement, or at least one core for each street, whichever is lease in area. e. Fill core hole with non-shrinking grout at no additional cost to Owner. f. Test core for compressive strength and for thickness. 5. For air entrainment,make two tests, in accordance with ASTM C138 or C173, for each day's placing. 6. Make slump tests periodically in accordance with ASTM C 143. E. Specimen handling 1. Mark test specimens clearly in a definite sequence. 2. Transport and store specimens to prevent damage. 3. Provide insulated shed for storage of cylinders and beams. 4. Provide records identifying each cylinder with locations from which specimens were taken. 5. Cure specimens under laboratory conditions, except that for a possibility of surrounding air temperature falling below 40o F, additional specimens to be cured under job conditions may be required. F. Failure to Meet Specifications 1. Concrete failing to meet specifications will be rejected. 2. Should a 3-day(high-early cement)or 7-day(normal cement)test fail to meet established strength requirements, extended curing or resumed curing may be required. 3. Contractor to strength structures or replace portions thereof which fail to meet established strength requirements, at Contractor's expense. 4. Test cores,when required,to be in accordance with procedures of ASTM C42 at no additional cost to Owner. B1001 -2/8 8/4/14 1.04 PRODUCT DELIVERY, STORAGE, AND HANDLING A. Cement 1. Store in weathertight enclosure and protect against dampness, contamination,and warehouse set. 2. Use only one supply source for each aggregate stockpile. B. Aggregates 1. Stockpile to prevent excessive segregation, or contamination with other materials or other sizes of aggregates. 2. Use only one supply source for each aggregate stockpile. C. Admixtures 1. Store to prevent contamination, evaporation, or damage. 2. Protect liquid admixtures from freezing or harmful temperature ranges. 3. Agitate emulsions prior to use. PART 2—PRODUCTS 2.01 MATERIALS A. Concrete: Ready-mix concrete conforming to ATSM C94 or site-mixed concrete (dry weight 145-150 pounds per cubic foot). 1. Cements a. ASTM C 150, Type I. b. ASTM Specifications for weight variations and length of storage. c. Use no caked cement. d. Deliver in bags for site-mixed concrete. e. Use only one brand of cement in any one structure. f. Cement for Class "P"concrete may be delivered in bulk if method of handling is approved. 2. Admixtures a. Air-entraining admixtures in accordance with ASTM C260. b. Water-reducing and retarding admixtures in accordance with ASTM C494, Type A, or Type D admixture, modified as follows 1) Bleeding water no greater than bleeding water of ASTM C494 reference concrete when tested as per ASTM C232. 2) Increase durability, decrease permeability, and increase resistance to surface scaling,when compared to ASTM C494 reference concrete. 3) No chlorides or alkalis added during manufacture of admixture. c. High range water-reducing admixture(superplasticizer)in accordance with ASTM C494, Type F or Type G modified as follows: 1) Superplasticized concrete to be nonsegregating,have little bleeding, and have physical properties similar to low water-cement ratio concrete. B1001 - 3/8 8/4/14 2) Admixture composed of a synthesized suffocated polymer to be added to the concrete mixer with gauge water at the central batch plant. 3) Use only one liquid admixture to achieve the superplasticized concrete, except where air entrainment is desired, in which case, air entraining admixture to be compatible with superplasticizer admixture. 4) Treated concrete must be capable or maintaining superplastic state in excess of two hours. 5) Dosage as recommended by the manufacturer. d. Additional Requirements 1) Manufacturer to provide proof of successful field use of water- reducing and retarding admixture from recognized laboratories and other authorities. 2) Manufacturer to provide local representative and warehouse facilities,when requested by Owner. 3) Provide qualified concrete technician to assist in concrete mix design, if required. 4) If required, Contractor to acquire approved commercial laboratory testing at no cost to Owner to furnish certification of compliance with this specification. 5) Water reducing a retarding admixtures used in Class A and Class K concrete only,unless other wise specified. 6) Use manufacturer's published recommended dosage for optimum results as minimum requirements. Engineer may vary dosage after analysis of results of local commercial laboratory tests using materials from sources assigned by Contractors. 7) Dispensing and mixing equipment and procedures at batch plant are subject to approval. 3. Coarse Aggregate a. Durable particles of gravel, crushed gravel, crushed blast furnace slag, crushed stone, or combination thereof, conforming to ASTM C33. b. Use clean, durable particles, free from frozen materials, clay, salt, alkali, vegetable matter, or other coating,which would adversely affect strength of concrete or bonding of aggregate to cement paste. 1) Non-Prestressed Concrete aggregate size from No. 4 to 1 'A-inch. 2) Prestressed Concrete aggregate size from No. 4 to 1-inch. c. The maximum size coarse aggregate to be as indicated above or no greater than three-fourths of the minimum clear spacing between parallel reinforcing bars or prestressing tendons, whichever is smaller. 4. Fine Aggregate a. Natural sand as per ASTM C33. b. Fineness modulus between 2.4 and 2.9. 5. Water a. Free from oils, acids, alkalis, organic mater or other deleterious substances, and not containing more than 1,000 parts per million of sulphates. B 1001 - 4/8 8/4/14 b. Testing not required from municipal supplies approved by Texas Commission on Environmental Quality(TCEQ),but from other sources water will be sampled and tested, at no additional cost to Owner,before use. 6. Slump a. Test method as per ASTM C 143. b. As indicated in Classification Table. 7. Mix Proportioning a. As per Classification Table,based on maximum water-cement ratio and minimum strength requirements,with limits set on minimum cement content. b. Increase cement content above minimum or use approved admixtures, without additional cost to Owner, if type, gradation, or sizes of aggregate being supplied gives concrete mixture not meeting strength and workability requirements. 8. Coring Materials: Per Item"Concrete Structures." B. Nonshrink Grout: Grout to have moderate fluidity and to conform to Corps of Engineers Specification CRD-C 621-82B. C. Pumpable Flowable Backfill: 1. Mix#94564FFP: (Per Knife River—An MDU Resources Company) a. Sand 2450#/CY ASTM C-33 b. Cement 94#/CY ASTM C-150 c. Fly Ash 564#/CY ASTM C-618 d. Eucon Air-40 5 oz/CY ASTM C-680 e. Water 49 gal/CY Municipal B1001 - 5/8 8/4/14 CLASSIFICATION TABLE Max.Water Content") ,. Min.Comp. Pounds of Gallons of Min.Cement Per Slump Range Total Air Content Stren (psi) Water/Lb. Water/Bag C.Y. * o Class-Type 7-Day 28-Day Cement Cement Lbs. Bags (m.) (/o) A-Structural 2000 3000 0.55 6.25 494 5.25 2%to 4'/2 2`/z to 4%z Asp-Structural t'> 2000 3000 0.50 5.65 423 4.50 7 to 10(4) 3 to 5 B-Slope 1200 2000 0.75 8.50 400 4.25 2%2 to 4 2'/ Protection C-Pipe Blocking -- 1500 0.97 11.00 282 3.00 3 to 5 3 to 6 D-Seal Slab --- -- -- --- 376 4.00 6 to 8 As needed E-Monolithic 2000 3000 0.55 6.25 564 6.00 4 to 6 3 to 5 Sewer F-Prestressed(5) - 5000 0.51 5.75 635 6.75 2 to 3 As needed G-Prestressed") -- 6000 0.49 5.50 658 7.00 2 to 3 As needed K-Structural(s) 2800 4000 0.50 5.65 564 6.00 3'/z to 5 2`/2 to 4%z Ksp-Structural(3) 2800 4000 0.45 5.00 470 5.00 7 to 100> 3 to 5 P-Paving 6-Inch 1800 2800 0.66 7.50 423 4.50 3 to 5 2%to 4'% (8) 450)7) P-Paving 7-Inch 2000 3000 0.66 7.50 470 5.00 3 to 5 2'/2 to 4`/2 (8) 500(') P-Paving 8-Inch 2000 3000 0.66 7.50 470 5.00 3 to 5 2'%to 4'% (8) 550(7) *All slump Ranges+'/Z-Inch Tolerance (1) Include in maximum water,free water in aggregate minus absorption of aggregate based on a 30-minute absorption period. (2) For concrete placed under water,minimum cement per cubic yard shall be 611 pounds (6.5 bags). (3) Asp and Ksp to contain approved High Range Water Reducing(HRWR)Admixture. (4) Maximum 2-Inch slump before addition of HRWR Admixture. (5) For prestressed concrete,water-reducing admixture may be used as needed. (6) Use approved water-reducing and retarding admixture. (7) Minimum flexural strength at 7 days. (8) Slump range 1-Inch to 3-Inch when slip form method of construction used. B1001 - 6/8 8/4/14 PART 3—EXECUTION 3.01 MIXING CONCRETE A. General 1. Ready mixed and in accordance with requirements of current ACI Building Codes. 2. Postpone or delay work during adverse weather conditions. 3. Protect dry batch material so that it reaches mixer in a dry condition. 4. Use batch mixer having approved and positive water control, and measuring device for all materials. 5. Continue mixing to ensure uniform distribution of materials,but not less than 11/z minutes after all materials have been introduced into mixer drum. 6. Rotate drum at peripheral speed recommended by mixer manufacturer. 7. Mix and deliver as per ASTM C94. a. Add mixing water at plant. b. Mix concrete in quantities required for immediate use, and discharge at job site within one hour after introduction of cement to aggregate. If Contractor can prove that concrete consistency measured by slump will not be reduced by more than 2-inches when superplasticized concrete is used,time interval between mixing and placing may be extended to a maximum of 90 minutes or to a period in which slump loss will not exceed 2-inches. c. Begin mixing operation within 30 minutes after cement and aggregates intermingled. d. Ready-mixed concrete producer to furnish delivery tickets indicating: 1) Delivery date and time dispatched. 2) Name and location of project. 3) Name of contractor. 4) Name of ready mixed concrete producer. 5) Truck number. 6) Number of cubic yards of concrete in load. 7) Class of concrete. 8) Cement content in bags per cubic yard of concrete. 9) Amount of admixture in concrete, if any. 10) Number of gallons of water in mixture. 11) Air content. 8. Job mix concrete in approved type mixer, and do not load beyond manufacturer's rated capacity. a. Normal Weight Concrete 1) Mix batches of one cubic yard or less for minimum of 1 Y2 minutes after materials are placed in mixer. 2) Increasing mixing time 15 seconds for each half yard increased over on cubic yard batch. b. Maintain positive batch control equipment to within one percent(1%) accuracy. c. Clean, maintain, and operate equipment so as to thoroughly mix material as required. B1001 - 7/8 8/4/14 d. Hand mixing permitted for small placements only, or in emergencies, as authorized. e. Hand-mixed batches not to exceed a two-bag in volume. 9. Do not mix when air temperature is at or below 40 deg. F (taken in the shade away from artificial heat) and falling,or if likely to fall below 40 deg. F in next 24 hours. 10. To produce concrete with minimum temperature of 50 deg. F,heat aggregate and/or water uniformly as follows: 1) Water temperature not to exceed 180 deg. F, and/or aggregate temperature not to exceed 150 deg. F. 2) Heat mass of aggregate uniformly. 3) Temperature of aggregates and water to be between 50 deg. F and 85 deg. F before introduction of cement. 3.02 INSTALLATION In accordance with other applicable TECHNICAL SPECIFICATIONS. 3.03 MEASUREMENT AND PAYMENT A. No separate measurement and payment for work performed under this Item, except as indicated below. Include cost of same in contract price bid for work of which this is a component part. B. Measure"Extra Concrete,"when approved by Engineer,by cubic yard of concrete of class ordered, complete in place. Pay for"Extra Concrete unit price bid per cubic yard for classes of"Extra Concrete"used B 1001 - 8/8 01/17/2011 ITEM NO. B2001 -CONCRETE STRUCTURES PART 1 - GENERAL 1.01 DESCRIPTION A. Scope: Construction procedures for all types of concrete cast-in-place structures including methods for forming,placing, and curing. B. Related work as called for on PLANS or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. 1.02 SUBMITTALS A. Submit samples mix designs,tests, and reports,per Item No.B1001 - "Concrete." B. Prior to start of work, submit following information when requested by Special Provision. 1. Methods of construction. 2. Plans for forms and falsework. 3. Amount and type of equipment. 4. Concrete placing schedule with facilities for handling concrete shrinkage. 5. Tabulation of concrete surfaces indicating types of finish on each surface. PART 2 -PRODUCTS 2.01 MATERIALS A. Concrete: Item No. B 1001 - Concrete. The class of concrete for each type of structure or unit shall be as shown on the plans,or by pertinent governing specifications. B. Reinforcing Steel. All reinforcing steel shall conform to the provisions of Item No. B3001 - "Reinforcing Steel." C. Expansion Joint Material: Per ASTM D1752 and Texas Department of Transportation Standard Specifications for construction of highways, streets and bridges (TXDOT) Item 433, "Joint Sealants and Fillers." 1. Performed Fiber Material. Preformed fiber expansion joint material shall conform to the dimensions shown on the plans. Unless otherwise specified, "Performed Bituminous Fiber Material" shall be used. 2. Joint Sealing Material. Unless shown otherwise, the sealer shall be a "Low Modulus Silicone Sealant." B2001 - 1/27 01/17/2011 3. Asphalt Board. Asphalt board shall conform to the dimensions shown on the plans. 4. Rebonded Neoprene Filler. Rebonded neoprene filler shall conform to the dimensions shown on the plans. D. Waterstop. 1. Rubber waterstop or polyvinyl chloride (PVC) waterstop shall be in conformance with TXDOT Item 435,"Elastomeric Materials." 2. Other types shall be as shown on the plans. E. Curing Materials: Unless otherwise indicated,use one of the following. 1. Membrane curing shall conform to TXDOT Item 526, "Membrane Curing." 2. Cotton mats shall consist of a filling material of cotton "bat" or "bats" (min. 12 oz. per sq. yd.); covered with unsized cloth (min. six (6) oz. per sq. yd); tuft or stitched to maintain stability; shall be free from tears;and shall be in good general condition. 3. Polyethylene sheeting shall be four(4)mil.minimum thickness and free from visible defects. It shall be clear or opaque white except when the temperature during the curing period does not exceed 60 F or when applicable to control temperature during mass pours. 4. Burlap-polyethylene mats shall be made from burlap impregnated on one side with a film of opaque white pigmented polyethylene and free from visible defects. 5. Laminated mats shall have not less than one(1)layer of an impervious material such as polyethylene, vinyl plastic or other acceptable material (either as a solid sheet or impregnated into another fabric)and shall be free of visible defects. F. Admixtures. Concrete admixtures shall comply with the requirements of TXDOT Item 437, "Concrete Admixtures". G. Epoxy. Unless otherwise specified,epoxy materials shall conform to TXDOT Item 575, "Epoxy". H. Latex Emulsions. Latex emulsion used for latex based grout/mortar, latex adhesive grout/mortar or other purposes shall conform to TXDOT Departmental Materials Specification D9-8110. Forms and Falsework 1. Timber a. Seasoned good quality timber, free from loose or unsound knots, knot holes, twists,shakes,decay,and other imperfections which would affect its strength or impair finished surface of concrete. b. Wedges,when required,to be hardwood or metal. 2. Metal a. Thickness of metal forms as required to maintain true shape without warping or bulging. B2001 - 2/27 01/17/2011 b. Keep metal forms free from rust, grease, or other foreign materials, and use only those which present a smooth surface and line up properly. c. Aluminum not permitted. J. Grout 1. Nonshrinking Grout: Premixed grout which is nonmetallic, noncorrosive, and nonstaining; containing specially selected silicon sands, cement, shrinkage compensating agents,plasticizing and water reducing agents. a. Conform to requirements of Corps of Engineers CRD-0588 Test Method CRD- 0589. b. Minimum 28-day compressive strength of 8,000 psi. c. Maintain grout temperature during placement between 50 deg.F and 90 deg.F. d. Prepare and place grout according to grout manufacturer's specifications. 2. Nonshrink Epoxy Grout: Five Star epoxy grout as manufactured by U.S. Grout Corporation or equal. K. Permanent Moisture Barrier: Polyethylene film minimum thickness of .006 inch (six mils)with high impact strength rating. L. Paint Type Coating: Synthetic elastomer-polyester base coating containing fiberglass, mica,and perlite,and may be either of the following: 1. "Tex-Cote" concrete gray fine textured "Bridge Coat" (Textured Coatings of America, Inc.) 2. "Scotch Shield" coatings(Preston Company). M. Waterproofing: Self-adhering polyethylene with a rubberized asphalt mastic material. 1. Minimum 4 mil thickness polyethylene coated on one side with a layer of adhesive rubberized asphalt with protective membrane. 2. Designed for tensile strength of 250 psi when tested in accordance with ASTM D412-80. 3. Thickness to be 60 mils excluding the protective release membrane. 4. Furnish in rolls 36 inches minimum width and 50 feet minimum length. N. Coal Tar Epoxy Coating 1. Modified Coal Tar Epoxy Compound consisting of 100 percent sprayable solids not requiring solvent material for application or curing. Finished product to be flexible and free of chalking, checking, and hairline shrinkage cracks. Manufacturers: Madewell 1103 Coal Tar Epoxy Coating or equal. 2. Coal Tar Epoxy Primer: Madewell 927 or equal. B2001 - 3/27 01/17/2011 PART 3 -EXECUTION 3.01 GENERAL REQUIREMENTS Concurrence on the part of the Engineer of any proposed construction methods, approval of equipment, or of form and falsework plans does not relieve the Contractor of the responsibility for the safety or correctness of the methods,the adequacy of his equipment or from carrying out the work in full accordance with the contract. A. Time Sequence of Construction Operations. 1. Do not place superstructure members, forms, falsework, or erection equipment on substructure before concrete therein has attained a flexural strength of 425 psi. 2. Erect forms on footings support by piling or drilled shafts after concrete has attained a minimum flexural strength of 340 psi. Such work may begin on spread footings after concrete has aged at least 2 curing days. Concrete may be placed as soon as the forms and reinforcing steel are approved. 3. Support of tie beam and/or cap forms by falsework placed on previously placed tie beams is permissible, provided such beams have attained 425 psi. flexural strength, properly supported to eliminate stresses not provided for in design. 4. For bridges and direct traffic culverts, construction traffic and traveling public permitted in accordance with the following. a. Authorization for light construction traffic not to exceed a three-quarter ton truck may be given after last slab of concrete has been in place at least 14 days. b. After the last slab concrete has been in place at least 21 days, authorization may be given for other construction traffic, or for the traveling public when necessary. Vehicle exceeding the legal load limit will be allowed in accordance with TXDOT Item 6, "Control of Materials". 5. Forms, or screed supports for bridges, may be attached to I-beams or girders by welding, subject to the following requirements: a. Welds will not be permitted on tension flanges and in those areas shown on the plans or as directed by the Engineer. b. Welds shall be made in accordance with TXDOT Item 448, "Structural Field Welding". 3.02 CONSTRUCTION A. Forming 1. General Requirements: Shall be designed and constructed to safely carry the maximum anticipated loads, including wind loads, and to provide the necessary rigidity. Details of falsework construction shall be subject to review and approval by the Engineer. 2. Design Loads: For evaluating the adequacy of job fabricated falsework, a weight of 150 pounds per cubic foot shall be assumed for concrete, and a live load allowance of 50 pounds per square foot of horizontal surface of the form work shall be included. The maximum stresses shall not exceed 125 percent of the allowable stresses used for the design of structures. Commercially produced structural units used in falsework shall not exceed the manufacturer's maximum allowable working load for moment, and shear or end reaction. The maximum allowable working load B2001 -4/27 01/17/2011 shall include an allowance of 35 pounds per square foot of horizontal form surface and sufficient details and data shall be submitted to the Engineer for approval. 3. Falsework a. When wedges are used to adjust falsework to desired elevations, the wedges shall be used in pairs to insure even bearing. The use of wedges to compensate for incorrectly cut bearing surfaces will not be permitted. b. Sills or grillages shall be large enough to support the superimposed load without settlement, and unless founded on solid rock, shale or other hard materials, precautions shall be taken to prevent yielding of the supporting material. c. Falsework, which cannot be founded on a satisfactory spread footing, shall be placed on piling or drilled shafts having a bearing capacity sufficient to support the superimposed load without settlement. Falsework piling shall be driven to the required resistance determined by the applicable formula given in TXDOT Item 404, "Driving Piling". Drilled shafts for falsework shall be designed to carry the superimposed load using both skin friction and point bearing. d. Welding, when used, shall conform to the requirements of TXDOT Item 448, "Structural Field Welding". Each falsework bent shall be securely braced to provide the stiffness required with the bracing securely fastened to each pile or column it crosses. The falsework shall be removed when no longer required. Falsework piling shall be pulled or cut off not less than six (6) inches below finished ground level. Falsework, piling or drilled shafts in a stream, lake, or bay shall be completely removed to a point specified by the Engineer to prevent any obstruction to the waterway. 4. Forms. All forms shall be constructed in accordance with the following: a. General. Except where otherwise specified, forms may be of either timber or metal. 1) Forms for round columns exposed to view shall be of steel, except that other materials will be allowed with written permission of the Engineer. 2) Studs, joists, wales or other devices used for form supports shall be of sufficient section and rigidity to withstand undue bulging or settling of the forms. Any device or method used for form support shall be subject to the approval of the Engineer. 3) Forms shall be designed for the pressure exerted by a liquid weighing 150 pounds per cubic foot. The rate of placing the concrete shall be taken into consideration in determining the depth of the equivalent liquid. Job fabricated forms shall be designed for an additional live load of 50 pounds per square foot of horizontal surface. The maximum unit stresses shall not exceed 125 percent of the allowable stresses used for the design of structures. 4) Commercially produced structural units used in form work shall not exceed the manufacturer's maximum allowable working load for moment, shear or end reaction. The maximum working load shall include a live load of 35 pounds per square foot of horizontal form surface and sufficient details and data shall be submitted to the Engineer for review. 5) Forms shall be practically mortar-tight, rigidly braced and strong enough to prevent bulging between supports and shall be maintained to the proper B2001 - 5/27 01/17/2011 line and grade during concrete placement. Forms shall be maintained in a manner to prevent warping and shrinkage. 6) Offsets at form joints shall not exceed 1/16 inch. Form supports for slabs shall not be welded to the top flange of I-beams or girders except in accordance with the provisions of Article 3.02.A. 7) Deflections due to cast-in-place slab concrete and railing shown in the dead load deflection diagram shall be taken into account in the setting of slab forms. 8) All forms and footing areas shall be cleaned of any extraneous matter before placing concrete. 9) Permission to place concrete will not be given until all preparatory work is complete to the satisfaction of the Engineer. 10) If, at any stage of placement, the forms show signs of bulging or sagging, the portion of the concrete causing such condition shall be removed immediately, if necessary,and the forms shall be reset and securely braced against further movement. 11) Wet surface of forms to be in contact with concrete immediately before placing concrete. 12) Before concrete placement, align edges and faces of form panels and tape or fill joints with patching plaster or cold-water putty to prevent leakage; sand lightly with No. 0 sandpaper to make joints smooth. 13) Forms of any kind are not permitted under permanent structures. B. Timber Forms. 1. Lumber for forms shall be properly seasoned, of good quality, and free from imperfections, which would affect its strength or impair the finished surface of the concrete. 2. Forms or form lumber to be reused shall be maintained clean and in good condition. Any lumber which is split, warped, bulged, marred or has defects that will produce inferior work shall not be used and shall be promptly removed from work. 3. Form lining will be required for all forms surfaces, except for the inside of culvert barrels,inlets,manholes and box girders;the bottom of bridge decks between beams or girders; surfaces that are subsequently covered by backfill material or are completely enclosed; and, any surface formed by a single finished board. Lining will not be required when plywood forms are used. Form lining shall be of an approved type such as Masonite or plywood. Thin membrane sheeting such as polyethylene sheets shall not be used for form lining. Commercial form liners used to imprint a pattern or texture on the surface of the concrete shall be as shown on the plans and/or as approved by the Engineer. 4. Forms may be constructed of plywood not less than 1/2 inch in thickness. The grain of the face plies on plywood forms shall be placed parallel to the span between the supporting studs or joists. Plywood used for forming surfaces which remain exposed shall be equal to that specified as B-B Plyform Class I or Class II Exterior of the U.S. Department of Commerce, National Institute of Standards and Technology,U.S.Product Standard,latest edition. 5. Studs and joists shall be spaced so that the facing form material remains in true alignment under the imposed loads. B2001 - 6/27 01/17/2011 6. Wales shall be spaced close enough to hold forms securely to the designated lines and scabbed at least four(4) feet on each side of joints to provide continuity. A row of wales shall be placed near the bottom of each placement. 7. Facing material shall be placed with parallel and square joints and securely fastened to supporting studs. 8. Forms for surfaces receiving only an ordinary finish and exposed to view shall be placed with the form panels symmetrical, i.e., long dimensions set in the same direction. Horizontal joints shall be continuous. 9. Molding for chamfer strips or other uses shall be made of materials of a grade that will not split when nailed and which can be maintained to a true line without warping. Wood molding shall be mill cut and dressed on all faces. Unless otherwise provided herein or shown on the plans, forms shall be filleted at all sharp corners and edges with triangular chamfer strips measuring 3/4 inch on the side. 10. Except at structures where railing is to be attached,culvert headwall heights shall be adjusted as necessary to provide a maximum projection of three(3)inches above the roadway slope unless otherwise directed by the Engineer. As the entrance of all box culverts, a three(3)inch chamfer shall be provided along the bottom edge of the top slab. Reinforcing steel shall be adjusted as necessary to provide a minimum 1-1/4 inch clear cover. No changes will be made in quantities and no additional compensation will be allowed for this work. 11. All forms shall be constructed to permit their removal without marring or damaging the concrete. The forms may be given a slight draft to permit ease of removal. 12. Metal form ties of an approved type or a satisfactory substitute shall be used to hold forms in place and shall be of a type that permits ease of removal of the metal as hereinafter specified. 13. All metal appliances used inside of forms for alignment purposes shall be removed to a depth of at least 1/2-inch from the concrete surface. The appliances shall be made so the metal may be removed without undue chipping or spiting of the concrete, and when removed, shall leave a smooth opening in the concrete surface. Burning off of rods,bolts or ties will not be permitted. 14. Any wire ties used shall be cut back at least 1/2-inch from the face of the concrete. 15. Devices holding metal ties in place shall be capable of developing the strength of the tie and adjustable to allow for proper alignment. 16. Metal and wooden spreaders which are separate from the forms shall be removed entirely as the concrete is being placed. 17. Adequate clean-out openings shall be provided for narrow walls and other locations where access to the bottom of the forms is not readily attainable. 18. The facing of all forms shall be treated with bond breaking coating of such composition that would not discolor or otherwise injuriously affect the concrete surface. Care shall be exercised to prevent coating of the reinforcing steel. C. Metal Forms. The foregoing requirements for timber forms regarding design, mortar- tightness, filleted corners, beveled projections, bracing, alignments, removal, reuse and wetting shall also apply to metal forms, except that these will not require lining, unless specifically noted on the plans. The thickness of form metal shall be as required to maintain the true shape without warping or bulging. All bolt and rivet heads on the facing sides shall be countersunk. Clamps, pins or other connecting devices shall be designed to hold the forms rigidly B2001 -7/27 01/17/2011 together and to allow removal without injury to the concrete. Metal forms which do not present a smooth surface or which line up improperly shall not be used. Metal shall be kept free from rust, grease or other foreign materials. D. Form Supports for Overhang Slabs. Form supports which transmit a horizontal force to a steel girder or beam, or to a prestressed concrete beam will be permitted, providing a satisfactory structural analysis has been made of the effect on the girder or beam and approval is granted by the Engineer. 1. When overhang brackets are used on prestressed concrete beam spans with slab overhangs not exceeding three (3) feet six (6) inches, bracing requirements shall conform to the details shown on the plans. 2. For spans in which the overhang exceeds three (3) feet six (6) inches, additional support will be required for the outside beams regardless of the type beam used. Details of the proposed support system shall be submitted by the Contractor for approval. 3. Holes in steel members for support of overhand brackets may be punched or drilled full size or may be torch cut to 1/4-inch under size and reamed full size. In no case shall the holes be burned full size. The hole shall be left open unless otherwise shown on the plans. The holes shall never be filled by welding. E. Drains. Weep holes and roadway drains shall be installed and constructed as shown on the plans. F. Joints 1. Expansion Joints. a. Joints and devices to provide for expansion and contraction shall be constructed in accordance with plan details and the requirements of this Item. b. The bearing area under the expansion ends of concrete slabs and slab and girder spans shall be given a steel trowel fmish, and finished to the exact grades required. c. Bridging of concrete or mortar around expansion joint material in bearings and expansion joints shall be prevented. d. All open joints and joints to be filled with expansion joint material shall be constructed using forms adaptable to loosening or early removal. To avoid expansion or contraction damage to the adjacent concrete, these forms shall be loosened as soon as possible after fmal concrete set to permit free movement of the span without requiring full form removal. e. When a "Type A"joint is shown on the plans, preformed fiber joint material shall be used in the vertical joints of the roadway slab, curb,median or sidewalk and the top one (1) inch thereof shall be filled with the joint sealing material shown herein or shown on the plans. f. The sealer shall be installed in accordance with TXDOT Item 438, "Cleaning and/or Sealing Joints and Cracks (Portland Cement Concrete)", and the manufacturer's recommendations. g. Where preformed fiber joint material is used, it shall be anchored to the concrete on one(1)side of the joint by light wire or nails. h. Finished joints shall conform to the plan details with the concrete sections completely separated by the specified opening or joint material. B2001 - 8/27 01/17/2011 i. Soon after form removal and again where necessary after surface finishing, all concrete shall be removed from within the joint opening to insure full effectiveness of the expansion joint. 2. Construction Joints. a. The joint formed by placing plastic concrete in direct contact with concrete that has attained its initial set shall be deemed a construction joint. The term monolithic placement shall be interpreted to mean that the manner and sequence of concrete placing shall not create a construction joint. b. Construction joints shall be of the type and at the locations shown on the plans. Construction joints other than those shown on the plans will not be permitted in bridge slabs. Additional joints in other members will not be permitted without written authorization from the Engineer. When additional joints are authorized, they shall have details equivalent to those shown on the plans for joints in similar locations. c. Unless otherwise provided, construction joints shall be square and normal to the forms. Bulkheads shall be provided in the forms for all vertical joints. d. Construction joints requiring the use of joint sealing material shall be as shown on the plans. e. A concrete placement terminating at a horizontal construction joint shall have the top surface roughened thoroughly as soon as practicable after initial set is attained. f. The hardened concrete surface shall be thoroughly cleaned of all loose material, laitance, dirt or foreign matter and saturated with water. All freewater shall be removed and the surface shall be in a moist condition when concrete and/or bonding grout is placed against it. g. Forms shall be drawn tight against the existing concrete to avoid mortar loss and offsets at joints. h. When shown on the plans or in other specifications, the joint surface shall be coated with bonding mortar,grout,or other specified material. i. When shown on the plans, Type V epoxy material shall be used for bonding fresh concrete to hardened concrete. The bonding epoxy shall be placed on a clean,dry surface and shall be tacky when the fresh concrete is placed. G. Seal for Foundations. Concrete for foundation seals,unless otherwise specified, shall be in accordance with TXDOT Item 400, "Excavation and Backfill for Structures". H. Placing Reinforcement. 1. Reinforcement shall be placed as provided in Item No. B3001 - "Reinforcing Steel". Reinforcing steel supports shall not be welded to I-beams or girders or to reinforcing steel except where shown on the plans to be permissible. 2. Post tensioning ducts shall be placed in accordance with the approved prestressing details, and in accordance with TXDOT Item 426, "Prestressing". The Contractor shall maintain all ducts free of obstructions until all post tensioning operations are complete. Placing Concrete-General. B2001 -9/27 01/17/2011 1. The Contractor shall give the Engineer sufficient advance notice before placing concrete in any unit of the structure to permit the inspection of forms, reinforcing steel placement and other preparations. 2. The sequence of placing concrete shall be as shown on the plans or as required herein. 3. Concrete placement will not be permitted when impending weather conditions would impair the quality of the finished work. If conditions of wind,humidity, and temperature are such that concrete cannot be placed without cracking, concrete placement shall be done in the early morning or at night. When concrete mixing, placing, and finishing is done in other than daylight hours,provisions shall be made to adequately light the entire placement site. The Engineer will approve the adequacy of such lighting before operations are begun. 4. Where work has been started and changes in weather conditions require protective measures, the Contractor shall furnish adequate shelter to protect the concrete against damage from rainfall, or from freezing temperatures as outlined in Article 3.02.J. If necessary to continue operations during rainfall, the Contractor shall also provide protective coverings for the material stockpiles. Aggregate stockpiles need to be covered only to the extent necessary to control the moisture conditions in the aggregates. 5. After concrete has achieved initial set, at least one(1) curing day shall elapse before placing strain on projecting reinforcement in order to prevent damage to the concrete. 6. Placing Temperature. a. The temperature of all concrete at the time of placement shall be not less than 50 F. b. The temperature of cast-in-place concrete in bridge slabs and top slabs of direct traffic structures shall not exceed 85 F when placed. Concrete diaframs, parapets, concrete portions of railing, curbs, and sidewalks, unless monolithically placed with the slab,will not be subject to the above maximum. Other portions of structures, when shown on the plans, shall require the temperature control specified. c. For mass concrete placements, as defined in Subarticle 3.02.I.15, the concrete temperature at the time of placement shall not exceed 75 F. 7. Transporting Time. The maximum time interval between the addition of cement to the batch and the placing of concrete in the forms shall conform to the requirements in Table 1. TABLE 1 TEMPERATURE-TIME REQUIREMENTS Concrete Temperature Max Time Max Timed') (at point of placement) (No Retarding Agent) (With Retarding Agent) Non-Agitated Concrete: Above 80° F 15 30 B2001 - 10/27 01/17/2011 80° F and Below 30 45 Agitated Concrete: Above 90° F 45 75 Above 75°through 90° F 60 90 75° F and Below 90 120 (1)Normal dosage of retarder 8. Transporting Equipment. a. The method and equipment used to transport concrete to the forms shall be capable of maintaining the rate of placement shown on the plans or required by the Engineer. Concrete may be transported by buckets, chutes, buggies, belt conveyors,pumps or other methods. b. When belt conveyors or pumps are used, sampling for testing should be done at the discharge end. When in the opinion of the Engineer, it is deemed impractical to sample as the discharge end, sampling may be done at the mixer provided that correlation testing is performed and documented to ensure specification requirements are met at the discharge end. c. Concrete transported by conveyors shall be protected from sun and wind, if necessary, to prevent loss of slump and workability. Pipes through which concrete is pumped shall be shaded and/or wrapped with wet burlap, if necessary, to prevent loss of slump and workability. Concrete shall not be transported through aluminum pipes, tubes, or other aluminum equipment. Pump lines shall conform to the following: 1) For Grade 2 coarse aggregate and smaller, the minimum size pump line shall be five(5)inches ID. 2) For Grade 1 coarse aggregate, the minimum size pump line shall be eight (8)inches ID. d. Chutes,troughs,conveyors or pipes shall be arranged and used so that the concrete ingredients will not be separated. When necessary to prevent segregation, such equipment shall terminate in vertical down-spouts. Open troughs and chutes shall extend, if necessary, down inside the forms or through holes left in the forms. e. All transporting equipment shall be kept clean and free from hardened concrete coatings. Water used for cleaning shall be discharged clear of the concrete. 9. Forms. a. Openings in forms shall be provided, if needed, for the removal of laitance or foreign matter. b. All forms, prestressed concrete panels, T-beams, and concrete box beams on which concrete is to be placed shall be wetted thoroughly prior to placing concrete thereon. Any remaining puddles of excess water shall be removed. The top of such members shall be in a moist surface dry condition when concrete is placed on them. 10. Handling, Placing, and Consolidation. The method of handling, placing, and consolidation of concrete shall minimize segregation of the concrete and B2001 - 11/27 01/17/2011 displacement of the reinforcement. A uniform dense compact mass shall be produced. a. Handling and Placing. Concrete shall not have a free fall of more than five (5) feet, except in the case of thin walls such as in culverts or as specified in other items. Any hardened concrete splatter ahead of the plastic concrete shall be removed. Each part of the forms shall be filled by depositing concrete as near its final position as possible. Depositing large quantifies at one point and running or working the concrete along the forms will not be allowed. Concrete shall be deposited in the forms in layers of suitable depth but not more than 36 inches in thickness,unless otherwise directed by the Engineer. Cold joints in a monolithic placement shall be avoided. The sequence of successive layers or adjacent portions of concrete shall be such that they can be vibrated into a homogeneous mass with the previously placed concrete. Not more than one (1)hour shall elapse between adjacent or successive placements of concrete, except as otherwise required by an approved placing procedure when revibration of the concrete is shown on the plans or specifications. This time requirement may be extended by 1/2 hour when the concrete contains not less than a normal dosage or retarding admixture. An approved retarding agent shall be used to control stress cracks and/or cold joints in placements where differential settlement and/or setting time may induce stress cracking. b. Consolidation. All concrete shall be well consolidated and the mortar flushed to the form surfaces with immersion type vibrators. Vibrators which operate by attachment to forms or reinforcement will not be permitted, except on steel forms. At least one (1) stand-by vibrator shall be provided for emergency use in addition to those required for placement. The concrete shall be vibrated immediately after deposit. A systematic spacing of the points of vibration shall be established to insure complete consolidation and thorough working of the concrete around the reinforcement,embedded fixtures, and into the corners and angles of the forms. The vibrator may be inserted in a sloping or horizontal position in shallow slabs. The entire depth of each lift shall be vibrated, allowing the vibrator to penetrate several inches into the preceding lift. Concrete along construction joints shall be thoroughly consolidated by operating the vibrator along and close to but not against the joint surface. The vibration shall continue until thorough consolidation and complete embedment of reinforcement and fixtures is produced, but not long enough to cause segregation. Vibration may be supplemented by hand spading or rodding, if necessary, to insure the flushing of mortar to the surface of all forms. 11. Slabs. a. Unless otherwise shown on the plans or other specifications, slab concrete shall be mixed in a plant located off the structure. Carting or wheeling concrete batches over completed slabs will not be permitted until the slabs have aged at least four (4) full curing days. For the remainder of the curing period, timber planking will be required for carting of the concrete. Carts shall be equipped with pneumatic tires. Curing operations shall not be interrupted for the purpose of wheeling concrete over finished slabs. B2001 - 12/27 01/17/2011 b. The storing of reinforcing or structural steel on completed roadway slabs generally shall be avoided and, when permitted, shall be limited to quantities and distribution that will not induce excessive stresses. c. A longitudinal screed may be placed directly on previously placed concrete slabs for the purpose of checking and grading of an adjacent slab after the previously placed slab has aged not less than 24 hours. Actual screeding may be done after the previously placed slabs have aged at least 48 hours. 12. Continuous Placements. For continuous placement of the deck on steel units, the initial set of the concrete shall be retarded sufficiently to insure that the concrete remains plastic in not less than three (3) spans immediately preceding the slab being placed. For simple spans,retardation shall be required only if necessary to complete finishing operations or as required by Article 3.02. 13. Fogging and Interim Curing. a. From the time of initial strike off of the concrete until finishing is completed and required interim curing is in place, the unformed surfaces of slab concrete in bridge decks and top slabs of direct traffic culverts shall be fogged when necessary to replace water loss due to evaporation. b. Fogging equipment shall be capable of applying water in a fine mist, not a spray. The fog shall be produced using equipment which pumps water or water and air under high pressure through a suitable atomizing nozzle. The equipment shall be hand operated and sufficiently portable for use in the direction of any prevailing wind. It shall be adaptable for intermittent use as directed by the Engineer to prevent excessive wetting of the concrete. c. Interim curing will be required for slab concrete in bridge decks and top slabs of the direct traffic culverts immediately upon completion of final finish. Type 1- D membrane curing compound (Resin Base Only) will be required. Water curing will be required in accordance with Article 3.02 and shall be commenced as soon as possible without damaging the surface finish. 14. Installation of Dowels and Anchor Bolts. Dowels and anchor bolts may be cast-in- place or installed by grouting with grout, epoxy or epoxy mortar. Holes for grouting may be formed or drilled. a. General. Holes for anchor bolts shall accommodate the bolt embedment required by the plans. Holes for dowels shall be a minimum of 12 inches deep unless otherwise shown on the plans. When grout or epoxy mortar is used, the diameter of the hole shall be not less than twice the dowel or bolt diameter nor more than the diameter plus 1 Y2 inches. When using epoxy, the hole diameter shall be 1/16 inch to 1/4 inch greater than the dowel or bolt diameter. Holes shall be thoroughly cleaned of all loose material, oil, grease, or other bond breaking substance and blown clean with filtered compressed air. Holes shall be in a surface dry condition when epoxy type material is used. Holes shall be in a surface moist condition when Portland cement grout is used. The Contractor shall develop and demonstrate a procedure for cleaning and preparing the holes for installation of the dowels and anchor bolts that is satisfactory to the Engineer. The void between the hole and dowel or bolt shall be completely filled with grouting material. b. Cast-in-Place or Grouted Systems. Portland cement grout, epoxy mortar, or other prepackaged grouts as approved by the Engineer may be used. B2001 - 13/27 01/17/2011 Port cement grout shall conform to the pertinent provisions of TXDOT Item 421, "Portland Cement Concrete". Epoxy (Type V) and Epoxy Mortar (Type VIII) shall conform to TXDOT Item 575, "Epoxy". Grout, epoxy or epoxy mortar may be used as the binding agent unless otherwise indicated on the plans. c. Other Anchor Systems. These systems shall be in accordance with the plans and approved by the Engineer. 15. Mass Placements. a. Unless otherwise shown on the plans, for monolithic mass placements having a least dimension greater than five (5) feet,the Contractor shall develop a plan to assure that during the heat dissipation period, the temperature differential between the central core of the placement and the exposed concrete surface does not exceed 35°F. b. A detailed plan, along with an analysis of the associated heat generation and dissipation(heat flow analysis) shall be submitted to the Engineer for approval. No concrete shall be placed until this plan is approved. This plan may include a combination of the following: 1. Selection of concrete ingredients to minimize heat of hydration. 2. Using ice or cooling concrete ingredients. 3. Controlling rate of concrete placement. 4. Using insulation to control heat loss. 5. Using supplemental heat to control heat loss. 6. Use of fly ash. c. The Contractor shall furnish and install two (2) sets of strip chart temperature recording devices or approved equivalent at locations designated by the Engineer. These devices shall be accurate to within+/-2°F within the range of 32° F to 212°F and shall be used to simultaneously measure the temperature of the concrete at the core and the surface. J. Placing Concrete in Cold Weather. 1. The Contractor is responsible for the protection of concrete placed under any and all weather conditions. Permission given by the Engineer for placing during cold weather will not relieve the Contractor of the responsibility for producing concrete equal in quality to that place under normal conditions. Should concrete placed under such conditions prove unsatisfactory, it shall be removed and replaced. 2. Concrete may be placed only when the atmospheric temperature is greater than 35°F. Concrete shall not be placed in contact with any material coated with frost or having a temperature less than 32°F. 3. Aggregates shall be free from ice, frost and frozen lumps. When required, in order to produce the minimum specified concrete temperature, the aggregate and/or the water shall be heated uniformly,in accordance with the following: The water temperature shall not exceed 180° F, nor shall the aggregate temperature exceed 150° F. The heating apparatus shall heat the mass of aggregate uniformly. The temperature of the mixture of aggregate and water shall be between 50° F and 85°F before introduction of the cement. 4. The Contractor shall provide and install recording thermometer(s) or other suitable temperature measuring device(s)to verify that all concrete is effectively protected as follows: B2001 - 14/27 01/17/2011 a. The temperature of all unformed surfaces of bridge decks and top slabs of direct traffic culverts shall be maintained at 50° F or above for a period of 72 hours from time of placement and above 40°F for an additional 72 hours. b. The temperature at the surface of all concrete in bents, piers, culvert walls, retaining walls, parapets, wingwalls, bottom of slabs, and other similar formed concrete shall be maintained at 40° F or above for a period of 72 hours from time of placement. c. The temperature of all concrete,included the bottom slabs(footings)of culverts placed on or in the ground, shall be maintained above 32° F for a period of 72 hours from time of placement. 5. Protection shall consist of providing additional covering, insulated forms or other means, and if necessary, supplementing such covering with artificial heating. Curing as specified under Article 3.02.A shall be provided during this period until all requirements for curing have been satisfied. 6. When impending weather conditions indicate the possibility of the need for such temperature protection, all necessary heating and covering material shall be on hand and ready for use before permission is granted to begin placement. 7. Sufficient extra test specimens will be made and cured with the placement to ascertain the condition of the concrete as placed prior to form removal and acceptance. K. Placing Concrete in Hot Weather. Unless otherwise directed by the Engineer,when the temperature of the air is above 85° F, an approved retarding agent will be required in all concrete used in superstructures and top slabs of direct traffic culverts. L. Placing Concrete in Water. 1. Concrete shall be deposited in water only when shown on the plans or with the written permission of the Engineer. The forms or cofferdams shall be sufficiently tight to prevent any water current passing through the space in which the concrete is being deposited. Pumping of water will not be permitted during the concrete placing,nor until it has set for at least 36 hours. 2. The concrete shall be placed with a tremie, or other approved method, and shall not be permitted to fall freely through the water nor shall the concrete be disturbed after being placed. The concrete surface shall be kept approximately level during placement. 3. The tremie shall consist of a water-tight tube of a diameter which will permit adequate placement of the concrete,but not greater than 14 inches. The tremie shall be constructed so that the bottom can be sealed and opened after the tremie is in place and fully charged with concrete. The tremie shall be supported so that it can be easily moved horizontally to cover all the work area and vertically to control the concrete flow. The lower end of the tremie shall be submerged in the concrete at all times. 4. The placing operations shall be continuous until the work is complete. 5. Unless otherwise specified, all classes of concrete placed under water, except Class E and Class SS, shall be redesigned to contain an additional sack of cement per cubic yard more than the mix design being used. Pilot beam tests may be waived by the Engineer for this redesign. M. Placing Concrete in Superstructure. B2001 - 15/27 01/17/2011 1. Unless otherwise shown on the plans, simple span bridge slabs shall be placed without transverse construction joints by using either a mechanical longitudinal screed or a self propelled transverse finishing machine. For small placements or for unusual conditions, the Engineer may waive the mechanical screed requirement and permit the use of manually operated screeding equipment. The screed shall be adequately supported on a header or rail system sufficiently stable to withstand the longitudinal or lateral thrust of the equipment. Unless otherwise shown on the plans, temporary intermediate headers will be permitted for placements exceeding 50 feet in length for the longitudinal screed,provided the rate of placement is rapid enough to prevent a cold joint and that these headers are designed for early removal to permit satisfactory consolidation and finish of the concrete at their locations. 2. Unless otherwise shown on the plans, slabs on continuous units shall be placed in one continuous operation without transverse construction joints using a mechanical longitudinal screed or a self propelled transverse finishing machine. For unusual conditions, such as widening, variable cross slopes or transitions, the Engineer may waive the mechanical screed requirement and permit the use of manually operated screeding equipment. Rails for transverse finishing machines which are supported from the beams or girders shall be installed so that the supports may be removed without damage to the slab. Bond between removable supports and the concrete shall be prevented in a manner acceptable to the Engineer. Rail support parts which remain embedded in the slab shall not project above the upper mat of reinforcing steel. Rail or screed supports attached to I-beams or girders shall be subject to the requirements of Article 3.02.A. 3. Unless otherwise shown on the plans, for transverse screeding, the minimum rate of concrete placement shall be 30 linear feet of bridge deck per hour. The Contractor shall furnish personnel and equipment capable of placing, finishing and curing the slab at an acceptable rate to insure compliance with the specifications. 4. The profile gradeline may require adjustment, due to variation in beam camber and other factors, to obtain the required cover over the slab reinforcement. Beams shall be set in a sufficient number of spans so that when adjustment is necessary, the profile gradeline can be adjusted over suitable increments and the revised gradeline will produce a smooth riding surface. 5. One (1) or more passes shall be made with the screed over the bridge deck segment prior to the placement of concrete thereon to insure proper operation and maintenance of grades and clearances. 6. Slab concrete shall be deposited between the exterior beam and the adjacent beam prior to placing concrete in the overhang portion of the slab. 7. For transverse screeding, concrete shall be placed in transverse strips. Additionally, on profile grades greater than 1-1/2 percent,placement shall begin at the lowest end. 8. For longitudinal screeding,concrete shall be placed in longitudinal strips starting at a point in the center of the segment adjacent to one side, except as provided herein, and the strip completed by placing uniformly in both directions toward the ends, except that for spans on a grade of 1-1/2 percent or more placing shall start at the lowest end. 9. The width of strips shall be such that the concrete therein will remain plastic until the adjacent strip is placed. Where monolithic curb construction is specified, the concrete shall be placed therein in proper sequence to be monolithic with the adjacent longitudinal strips of the slabs. B2001 - 16/27 O1/17/2011 10 An approved system of checking shall be used to detect any vertical movement of the forms or falsework. Forms for the bottom surface of concrete slabs, girders and overhangs shall be maintained to the required vertical alignment during concrete placing. 11. Unless otherwise shown on the plans, girders, slab and curbs of slab and girder spans shall be placed monolithically. Concrete girder stems shall be filled first and the slab concrete placed within the time limits specified in Article 3.02.I. a. Construction joints,when permitted for slab placements on steel and prestressed concrete beams, shall be shown on the plans. Where plans permit segmental placing without specifying a particular order of placement, any logical placing sequence which will not result in the overstressing of any of the supporting members will be permitted subject to the approval of the Engineer. 12. Any falsework under steel girder or truss spans shall be released and the spans swung free on their permanent supports before placing any slab concrete thereon. 13. When the curb forms are filled,the top of curb and sidewalk section shall be brought to the correct camber and alignment and finished as described in Articles 3.02.P and 3.02 V. N. Placing Concrete in Box Culverts. 1. Where the top slab and walls are placed monolithically in culverts more than four(4) feet in clear height, an interval of not less than one (1) nor more than two (2) hours shall elapse before placing the top slab to allow for settlement and shrinkage in the wall concrete. 2. The footing slab shall be accurately finished at the proper time to provide a smooth uniform surface. Top slabs which carry direct traffic shall be finished as specified in Article 3.02.Q. Top slabs of fill type culverts shall be given a float finish. O. Placing Concrete in Foundation and Substructure. 1. Concrete shall not be placed in footings until the depth and character of the foundation has been inspected by the Engineer and permission has been given to proceed. 2. Placing of concrete footings upon seal concrete will be permitted after the cofferdams are free from water and the seal concrete cleaned. Any necessary pumping or bailing during the concreting operation shall be done from a suitable sump located outside the forms. 3. All temporary wales or braces inside cofferdams shall be constructed or adjusted as the work proceeds to prevent unauthorized construction joints. 4. When footings can be placed in a dry excavation without the use of cofferdams, forms may be omitted, if approved by the Engineer, and the entire excavation filled with concrete to the elevation of the top of footing. In this case, measurement for payment will be based on the footing dimensions shown on the plans. 5. Concrete in columns shall be placed monolithically between construction joints unless otherwise provided. Columns and caps and/or tie beams supported thereon may be placed in the same operation. To allow for settlement and shrinkage of the column concrete, it shall be placed to the lower level of the cap or tie beam and placement delayed for not less than one (1) hour nor more than two (2) before proceeding. B2001 - 17/27 01/17/2011 P. Treatment and Finished of Horizontal Surfaces Except Roadway Slabs. 1. All unformed upper surfaces shall be struck off to grade and finished. The use of mortar topping for surfaces under this classification will not be permitted. 2. After the concrete has been struck off, the surface shall be floated with a suitable float. Bridge sidewalks shall be given a wood float or broom fmish or may be striped with a brush,as specified by the Engineer. 3. The tops of caps and piers between bearing areas shall be sloped slightly from the center toward the edge, and the tops of abutments and transition bents sloped from the backwall to the edge, as directed by the Engineer, so that the water drains from the surface. The concrete shall be given a smooth trowel finish. When shown on the plans, the top of caps and piers shall be coated with Type X epoxy material except for areas under shoes and bearing pads. Unless otherwise shown on the plans, the color shall be concrete gray. The color of the epoxy may be adjusted to concrete gray by the use of a black universal type tinting paste. Bearing areas for steel units shall be constructed in accordance with TXDOT Item 441, "Steel Structures". 4. Bearing seat build-ups or pedestals for concrete units may be cast integrally with the cap or with a construction joint as follows: 5. The bearing seat build-ups shall be constructed of a latex based mortar or an epoxy mortar, mixed in accordance with the manufacturer's recommendation. Pedestals shall be constructed of Class "C" concrete,reinforced as shown on the plans. 6. Bearing areas under elastomeric pads or non-reinforced bearing seat build-ups shall be given a textured,wood float finish. Q. Finish of Roadway Slabs. 1. In all roadway slab finishing operations, camber for specified vertical curvature and transverse slopes shall be provided. 2. For concrete slab or concrete slab girder spans cast in place on falsework, an additional amount of camber shall be provided to offset the initial and fmal deflections of the span. The additional amount of camber shall be determined from the dead load deflection diagram shown on the plans. When dead load deflections is not shown on the plans, the additional amount of camber shall be 1/8 inch per ten foot of span length but not to exceed 1/2 inch. For pan girder spans the additional camber for initial and final deflections shall be approximately 1/2 inch for 30 foot spans and 5/8 inch for 40 foot spans unless otherwise directed by the Engineer. 3. Roadway slabs supported on prestressed concrete, steel beams or girders shall receive no additional camber, except that for slabs without vertical curvature, the longitudinal camber shall be approximately 1/4 inch. 4. Dead load deflection shall be taken into account in setting the grades of headers and rail systems. 5. Work bridges or other suitable facilities shall be provided by the Contractor from which to perform all finishing operations and check measurements for slab thickness and reinforcement cover. 6. As soon as the concrete has been placed and vibrated in a section of sufficient width to permit working, the surface shall be approximately leveled, struck off and screeded, carrying a slight excess of concrete ahead of the screed to insure filling of all low spots. The screed shall be rigid enough to hold true to shape and shall have sufficient adjustments to provide for the required camber or section. A vibrating B2001 - 18/27 01/17/2011 screed may be used if heavy enough to prevent undue distortion. The screeds, except those of the roller drum type,shall be provided with metal cutting edges. 7. Longitudinal screeds shall be moved across the concrete with a saw-like motion while their ends rest on headers or templates set true to the roadway grade or on the adjacent finished slab. 8. The surface of the concrete shall be screeded a sufficient number of times and at such intervals to produce a uniform surface,true to grade and free of voids. 9. If necessary, the screeded surface shall be worked to a smooth finish with a long handled wood or metal float,or hand floated from bridges over the slabs. 10. When required by the Engineer, the Contractor shall perform sufficient checks with a long handled 10 foot straightedge on the plastic concrete to insure that the final surface will be within the tolerances specified below. The check shall be made with the straightedge parallel to the centerline. Each pass thereof shall lap half of the preceding pass. All high spots shall be removed and all depressions over 1/16 inch in depth shall be filled with fresh concrete and floated. The checking and floating shall be continued until the surface is true to grade and free of depressions, high spots,voids or rough spots. 11. Rail support holes shall be filled with concrete and finished to match the top of the slab. 12. Unless otherwise shown on the plans, when no additional wearing course is to be placed, the bridge deck surface shall be given a grooved steel tine finish. The grooves shall be approximately 1/8 to 3/16 inch deep, approximately 1/8 inch wide. The tines shall be randomly spaced approximately 3/4 to one (1) inch apart. The grooves shall run perpendicular to the structure center line when a transverse screed is used and parallel to the structure centerline when a longitudinal screed is used. Areas which receive insufficient texture depth shall receive additional texturing, when directed by the Engineer, by saw grooving in accordance with the procedure given below. 13. At the option of the Contractor, or when shown on the plans, the surface shall be given its final texture by saw grooving to meet the above requirements. Saw grooving may be done a minimum of four (4) days after the slab concrete has been placed. If saw grooving is done prior to the completion of curing,the curing shall be continued after sawing to provide the minimum curing time required. 14. When shown on the plans that a concrete overlay is to be placed on the slab (new construction) or on prestressed concrete box beams or other precast elements, the slab or the top surface of shear key and diafram concrete shall be given a broom finish. The finish shall have an average texture depth of approximately 0.035 inches with any individual test, not falling below 0.020 inches unless otherwise shown on the plans, when tested in accordance with Test Method Tex-436-A. Should the texture depth fall below that intended, the finishing procedures shall be revised to produce the desired texture. 15. When the plans require that an asphaltic seal, with or without overlay, on the slab (new construction), on prestressed concrete box beams or other precast elements,the slab or top surface of shear key and diafram concrete shall be given a lightly textured broom finish having an average texture depth of approximately 0.025 inches when tested in accordance with TXDOT Test Method Tex-436-A. 16. Straightedge requirements will be required on slabs (new construction) to be overlaid. B2001 - 19/27 O1/17/2011 17. After the concrete slab has attained final set, the Engineer may require that the finished surface be tested with a standard 10-foot straightedge. The straightedge shall be used parallel to the centerline of the structure to bridge any depressions and tough high spots. Ordinates of the irregularities, measured from the face of the straightedge to the surface of the slab, should normally not exceed 1/8 of an inch, making proper allowances for camber, vertical curve and surface texture; however, occasional variations exceeding this will be acceptable if, in the opinion of the Engineer,the variations will not produce unacceptable riding qualities. 18. When directed by the Engineer,irregularities exceeding the above shall be corrected. Areas which are corrected to produce satisfactory riding qualities shall be provided with an acceptable surface texture in a manner approved by the Engineer. R. Curing Concrete. 1. The Contractor shall inform the Engineer of the methods proposed for curing; shall provide the proper equipment and material in adequate amounts; and shall have the proposed methods,equipment and material approved prior to placing concrete. 2. Unless otherwise noted herein or shown on the plans, the choice of curing methods shall be at the option of the Contractor, except that the Engineer may require the same curing methods for like portions of a single structure. 3. Inadequate curing and/or facilities shall be cause for the Engineer to delay all concrete placement on the job until remedial action is taken. 4. All concrete shall be cured for a period of four (4) curing days except as noted herein. B2001 - 20/27 01/17/2011 TABLE 2 EXCEPTIONS TO 4-DAY CURING Description Type of Cement Required Curing Days Upper surfaces of bridge slabs, top slab of direct traffic culverts, I or III 8 and concrete overlays II or I/III* 10 All types with fly ash 10 Concrete Piling Build-ups All 6 *Meets the requirements of both Type I and Type H.. 5. When the air temperature is expected to drop below 40° F, the concrete shall be covered with polyethylene sheeting, burlap-polyethylene blankets, mats or other acceptable materials to provide the protection required by Article 3.02.J. A curing day is defined as a calendar day when the temperature, taken in the shade away from artificial heat, is above 50° F for at least 10 hours, or on colder days if satisfactory provisions are made to maintain the temperature of all surfaces of the concrete above 40°F for the entire 24 hours. The required curing period shall begin when all concrete therein has attained its initial set. The following methods are permitted for curing concrete subject to the requirements of Table 3 and the following additional requirements for each method of curing: a. Form Curing: When forms are left in contact with the concrete, other curing methods will not be required except for exposed surfaces and for cold weather protection. b. Water Curing. All exposed surfaces of the concrete shall be kept wet continuously for the required curing time. The water used for curing shall meet the requirements for concrete mixing water as specified in TXDOT Item 421, "Portland Cement Concrete". Sea water will not be permitted. Water which stains or leaves an unsightly residue shall not be used. 1) Wet Mat Curing. This curing method shall consist of keeping the concrete continuously wet by maintaining wet cotton mats in direct contact with the concrete for the required curing time. Damp burlap blankets made from nine (9) ounce stock may be placed on the damp concrete surface for temporary protection prior to the application of cotton mats. The cotton mats may then be placed dry and wetted down immediately after they are placed. The mats shall be weighted down adequately to provide continuous contact with all concrete where possible. B2001 - 21/27 01/17/2011 Surfaces which cannot be cured by direct contact shall be covered with mats forming an enclosure well anchored to the forms or ground so that outside air cannot enter the enclosure. Sufficient moisture shall be provided inside the enclosure to keep all surfaces of the concrete wet. Wet mat curing will be required for Part A in Table 3 when the anticipated ambient temperature is expected to remain above 40 F for the first 72 hours of the curing period. Polyethylene sheeting, burlap-polyethylene blankets, laminated mats or insulating curing mats placed in direct contact with the slab will be required when the air temperature is expected to drop below 40 F during the first 72 hours of the curing period. These curing materials shall be weighted down with dry mats to maintain direct contact with the concrete and to provide insulation against cold weather. Supplemental heating or insulation may be required in cold and/or wet weather if the insulating cotton mats become wet or if the concrete drops below the specified curing temperature. 2) Water Spray. This curing method shall consist of overlapping sprays or sprinklers that keep all unformed surfaces continuously wet. 3) Ponding. This curing method requires the covering of the surfaces with a minimum of two (2) inches of clean granular material, kept wet at all times, or a minimum of one (1) inch depth of water. Satisfactory provisions shall be made to provide a dam to retain the water or saturated granular material. c. Membrane Curing. Unless otherwise provided herein or shown on the plans, either Type 1-D or Type 2 membrane curing compound may be used where membrane curing is permitted except that Type 1-D (Resin Base Only) will be required for bridge slabs and top slabs of direct traffic culverts and all other surfaces which may require a higher grade of surface finish. B2001 - 22/27 01/17/2011 TABLE 3 CURING REQUIREMENTS REQUIRED PERMITTED STRUCTURE UNIT Water for Membrane Water for Membrane for DESCRIPTION Complete for Interim Complete Complete Curing Curing Curing Curing A. Upper surfaces of Bridge X X Roadway,Median and Sidewalk (Resin slabs,Top Slabs of Direct Traffic Base) Culverts. B. Top Surface of any Concrete X Unit upon which Concrete is to be placed and bonded at a later interval(Stub Walls,Risers,etc.). Other Super structure Concrete (Curbs Wingwalls,Parapet Walls, etc.). C. All Substance Concrete, *X *X Culverts,Box Sewers,Inlets, Manholes,Retaining Walls, Riprap,Railin All other concrete As specified in other items. *Polyethylene Sheeting, Burlap-Polyethylene Mats or Laminated Mats in close intimate contact with the concrete surfaces will be considered equivalent to water or membrane curing. For substructure concrete only one (1) type of curing compound will be permitted on any one (1) structure. Material requirements and construction methods shall be as required by TXDOT Item 526, "Membrane Curing",except as changed herein. Membrane curing shall not be applied to dry surfaces, but shall be applied just after free moisture has disappeared. Formed surfaces and surfaces which have been given a first rub shall be dampened and shall be moist at the time of application of the membrane. When membrane is used for complete curing, the film shall remain unbroken for the minimum curing period specified. Membrane which is damaged shall be corrected immediately by reapplication of membrane. Unless otherwise noted herein or shown on the plans, the choice of membrane type shall be at the option of the Contractor. S. Removal of Forms and Falsework. B2001 - 23/27 O1/17/2011 1. Except as herein provided, forms for vertical surfaces may be removed when the concrete has aged not less than 12 hours,provided the removal can be done without damage to the concrete. 2. Forms for inside curb faces be removed at such time the removal can be done without damage to the curb. 3. Weight supporting forms and falsework for all bridge components and culvert slabs, except as noted herein, shall remain in place a minimum of four (4) curing days. The forms then may be removed if the concrete has attained a flexural strength of 425 psi, as evidenced by strength tests using test beams made from the same concrete and cured under the same conditions as the portion of the structure involved. Forms for other structural components may be removed as specified by the Engineer. 4. Inside forms(walls and top slabs) for box culverts and sewers may be removed after concrete has aged not less than one (1) day (24 hrs.) and has acquired a flexural strength of not less than 225 psi,provided an overhead support system, approved by the Engineer, is used to transfer the weight of the top slab to the walls of the box culvert or sewer before the support provided by the forms is removed. 5. When all test beams made for the purpose of form removal have been broken without attaining the required strength, forms shall remain in place for a total of 14 curing days. 6. The above provisions relative to form removal shall apply only to forms or parts thereof which are constructed to permit removal without disturbing forms or falsework required to be left in place for a longer period on other portions of the structure. 7. All forms and falsework shall be removed unless otherwise approved by the Engineer. T. Defective Work. Any defective work shall be repaired as soon as possible. Any defect which in the opinion of the Engineer cannot be repaired satisfactorily to the extent required by the Engineer shall be removed and replaced at the expense of the Contractor. U. Finishing Exposed Surfaces. A Surface Finish shall be applied to all concrete surfaces and shall be in accordance with TXDOT Item 427, "Surface Finishes for Concrete". 3.03 MEASUREMENT A. The quantities of concrete of the various classifications which will constitute the completed and accepted structure or structures in place will be measured by the cubic yard, each, square foot, square yard, or linear foot as shown on the plans or as each is shown in the bid proposal. Measurement will be as follows: 1. General. a. All concrete quantities will be based on the dimensions shown on the plans or those established in writing by the Engineer. Diafram concrete,when required, will be included in the slab measurement. b. In determining quantities, no deductions will be made for chamfers less than two (2) inches, embedded portions of structural steel or prestressed concrete beams, piling, anchor bolts, reinforcing steel, drains, weep holes, junction B2001 -24/27 01/17/2011 boxes, electrical or telephone conduit, conduit and/or voids for prestressed tendons or for embedded portions of light fixtures. c. For pan girder spans, a quantity will be included for the screed setting required to provide proper camber in the roadway surface after form removal. d. For slabs on steel and prestressed beams, a quantity for the haunch between the slab and beams will be included when required. No measurement will be made during construction for variation in the amount of haunch concrete due to deviation from design camber in the beams. e. For slabs on panels, T-beams, or box beams, the combination of span length, theoretical camber in beams, computed deflections, and planvertical curve will be taken into account in determining the quantity for the slab. f. Additional concrete which may be required by an adjustment of the profile grade line during construction, to insure proper slab thickness, will not be measured for payment. g. Variation in concrete headwall quantity incurred when an alternate bid for pipe is permitted will not be measured for payment. h. Quantities revised by a change in design, measured as specified herein, will be increased or decreased,as the case may be,and included for payment. 2. Plan Quantity. a. For structure elements designated in Table 4, and when measured by the cubic yard, this is a plans quantity measurement Item and the quantity to be paid for will be that quantity shown in the proposal. If no adjustment of quantities is required,additional measurements or calculations will not be required. b. When the quantity for a complete structure element has been erroneously included or omitted from the plans, the quantity shown on the plans for that element will be added to or deducted from the plan quantity and included for payment. A complete structure element will be the smallest portion of a total structure for which a quantity is included on the plans. c. When the plan quantity for a complete structure element is in error by five (5) percent or more, a recalculation will be made and the corrected quantity included for payment. 3. Measured in Place. a. For those Items not measured for plan quantity payment, measurement will be made in place. B2001 - 25/27 01/17/2011 TABLE 4 PLAN QUANTITY PAYMENT (Cubic Yard Measurement Only) Culverts and Wingwalls Slabs on Steel Spans Headwalls for pipe Slabs on Prestressed Spans Retaining Walls Pan Girder Spans Inlets and Manholes Pile Bent Caps Slab Spans Shear Key Concrete Slab and Girder Spans Abutments Note: Other structure elements may be paid for as "plan quantity", including pier and bent concrete,when shown on the plans. For those portions of structures not listed in Table 4, the concrete quantities, measured as provided in Subarticle 3.03.A.(1) will be paid for at the unit price bid per "Cubic Yard", per "Each", per "Square Foot", per "Square Yard", or per "Linear Foot", in place, for the various classifications of concrete shown. 3.04 PAYMENT A. The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid for the various structure elements specified of the various classes of concrete. This price shall be full compensation for furnishing, hauling and mixing all concrete materials; for furnishing, bending, fabrication, splicing, welding and placing the required reinforcement; for all clips,blocks, metal spacers,ties,wire or other materials used for fastening reinforcement in place; for placing, finishing and curing all concrete; for all grouting and pointing; for furnishing and placing drains; for furnishing and placing metal flashing strips; for furnishing and placing expansion joint material required by this Item; and for all forms and falsework,labor,tools,equipment and incidentals necessary to complete the work. B. Concrete which fails to meet minimum strength requirements may be rejected or a structural review may be made by the Engineer. Such concrete which is proven structurally adequate may be accepted at an adjusted price based on the following formula: A = .10Bp+ .75(Sa/Ss)Z Bp A = Amount to be paid per unit of measure B2001 -26/27 01/17/2011 Sa = Actual strength from beams or cores. Ss = Minimum required strength(specified) Bp = Unit bid price B2001 - 27/27 10/13/2005 ITEM NO. B3001 -REINFORCING STEEL PART 1 -GENERAL 1.01 DESCRIPTION A. Extent of Work 1. This Item governs for furnishing and placing of reinforcing steel, deformed and smooth. 2. Furnish chairs, ties, splicing devices, and other reinforcing accessories required to complete the work. 1.02 QUALITY ASSURANCE A. General: Conform to approved shop drawings and to ACI Manual of Practice for Detailing Reinforced Concrete Structures. B. Submittals 1. Submit shop drawings indicating location,placement, sizes, and bending. 2. When welding is required, furnish report of chemical analysis, showing percentages of carbon,manganese,phosphorus, and sulfur. C. Tests: Submit certified copy of mill certificates of compliance with requirements herein specified. 1.03 PRODUCT DELIVERY, STORAGE,AND HANDLING A. Delivery: Deliver to job site free from dirt, loose scale and rust, paint, oil, or other foreign material. B. Storage: Store above surface of ground upon platforms, skids or other supports, and protect from mechanical injury and surface deterioration caused by exposure to conditions producing rust. C. Handling: Handle so as not to sustain crimping,bending, or warping before and during placement. B3001 - 1/4 08/03/2004 PART 2 - PRODUCTS 2.01 MATERIALS A. Reinforcing Steel 1. Deformed, conforming to ASTM A615, Grade 60. 2. Welded wire fabric conforming to ASTM A185. 3. Cold drawn steel wire conforming to ASTM A82. 4. Spiral reinforcement to be smooth (not deformed) bars or wire complying with ASTM A82. 5. Submit information on mechanical splicing devices, couplers, and all other reinforcing accessories. B. General Requirements 1. Nominal size, area, and theoretical weight in accordance with Table 1, ASTM A615 supplementary requirement. 2. Bending a. Bend in shop, cold, true to shapes indicated on PLANS. b. Irregularities in bending are cause for rejection. c. Detail bars in accordance with ACI 315. d. Inside diameter of bar bends, in terms of nominal bar diameter (d) of bar which is bent, in accordance with ACI 315. 3. Fabrication tolerances in accordance with ACI 315. 4. Splices a. Except where shown, not permitted without prior written approval. b. Not permitted in main reinforcement at points of maximum stress. c. When not indicated on PLANS, but permitted with prior written approval, subject to the following: 1. Not larger than#8 bars. 2. Not permitted in bars 30 feet or less in length, except vertical. 3. Distance center-to-center not less than 30 feet, and no individual bar length less than 10 feet. 4. Maintain specified concrete cover and tie bars together securely. 5. Stagger main bar splices in adjacent bars minimum of two splice lengths. d. Lap Splices 1. See General Notes in PLANS for standard bar lap lengths. 2. Lap bars so that both bars will be in the same plane parallel with the nearest concrete surface. e. Welding Splices 1. Procedures and electrodes as specified in AWS D12.1. B3001 - 2/4 08/03/2004 2. For bars No. 6 and smaller, use lap weld splices with fillet weld equal to one-half bar diameter on each side for four inches in length. 3. For bars No. 7 and larger, use butt weld splices in accordance with Figure 3.5,AWS D12.1 4. Prepare ends for butt-welding in the field, and deliver bars of sufficient length to permit this practice. f. All splices,whether lap, weld,mechanical, or coupler,to develop full strength of bar. PART 3 -EXECUTION 3.01 INSTALLATION A. Place reinforcing steel in positions indicated by PLANS and approved shop drawings. 1. Dimensions shown are to centers of bars,unless otherwise noted. 2. Hold bars securely in place with tie wires and other approved means during placing of concrete. a. In plans of steel parallel to nearest surface of concrete, bars not to vary from PLAN placement by more than one-twelfth of spacing between bars. b. In plans of steel perpendicular to nearest surface of concrete,bars not to vary from PLAN placement by more than one-quarter inch. 3. Do not use looped wire bar ties ("pig tails"). 4. Do not tack weld reinforcing. 5. Space steel required distance from forms by approved galvanized metal spacers, metal spacers with plastic coated tips, stainless steel spacers, plastic spacers, or approved precast mortar or concrete blocks. a. For approval of plastic spacers,provide samples of plastic, which show no indications of deterioration after immersion in a 5 percent solution of sodium hydroxide for 120 hours. b. Cast precast block, maximum 2-1/2 inches square, to thickness required for proper reinforcement clearance from forms. 6. Use hot-dipped galvanized metal or plastic chairs to support all reinforcing steel. Except for use with pavement steel, chairs need not be galvanized. 7. Use heavy bolster to support bottom layer of reinforcing in abutment caps,bent caps, and other beams. 8. In bridge deck slab, use two rows of supports for bottom layer of reinforcing parallel to beams for each by between beams. Use high chairs to support top layer. 9. Clean all mortar, mud, dirt, etc. from reinforcement before placing concrete. B3001 - 3/4 08/03/2004 10. Protect exposed steel from corrosion. 11. Placement of steel to be inspected before concrete is placed. 3.02 MEASUREMENT AND PAYMENT A. No separate measurement and payment for work performed under this Item, except as indicated below. Include cost of same in Contract unit prices bid for items of which this work is a component part. B. Measure "Extra Reinforcing Steel," when approved by Engineer, by pound of calculated weight of steel actually placed. Pay for "Extra Reinforcing Steel" at Contract unit prices bid per pound of"Extra Reinforcing Steel"used. B3001 - 4/4 ITEM NO. B3005—CONCRETE CONSTRUCTION PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work 1. Construction of concrete structures, except concrete pavement. 2. Contractor assumes responsibility for design of concrete. B. Related work as called for on PLANS or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. 1.02 QUALITY ASSURANCE Make test specimens to maintain check on concrete strength throughout job. 1.03 SUBMITTALS Submit designs for strength. PART 2 -PRODUCTS 2.01 MATERIALS A. Concrete: Ready mixed conforming to ASTM C94 or site mixed. 1. Cement a. ASTM C 150, Type I. b. Use no caked cement. c. Deliver in bags for site-mixed concrete. d. Use only one brand of cement in any one structure. 2. Water: Free from oils, acids, alkalis, organic matter, salts, or other deleterious substances. 3. Coarse Aggregate a. Per ASTM C33. b. Maximum size 1 1/2 inch. 4. Fine Aggregate: Natural sand conforming to ASTM C33. 5. Admixtures: Air-entraining admixtures in accordance with ASTM C260. 6. Classification: B3005 - 1/5 Class Type Min.28-day Max.Water Min.Cement Consistency Air Content Compressive Content per (bags per cu. Range in (%) Strength(lbs. bag of Cement yard) Slump(in.) per sq.in.) (gal.) A Structural 3,000 6.25 5.25 2%2 to 4%2 2Y2 to 4%2 B Slope Protection 2,000 8.50 4.25 21h to 4 21/2 C Pipe 1,500 11.0 3.0 3 to 5 3 to 6 Blocking D Seal Slab - - 4.0 6 to 8 as needed Include in maximum water, free water in aggregate minus absorption of aggregate based on a thirty-minute absorption period. B. Reinforcing Steel: 1. Bars a. Per ASTM C150,Type I. b. Grade 40 or Grade 60 (deformed). 2. Welded Wire Fabric: Per ASTM A185. C. Expansion Joint: Preformed rubber or cork conforming to ASTM D 1752. D. Curing Material: 1. Water: Free from oils, acids, alkalis, organic matter, salts, or other deleterious substances. 2. Cotton Mats: Filling material of cotton "bat" (min. 12 oz. per sq. yd.) with unsized cloth covering(min. 6 oz. per sq. yd.) E. Timber: Seasoned, of good quality and free from loose or unsound knots, knot holes, twists, shakes,or decay. F. Non-shrink Grout: Premixed grout which is non-metallic, non-corrosive and non- staining; containing specially selected silica sands, cement, shrinkage compensating agents,plasticizing and water reducing agents. 1. Conform to requirements of Corps of Engineers CRD-CR621-82B. 2. Yield of 0.9 cubic foot to 1.0 cubic foot per 100 pounds. 3. Mixing water per 100 pounds. a. Stiff: 2 gallons b. Plastic: 2%gallons c. Flowable: 2' gallons 4. Minimum 28-day compressive strength of 8,000 psi. 5. Maintain grout temperature during placement between 50°F and 90°F. G. Polyethelene Film for Permanent Moisture Barrier: Minimum thickness .006 inch (six Mils)and high impact-strength rating. B3005 - 2/5 PF H. Concrete Bonding Agent: "Daraweld-C" as manufactured by W.R. Grace and Co., or "Bond Crete-S" as manufactured by Burke Concrete Accessories, Inc. PART 3 -EXECUTION 3.01 CONSTRUCTION A. Forms 1. Timber: Mortar tight; smooth surface; true to line and grade and adequately braced. 2. Provide plywood or masonite surfaces for concrete faces to be rub finished. B. Mixing Concrete 1. Mix and deliver in accordance with ASTM C94. 2. Clean and maintain equipment for good operation. 3. Job-mix concrete in approved type mixer for minimum of 11/2 minutes for 1 cubic yard batch.Add 15 seconds for each half yard increase over 1 cubic yard batch. 4. Do not mix when air temperature is 40°F and falling. C. Placing Concrete 1. General Requirements: a. Give notice before placement. b. Place in daylight hours. c. Discharge within one (1)hour after start of mixing. 2. Handling and Transporting: a. Use method to prevent segregation. b. Use buckets, chutes,buggies,pipes,or troughs. c. Protect against sun and wind,to prevent loss of slump and workability. d. Use of aluminum equipment not permitted. 3. Depositing: a. Continuous horizontal layers 12 inches thick. b. Limit free fall to 5 feet. c. Use tremies for free fall over 5 feet. d. Minimum temperature of all concrete at time of placement to be not less than 50°F. e. Concrete temperature at time of placement not to exceed 85°F, plus a maximum tolerance of 5°F. f. Use retarding agent for air temperatures above 85°F. g. Provide thermometer for temperature verification. h. Concrete work varying from requirements specified will be rejected. D. Curing Concrete 1. Cure for six consecutive curing days, except for high-early-strength concrete. 2. Cure high-early-strength concrete for three consecutive curing days. B3005 - 3/5 3. "Curing Day" is a calendar day whose temperature is above 50°F for at least 19 hours. E. Form Removal 1. Remove forms under slabs, beams, or girders after seven days. 2. Remove all other forms after two days. F. Patching Concrete: Patch honeycomb and tie holes. G. Defective Work: Repair or replace at Contractor's expense immediately after form removal. H. Slab Finish: Wood float, or steel trowel as designated on PLANS. I. Rub-Finished Surfaces 1. Rub-finish exposed vertical and battered surfaces from 6 inches below final ground line of low water to top. 2. No rubbing required for structures extending 12 inches or less above ground or water. 3. Provide two rubbings: a. First with No. 16 carborundum stone. b. Second with No. 30 carborundum stone. 4. Finish to provide clean, smooth,uniform surface. J. Grout: One part Portland cement to two parts sand,by weight. K. Construction Joints: As shown or as approved. L. Reinforcing Steel 1. Bend, clean,place and tie in accordance with ACI Standards. 2. Splice bars only at locations shown on PLANS. 3. Lap bars in accordance with table shown on "Concrete Standards" sheet or as indicated or noted on drawings. M. Cleanup: Clean area from time to time during construction and clean area completely after completion of work. 3.02 MEASUREMENT AND PAYMENT A. No separate payment for work performed under this Item except as indicated below. Include cost of same in Contract price bid for work of which this is a component part. B. "Extra Concrete", when approved by Engineer, to be measured by cubic yard of concrete, complete in place. Pay to be at Contract unit Price per cubic yard for classes of"Extra Concrete"used. B3005 -4/5 C. "Extra Reinforcing Steel", when approved by Engineer, to be measured by pound of calculated weight of steel actually place. Pay to be at Contract unit price per pound of "Extra Reinforcing Steel"used. END OF ITEM B3005 - 5/5 Std. 08/03/2004 ITEM NO. H1001 -DUCTILE IRON PIPE AND FITTINGS PART 1 -GENERAL 1.01 SECTION INCLUDES A. Ductile iron pipe and fittings for water mains,wastewater force mains, and gravity sanitary sewers. 1.02 UNIT PRICES A. No separate payment will be made for ductile iron pipe and fittings under this Section. Include cost in unit price for water mains, force mains, gravity sanitary sewers, and storm sewers. 1.03 SUBMITTALS A. Conform to requirements of all sections and provisions of these specifications. B. Submit shop drawings showing design of new pipe and fittings indicating alignment and grade, laying dimensions, fabrication,fitting, flange, and special details. Show station numbers for pipe and fittings corresponding to Drawings. Production of pipe and fittings prior to review by the Owner's Representative is at Contractor's risk. 1.04 QUALITY CONTROL A. Provide manufacturer's certifications that all ductile iron pipe and fittings meet provisions of this Section and have been hydrostatically tested at factory and meet requirements of ANSI A21.51. B. Provide certifications that all pipe joints have been tested and meet requirements of ANSI A21.11. PART 2 - PRODUCTS 2.01 DUCTILE IRON PIPE A. Ductile iron pipe barrels: ANSI A21.15, ANSI A21.50 or ANSI A21.51; bear mark of Underwriters' Laboratories approval; pressure classes as shown on the Drawings and/or Bid Proposal. B. Provide pipe sections in standard lengths, not less that 18 feet long, except for special fittings and closure sections as indicated on shop drawings and/or Bid Proposal. 2.02 JOINTS H1001 - 1/3 A. Joint types: ANSI A21.11 push-on; ANSI A21.11 mechanical joint; or ANSI A21.15 flanged end. Provide push-on joints unless otherwise indicated on the Drawings or required by these specifications. For bolted joints, bolts shall conform to requirements of AWWA C111. B. Where restrained joints for buried service are required by Drawings, provide Series 1100 (MEGALUG)by EBAA Iron Inc., or equal. C. Threaded or grooved type joints which reduce pipe wall thickness below minimum required are not acceptable. D. Provide for restrained joints designed to meet test pressures required under Section 02676 — Hydrostatic Testing of Pipelines or Section 02731 — Sanitary Sewage Force Mains, as applicable. E. Where ductile iron water main is cathodically protected from corrosion, bond rubber gasketed joints as shown on Drawings to provide electrical continuity along entire pipeline, except where insulating flanges are required by Drawings. 2.03 GASKETS: A. Furnish, when no contaminant is identified, plan rubber (SBR) gasket material; for flanged joints 1/8-inch thick gasket in accordance with ANSI A21.15. B. Pipes to be installed in potentially contaminated areas, especially where free product is found near the elevation of the proposed pipeline, shall have the following gasket materials for the noted contaminants: Contaminant Gasket Material Required Petroleum(diesel,gasoline) Nitrile Rubber Other contaminants As recommended by the pipe manufacturer 2.04 FITTINGS A. Use fittings of same size as pipe. Reducers are not permitted to facilitate an off-size fitting. Reducing bushings are also prohibited. Make reductions in piping size by reducing fittings. Line and coat fittings as specified for pipe they serve. B. Push-on Fittings will not be allowed. C. Flanged Fittings: ANSI A21.10; ANSI B16.1 cast or ductile iron. Flanges: ANSI B16.1, Class 125;pressure rated at 250 psig. D. Mechanical Joint Fittings: ANSI A21.10 (AWWA C110);pressure rated at 250 psi. E. Ductile Iron Compact Fittings for Water Mains: ANSI A21.53 (AWWA C153); 4- inch through 12-inch diameter; fusion bonded epoxy-lined or cement-mortar lining; conform to requirements of Section 02630—Polyethylene Wrap. 2.05 COATINGS AND LININGS H1001 - 2/3 A. Water Main Interiors: ANSI A21.4, cement lined with seal coat. B. Sanitary Sewer and Force Main Interiors: 1. Preparation: Commercial blast cleaning conforming to SSPC-SP6. 2. Linear thickness: Nominal 40 mils, minimum 35 mils, for pipe barrel interior; minimum 6-10 mils at gasket groove and outside spigot end to 6-inches back from end. 3. Testing: ASTM G62, Method B for voids and holidays; provide written certification. 4. Acceptable Lining Materials: a. Virgin polyethylene conforming to ASTM D1248, with inert fillers and carbon black to resist ultraviolet degradation during storage heat bonded to interior surface of pipe and fittings; APolyline by American Cast Iron Pipe Company; or equal. b. Polyurethane: Corro-pipe II by Madison Chemicals. c. Ceramic Epoxy: Protecto-401 by Enduron Protective Coatings. C. Sanitary Sewer Point Repair Pipe: For pipes which will be lined with high density polyethylene liner pipe or cured-in-place liner, provide cement-lined with seal coat in accordance with ANSI A21.4. For pipes which will not be provided with named liner, provide pipe as specified in Paragraph 2.05B. D. Exterior: 1. Water Lines a. Auger Holes: Conform to requirements of Section 02629-Polyurethane Coatings on Steel or Ductile Iron Pipe. b. Above Ground(or Exposed): Conform to the following: Provide a 3-coat epoxy/polyurethane coating system as designated below. Surface Preparation SSPC SP10 Near White Blast Clean 2.0 to 3.0 mils surface profile Prime Coat ACRO 4422 Inhibitive Epoxy 2.0 to 4.0 mils DFT Primer, or approved equal Intermediate Coat ACRO 4460 Chemical Resistant 4.0 to 6.0 mils DFT Epoxy, or approved equal Finish Coat ACRO 4428 Polyurethane, 1.5 to 2.0 mils DFT Or approved equal c. Total Minimum allowable dry film thickness for system: 10 mils. d. All materials shall be from same manufacturer. e. Color of paint shall be in accordance with the City's standard. H1001 - 3/3 2. Sanitary Sewers: Prime coat and outside asphaltic coating conforming to ANSI A21.10, ANSI A21.15, or ANSI A21.51 for pipe and fittings in open cut excavation and in casings. E. Polyethylene Wrap: For buried water lines and sanitary sewers, including point repairs, provide polyethylene wrap unless otherwise specified or shown. Provide Polyethylene Wrap for all buried ductile iron pipe, including polyurethane coated pipe. Conform to requirements of Section 02630—Polyethylene Wrap. F. For flanged joints in buried service, provide petrolatum wrapping system, Denso, or equal, for the complete joint and all alloy steel fasteners. Alternatively, provide bolts made of Type 304 Stainless Steel. G. Pipe to be installed in potentially contaminated areas shall have coatings and linings recommended by the manufacturer as resistant to the contaminants. 2.06 MANUFACTURES A. Pre-approved manufactures of ductile iron are American Cast Iron Pipe Co., McWane Cast Iron Pipe Co., and U.S. Pipe and Foundry Co. PART 3 -EXECUTION 3.01 INSTALLATION A. Conform to installation requirements of Section 02664 — Water Mains, 02730 — Gravity Sanitary Sewers, and 02731 — Sanitary Sewage Force Mains, except as modified in this Section. B. Install in accordance with AWWA C600 and manufacturer's recommendations. C. Install all ductile iron pipe in polyethylene wrap, unless cathodic protection is provided. Do not use polyethylene wrap with a cathodic protection system. D. Holiday Testing 1. Polyurethane: Conform to requirements of Section 02629 — Polyurethane Coatings for Steel or Ductile Iron Pipe. 2. Fusion Bonded Epoxy: Conform to requirements for new fittings in ANSI A21.16. 3.02 GRADE A. Unless otherwise specified on Drawings, install ductile iron pipe for water service to clear utility lines with following minimum cover: Diameter Depth of Cover (Inches) (Feet) 16 and 24 5 12 and smaller 3.5 H1001 -4/3 3.03 FIELD REPAIR OF COATINGS A. Polyurethane: Conform to requirements of Section 02629—Polyurethane Coatings for Steel or Ductile Iron Pipe. B. Fusion Bonded Epoxy: Conform to requirements for new fittings in ANSI A21.16. END OF SECTION H1001 - 5/3 10/13/2005 ITEM NO. J1002 - POLYVINYL CHLORIDE(PVC) SEWER PIPE AND FITTINGS PART 1 -GENERAL 1.01 DESCRIPTION A. Scope of Work: Furnish Polyvinyl Chloride (PVC) Pressure Rated Pipe and fittings of size(s) shown on PLANS for use in sanitary sewer construction. B. Related Work Specified Elsewhere: Item J2001 - "Construction of Underground Lines." 1.02 QUALITY ASSURANCE TESTS: Sewer pipe shall be tested in accordance with Item J2005 - "Low Pressure Air Test- Sanitary Sewer Lines." PART 2—PRODUCTS 2.01 MATERIALS A. Pipe and Fittings 1. Pipe and fittings shall be made of PVC having a cell classification of 1245B (PVC 1120)per ASTM-D-1784. 2. Pipe and fittings shall conform to the requirements of ASTM-D-2241 Standard Specification for"Polyvinyl Chloride(PVC)Pressure-Rated Pipe(SDR 26 -Class 160)", and shall be furnished with integral bell gasketed joints. B. Lubricant: Lubricant used for assembly to have no detrimental effect on gasket or pipe and to be used in accordance with pipe manufacturer's recommendations. PART 3 -EXECUTION 3.01 INSTALLATION A. Trenching and Backfill: To be in accordance with Item J2001 - "Construction of Underground Lines." B. Joining: Assembly of joints to be per manufacturer's recommendation. J1002 - 1/2 10/13/2005 C. Connections to Manholes and Other Rigid Structures: Manhole couplings corresponding to size of sewer pipe to be cast directly into a rigid structure such as a manhole or manhole base. Manufactured fittings and adapters may be used for prefabricated manholes. D. Deflection Tests: All pipe to be satisfactorily tested for deflection by pulling a mandrel through the pipe no earlier than THIRTY (30) DAYS after backfilling is complete. Mandrel to have an outside diameter equal to 95% of the original inside diameter of pipe being tested. Mandrel to be pulled by hand line. Should mandrel meet any resistance, Contractor may clean the pipe and repeat test. Any pipe not meeting this test to be removed and replaced at Contractor's expense. 3.02 MEASUREMENT AND PAYMENT Measurement and payment to be made in accordance with Item J2001 - "Construction of Underground Lines." J1002 - 2/2 Std. 10/13/2005 ITEM NO. J1003 -POLYVINYL CHLORIDE(PVC)WATERLINE PIPE(4"-12") PART 1 GENERAL 1.01 DESCRIPTION A. Scope of Work: Furnish Polyvinyl Chloride(PVC)Pressure Pipe of size(s)shown on PLANS for use in water supply and distribution systems. B. Related Work Specified Elsewhere: Item J2001 "Construction of Underground Lines." 1.02 QUALITY ASSURANCE Tests: Waterline shall be tested in accordance with Item J2003 - "Hydrostatic Testing of Pressure Lines." PART 2 -PRODUCTS 2.01 MATERIALS A. Pipe: Pipe shall be made of PVC plastic meeting the requirements AWWA C-900, "Standard for Polyvinyl Chloride (PVC) Pressure Pipe, 4 in. through 12 in. for Water". All pipe and related products shall conform to American National Standards Institute / National Sanitation Foundation (ANSI/NSF) Standard 61 and must be certified by an organization accredited by ANSI. All Pipe shall bear the National Sanitation Foundation Seal of Approval. 1. 4-inch through 6-inch pipe shall be Class 200. 2. 8-inch through 12-inch pipe shall be Class 150. B. Lubricant:Lubricant used for assembly to have no detrimental effect on gasket or pipe and to be used in accordance with pipe manufacturer's recommendations. PART 3 -EXECUTION 3.01 INSTALLATION A. Trenching and Backfill: To be in accordance with Item J2001 "Construction of Underground Lines." B. Joining: Use elastic gasket joints,providing a watertight seal. Assembly of joints to be per manufacturer's recommendation. 3.02 MEASUREMENT AND PAYMENT Measurement and payment to be made in accordance with Item J2001 "Construction of Underground Lines." J1003 - 1/1 08/03/2004 ITEM NO. J1005 -HIGH DENSITY POLYETHYLENE(HDPE)PIPE PART 1 -GENERAL 1.01 DESCRIPTION A. Scope of Work: Furnish and install high-density polyethylene pipe and fittings of size(s) shown on plans for use in potable waterline construction. B. Related Work Specified Elsewhere: Item J2001 - "Construction of Underground Lines." 1.02 QUALITY ASSURANCE TESTS: Waterlines shall be tested in accordance with item J2003 - "Hydrostatic Testing of Pressure Lines." PART 2—PRODUCTS 2.01 MATERIALS A. Materials used for the manufacture of HDPE pipe and fittings shall be extra high molecular weight,high density PE 3408 polyethylene resin: The material shall be listed by PPI (Plastics Pipe Institute, a division of the Society of the Plastics Industry) in PPI TR-4 with a 73 degree F hydrostatic design basis of 800 psi. The PPI listing shall be in the name of the pipe manufacturer and shall be based on ASTM D 2837 testing. B. Pipe: Pipe supplied under this specification shall have a nominal DIPS (Ductile Iron Pipe Size) OD unless otherwise specified. The DR (Dimension Ratio) and the pressure rating of the pipe supplied shall be as specified by the engineer. The pipe shall be produced from approved HDPE pipe grade resin with the nominal physical properties outlined in Section III. Pipe having a diameter 3" and larger will be made to the dimensions and tolerances specified in ASTM F 714. C. Fittings: HDPE fittings shall be in acdor4dance with ASTM D 3261 and shall be manufactured by injection molding, a combination of extrusion and machining, or fabrication from HDPE pipe conforming to this specification. The fittings shall be fully pressure rated and provide a working pressure equal to that of the pipe with an included 2:1 safety factor. The fittings shall be manufactured from the same base resin type and cell classification as the pipe itself. The fittings shall be homogeneous J1005 - 1/3 08/03/2004 throughout and free from cracks, holes, foreign inclusions, voids, or other injurious defects. PART 3 -EXECUTION 3.01 INSTALLATION A. Trenching and Backfill: To be in accordance with Item J2001 - "Construction of Underground Lines." B. Jointing: Sections of polyethylene pipe shall be joined by the butt fusion process into continuous lengths at the job site. The joining method shall be the heat fusion method and shall be performed in strict accordance with the pipe manufacturer's recommendations. The heat fusion equipment used in the joining procedures should be capable of meeting all conditions recommended by the pipe manufacturer. Properly executed electrofusion fittings may be used. Extrusion welding or hot gas welding of HDPE shall not be used for pressure pipe applications or fabrications where shear or structural strength is important. Mechanical joint adapters, flanges, unions, grooved-couplers, transition fittings, and some mechanical couplings may be used to mechanically connect HDPE pipe. Refer to the manufacturer's recommendations. C. Pipe Packaging, Handling and Storage: The manufacturer shall package the pipe in a manner designed to deliver the pipe to the project neatly, intact, and without physical damage. The transportation carrier shall use appropriate methods and intermittent checks to insure the pipe is properly supported, stacked, and restrained during transport such that the pipe is not nicked, gouged, or physically damaged. Pipe shall be stored on clean, level ground to prevent undue scratching or gouging. If the pipe must be stacked for storage, such stacking shall be done in accordance with the pipe manufacturer's recommendations. The pipe shall be handled in such a manner that it is not pulled over sharp objects or cut by chokers or lifting equipment. Sections of pipe having been discovered with cuts or gouges in excess of 10% of the pipe wall thickness shall be cut out and removed. The undamaged portions of the pipe shall be rejoined using the heat fusion joining method. Fused segments of pipe shall be handled so as to avoid damage to the pipe. Chains or cable type chokers must be avoided when lifting fused sections of pipe. Nylon slings are preferred. Spreader bars are recommended when lifting long fused sections. J1005 - 2/3 08/03/2004 3.02 MEASUREMENT AND PAYMENT Measurement and payment to be made in accordance with Item J2001 - "Construction of Underground Lines." J1005 - 3/3 10/13/2005 ITEM NO. J1015 -CORRUGATED POLYETHYLENE PIPE PART 1 - GENERAL 1.01 DESCRIPTION A. Scope: Furnish labor, materials, equipment, supplies, supervision, and tools. Perform operations with the furnishing and jointing of Corrugated Polyethylene Pipe(CPP). B. Reference Standards: Corrugated Polyethylene Pipe and jointing to meet requirements under AASHTO M294M-98 and ASTM Standards D618, D883, D1693, D2122, D2412, D2444, D3350 and F405, as listed here after. C. Related Work Specified Elsewhere: Item No. J2001 - "Construction of Underground Lines" or as called for on PLANS or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. PART 2 -PRODUCTS 2.01 PERFORMANCE AND DESIGN REQUIREMENTS A. Corrugated Polyethylene Pipe(CPP) 1. Corrugated Polyethylene Pipe shall be manufactured from High Density Polyethylene HDPE,virgin compounds and conform to AASHTO M294. 2. Corrugated Polyethylene Pipe shall have a full circular cross-section, with an outer corrugated pipe wall and a smooth inner liner. 3. Pipe shall have integral bell and spigot joints with an elastomeric rubber gasket. PART 3 -EXECUTION 3.01 CONSTRUCTION METHODS A. Excavation. All excavation shall be in accordance with the requirements of Technical Specification J2001, "Construction of Underground Lines". B. Jointing Assembly 1. Thoroughly clean the bell and spigot ends, making sure they are free of mud and grit. Remove the protective shrink-wrap from the gasket. If the gasket has been removed, make sure the gasket seat is clean and reinstall the gasket by stretching it over the pipe and nesting it in the seat. 2. Lubricant should be liberally applied to both the bell and spigot ends of the pipe. Care should be taken to insure lubricant is applied to the chamfered leading edge of the bell. 3. Align the pipe and push the spigot home on grade. Joints should be installed with bells facing upstream for proper installation. Generally, pipes should be laid J1015-1/2 10/13/2005 starting at the downstream end and working upstream. If a bar or equipment is utilized a wood block should be used to prevent damage to the bell. C. Bedding and Backfill shall be in accordance with the requirements or Technical Specification Item J2001 or as called for on plans. D. Manholes Connections. Provide manhole adapters to ensure a watertight installation at all manholes. 3.02 MEASUREMENT AND PAYMENT Measurement and payment made in accordance with Item No. J2001 -Construction of Underground Lines. J1015-2/2 10/13/2005 ITEM NO. J2001 - CONSTRUCTION OF UNDERGROUND LINES PART 1 -GENERAL 1.01 DESCRIPTION A. Extent of Work: Furnish all plant, labor, equipment, supplies, supervision and tools, and perform all operations required for construction of underground lines. B. Related Work Specified Elsewhere: Item J2002 "Well Point System", Item J2003 "Hydrostatic Testing of pressure Lines", Item J3003 "Timber Ordered Left in Trench", Item J3006 "Cement-Stabilized Sand Backfill, Item J3024 "Bank Sand Backfill", and Item J3045 "Trench Excavation and Shoring Safety Plan." 1.02 QUALITY ASSURANCE A. Field Observation: Pipe installed in the permanent work to be placed in the presence of Engineer or his authorized representative. B. Testing of Gravity Sanitary Sewer Line: Leak tests of gravity sewer lines to be per Item J2005 "Low Pressure Air Test-Sanitary Sewer Lines." C. Testing of Pressure Lines: To be tested per Item J2003, "Hydrostatic Testing of Pressures Lines." 1.03 METHODS OF CONSTRUCTION A. Control of Work: Contractor shall be responsible for the control of his work. Engineer reserves the right to verify this control. Contractor may use laser equipment for control. B. For Lines Laid on Grade: Lay and maintain pipe to required lines and grades with specials at required locations, and with joints centered and spigots "home." Lay all lines on grade from downstream to upstream or as directed by Engineer. C. For Lines not Laid to Grade: Lay and maintain pipe and fittings to alignment shown on PLANS. Minimum cover(measured from top of pipe) at street intersection, 5 feet; minimum cover below flow line of drainage ditches, 1 foot 6 inches; minimum cover at other locations, 3 feet 6 inches. Vary depth uniformly to maintain required clearances and depths shown on PLANS. PART 2-EXECUTION J2001 - 1/7 10/13/2005 2.01 EXCAVATION AND TRENCH PREPARATION A. General: Excavate trench to alignment and depth required. Brace trench and drain as required so work may be accomplished safely and efficiently. All excavations shall be in accordance with Item J3045 "Trench Excavation and Shoring Safety Plan." B. Width of Trench for Pipe Less than 30-inch: Minimum width of outside barrel of pipe plus 12 inches, maximum width of outside barrel of pipe plus 18 inches. For pipes 30- inch and larger,minimum width of outside barrel of pipe plus 24 inches. Excavate and maintain sides of trench vertical for 2 feet above pipe. Above this level,trench may be gently sloped back. Protect existing pavements or utilities as necessary. C. Pipe Foundation: For ordinary bedding, excavate pipe trench to even grade and shape to closely fit lower part of pipe exterior for width of at least 50 percent of pipe breadth to provide uniform bearing for entire length of pipe and provide depressions for bell ends of each pipe. Excavate to grade required for shell, aggregate, or other special bedding. D. Correcting Faulty Grade: Correct any portion of trench excavated below grade with approved material. E. Bell Holes: Provide bell holes of ample dimensions to permit proper jointing. F. Braced and Sheeted Trenches: Sheet and brace all excavations in excess of 5 feet depth to prevent caving. Increase trench width as required and leave sheeting in place until pipe has been laid and backfill compacted to depth of 2 feet over pipe. Sheet and brace in accordance with Item J3045 "Trench Excavation and Shoring Safety Plan." G. Care of Surface Material for Reuse: Keep surface material approved for reuse separate from general excavation material. H. Manner Stockpiling Excavated Material: Stockpile excavated material so as not to endanger work or cause interference with public street and driveways. Keep drainage channel clear or provide other satisfactory means of drainage. I. Open Trench: Engineer may limit amount of trench opened or partially open at any time in advance of completed pipe laying operation, and amount of trench left unfilled. Open not more than 100 feet of trench on any street at one time. Keep streets open where possible. J. Disposition of Defective Materials: Remove rejected backfill materials from excavation operations and dispose of off job site at Contractor's expense. J2001 - 2/7 10/13/2005 K. When requested by Contractor and approved by the Engineer to dewater sewer trench because of groundwater conditions, install, operate, and maintain adequate well point systems in accordance with Item J2002 "Well Point Systems." 2.02 PIPE HANDLING A. Handling and Storage: Unload pipe, fittings, and other accessories at point of delivery: haul to and distribute at site of project. Load and unload materials by use of hoists, skids, or other approved means to avoid damage. Distribute for convenient laying and to cause minimum inconvenience to public. B. Inspection: Before lowering and while suspended, inspect pipe for defects. Inspect rigid pipe tapping with light hammer to detect cracks. C. Pipe Kept Clean: Remove foreign matter from pipe and keep clean by approved means during and after laying. 2.03 PIPE LAYING A. Unsuitable Conditions for Laying Pipe: Lay no pipe in water or when trench condition or weather is unsuitable for such work unless specifically approved by Engineer. B. Nonpressure Concrete and Vitrified Clay Pipe: Nonpressure concrete and vitrified clay pipe shall be installed with Class "A"beddings shown in this item. Lay pipe with ends abutting and true to line and grade. Fit and lay pipe to form smooth and uniform invert. Clean sockets prior to lowering into trench. Commence laying of pipe at lowest point so that spigot ends point in direction of flow. C. Ductile Iron Pipe: Lay ductile iron pipe using either "Ordinary" bedding Class "A" bedding where specified on PLANS and described in this item, with bell ends facing direction of laying. D. PVC and ABS Piping: 1. Sanitary Sewer Construction - PVC and ABS pipe shall be installed using Class"C"Bedding as shown in this item. 2. Waterline Construction - PVC pipe shall be installed using Class `B" Bedding as shown in this item. E. Other Pipe: Lay other types of pipe in accordance with applicable provisions of this or other TECHNICAL SPECIFICATIONS. F. Cutting Pipe: Cut cast or ductile iron pipe with wheel-type cutters or cold chisel. Flame cutting of cast iron pipe not allowed. Make cuts in a neat and workmanlike J2001 - 3/7 10/13/2005 manner without damage to pipe and so as to leave a smooth end at right angles to axis of pipe. Field cutting of PVC and A.B.S. type resin pipe to be per pipe manufacturer's recommendations. G. Temporary Plug: When pipe laying operation is halted, seal open end of pipe with temporary plug. Plug to remain in place until pipe laying operation commences again. 2.04 PLUGGING DEAD ENDS Insert standard plug into bells of all dead ends of pipe. 2.05 CONCRETE BLOCKING Thrust blocking to be used for pressure pipelines at bends, tees, points where reducers or changes in pipe diameter occurs, fire hydrants or flushing valves, and all plugged openings. Use Class "C" concrete having compressive strength not less than 1,500 pounds per square inch. Place blocking against solid ground, with area of bearing of pipe and on ground in each instance as required. Place blocking so that pipe and fitting joints will be accessible for repair. For gravity pipelines, use Class "C" concrete minimum of 6 inches on all sides of pipe for encasing, embedding, or blocking where indicated. Use all materials, including aggregate, cement, and water, and mix and place concrete in accordance with applicable concrete item. 2.06 BACKFILLING A. Time of Backfilling: As soon as practicable after completion of laying and jointing pipe, backfill trench. Trench to be completely backfilled to a point not more than 100 feet behind pipe laying operation. B. Materials: Trenches to be backfilled with select material from the sewer trench excavation, or obtained from other sources, free from stones which will interfere with compaction and free of large lumps which will not break down readily under compaction. Do not use material excavated in large lumps or which cannot be easily broken down or which cannot be spread in loose layers. Materials excavated by trenching machine will generally be suitable for use as backfill. 1. Bank sand backfill, where designated on PLANS, to be in accordance with Item J3024"Bank Sand Backfill." 2. Cement-stabilized sand, where designated on PLANS, to be in accordance with Item J3006 "Cement-Stabilized Sand Backfill." C. Backfill Procedure at Pipe Zone: In pipe zone, when designated on PLANS, use bank sand, cement stabilized sand or select backfill material, free from rocks and rock fragments, and deposit in trench simultaneously on both sides of pipe for full width of J2001 - 4/7 10/13/2005 trench and to elevation of 12 inches above the top of barrel of pipe. Moisten if necessary, tamp in thin (approximately 4-inch) layers, and thoroughly compact under and on each side of pipe to provide solid backing against external surface of pipe. Walking or working on completed pipeline, except as necessary in tamping or backfilling, not permitted until trench has been backfilled at least 12 inches over top of pipe. Backfill to be compacted to 95 percent in accordance with ASTM D698. Approximate optimum moisture content to be maintained during compaction. D. Backfill Procedure Above Pipe Zone: Place backfill above previously defined pipe zone in accordance with following applicable procedure. 1. For trench through or within 5 feet of existing, proposed or future asphaltic concrete, concrete, asphalt-topped concrete, flexible base with asphalt topping, shell or gravel surfaces either public or private roads, streets or driveways, place cement-stabilized sand backfill above pipe zone in approximate 12 inch layers. Thoroughly compact each 12" layer with a vibratory compactor or roller prior to placing additional layers of cement stabilized said. Bring compacted backfill up to bottom of pavement subgrade 2. For trench located in areas other than those previously stated, and not designated for improvement, place select backfill above pipe zone in 6 to 8 inch layers at near or optimum moisture and thoroughly compact to a density of 90 percent of the maximum in accordance with ASTM D698. E. Rock and Rock Fragment Exclusion: Allow no rock or rock fragment in backfill for at least one foot above top of pipe and allow no stone larger than 8 inches in its greatest dimension in backfill. F. Deficiency of Backfill: Supply any deficiency in quantity of materials for backfilling trenches or for filling depressions caused by settlement. 2.07 RESTORATION OF SURFACES Replace or repair sidewalks, driveway culverts, inlets, curbing, gutters, shrubbery, trees, fences, sod, and other like obstructions removed or disturbed, to condition equivalent to that existing prior to commencement of this work. Use concrete having compressive strength in 28 days of not less than 3,000 pounds per square inch in the replacement of curbing, gutters, inlets, and sidewalk. Use reasonable care in removal and replacement of shrubbery and trees designated to be replaced at original locations. Where at all possible, ditch alignment will be such as to minimize this work. Where tree or shrub deemed sufficiently valuable to save is encountered in excavation,ball in burlap, set aside in wet sand or puddling pit and later reset as required. Contractor not held responsible for subsequent care of plant. Restoration of asphalt-topped flexible base and concrete streets as specified under other items of TECHNICAL SPECIFICATIONS or PLANS. J2001 - 5/7 10/13/2005 2.08 CLEAN-UP Remove from site of work, and from public and private property, temporary structures, rubbish, and waste materials, including excess excavated materials. Dispose of surplus earth as shown on PLANS. Complete cleanup not greater than 500 feet behind pipe laying operation. Pipe-laying operation to be suspended temporarily if complete clean up is further behind than 500 feet. 2.09 MEASUREMENT AND PAYMENT A. For Gravity Pipelines: Measure by linear foot from center of manhole to center of manhole to center of manhole, exclusive of pipe installed in tunnel or augered hole construction, special structures, or other special sections, along pipe of size and at depth installed. Measure depth at manholes, at intervals not to exceed 50 feet between manholes, and at breaks in profile of natural ground from flow line of pipe to natural ground surface over center or pipe. Pay for gravity pipelines, furnished, installed, and measured as stated, at Contract unit prices bid for size and depth measured. B. For Pressure Pipelines: Measure by linear foot from center line of fitting to center line of fitting, exclusive of pipe installed in tunnel construction, special structures, or other special sections, along pipe of size and type installed. If depth of cut is shown on PROPOSAL, measure depth at intervals not to exceed 50 feet and at breaks in profile of natural ground from flow line of pipe to natural ground surface over center of pipe. If depth of cut is not shown on PROPOSAL,no consideration made for depth at which pipe is installed. Pay for pressure pipelines, furnished, installed and measured as stated, at Contract unit prices bid for size and type (and depth, if shown of PROPOSAL)measured. C. Concrete Blocking: No separate payment for concrete used for blocking, backing, encasement, or embedding. D. Rock Excavation: No separate payment for rock excavation when rock is encountered in trenching operation. E. Concrete Curbs, Gutters, and Sidewalks: Payment for Sidewalks shall be by the square yard or linear foot. Concrete Curbs and Gutters shall be paid by linear foot. Measured concrete used in repairing curbs, gutters, and sidewalks by cubic yard in place. Pay for concrete used in repairing curbs, gutters, and sidewalks, measured as stand in Contract unit prices bid for"Extra Concrete"of class installed. F. Street and Driveway Surfacing: As per applicable Item of TECHNICAL SPECIFICATIONS or PLANS. J2001 - 6/7 10/13/2005 G. Restoration of Other Surfaces: No compensation for restoration of surfaces, other than those specifically shown above. H. Bedding and Backfill: No separate payment for bedding and backfill called for under Paragraph 2.06. I. Cement-Stabilized Sand and Bank Sand Backfill: No separate payment for Cement- stabilized Sand and Bank Sand Backfill called for under Paragraph 2.06. J2001 - 7/7 Std. 08/03/2004 ITEM NO. J3001B - STORM SEWER MANHOLES PART 1 - GENERAL 1.01 DESCRIPTION A. Scope: This item governs for construction of reinforced concrete manholes for storm sewer lines. B. Work Specified Elsewhere: 1. Reinforcing Steel: Item No. B3001 - "Reinforcing Steel." 2. Concrete: Item No. B 1001 - "Concrete." 3. Storm Sewer Pipe and Fittings: See applicable Item for type used, or as shown on PLANS. PART 2 -PRODUCTS 2.01 MATERIALS A. Cast Iron. ASTM A-48, Class No. 20 grey cast iron. Make cast iron manhole frames and covers to dimensions shown on detail drawings. Castings shall be free from sand, blow holes or other defects. Machine bearing surfaces of frames and covers to obtain even bearing. Cast wording "Storm Sewer" on cover. B. Mortar. ASTM C-270, Type M using Portland Cement. C. Aggregate for Mortar. ASTM C-144. PART 3 -EXECUTION 3.01 CONSTRUCTION METHODS A. Construct manholes on concrete foundations of shape and size indicated on PLANS. Construct to line and grade and at locations shown on PLANS or as directed by Engineer. Terminate storm sewer pipes and leads such that ends of pipe protrude inside of manhole. Cut pipe ends flush with inside of manhole and point up irregularities with mortar. B. Backfill all manhole excavations located within 5 feet of existing or future pavement with cement-stabilized sand to a point one (1) foot below top of pavement or natural ground, whichever is higher. For manholes located in other areas, backfill with trench excavated material. Compact layers in 12-inch lifts to a density equal to that of the surrounding soil. J3001B - 1/2 Std. 08/03/2004 3.02 MEASUREMENT AND PAYMENT A. Measure "Standard Storm Sewer Manholes" per each being 0'-8' in depth. Measure "Extra Depth on Standard Storm Sewer Manhole per foot over 8 foot depth. B. Pay for "Standard Storm Sewer Manhole" at Contract unit price per each. When indicated in the PROPOSAL, pay for "Extra Depth on Standard Storm Sewer Manhole" at Contract unit price per foot. J3001B - 2/2 Std. 10/13/2005 ITEM NO. J3016 - INLETS PART 1 -GENERAL 1.01 DESCRIPTION A. Scope: Construction concrete inlets to type, shape, size, line, grade, and location(s) shown on PLANS. B. Related work as specified in Item No. J2001 - "Construction of Underground Lines", Item No. J3011 - "Reinforced Concrete Pipe", Item No. B 1001 - "Concrete", or as called for on PLANS, or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. PART 2 - PRODUCTS 2.01 MATERIALS A. Reinforcing Steel: Grade 60 deformed bars conforming to ASTM A615. B. Cast Iron: Per ASTM A48. Make frames and covers to dimensions indicated on PLANS, free from sand or blow holes or other defects. Machine bearing surfaces of frames and covers to obtain even bearing.. C. Concrete: Ready-mixed concrete conforming to ASTM C94. PART 3 -EXECUTION 3.01 CONSTRUCTION Construct inlets to line and grade at locations shown on PLANS. Cut inlet leads flush with inside face of inlet wall and point up with mortar. Shape invert with grout or mortar as shown on detail drawings in the PLANS. Backfill excavation adjacent to inlet with cement-stabilized sand within 12 inches of proposed finished grade or bottom of pavement .Remainder of fill behind curb to be select material from trenching or other operation or as indicated on the PLANS. Bring tamped backfill to grade and compact to a density of 95 percent of maximum in accordance with ASTM D698. 3.02 MEASUREMENT AND PAYMENT A. Measure "Inlets" per each type indicated in the PROPOSAL and shown on PLANS. The standard depth of"Inlet"is 4.0 feet measured from invert to top of inlet. Measure "Extra Depth on Inlet" per foot of depth or fraction thereof in excess of 4.0 feet as stated above. B. Pay for"Inlet" at Contract unit price bid for individual type or stage inlet construction. When indicated in the PROPOSAL, pay for "Extra Depth on Inlet" at Contact unit price bid for individual type or stage of inlet construction, complete in place. This J3016 - 1/2 Std. 10/13/2005 payment in addition to payment for standard depth "Inlet" of individual type. Such payment shall be full compensation for all work described herein. J3016 - 2/2 Std. 02/18/2009 ITEM NO. J3017 -FIRE HYDRANTS PART 1 -GENERAL 1.01 DESCRIPTION A. Extent of Work: Furnish and install fire hydrant assemblies at locations shown on PLANS. B. Standard Specifications: Conform to the requirements of AWWA C502-73 unless otherwise specified hereinafter. 1.02 QUALITY ASSURANCE Fire hydrants to be American-Darling B-84-B, or approved equal. If required, submit affidavit of compliance in accordance with AWWA C502-73 Section 1. 1.03 PRODUCT DELIVERY STORAGE AND HANDLING In accordance with AWWA C502-73 Section 6. PART 2 -PRODUCTS 2.01 DESIGN REQUIREMENTS A. Main Valve Opening: Minimum of 5-1/4 inches. B. Barrel Diameter: Minimum internal diameter of 7-1/4 inches. C. End Opening and Connection: 6-inches with same connections as specified for pipe,valves, and fittings. D. Depth of Bury: Distance from bottom of inlet pipe to "ground-line" or "bury- line", said "ground line" or "bury line" being not less than 22 inches below centerline of steamer nozzle. E. Nozzles: Two 2-1/2 inch hose nozzles and one 5-1/4 inch "STORZ" steamer nozzle or other dimension, which conform to Owner's standard. Hose connection threads to be National Standard. Steamer connection threads to be Owner's standard. F. Operating Nut: Open by turning counterclockwise. Pentagonal shape, 1-1/2 inches from point to flat, not less than 1-1/4 inches depth. Owner's standard to take precedence if different from this requirement. G. Extension Section: Provide extension sections when indicated on PLANS or where required to conform to Paragraph D. above. J3017 - 1/2 Std. 02/18/2009 H. Protection from Traffic Damage: Equip hydrants with a breakable feature on the stem and the barrel at the ground-line. In the event of an impact accident, the hydrant main valve to remain closed with no leakage. I. Lubrication: Provide permanent lubrication around threaded upper end of stem. Use "0" ring seals to prevent lubricant from leaking out of reservoir into interior surfaces of fire hydrant that are in contact with potable water. J. Dry Top Design: Equip hydrant with drain valves which are an integral part of the valve mechanism, which is to be in the open position when the main valve is closed, for the purpose of draining the hydrant barrel. When the main valve is open,these valves are to be closed. L. Color: Furnish with the standard color as requested by the Owner. PART 3 -EXECUTION 3.01 GENERAL Furnish and install valves, fittings, and appurtenances used to complete fire hydrant installation in accordance with applicable provisions of other TECHNICAL SPECIFICATIONS. 3.02 CONSTRUCTION METHODS A. Place fire hydrants at required locations shown on PLANS and in conformity with details as indicated. Install fire hydrants, valves, and valve boxes plumb, and place valve boxes directly over valves after they have been connected. B. Install fire hydrants on concrete bed as indicated, and block between hydrant and vertical wall of trench to prevent it from blowing off line. C. Place %2 cubic yard of broken stone or gravel and base of each fire hydrant to ensure drainage of valve when closed. Thoroughly compact gravel and backfill around fire hydrant to surface of natural ground. D. Before installation of any fire hydrant or valve, clean foreign material from interior of valve or barrel of fire hydrant. Tighten stuffing boxes on valves and fire hydrant and open and close them to insure that parts are in good working order. 3.03 MEASUREMENT AND PAYMENT Measure "Fire Hydrant Assemblies" per each assembly at all depths. Measurement shall include swivel/parallel tee, 6" valve, grade lock, hydrant, hydrant extension, and related appurtenances that compose the "Fire Hydrant Assembly" shown on PLANS. Payment for"Fire Hydrant"measured as stated above will be at the contract unit price bid per each. J3017 -2/2 Std. 10/13/2005 ITEM NO. J3019 - FIBERGLASS MANHOLE PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: Furnish and install fiberglass manholes on sanitary sewer lines when approved by Owner. B. Related Work Specified Elsewhere 1. Concrete and reinforcing steel per Item No. B3005 "Concrete Construction". 2. Sewer pipe and fittings per applicable Item No. J1002 "Polyvinyl Chloride (PVC) Sewer Pipe and Fittings" or Item No. H1001 "Ductile Iron Pipe and Cast Iron and Ductile Iron Fittings". 3. B3001 "Concrete, B2001"Concrete Structures" and B3001 "Reinforcing Steel". 1.02 QUALITY ASSURANCE Fiberglass manholes to be "Fiberglass Flowtite Manholes" by Owens/Corning Fiberglass Corporation or "Fiberglass Reinforced Plastic Manhole" by Armco, or approved equal. 1.03 STORAGE AND HANDLING Do not drop or impact manhole. Manhole to be chocked until installed. If manhole is rolled, insure that ground is smooth and free of rocks, debris, etc. Lift manhole with two slings on spreader bar in horizontal position or by use of 4-inch x 4-inch timber - 33 inches long inserted through top access hole for vertical positioning. PART 2 - PRODUCTS 2.01 MATERIALS Fiberglass manholes to meet, as a minimum, materials requirements as specified by ASTM D3753-79. PART 3 -EXECUTION 3.01 SITE PREPARATION Excavation at manhole location to be wide enough to accommodate slab specified on PLANS and provide working room around manhole. J3019 - 1/3 Std. 10/13/2005 3.02 MANHOLE PREPARATION A. Pipe cutouts to be made in manhole skirt prior to setting manhole in place over pipe in trench. Cutouts to be made using a saber saw or thin blade type saw. Fasten pipe connectors to manhole as shown on detail. Size of cutout is determined as follows: 1. Width to be equal to pipe outside diameter plus 1/2 inch. 2. Height of cutout to be deep enough to ensure that 4 inches of base of manhole will penetrate concrete slab. 3. Height of manhole to be sufficient to insure that manhole, when set in place over pipe, will be below finished grade to allow for final adjustment of chimney and ring and cover. 3.03 MANHOLE INSTALLATION A. With cutouts made, position manhole so that it may be set in place with backhoe or other lifting device. B. Lower manhole in place until top of cutout rests gently upon pipe. C. Connect pipe to manhole by means of molded connectors bonded to the manhole. D. Pour ready-mix concrete to spring line of pipe. E. Plumb manhole and work concrete around manhole and over pipe, forming a tight seal at least 6 inches high. 3.04 BACKFILLING A. Backfill after concrete base has hardened sufficiently to provide rigid support for both manhole and backfill. B. Backfill a minimum of one (1) foot out from fiberglass manhole with cement stabilized sand to a point of 18 inches below finished grade. Cement stabilized sand to be placed in 12-inch layers and thoroughly rodded. The remainder of the fill shall be select backfill from trenching or excavation operation. Foreign objects such as large stones, concrete, clay lumps, etc. over 5 inches in size are not allowed. C. Compact select backfill to a condition equal to or greater that the undisturbed surrounding material. D. Prevent backfill from sliding down bank and do not allow backfill material or equipment to impact manhole during filling. E. Invert Forming and Service Connection: Invert to be formed in accordance with standard procedures. Service connections to be accomplished as specified under Paragraph 3.03 C. 3.05 LATERALS J3019 - 2/3 Std. 10/13/2005 In the event that one or more laterals are to be tied into manhole, standard drops are to be used. Cutout and pipe connections are to be the same as specified under Paragraph 3.02 Cutouts to be just large enough to fit pipe through. Same procedure for drop line cutout to be followed. 3.06 FINISHING MANHOLE TO GRADE A. Flat base for chimney to be one foot below fmished grade. Construct chimney with precast concrete rings and mortar to bring manhole to finished grade. (Use chimney for ring support.) Bricks are not acceptable. Do not in any case place manhole cover ring directly on fiberglass manhole. Do not load manhole except on flat part of cone. B. When located in easements, finished rim elevation to be set 3 inches above natural ground or finish grade(where indicated)or as shown on Plans. C. For construction of manholes located in street right-of-way, refer to Sanitary Sewer Construction Notes. 3.07 TESTING A. After backfilling procedure is completed,manhole to be tested for leakage as follows: 1. Provide watertight plug on all manhole outlets. 2. Fill manhole with water up to base of chimney. 3. Allow water to stand in manhole for 24 hours. If leakage is detected, Contractor to drain manhole and make repairs as required to maintain the same water level at the base of the chimney for a 24-hour period. 4. Include cost of any repairs in unit price bid for manhole. 3.08 MEASUREMENT AND PAYMENT A. Measurement: Measure "Fiberglass Manhole" per each, being 0'-8' in depth, measured from flow line of manhole to top of manhole casting. Measure "Extra Depth on Fiberglass Manhole"per vertical foot or fraction thereof in excess of 8 foot depth. B. Payment: Pay for"Fiberglass Manhole" measured as stated above shall be at Contract Unit Price indicated per each. Pay for"Extra Depth on Fiberglass Manhole" measured as stated above shall be at Contract Unit Price indicated per foot. J3019 - 3/3 Std. 10/13/2005 ITEM NO. J3022 -RESILIENT SEATED GATE VALVES -4-INCH THROUGH 12- INCH FOR WATER DISTRIBUTION SYSTEMS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish and install iron-body, bronze-mounted, nonrising stem gate valves which are intended for use in approximate level setting on buried water distribution system pipelines. B. Related Work Specified Elsewhere: As specified in Item No. J2001 - "Construction of Underground Lines, or other related work as called for on PLANS or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. 1.02 QUALITY ASSURANCE A. Valves to be manufactured in accordance with ANSI/AWWA C509 unless otherwise specified hereinafter. B. Valve shall be seat tested at the rated working pressure of 200 psi with no leakage. Shell test of 400 psi shall be applied to body with valve in the open position with no leakage through the metal, flanged joints, or stem seals. C. Valves shall be available with various ends designed for connection to piping specified. Mechanical joints are to be per ANSI/AWWA C111/A21.11 and include MJ accessories. 1.03 PRODUCT DELIVERY STORAGE AND HANDLING In accordance with AWWA C500, Section 31. PART 2 - PRODUCTS GENERAL 2.01 VALVE CONSTRUCTION A. Sealing mechanism shall provide zero leakage at the water working pressure against line flow from either direction and be designed such that no exposed metal seams, edges, screws etc., are within the waterway in the closed position (all rubber surfaces). The rubber covered gate shall not be wedged into a pocket nor slide across the seating surface to obtain tight closure. J3022 - 1/3 Std. 04/26/2005 B. The stem shall be vertical and furnished with dual 0-rings above the stem collar for an inside screw design. Another 0-ring shall be provided underneath the stem collar to seal bearing surfaces from line content. The area between the 0-rings shall be filled with lubricant. Anti-friction washers shall be provided at the stem collar for inside screw design. C. Outside screw and yoke style valves shall have asbestos-free packing with bronze packing gland. Bonnet opening for stem shall be bronze bushed to allow repacking if necessary while valve is in fully open position. D. All internal and external ferrous surfaces of the valve, including the interior of the gate, shall be coated with epoxy. Coating to be applied to castings prior to assembly to insure all exposed area, including bolt holes and flange face surfaces, will be covered. Grade II, III, IV, and XI bronze not permitted where subject to contact by water. E. Inside screw valves may be fitted with bonnet flange for mounting indicator post if desired. Bonnet bolts and glands to be cadmium plated. F. Provide mechanical joint valve ends for use with PVC or ductile iron pipe and flanged valve ends for use with steel pipe or steel cylinder reinforced concrete pipe, unless noted otherwise on PLANS. Pipe size, wall thickness, working pressure, thickness class, or other pertinent information is furnished under applicable pipe specification or notes on PLANS. 2.03 VALVE BOX CONSTRUCTION A. Material: Cast iron,ASTM A126, Class B. B. Type: Either two-or three-piece, screw type, as required by installation drawings. C. Base: Either round or oval and of proper size to fit valve on which they are installed. D. Height: Provide extension section, if required, so that lid of valve box if flush with surrounding surface. E. Lid: Cast with word"WATER." PART 3 -EXECUTION 3.01 INSTALLATION A. General: Make valve installation in accordance with applicable provisions of other items pertaining to construction of lines and as follows: J3022 -2/3 A Std. 04/26/2005 1. Place valves at locations shown on PLANS. Install valves and valve boxes plumb, with valve boxes directly over valve stems. 2. Before installation of valves, clean foreign material from interior of valves. Open and close valves to insure that they are in good working order. Do not backfill valves until tested with lines. Adjust glands with pressure on valve. 3. Install valves on 6-inch thick x 18-inch square precast concrete base. 4. Bolts,nuts, and washers on buried flanged valves to be epoxy coated. 5. Wrap all valves with polyethylene film in accordance with AWWA C105/A21.5. 3.02 MEASUREMENT AND PAYMENT A. Measurement: Measure gate valves with valve boxes ("Gate Valve and Box") and support blocking per each, for each size valve furnished and installed. B. Payment: Pay for gate valves with valve boxes and support blocking, measured as stated, at Contract unit price bid for respective sizes. J3022 - 3/3 Std. 10/13/2005 ITEM NO. K3003 - LIME-STABILIZED SUBGRADE PART 1 - GENERAL 1.01 DESCRIPTION A. Scope: Preparation and treatment of subgrade by addition of hydrated lime or lime slurry when plasticity index exceeds 20, mixing and compacting to required lines, grades, and typical sections. Treatment applies to natural ground, cut sections, embankments, or existing subgrade. B. Related work as called for on PLANS or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. 1.02 DELIVERY, STORAGE, AND HANDLING A. Store and handle lime in weatherproof containers, bins, or buildings. Protect lime from any dampness or moisture until distribution on subgrade. B. Weigh lime furnished in trucks on approved scales. C. Lime furnished in bags to bear manufacturer's certified weight. Bags varying more than±5 percent from average bag weight may be rejected. PART 2—PRODUCTS 2.01 MATERIALS A. Hydrated Lime: Conforming to requirements of Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges, 2004 Edition, Item "Lime Treatment(Road-Mixed)". B. Commercial Lime Slurry: Conforming to requirements of Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges, 2004 Edition, Item"Lime Treatment(Road-Mixed)". K3003 - 1/3 Std. 10/13/2005 PART 3 —EXECUTION 3.01 CONSTRUCTION METHODS A. Preparation: Prior to placing lime treatment, shape subgrade to elevations indicated on PLANS by scarifying or excavating soil with proper machinery. Correct unstable or loose material at given cross-section depths by removal of such material. Backfill voids with approved select material and compact to indicated grades. B. Placing: Place lime only on areas where mixing operations can be completed in same workday. Spread lime uniformly over subgrade by "dry placing" or "slurry placing" methods described herein. 1. Dry Placing: Spread lime with approved spreader or by bag distribution. Do not spread with maintainer or motor grader. Do not spread lime during windy or other adverse weather conditions. 2. Slurry Placing: Mix lime with water in trucks and place mixture or slurry using approved distributor. Make successive passes over measured section of roadway until proper lime content has been secured. Furnish truck with approved agitator which will keep lime and water uniformly mixed. Do not change grade of slurry without prior approval. C. Mixing: Mixing procedure to be same for either "dry placing" or "slurry placing". Obtain uniform mixture and moisture content. 1. First Mixing: Thoroughly mix soil and lime to required depth, using approved pulver-type road mixer. Mix until homogeneous, friable mixture of lime and soil is obtained, free of clods or lumps. Add water by sprinkling until proper moisture content is obtained, then cure from 1 to 2 days as required. Keep moist during curing period prior to final mix. 2. Final Mixing: Uniformly mix, after proper curing, using approved pulver-type road mixer. Reduce all clods and lumps by pulverization methods such that, when all non-slaking aggregates (sound or firm particles)retained on 3/4-inch sieve are removed,remainder of material meets following requirements when tested dry by laboratory sieves: Percent Minimum Passing 13/4-inch Sieve 100 Minimum Passing 3/4-inch Sieve 85 Hydrated lime exposed to open air for period of 6 hours or more, or to excessive loss due to washing or blowing between time of application and mixing, will not be accepted for payment. 3. Required amount of water necessary to provide optimum moisture to be added uniformly and mixed thoroughly with lime and soil. K3003 - 2/3 Std. 10/13/2005 D. Compaction: Begin compaction immediately after final mixing. Maintain moisture content at or near optimum to achieve compaction. Where total compacted thickness is to be greater than 8 inches, spread and compact material in two or more approximately equal layers. Uniformly compact for entire required depth using approved tamping rollers. Compact treated material in such manner that it will not be mixed with underlying subgrade material. Correct all irregularities or weak spots immediately by replacing material and recompacting. Maintain surface in smooth condition until base course is placed. Acquire density of at least 95 percent as determined by AASHTO Standard Method T-99-81. Use pneumatic-type roller for final surface rolling. Moist-cure completed subgrade section for minimum of 4 days before placing pavement. 3.02 MEASUREMENT AND PAYMENT A. Measurement 1. Measure "Compacted Subgrade" of depth specified when stabilized with lime by the square yard of surface area to a point 2 feet beyond back of curb or edge of pavement. 2. Measure manipulation of lime during stabilization of subgrade by the square yard of subgrade actually stabilized. 3. Measure lime as follows: a. Hydrated Lime: Measure by ton of 2,000 pounds, dry weight. b. Commercial Lime Slurry: Measure by ton of 2,000 pounds of lime "dry solids" in slurry. Calculate quantity of lime from required minimum percent solids for grade used. 1) Grade 1: At least 31 percent by weight of slurry and calculate quantity of lime by ton of 2,000 pounds,based on 31 percent lime content. 2) Grade 2: At least 35 percent by weight of slurry and calculate quantity of lime by ton of 2,000 pounds,based on 35 percent lime content. B. Payment 1. Pay for "Compacted Subgrade" at Contract unit price per square yard of compacted subgrade of depth specified. 2. Pay for"Manipulation of Lime for Stabilized Subgrade" at Contract unit price per square yard of manipulation of lime for stabilized subgrade. 3. Pay for "Lime" at Contract unit price per ton of lime used for stabilizing subgrade. 4. In the event that completion of subgrade is delayed or postponed by adverse weather or wet soil conditions, no separate pay will be made to the Contractor to make the subgrade meet specifications. K3003 - 3/3 08/03/2004 ITEM NO. K3007 - REMOVAL OF EXISTING PAVEMENTS AND CURBS PART 1 - GENERAL 1.01 DESCRIPTION A. Scope: Remove existing concrete and/or asphalt pavement and concrete curbs as indicated on PLANS. B. Related work as called for on PLANS or specified elsewhere in this or other TECHNICAL SPECIFICATIONS. PART 2—PRODUCTS Not applicable to this Item. PART 3 —EXECUTION 3.01 METHOD OF REMOVAL A. Remove pavements and curbs by methods that will not damage existing underground utilities or existing surface facilities that will remain in service adjacent to work area. In areas where only a portion of existing concrete is to be removed, special care is to be exercised to avoid damage to portions of concrete remaining in place. B. Existing concrete to be cut to the neat lines as shown on PLANS. Existing concrete beyond the established neat lines, which is damaged or destroyed by these removal operations to be replaced at Contractor's expense. C. Provide clean break from existing pavement that will remain in place with a sawed joint. Saw joint along break line with a power driven concrete pavement saw. Cut groove to a minimum depth of 2 inches on concrete surface or 3 inch on asphalt surfaces. Break and remove all unwanted pavement and curb. Cut exposed pavement reinforcement to remain in place, as necessary, to provide sufficient length as dowel bars. D. Unless shown on PLANS, excavations for the removal of pavement or curbs to be backfilled to grade with excavated material compacted to a density equal to density of material inside of trench. E. Unless shown on PLANS, all materials removed except inlet frames and grates, manhole frames and covers, and salvageable utility pipe and fittings to become K3007 - 1/2 08/03/2004 property of Contractor. Remove and dispose material at locations off jobsite in such a manner so as not to cause damage to Owner or any individual. 3.02 MEASUREMENT AND PAYMENT A. Unless otherwise indicated, no separate payment for work performed under this Item if noted as such in PLANS. Include cost of same in Contract price for work of which this is a component part. B. When indicated in the PROPOSAL, measure removal of existing pavement and/ or curbs or curbs and gutters as indicated below. Pavement to be made at Contract price bid for the following items as applicable. Such payment to be full compensation for all work described herein, including removal of curbs and/or gutters. 1. Pay for"Removal of Existing Concrete Pavement"at contract price bid per square yard. 2. Pay for "Removal of "Existing Asphalt Pavement" at contract price bid per square yard. 3. Pay for "Removal of Existing Concrete Pavement with Asphalt Overlay" at contract price bid per square yard. 4. Pay for"Removal of Existing Concrete Curb" at contract price bid per linear foot. K3007 - 2/2 10/13/2005 ITEM NO. K3101 - CONCRETE PAVEMENT PART 1 -GENERAL 1.01 DESCRIPTION Extent of Work: This Item governs for construction of concrete pavement for roadways, driveways, turnouts, and concrete curbing. Unless specified otherwise in preceding Special Provision or on PLANS, pavement to conform to residential requirements. 1.02 WORK SPECIFIED ELSEWHERE A. Roadway Preparation: Item No. K3203 "Roadway Excavation" or Item No. K3203 "Roadway Excavation and/or Embankment(Station Grading)" B. Concrete: Item No. B1001 "Concrete." C. Reinforcing Steel: Item No. B3001 "Reinforcing Steel." 1.03 QUALITY ASSURANCE A. Submittals: For samples, mix designs, tests, and reports, see Item No. B1001 "Concrete." B. Standard Beam Test: See Item No. B1001 "Concrete." C. Core Samples: One core to be taken for each 1,000 square yards of finished pavement (minimum one core per street). Each core to be tested for thickness and compressive strength. PART 2 - PRODUCTS 2.01 MATERIALS A. Concrete: Item No. B1001 "Concrete." Thickness as shown on PLANS or in Proposal. B. Reinforcing Steel: Item No. B3001 "Reinforcing Steel." Bar size and type as shown on PLANS. C. Expansion Joint Material: To be in accordance with section and location as shown on PLANS. K3101 - 1/10 10/13/2005 1. Fillers a. Premolded 1) Asphalt filler board per ASTM D994-71. 2) Premolded joint material per ASTM D1751-73. b. Wood 1) Redwood: Heart, clear; maximum weight per cubic foot when oven dried to constant weight to be 30 pounds. 2) Other materials may be used with prior approval or Engineer. c. Hot poured: Per ASTM D1190-74. Also to be used in other type of joints as required. Other materials may be used with prior approval of Engineer or as directed on the PLANS. 2. Load Transmission Devices: To be of type and size shown on PLANS. D. Forms 1. Pavement a. Wood Forms: (Used only in residential construction) to be 2X material, free from warps, bends and kinks, and sufficiently true to provide a straight edge on concrete. Use precautionary methods to prevent leakage of mortar through of under side forms. Top of each form section, when tested with a straight edge, to conform to the requirements specified for the surface of completed pavement. b. Metal Forms: Use metal forms approved shape and section. Preferred depth of form to be equal to required edge thickness of pavement. Forms with depths greater or less than 1 inch of pavement thickness, may be used. Forms with less depth than pavement thickness to be brought to required depth by securely attaching wooden planks of approved section and size to bottom of form. Use forms section at least 10 feet in length, and provide for staking in position with not less than 3 pins. Use forms of adequate strength to withstand machine loads without visible springing or settlement. Use forms free from warps, bends and kinks, and sufficiently true to provide a straight edge on concrete. Top of each form section, when tested with a straight edge, to conform to the requirements specified for the surface of the completed pavement. Use flexible or curved forms of wood or metal of proper radius for curves of 200-foot radius or less. 2. Curbs a. Wood or Metal: Wood or metal curb forms to be of approved section, straight and free of warp. Outside curb forms to have a depth at least 1/2-inch K3101 - 2/10 10/13/2005 greater than height of curb. Rigidly attach inside curb forms (if required) to outside forms. b. Machine Laid: Equipment to conform to the requirements as specified under Paragraph 3.01 CONSTRUCTION. Use flexible or curved forms of wood or metal of proper radius for curves but not to exceed radius recommended by curb machine manufacturer. E. Metal or Plastic Supports: Supports for reinforcing steel to be either metal or plastic of approved shape and size, and spacing to conform to details shown on PLANS. F. Materials for Curing 1. Burlap: Mats to be in good condition, clean, and free of any substance, which would have deleterious effect on concrete. 2. Cotton Mats: Mats to be in good condition, clean, and free of any substance, which would have deleterious effect on concrete. 3. Waterproof Paper: Per ASTM C171-69. 4. Membrane Curing Compounds: Conform to ASTM C309-74. 5. White or clear Polyethylene Sheeting: Sheet having thickness not less than 4 mils (.004 inch). G. Grouting 1. Material and mixtures for grouting curb dowels. a. Proportion by weight. b. One part Portland cement, Type I or Type II. c. One part clean, sharp sand. d. Seven-tenths part nonshrinking grout aggregate. e. No more than 5-1/2 gals. water per sack cement. 2. Other: Use mixture by weight of one part Portland cement and two parts sand for general purposes. If space to be grouted is less than one inch and is impossible to tamp grout use one-to-one mix. Where space to be filled with grout is large, use original concrete mixture. Use stiff mixture for grout to be tamped, produced by prolonged mixing. To obtain stiff grout, mix mortar using amount of water required to thoroughly mix ingredients, then continue mixing without additional water until grout is stiff enough to be compacted by tamping when placed. For grouting block outs for embedded pipes and similar items, use grout to which 5 pounds of nonshrinking grout aggregate per sack of cement has been added. K3101 - 3/10 10/13/2005 PART 3 -EXECUTION 3.01 CONSTRUCTION A. Subgrade: Excavate, shape, and compact subgrade to grades, sections and densities shown on PLANS. Maintain drainage of subgrade at all times. Test subgrade section with an approved template, operated and maintained by Contractor. Wet down subgrade sufficiently in advance of placing pavement. No pavers, batch trucks, or other equipment to be permitted between forms during paving operations. B. Wood and Steel Forms 1. Setting: Set forms on compacted subgrade, cut true to grade so that entire form section is supported by subgrade. Stake metal form sections with at least 3 pins per section, with a pin on each side of every joint. Adequately stake wood form sections to prevent bows in form and to keep form sections to grade. Join form sections to prevent displacement. Clean and oil forms with form oil each time they are used. Set forms to line and grade for at least 200 feet ahead of mixer. Check conformity of alignment and grade immediately prior to placing concrete. 2. Removal: Leave forms in place for at least 12 hours. Remove forms without injury to concrete. Immediately repair damage resulting from form removal. Point up all exposed honeycomb areas with approved mortar. As soon as curb forms are removed, backfill behind curbs with approved material and compact to 90 percent Standard Proctor density. C. Slip Forms: Equipment to be provided with traveling side forms of sufficient dimensions, shape and strength to support concrete laterally for sufficient length of time during placement to produce pavement of required cross-section. Concrete to be distributed uniformly into final position by slip form paver, and horizontal deviation in alignment of edges not to exceed 1-1/4 inches form established alignment. D. Concrete Placing and Handling 1. Wood and Steel Forms a. Deposit concrete on subgrade in such manner as to require as little rehandling as possible. Use shovels for hand spreading of concrete. Use of rakes will not be permitted. Place concrete in a rapid, continuous operation. b. Consolidate all concrete placed for pavement by an approved mechanical vibratory unit designed to vibrate the concrete internally. Use vibratory member equipped with synchronized vibratory units to extend across pavement practically to, but not to come in contact with side forms. Space separate vibratory units at sufficiently close intervals to provide uniform vibration and consolidation to entire width of pavement. Mount K3101 -4/10 10/13/2005 mechanically operated vibrators in such manner as not to come in contact with forms or reinforcement, and not to interfere with transverse or longitudinal joints. c. Furnish hand-manipulated mechanical vibrators in number of required for proper consolidation of concrete along forms, at joints, an in areas not covered by mechanically controlled vibrators. 2. Slip Forms a. Concrete, for full paving width, to be effectively consolidated by internal vibration, with transverse vibrating units or with a series of longitudinal vibrating units. Internal vibration to mean vibration by means of vibrating units loaded within the specified thickness of pavements section and at a minimum distance ahead of screed equal to pavement thickness. b. When concrete is being placed adjacent to an existing pavement, that part of the equipment which is supported on the existing pavements to be equipped with protective pads on crawler tracks or rubber-tired wheels, offset to run a sufficient distance from edge of pavement to avoid breaking or cracking pavement edge. c. After concrete has been given a preliminary finish by finishing devices incorporated in the slip-form paving equipment, surface of the fresh concrete to be checked with a straightedge to tolerances and finish required. 3. Wood or Metal Formed Curb: Curbing may be poured monolithic with pavement or may be added to pavement surface at a latter time. Place curb dowel bars while pavement is plastic. Provide expansion joint or contraction joint in curb opposite each expansion joint or contraction joint in pavement and at each curb inlet. Use same expansion joint material as used in pavement. Cut weakened plane joints with an approved grooving tool opposite each joint in pavement, as required. Apply finish coat of mortar on exposed surfaces of curb. Mortar is composed of one part Portland cement and two parts sand. Apply mortar with a template or "mule" conforming to plan curb dimensions. Steel trowel finish all exposed surfaces of curb and brush to a smooth,uniform surface. 4. Machine-Laid Curb a. Lay curbs by an extrusion-type machine. Immediately prior to placing of the curb,thoroughly clean the previously approved foundation. b. Grade and alignment for top of curb to be as shown on PLANS. The forming tube of the extrusion machine to be readily adjustable vertically during the forward motion of the machine, to provide required variable motion of the machine,to provide required variable height of curb necessary to conform to the established grade line. K3101 - 5/10 10/13/2005 c. Feed concrete into machine in such a manner and at such consistency that the finished curb will present a well-compacted mass with a surface free from voids and honeycomb and true to established shape, line, and grade. d. Perform any additional surface fmishing's specified and/or required immediately after extrusion. Construct joints as specified or as shown on PLANS. 5. Placing Concrete in Cold Weather: Minimum ambient air temperature at time of concrete placement to be not less than 50 deg. F. a. Maintain temperature of concrete placed on or in the ground above 40 deg. F. for a period of 72 hours from time of placement. b. Protect concrete against freezing during curing period in accordance with Portland Cement Association"Design and Control of Concrete Mixtures." c. Protect concrete from temperatures below 40 deg. F. until it has cured for a minimum of three days at 70 deg. F. or five days at 50 deg. F. Remove and replace at Contractor's expense, all concrete not meeting this requirement. d. Protection may consist of additional covering, insulated forms, artificial heating, or other means approved by Engineer. 6. Placing Concrete in Hot Weather: When air temperature is above 90 deg. F. use approved retarding agent in all exposed concrete. a. Reinforcing steel and other surfaces in contact with concrete, to be cooled to below 90 deg. F. by means of water spray or other approved methods. b. Concrete temperature prior to placement not to exceed 85 deg. F., plus a maximum tolerance of 5 deg. F. Concrete above this maximum will be rejected. c. Reduce concrete temperature at time of placement to satisfy maximum allowable temperature by one or more of the following: (1) Addition of cold water with a subsequent addition of cement to maintain proper water-cement ratio. Tanks or trucks used for storing or transporting water to be insulated or painted white. Mechanical refrigeration may be used to reduce water temperatures. (2) Addition of crushed, shaved, or shipped ice directly into the mixer with a subsequent addition of cement to maintain proper water- cement ratio. Continue mixing until ice is completely melted. (3) Other approved methods. E. Finishing K3101 - 6/10 10/13/2005 1. Nonresidential Pavements: Finish concrete pavement by power-driven transverse finishing machines and longitudinal finishing machines. Provide transverse finishing machine with two screeds accurately adjusted to crown of pavement. Ride transverse finishing machine on forms, so designed and operated as to strike off and consolidate concrete. Make at least two trips over each area, or more if necessary. Provide longitudinal finishing machine with a longitudinal float not less than 10 feet in length, adjusted to a true plane. Ride longitudinal finishing on forms, so designed and operated as to finish pavement to required grade. Equip finishing machines with rubber tires to roll on concrete pavement. Just before concrete becomes nonplastic, belt pavement surface with a canvas or canvas-rubber composition belt of two- or four-ply construction, not less than 6 inches nor more than 10 inches wide, and at least 2 feet longer than width of pavement. Use short transverse strokes and rapidly advance longitudinally to produce uniform surface of gritty texture. 2. Residential Pavements: Concrete pavement may be finished by machine or by hand. If by machine, see Paragraph E.1. above. If finished by hand, thoroughly vibrate concrete around reinforcement and embedded fixtures. Tamp concrete with a tamping template make of 4-inch by 10-inch lumber, or equivalent metal section, at least 2 feet longer than width of pavement, to conform to crown section of pavement. If wood-tamping template is used, it is to have a steel face not less 3/8 inch in thickness. Strike off concrete with a strike-off screed made of 4-inch by 10-inch lumber or equivalent metal section at least 2 feet longer than width of pavement and conforming to crown section of pavement. Move strike-off screed forward with combined transverse and longitudinal motion in direction work is progressing, maintaining screed in contact with forms, and maintaining slight excess of materials in front of cutting edge. Use a longitudinal float not less than 10 feet in length to level surface. Prior to concrete becoming nonplastic, belt pavement surface with a canvas or canvas-rubber composition belt or two- or four-ply construction not less than 6 inches nor more than 10 inches wide, and at least 2 feet longer than width of pavement. Use short transverse strokes and rapidly advance longitudinally to produce uniform surface of gritty texture. 3. Slip Form: If this method of construction is used, all requirements of this TECHNICAL SPECIFICATION in regard to subgrade and pavement depth, alignment, consolidation, finishing, workmanship, etc. to be met. Equip "slip form paver"with longitudinal transangular finishing float adjustable to crown and grade. Extend float across the pavement almost to the side form and/or the edge of slab. F. Surface Tests 1. Test entire surface before initial set and correct irregularities or undulations to bring surface within requirements of following test,then finish. K3101 - 7/10 10/13/2005 2. Place approved 10-foot straight edge parallel to center of roadway so as to bridge any depressions and touch all high spots. Ordinates measured from face of straight edge to surface of pavement not to exceed 1/16 inch per foot from nearest point of contact, and in any case maximum ordinate to 10-foot straight edge to be no greater than 1/8 inch. G. Joints: Place joints of types shown on PLANS at required locations and at spacing shown. 1. Construction Joints: Place transverse construction joint when necessary to stop concrete placement for period of more than 30 minutes. Length of slab to be not less than 10 feet from nearest joint of complete slab. If closer than 10 feet from nearest joint of complete slab. If closer than 10 feet, Contractor to remove concrete from between forms back to nearest normal join and place construction joint bulkhead. Use longitudinal keyed construction joints at pavement edges where required. 2. Expansion Joints: Place expansion joint at radius points of curb returns for cross-street intersections, or as shown on PLANS. Do not use boards less than 6 feet in length. When pavements are 24 feet or less in width, use not more than two lengths of board. Secure pieces to form straight joint. Shape board filler accurately to cross-section of concrete slab. Use premolded joint filler, accurately shaped, in curb section. Load transmission devices to be of type and size shown on PLANS. Use joint sealing compound as required. 3. Contraction Joints: Make straight and place at spacing shown on PLANS. Place asphalt-coated smooth dowels accurately and normal to joint. Tool edges of groove and seal with joint sealing compound. 4. Longitudinal Weakened Plane Joints: Form longitudinal weakened plane joint by an approved continuous metal shield or asphalt impregnated felt strip placed continuously behind longitudinal float by a machine of the flex plane type. H. Protection and Curing: Following requirements apply on alternate methods of curing. Cover concrete with burlap or cotton mats, when concrete has hardened sufficiently to prevent marring of surfaces, and keep wet continuously for 72 hours. Apply curing compound immediately after free water has disappeared and at rate specified. Keep polyethylene sheets or membrane curing film in place and intact for five days, in lieu of 72 hours wet curing. Cure concrete curbs and gutters to prevent checking while setting. After each day's run, barricade street. No wheeling will be allowed on concrete during curing period. Do not open pavement to traffic until concrete is at least 10 days old. Clean off pavement and seal joints before opening pavement to any traffic. Polyethylene sheeting will be kept on the job site at all times to cover and protect pavement during adverse weather conditions. Concrete surface, which is still in a plastic state, shall be protected from adverse rainfall conditions so as not to impair the quality of the pavement surface. K3101 - 8/10 F 10/13/2005 Removal and replacement of Deficient Concrete: REMOVE AND REPLACE with pavement of specified thickness. Length of pavement to be removed shall be to the nearest existing joint (Type A, C, or E) in both directions. Width of pavement to be removed shall be from the centerline of pavement to edge of pavement. Contractor shall saw completely through existing reinforcing steel at said joints, except at expansion joints. Prior to replacement of deficient concrete pavement, Contractor shall drill and dowel concrete pavement for 5/8-inch diameter reinforcing rods 30 inches long on 24 inch centers as shown on plans for TYPE E construction joint. 3.02 MEASUREMENT AND PAYMENT A. Measurement: "Concrete Pavement to be measured by square yard of surface area of completed and accepted pavement of thickness designated. Measurement to be made from back to back of curb. "Monolithic Concrete Curb and Gutter," "Concrete Curb," "Temporary Concrete Curb," and "Mountable Concrete Curb" of height designated will be measured by linear foot. "Driveway Turnout" will be measured by the square yard of surface area of completed and accepted turnout. B. Payment 1. Adjustment of payment for acceptable pavement and replacement of faulty pavement to be in accordance with the following: a. Thickness of pavement to be determined by measurement of cores taken prior to final acceptance, at such points as Engineer may select. 6-inch diameter cores taken at rate of at least one core per each 1,000 square yards of pavement. These initial cores to be paid for by owner. b. Pavement of thickness within 1/4-inch of designated thickness to be considered of satisfactory thickness, and to be paid for at Contract unit price. c. Pavement of thickness less than thickness designated by more than 1/4-inch, but less than 'A-inch, to be considered of deficient thickness, and adjusted unit price to be used in payment. This price shall be one-half of the Contract unit price. Length of area of such deficient thickness to be determined by additional cores in each direction until cores are obtained which measure designated thickness. Width of such area to be entire width of pavement within length thus determined. 2. Payment will not be made for pavement which is deficient in thickness by 1/2-inch or more. Length of area of such unsatisfactory thickness to be determined by additional cores taken at intervals of 10 feet along length of pavement in each direction until cores are obtained which have designated thickness less 1/2-inch. Width of such area to be entire width of pavement within length of such area to be determined. If deficiency in thickness is not more than 3/4-inch, Contractor may leave such pavement in place, relinquishing thereby any claim for compensation incurred in its construction. If deficiency in thickness is 3/4-inch or more remove, dispose and replace with pavement of specified thickness as described in paragraph 3.01. 3. No additional payment over Contract unit price to be made for pavement of thickness exceeding that required by PLANS. K3101 -9/10 10/13/2005 4. Additional 6-inch diameter cores required determining areas of deficient thickness to be paid for by Contractor. 5. "Concrete Curb"to be paid for at Contract unit price. K3101 - 10/10 08/03/2004 ITEM NO. K3 109 - TRAFFIC AND ZONE MARKING PAINT PART 1 -GENERAL 1.01 DESCRIPTION A. Extent of Work: This Item governs for pavement marking for roadways, crosswalks, parking lots, and other locations shown on PLANS. B. Work Specified Elsewhere: Striping location, color of paint, and length and width of stripe to be as shown on PLANS. PART 2 -PRODUCTS 2.01 MARKING PAINT Manufacturer: Mobil 18-W-7 white, 18-Y-7 yellow; Pittsburgh 11-3 white, 11-4 yellow. PART 3 -EXECUTION 3.01 MARKING APPLICATION A. Surface Preparation: Surfaces to be thoroughly dry and free from dirt, loose paint, oil, grease, or other contaminants. Remove dust or dirt by scrubbing brush or hosing. Paint only in dry weather. B. Application: Use brush, marking machine, roller, conventional or airless spray equipment. Spray equipment to be clean and free of all other previous paint and solvent to ensure proper application. Paint to be applied per paint manufacturer's recommendations with a minimum of 2.0 dry mil thickness. Traffic to not be allowed on striping until paint is completely dry. 3.02 MEASUREMENT AND PAYMENT No separate payment for work performed under this item. Include cost of same in Contract prices for items of which this work is a component part. K3109 - 1/1 SECTION 02810 IRRIGATION SYSTEM 1.00 GENERAL 1.01 Scope A. The work in this Section includes the installation of all materials specified herein and as shown on the contract drawings required to complete the irrigation system. Work shall include,but not be limited to: 1. Furnishing and installing a complete irrigation system. 2. Permit and fees as per City of Port Arthur regulations. 3. Trenching and backfill. 3. Furnishing and installing backflow prevention devices. 4. Furnishing and installing sleeves where indicated. 5. Coordinate all activities with the installation of related electrical equipment and primary power wiring by electrical subcontractor or the owner. 6. Coordinating and installation of water meter according to plans. 7. Boring under existing paving for irrigation piping and control valve wring if additional sleeves are required. 8. Inspections and tests. 9. Install extra control and ground wires if requested by Owners. 11. Clean up and disposal. 12. Coordinate connector of controller inside of building with other trades. 13. Record"As Built" drawings if requested by Owners. 13. Warranties. 1.02 Related Work A. Costs for the following related items shall be part of the irrigation subcontract,unless otherwise specifically arranged for: 1. Contractors are required to notify City of Port Arthur authorities for work within city right-of-way. Section 02810.1 Irrigation System 2. Contractor is required to obtain all necessary permits and pay all fees prior to any construction. 3. Water meters installation. 4. Electrification of controllers,including meters and disconnects. 1.03 Related Sections A. Planting: Section 02950 B. Lawns: Section 02930 C. Landscape Maintenance: Section 02970 1.04 Coordination of Work A. No portion of the irrigation system shall be installed until such time that all mechanical transplanting is complete. B. Contractor is to coordinate with other trades for construction sequence to avoid conflicts. 1.05 Inspection of Site A. The irrigation Contractor shall inspect the site and become familiar with the conditions. Where additional site prep is required prior to irrigation work under this Contract, Contractor shall coordinate his portion of the work with all other trades under this con- tract. The irrigation Contractor shall not mobilize his forces until the site is suitably prepared to facilitate the completion of all work in any given portion of the site. Beginning the work of this Section without reporting unsuitable conditions to the Landscape Architect constitutes acceptance of conditions by the Contractor. Any required removal,repair,or replacement of this work caused by unsuitable conditions shall be done at no additional cost to Owner. Contractors shall take necessary precautions to protect site conditions. Should damage be incurred,this Contractor shall repair damage to its original condition,or furnish and install equal replacement at his expense. 1.06 Requirements of Regulatory Agencies A. All work and materials shall be in full accordance with the latest rules and regulations of safety orders of Division of Industrial Safety,the Uniform Plumbing Code published by the Western Plumbing Officials'Association,and other applicable laws or regulations, including the City of Richmond Plumbing Code. Nothing in these drawings or specifications is to be construed to permit work not conforming to these codes. Should the Contract Documents be at variance with the rules and regulations,notify Landscape Architect and get his instructions before proceeding with the work affected. B. Furnish and maintain all warning signs,shoring,barricades,red lanterns,etc., as required by the Safety Orders of the Division of Industrial Safety, and local ordinances. Section 02810.2 Irrigation System C. Procure required permits and pay required fees for water meter taps and backflow devices. D. Arrange inspections required by local agencies and ordinances during construction,as required. 1.07 Applicable Standards A. Current published standards,specifications,tests or recommended methods of trade, industry,or governmental organizations apply to work of this Section where cited by abbreviations noted below: 1. American Society of Testing and Materials(ASTM) 1.08 Submittals A. At least ten(10)days prior to beginning work,submit five(5)copies of manufacturer's current catalog cuts,specifications,and operating instructions of the complete list of materials and assemblies to be installed. Quantities of materials and equipment need not be included. 1.09 Substitutions A. Specific references to manufacturers'names and products specified in this Section are used as standards. This implies no right to substitute other material or methods, without written approval of the Landscape Architect. No substitutions should be used as a basis for bid unless otherwise allowed and authorized by bid addendum,prior to receipt of bids. 1.10 Scheduling A. Submit a proposed work schedule to Landscape Architect at least ten(10)days prior to start of work under this Section. After approval,no delays shall be authorized to this schedule without written authorization by Landscape Architect. B. The Contractor shall complete all irrigation and related electrical work and have complete irrigation system installed prior to the commencement of any planting. C. The Contractor may submit an alternate plan for release of partial areas where irrigation is complete and automated for commencement of planting operations. 1.11 Product Handling A. Protect work and materials under this Section from damage during construction and storage. Protect pipes and fittings from direct sunlight. Beds on which pipe is stored must be the full length of the pipe. Do not use any pipe or fitting which has been damaged or dented. 1.12 Record Irrigation Drawings Section 02810.3 Irrigation System A. Contractor shall furnish Record Drawings of the complete irrigation system,in accordance with the General and Special Conditions. Procure from the Landscape Architect full-sized sepias of Contract Drawings.Construction drawings shall always be on the construction site while the irrigation system is being installed. Contractor shall make a daily record of all work installed during each day. Actual location of valves and quick couplers and all irrigation and drainage piping shall be shown on the prints by dimensions from easily identified permanent features,such as buildings,curbs, fences,walks or property lines. B. Drawings shall show approved substitutions,if any,of material,including manufacturer's name and catalog number. The drawings shall be made to scale,and all indications shall be neat. All information noted in the print shall be transferred to the sepia by Contractor,and all indication shall be recorded in a neat,orderly way. The record sepia shall be turned over to the Landscape Architect at or before the Final Acceptance of the project. 1.13 Irrigator License A. All work in this contract shall be performed under the direct supervision of a Texas licensed irrigator. 1.14 Reviews and Tests A. The Contractor shall test lines under hydrostatic(line)pressure for a 12-hour period and repair any leaks as required by the Landscape Architect. B. Final review shall be made in conjunction with the final review of lawn,shrubs and tree planting. C. The Contractor shall be responsible for making all repairs required to the irrigation system until the issuance of the Certificate of Substantial Completion. Upon the issuance of the Certificate,the Owner shall assume responsibility for the repair and maintenance of the irrigation system. D. All hydrostatic testing required in this section shall be at the Contractor's expense,and part of this contract. 2.00 MATERIALS 2.01 General A. All materials and equipment to be installed shall be new and the best of their respective kinds. 2.02 Pipe A. All pipe shall be continuously and permanently marked with the following information: Manufacturer's name or trademark,size,schedule and type of pipe,working pressure at 73 degrees F.and National Sanitation Foundation(N.S.F.)approval. Section 02810.4 Irrigation System B. Piping on pressure side of irrigation control valves: 1. Three-inch(3")diameter and smaller, and all mains in sleeve polyvinyl chloride(PVC) 1120-1220,and shall conform to ASTM #D-224.1-73 2. Four-inch(4")Class 200 Solvent Weld. and larger: Polyvinyl chloride(PVC) 1120-1220 SDR 21.0,Class 200 rubber-gasketed pipe,conforming to ASTM D- 1784 and ASTM D-2241. Rubber gaskets shall conform to ASTM D-1869 and shall be provided by the pipe manufacturer. C. Piping on non-pressure side of irrigation control valves: 1. Polyvinyl chloride(PVC) 1120-1220,SDR 21,Class 200,and conforming to ASTM D-2241-73. Except one-half inch(1/2")diameter pipe shall be Class 315,SDR 135. D. Backflow Devices 1. Type K-Copper pipe 2.03 Fittings A. Fittings for Rubber-Gasketed Pipe 1. Connections at 3" and 4"mains to 3"and 4"mains or laterals shall be Schedule 80,as provided by the same manufacturer as the pipe, and conforming to ASTM D-2466 and ASTM D-1869. 2. Connections at 3"and 4"mains to 2 1/2"and smaller mains and laterals to remote-control and quick-coupling valves shall be Schedule 40 solvent-weld socket fittings conforming to ASTM-2466. B. Fittings for Solvent-Welded Pipe 1. Schedule 40,polyvinyl chloride,standard weight,as manufactured by"Sloane", "Lasco",or approved equal,to meet ASTM D-2466-73 and D-2467-73. 2. Threaded PVC nipples shall be Schedule 80 PVC. 3. Solvent glue shall be"Christy's Red Hot Blue Glue"with compatible primer. C. Fittings for Polyethylene Pipe(Flex-Joints) 1. Polyallomer,as manufactured by"Flint Kote"or approved equal. 2. Compression type of COVC, as manufactured by"Pepco"or equal. D. Fittings for Sprinkler Swing Joints Section 02810.5 Irrigation System 1. Supply two(2)Schedule 40"Marlex"street elbows and one(1)Schedule 40 thread-to-thread. 2. Threaded PVC Nipples shall be Schedule 80 PVC. 3. Lengths of nipples as shown on plans. E. Fittings for Quick Coupler Swing Joints(Schedule 40) 1. Supply three(3)galvanized thread-to-thread elbows 2. Two(2)three inches(3")galvanized nipples 3. One two inch(2")threaded galvanized nipple 4. One twelve inch(12")threaded galvanized nipple 5. Use"Permatex"pipe compound for all threaded fittings 6. Eighteen inches(18")#5 rebar 7. Two(2)stainless steel hose clamps 2.04 Gate Valves A. Up to three inches(3"): 125 lb.bronze construction,non-rising,as manufactured by "Grinner",Red and White,or approved equal 2.05 Sleeves for Control Wire and Water Line A. All conduits and sleeves for irrigation mains and laterals shall be six-inch(6") Schedule 40 PVC,common conduit. Use two-inch(2")Schedule 40 PVC for remote control wiring. For controller power feed,use 3/4"galvanized steel,unless otherwise specified on the drawings or existing in the field. 2.06 Control Wire A. Wire 1. Solid copper wire,U.L. approved for direct burial in ground. 2. Minimum gauge: 14 U.F. 3. Common ground wire shall be white. B. Extra Wire 1. Supply a minimum of one(1)extra wire for each direction of run to last valve. Section 02810.6 Irrigation System 2. Extra wire shall be of a fugitive color,loop at each valve. C. Splicing Material 1. "Scotch lock Sealing Pack"or"Rainbird Snap-Tites"(use separate packs for each splice)or ring on step. 2.07 Valve Boxes A. Valve boxes shall be injection-molded of polyesters and fibrous inorganic,temperature- resistant components. Box should provide adequate clearance to operate and service valve. Box and lids to be black,except for Quick Coupler lids which shall be purple as manufactured by Carson Industries,Inc.,Laverne,California. 1. Hose Connection Valve Boxes shall be rectangular,approximately ten inches by fourteen inches(10"x 14"),and shall be approximately fifteen inches(15") deep. Model#1419-12 with 1419-2 hinged cover. Extensions for rectangular boxes shall be Carson#1419E-12 or Rainbird. 2. Gate Valve and Electric Valve Boxes shall be round,approximately nine inches (9")inside diameter by ten inches(10")deep. Model#910-12. Extensions for round boxes shall be Carson#910E-12 or Rainbird. 2.08 Hose End Connections A. Hose connectors shall be NIBCO#or approved equal. B. Furnish two(2)valve keys fitted with three-quarter inch(3/4")swivel hose ells. 2.09 Control Wire Splice Boxes A. Shall be nine inches(9")in diameter by ten inches(10")deep. Carson#910-12 or Rainbird. 2.10 Sprinkler Heads A. See plans legend for Manufacturer and Model. 2.11 Remote Control Valves A. Valves shall be of plastic construction,slow acting"Rainbird"PE Series or approved equal. Use PRS regulators where shown on plans. 2.12 Controller(s) A. All controllers shall be positively grounded to a three-quarter inch(3/4")copper rod, driven by a minimum of forty-two inches(42")into the ground. All units shall be equipped from the manufacturer with complete lighting and power surge protection. B. See plans legend for Manufacturer and Model. Section 02810.7 Irrigation System 2.13 Concrete for Thrust Blocks A. Portland Cement 1. Shall conform to current requirements of ASTM Designation C150,Type I or II cement. B. Coarse Aggregate 1. Coarse aggregate for regular-weight concrete shall be hard,durable,uncoated, washed,graded,cleaned and screened crushed rock or gravel,conforming to current requirements of ASTM Designation C33. C. Concrete shall be designated to surpass compressive strength of 3,000 PSI. 2.14 Gravel Backfill A. Gravel for backfilling quick-couplers,remote control valve boxes and rotor heads shall be three-eighths inch(3/8")diameter"pea gravel". 3.00 EXECUTION 3.01 Layout A. No consideration shall be given to any design changes until after the awarding of the contract. Should any changes be deemed necessary after award of contract for proper installation and operation of the system,such changes shall be negotiated by the Landscape Architect,based upon the price schedule. B. Sprinkler heads shown on the drawings are diagrammatic. It shall be the Contractor's responsibility to establish the location of all sprinkler heads on all turf areas,in order to assure proper coverage of all areas. In no case shall spacing of sprinkler heads exceed distances shown on the drawings and/or those specified. Pipe sizes shall conform to those shown on the drawings. No substitutions of smaller pipe sizes will be permitted, but substitutions of larger sizes may be approved. All pipes damaged or rejected because of defects shall be removed from the site at the time of rejection. C. The Contractor will stake out the location of each run of pipe and all sprinkler heads for sprinkler valve locations,prior to trenching. Before installation is started in a given area,Landscape Architect shall check all locations and give his approval. 3.02 Preparation A. Generally,all piping under concrete and special paving shall be Schedule 40 PVC. Piping under concrete or asphalt shall be installed by boring. Where any cutting or breaking of sidewalks,concrete work and/or asphalt is necessary,it shall be removed and replaced by the Contractor as part of this contract,in accordance with the Owner and/or Landscape Architects'direction,at no cost to the Owner. Where piping on the drawings is shown under paved areas but running parallel and adjacent to planted Section 02810.8 Irrigation System areas or turf areas,the intent of the drawings is to install the piping in the planted turf areas. B. Unless otherwise specified or indicated on the drawings,the construction of the sprinkler system shall include the furnishing,installing,and testing of all mains,laterals,risers and fittings,the furnishing and installing of sprinkler heads,control valves and all necessary specialties and accessories,the removal and/or restoration of existing improvements, excavation and backfill,and all other work in accordance with the plans and specifica- tions,as required for a complete system. 3.03 Excavating and Trenching A. In areas where electrical conduits will be installed by the electrical contractor, coordinate all trenching activities with electrical subcontractor,so as to minimize duplication of work and/or damage to other's work. B. Perform all excavations as required,for installation of work included under this Section,including shoring of earth banks,if necessary. Restore all surfaces,existing underground installations,etc.,damaged or cut because of the excavations,to their original conditions. C. The exact location of all existing utilities and structures and/or underground utilities, which may not be indicated on the drawings,shall be determined by the Contractor and indicated on the"as built"drawings as they are encountered. The Contractor shall conduct his work to prevent interruption of service or damage to them. D. The Contractor shall protect existing structures and utility services and be responsible for their replacement if damaged by him,or make necessary adjustments in their location,if required,in order to complete the work of this Contract. Minor adjustments in the system will be permitted to clear existing fixed obstructions,subject to the approval of the Owner's representative or the Landscape Architect. E. Installation of main and lateral lines by the vibratory flow method will not beallowed. F. Trenches for plastic pipes shall be excavated of sufficient depth(12"to top of pipe)and width to permit handling and installation of the pipe and fittings. The backfill shall be thoroughly compacted by water tamping or approved method and evened off with the adjacent soil level. All trenches that are opened during any working day shall be closed and backfilled the same day. No open trenches or partially backfilled trenches shall be left overnight,except as required for inspection. G. Trenches shall be of sufficient depth to provide minimum cover from finish grade,as follows: 1. Over pipe,on pressure side of irrigation control valve,control wires and quick- coupling valves:twenty inches(20"). 2. Over pipe,on non-pressure side of irrigation control valve:twelve inches(12"). Section 02810.9 Irrigation System 3.04 Boring Method(If required) A. All borings shall be performed with a water-lubricated rotary machine. B. All bores shall be a minimum of eighteen inches(24")below any pavement,or at a depth required by governing code. C. For bores greater than two inches(2"),a maximum pilot diameter of two inches(2") shall be used,with reamers for larger bores at a maximum of two-inch(2")increments. D. Sleeves shall be immediately installed as part of the boring operation. E. Provide shoring,if required,to eliminate subsidence from under pavement structures. F. Report any irregularities and obstructions in the boring process to the Landscape Architect. 3.05 Water Meters A. Make required connections to water meter per the requirements of the local water authority codes. 3.06 Backflow Prevention Device A. Install pressure-type backflow preventer at required grade for plumbing code. All exposed main line and main line riser above PVC main elevation,shall be type"K" copper. Install one(1)brass union in riser downstream,or device. Wrap all controllers with foam-type insulators. 3.07 Line Installation A. All pipe,fittings,and valves,etc.shall be carefully placed in the trenches. Interiors of pipe shall be kept free from dirt and debris.When pipe laying is not in progress,open ends of pipe shall be closed by approved means. B. All lateral connections to the mainline,as well as all other connections,shall be made to the side of the mainline pipe. No connections to the tip of the line shall be allowed. Pipes shall be bedded in at least two inches(2")of finely divided material with no rocks or clods over one inch(1")diameter,to provide a uniform bearing. In common trenches,do not allow pipes to overlap. C. Plastic pipe shall be installed in a manner to provide for expansion and contraction,as recommended by the manufacturer. D. Plastic pipes shall be cut with PVC pipe cutters or hacksaw,or in a manner as to ensure a square cut. Burrs at cut ends shall be removed prior to installation,so that a smooth, unobstructed flow will be obtained. E. All plastic-to-plastic joints,except polyethylene,shall be solvent-weld joints or slip- seal joints. Section 02810.10 Irrigation System 3.08 Plastic-to-Metal Joints A. Shall be made with plastic male adaptors. 3.09 Solvent-Weld Joints for Plastic Pipes A. Thoroughly clean the mating pipe and fitting with a clean, dry cloth. B. Apply a uniform coat of primer to the outside of the pipe and the fitting. C. Apply a uniform coat of solvent to the outside of the pipe first,and then inside the fitting.Apply a second coat of solvent to the outside of the pipe and quickly insert it into the fitting. D. Give the pipe or fitting a quarter turn to ensure even distribution of the solvent,and make sure the pipe is inserted to the full depth of fitting socket. E. Hold in position for fifteen(15)seconds. F. Wipe off excess solvent that appears at the outer shoulder of the fitting. Care should be taken so as not to use an excess amount of solvent, causing an obstruction to form on the inside of the pipe. The joints shall be allowed to set at least twelve(12)hours before pressure is applied to the system on PVC pipe. 3.10 Threaded Joints for Plastic Pipes A. Use"Permatex"pipe compound on the threaded PVC fittings,except where Marlex fittings are used. B. Use strap-type friction wrench only. Do not use metal-jawed wrench. C. When connection is plastic-to-metal,male adaptors shall be used. The male adaptor shall be hand tightened,plus one turn with a strap wrench. Joint compound shall be Teflon tape or equal,upon approval. 3.11 Concrete Thrust Blocks A. Install where the rubber-gasketed irrigation main changes direction,as at ells and tees, and where the rubber-gasketed main terminates. B. Pressure tests shall not be made for a period of thirty-six to forty-eight(36-48)hours following the completion of pouring the blocks. C. Blocks for these mains shall be sized and placed in strict accordance with the pipe manufacturer's specifications. Blocks shall be placed to take all thrust created by the maximum internal water pressure. 3.12 Remote Control Valves Section 02810.11 Irrigation System A. Unless otherwise specified,the installation of all valves shall include the excavation and backfill, the furnishing,installing and testing of risers,fittings and valves,and the removal and/or restoration of existing improvements,and all other work,in accordance with the plans and specifications,and as required for the completed installation. B. Valve installation shall include setting of the specified valve box to proposed grade. All valves shall be teed off the main,to facilitate setting at six inches(6")below grade,measured at the top of the handle. C. Install control valves in valve boxes where shown,and group together,where practical. Place no closer than eighteen inches(18")to walk edges,buildings and walls. Valve boxes shall be flush with finished grade. Set all remote-control boxes in centerline of median for all esplanade applications. D. Set valves in bead of four inches(4")of pea gravel and fill to half of valve body. 3.13 Sprinkler Installation A. All sprinkler heads and quick-coupling valves shall be set perpendicular to finished grade,unless otherwise designated on the drawings,or otherwise specified. Sprinkler heads adjacent to existing walls,curbs and other paved areas shall be set to grade no closer than eighteen inches(18")from such walls. Sprinkler heads which are to be installed in lawn areas where the turf is not yet established shall be set one-half inch (1/2")above the proposed finish grade. B. Heads installed in this manner will be lowered to grade when the turf is sufficiently established to allow walking on it without appreciable destruction. Such lowering of heads shall be done by the Contractor as part of the original contract,with no additional cost to Owner. All sprinklers having an adjusting screw shall be adjusted on a lateral line or circuit,as required,for the proper arc of coverage,radius,diameter and/or gallonage discharge. C. Backfill all rotor heads having drain holes in body with a minimum of one-half cubic foot(1/2 c.f.)of pea gravel. D. After all new sprinkler piping and risers are in place and connected,and all necessary division work has been completed,and prior to the installation of sprinkler heads,all control valves shall be opened and a full head of water used to flush out the system. The same procedures apply to polyethylene tubing. Testing of the system shall be performed after completion of each section. 3.14 Automatic Controller A. Install specified units in specified enclosures. B. Install per local code and manufacturer's latest printed instructions. Section 02810.12 Irrigation System C. Connect remote control valves to controller in clockwise sequence to correspond with station setting,beginning with Stations 1,2,3,etc. D. All controllers shall be fully grounded and have full manufacturer-approved lightening protection. E. Contractor shall contract with licensed electrician to supply electricity for the required controllers. 3.15 Quick Couplers A. Pre-assemble quick coupler swing joint,using brass nipples and fittings as shown on details. Use Teflon tape for all threaded joints. B. Discard nipples and fittings with damaged threads. C. Test swing joint and quick coupler by pressuring to specified main line pressure. All joints should withstand pressure,while still being flexible. D. Glue pre-assembled quick coupler and swing joint to main line and stack quick coupler, as shown. E. Stake quick coupler assembly with specified rebar and two(2)hose clamps. F. Install specified nine-inch(9")round box and pea gravel. Top of quick coupler shall be four inches(4")below top of box.Fill box with pea gravel to six inches(6")below top of box. 3.17 Sprinkler Swing Joints A. Install swing joints,as shown on drawings. B. All joints shall be hand-tightened to eliminate leakage,but loose enough to remain flexible. C. All pipe and fittings shall be oriented on either horizontal or vertical access. D. When complete,the heads should be fully adjustable. E. Where possible,make all connections to the bottom of the sprinkler body. Avoid side connections,except for planter box applications. F. All head height adjustments shall be made through the swing joint. When adjusted to grade,sufficient adjustment shall remain to facilitate raising or lowering at a later date. 3.18 Control Wires Section 02810.13 Irrigation System A. Install control wires with sprinkler mains and laterals in common trenches,wherever possible. Lay to the side of pipelines. Snake wires in trench,to allow for contraction of wires. Tie wires in bundles at ten foots(10')intervals with 3/4"black electrician tape. B. Control wire splices at remote control valves to be crimped and sealed with specified splicing materials. Line splices will be allowed only on runs of more than five hundred feet(500').Splice each connection in a separate"Scotch lock Sealing Pack". Place all splices in nine inches(9")diameter boxes. C. Coil control wires and extra wires at each R.V.C.connection. Coil by neatly wrapping wire around a section of pipe,ten(10)wraps before splicing. Similarly coil all control wires at each end of all sleeves and where wire changes direction. D. Install a minimum of one(1)extra control wire to the control valve located the greatest distance from the controller in each direction and label each blank end. E. Pilot Wires to be red or black and white to be for all common ground wires. 3.19 Gate Valves A. Install isolation and branch gate valves directly on main. B. Where gate valves isolate branch mains of a smaller size,size valve to largest main and add reducing fittings down stream of valves. C. Place gate valve on minimum of four inches(4")of pea gravel. Place to cover pipe, while leaving handle fully exposed. D. Install specified"Carson"box and"Carson"extension over valve. Box and extensions should extend from finished grade to top of pipe. 3.20 Conduits and Sleeves A. Furnish and install conduit where control wires pass under or through curbs. B. Conduits to be of adequate size to accommodate retrieval for repair of wiring and shall extend twenty-four inches(24")beyond edge of walls. Minimum size shall be four inches(4"). C. Install sleeves for all pipes passing through or under walls,walks,and paving. Sleeving to be of adequate size to accommodate retrieval for repair and wiring,or piping,and shall extend twelve inches(12")beyond edge of paving or other construction,where possible. Minimum size shall be six inches(6"). 3.21 Testing A. Test piping on the non-pressure side of control valves after system is operational,by observing for leaks in pipe trenches. Section 02810.14 Irrigation System B. Leaks resulting from tests shall be repaired, and tests repeated until system passes tests. C. Completely install meter,mains,control valves and isolation valves. D. Fill all lines with water and shut off at backflow. E. Open all isolation valves. F. Pressurize main to approximately 125 PSI. Monitor gauge for pressure for four(4)hours, with a maximum allowable loss of one(1)PSI per hour. Pressurize at quick coupler,or fabricate a fitting for this purpose. G. Repair any leaks or sources of pressure loss. H. Test all isolation valves for leakage. I. Perform above test prior to operation of laterals. J. Laterals to be visually inspected for leaks during operation. 3.22 Backfill and Compacting A. After system is operating and required tests and inspections have been made,backfill excavations and trenches with clean soil,free of debris. B. Backfill for all trenches,regardless of the type of pipe covered,shall be compacted to minimum 95%density under pavements,85%under planted areas. C. Compact trenches in areas to be planted,by thoroughly flooding the backfill. Jetting process may be used in those areas. D. Dress off all areas to finish grades. 3.23 Clean up A. Keep all areas of work clean,neat and orderly always. Keep paved areas clean during installation. Clean up and remove all debris from the entire work area to satisfaction of the Landscape Architect prior to Final Acceptance. 3.24 Extra Materials A. The Contractor shall provide the following extra parts as part of this contract,prior to Final Acceptance. ITEM OUANTITY Quick Couplers 2 Gate Valve Box 2 Quick Coupler Box Covers 2 R.C.V.Box 2 Sprinkler Heads 3 of each type used Section 02810.15 Irrigation System Quick Coupler Keys 3 Thompson Keys 3 Valve Cover Keys 3 of each type used 3.25 Warranty A. In addition to manufacturer's guarantees or warranties,all work shall be warranted for one(1)year from the date of Substantial Completion against defects in material, equipment and workmanship by the Contractor. Warranty shall also cover repairs of damage to any part of the premises resulting from leaks or other defects in materials, equipment,and workmanship,to the satisfaction of the Owner.This shall not be interpreted to include damage caused by vandalism,accident or the result of activities by other parties. B. The irrigation Contractor shall submit a letter of warranty,through the prime Contractor,containing the following paragraph: "We hereby guarantee that the sprinkler irrigation system that we have furnished and in- stalled is free from defects in materials and workmanship. The work has been completed in accordance with the drawings and specifications,ordinary wear and tear and/or unusual abuse or neglect,excepted. We agree to repair or replace any defects in material or workmanship which may develop during the period of one year from the date of acceptance,and to repair or replace any damage resulting from the repairing or replacing of such defects at no additional cost to the Owner. We shall make such repairs or replacements within a reasonable time,as determined by the Owner,after receipt of replacements within a reasonable time,after receipt of written notice by Certified Mail from the Owner,we authorize the Owner to proceed to have said repairs or replacements made at our expense and we will pay the costs and charges therefore upon demand." END OF SECTION Section 02810.16 Irrigation System SECTION 02900 PLANTING MEDIA 1.00 GENERAL 1.01 Work Included A. Provide materials,testing,equipment and labor required to prepare amended plant mediums for: 1. Planting Backfill Mix 2. Tree Planting Pit Backfill Mix 3. Shrub Bed Planting Backfill Mix 1.02 Related Section A. Planting: Section 02950 1.03 Testing will be at the expense of the Owner. 1.04 Excavated material from tree pits and shrub beds shall not be used for preparation of backfill mix. 1.05 Quality Assurance A. All soil components shall be tested&analysis by local testing laboratory per owner's requests. B. For delivered material,test one grab sample for each 100 c.y. of bulk material delivered to the site. 1.06 Product Delivery,Storage and Handling A. Deliver material to site when permitted by the Owner and only when project is ready for related work. 2.00 MATERIALS 2.01 On Site Materials A. Specified backfill mixes shall consist of material like that used for landscape grading. 2.02 Soil Amendments A. Wood Residuals 1. Source Section 02900.1 Planting Media A. Shall be naturally composted stockpiled and not have been chemically treated. 2. Physical Properties A. Grading: U.S.Sieve Dry Weight Percent Passing 3/8 100 1/4" 90-100 No. 8 70-100 No.35 0-30 3. Organic Content by Ash Analysis: 90-100%Dry Weight 4. Chemistry A. Saturation Extract Conductivity(EDc): Nil-3.5 B. Reaction(pH): 3.0-5.5 5. Salinity A. Maximum saturation extract conductivity 1.0 millimhos per cm at 25 degrees centigrade. B. Sand 1. Physical Properties A. Grading: U.S. Sieve Percent Passing No. 4 100 No. 10 95-100 No. 18 90-100 No. 35 65-100 No. 60 0-50 No. 140 0-20 Section 02900.2 Planting Media No.270 0-7 2. Chemistry A. Saturation Extract Conductivity(EDC): Nil-3.0 B. Sodium Absorption Ratio(SAR): Ni1-6.0 C. Boron-ppm in saturation extract sltn.: Nil-1.0 D. Reaction(pH): 6.0-7.5 E. Available calcium-sodium acetate extractable-ppm dry weight: Nil-2000 C. Iron Sulfate(Ferric or Ferrous) 1. Shall contain 30 to 35%iron,35-40%Sulphur and be supplied by a commercial fertilizer supplier. D. Treble Superphosphate 1. Commercial products containing 19 to 20%available phosphoric acid. E. Urea Formaldehyde 1. Commercial product containing 38%Nitrogen. F. Soil Sulphur 1. Agricultural grade Sulphur containing a minimum of 96%Sulphur. G. Ammonium Sulfate 1. Commercial products containing approximately 21%ammonia. 2.03 Planting Mix A. Shall be thoroughly mixed in the following proportions: 1. Tree Planting,Shrub Bed,and Planter Backfill mixes A. Contain sandy loam topsoil B. .Double ground aged rice hull compost Section 02900.3 Planting Media C. #1 bank sand D. Growers grade pine bark E. Forest floor mulch(Black Humus) F. All material are screened to provide 99% 1" minus sizing then blended to provide a uniform mixture. A minimum of 40%composted organic is utilized to add natural nutrients,provide aeration and optimum moisture retention capacities. B. Actual mixes and additives may vary depending on samples extracted from actual plant sources. C. Prepared backfill mixes shall come from a reputable source such as the following: 1. Living Earth Technology,Houston,TX (713)466-7360 D. Contractors may select their own sources,if the sources are reputable. Contractors must submit samples for approval prior to ordering materials. 3.00 EXECUTION 3.01 Mixing A. Mix soil base, amendments and chemical additives by mechanical means. Do not mix additives with excavated material at the plant pit site. B. Thoroughly mix all amendments with soil by mechanical means. C. Soil and sand bases shall be completely pulverized and free of lumps or aggregated material. Moisture content of base materials shall not be such that chemical,granular or pelletized additives become dissolved during the mixing process. D. Mix media in quantities of not less than 50 cubic yards or mix total quantity required,if less than 100 cubic yards. The Contractor shall be responsible for continuity between batches. E. For soil media mixes,do not incorporate soil from mixing area with mix. END OF SECTION Section 02900.4 Planting Media SECTION 02910 MECHANICAL TRANSPLANTING/CONTAINERIZATION 1.00 GENERAL 1.01 Related Sections A. Site Grading: Section 02210 1.02 Work Included This Section includes specifications for mechanical and hand transplanting of plant material, placement in temporary storage yard and subsequent replanting in final locations shown on the plans and as approved in the field by the Owner or his authorized Representative. Scope of work includes,but is not limited to the following: A. Securing of required fees and permits if applicable. B. Verification of existing utilities. C. Repairs to all damaged utilities. D. Trenching and controlled backfilling. E. Pruning of all damaged branches during transplant. F. Watering(hand water if irrigation system is not yet established.) G. 1-year guarantee on machine transplants. H. Coordinate with paving contractor and drainage pipes installer for work sequence and schedule. 1.03 Standards A. American National Standards Institute(ANSI)American Association of Nurserymen(AAN): ANSI Z60.1 1-069"Nursery Stock". B. Perform work in accordance with all applicable laws, codes and regulations required by au- thorities having jurisdiction over such work and provide for all inspections and permits required by Federal,State,and local authorities in furnishing,transporting,and installing materials. 1.04 Plant Material Delivery,Storage and Handling A. Submit a plan for digging,transporting and containerizing plant material to the site for Landscape Architects' approval. Such a plan should include: 1. Mobilization schedule. Section 02910.1 Mechanical Transplanting/Containerization 2. Projected schedule for installation. 3. Schedule of completion. 4. Watering schedule. B. The following considerations for product handling shall be evaluated: 1. Protect trunks,stems,branches and root balls from all damage during tree tying,wrap- ping and digging operations. 2. The Contractor shall be solely responsible for the safe transportation of plants on the site and their condition upon arrival. Trees damaged,dehydrated or abused during transit and storage will be rejected and payment delayed. C. The Owner/Landscape Architect may inspect any phase of this operation and may reject any plant material improperly handled during any point of this operation. D. Damaged materials shall be replaced with material of equal size and quality at no cost to the Owner. 1.06 Incidental Repairs A. The Contractor shall repair of damage to all turf areas,irrigation systems,utility lines,curbs, and paver/pavement incidental to the planting operation. Above repairs shall be coordinated to not interfere with the transplanting operation in progress and shall reflect a finished condition matching adjacent areas,upon acceptance. B. Incidental damage to work by other Subcontractors during landscape installation shall be made immediately and at no extra cost to the Owner. 2.00 MATERIALS 2.01 Water(Supplied by Owner) Potable. Transport as required. 2.02 Mulch Shredded Pine Oak,or Hardwood Bark;shall be the product of standard stripping of bark from Pine trees for timer or pulp manufacturing. Bark shall be shredded in a manner where large pieces are at a minimum. The mulch shall be free of debris. 2.03 Agricultural Sand 1. Physical Properties Section 02910.2 Mechanical Transplanting/Containerization A. Grading U.S.Sieve Percent Passing No. 4 100 No. 10 95-100 No. 18 90-100 No. 35 65-100 No. 140 0-20 No.270 0-7 B. Chemistry: Range: 1. Saturation Extract Conductivity(ECC): Nil-3.0 2. Sodium Absorption Ratio(SAR): Nil-6.0 3. Boron-ppm in saturation extract sltn. Nil-1.0 4. Reaction(pH): 6.0-7.5 5. Available calcium-sodium acetate extractable-ppm dry weight: Nil-2000 2.04 Insecticide A. Borers Shall be Ortho"'Lindane Borer and Leaf Miner Spray"by Ortho,Consumer Products Divi- sion,Chevron Chemical Company,San Francisco,California 94119,or"Borer Killer",by Greenlight Company,San Antonio,Texas 78217. B. General insecticides for Larvae,Aphids,Beetles,etc. should be suited to particular infes- tation of preventive measures required. 2.05 Fertilizer_(For Reference Only) A. Post Planting Fertilization(trees) 1. "Doggett's" Injectofeed 32-10-10 fertilizer as manufactured by A.L.Doggett,Lebanon, New Jersey. 2. Mix the following quantities in 100 gallons of water: Injectofeed 20 lbs. 2.06 Fertilizer Injector_(For Reference Only) A. Power injector capable of delivering 225 to 250 PSI at the nozzle. B. Injector shall have a hydraulically agitated mixing tank. Section 02910.3 Mechanical Transplanting/Containerization C. Nozzle point shall have 3 distribution orifices 120 degrees apart,capable of delivering fluid perpendicular to the direction of the shaft. D. Nozzle shaft shall have an adjustable or permanent stop plate to stop the shaft at the required depths. E. Injector shall have ability to meter amount of material applied per injection. 3.00 EXECUTION 3.01 Layout and Execution of Planting/Container Holding Areas A. The Contractor shall stake plant layout for on-site transplants for approval prior to transplanting. B. The Contractor shall locate containers at Owner's holding area,at spacing designated by Owner. C. If underground obstructions are encountered,notify the Owner/Landscape Architect as to whether an adjustment or change of location is possible within the design intent. D. Do not excavate tree pits more than 24 hours in advance of planting operation. E. Coordinate machinery and layout used for final replanting so as to not cut newly formed roots. Do not use smaller machinery for final transplanting than machine originally used for moving from existing site. G. Small trees and shrubs may be transplanted by hand methods and tools. If such procedures are utilized, adequate protection and reinforcement of root ball during all phases of the op- eration shall be maintained. 3.02 Mechanical Transplanting of Trees A. Use machinery in good condition with minimum tolerances(max.2")between cutting blades. All blades shall be true to their designed shape and free of bends which could interfere with their operation. The tree spade shall be mounted on a suitable stable machine capable of supporting the weight of all dug material and heavy enough to force all blades into the soil. B. Cut and remove all vines and underbrush from the trunk and branches of tree to facilitate access by machinery. C. Machine transplant trees in accordance with the following criteria: Caliper Min.Machine Size Under 3" 44"spade 3"-5" 60"spade Section 02910.4 Mechanical Transplanting/Containerization I 5"—7" 88"spade 7"—9" 90"spade Above 9" Boxed, 12" of root ball/caliper inch Date Palms Boxed 6'Dia.root ball D. Provide necessary 2x10 planking or 3/4"plywood for curb and sidewalk protection. Wood blocks and sheeting may be necessary for protection of asphalt,concrete paving,and special pavers from tree spade stabilizers/outriggers,and to hold loose oil in place. E. Prune and thin the tree by removing dead wood,including branches broken in transport. Remove crossing branches and branches that detract from trees. Keep pruning to a minimum,corrective and access pruning only. F. Make all cuts at lateral branch and remove them from the branch collar. G. Do not use pruning paint,except on Oak trees from January 15 to July 15. H. Leave all foliage on the tree during the digging operation. The Contractor shall have the capability of misting the foliage during the digging and transportation periods. I. Holes to receive machine transplanted trees shall be dug with machines of like manufacture to that used to dig the intended tree. J. Tie protruding branches as necessary to avoid damage in digging or transporting. K. Cut the protruding roots from the digging module flush with the root ball before planting using hand saw or hand pruners. L. Protect all foliage during the transportation period from sun,wind and prolonged exposure. Consider misting foliage and root balls at intervals during transit. M. Plant tree 2" to 3"higher than surrounding grade. H. Provide periodic watering and foliage misting as required to maintain foliage viability. Mist in late evening to prevent foliage damage. 3.03 Sanding A. Tree shall be sanded with approved sand. Bank sand is recommended. Coarse sand/gravel mix cannot be used for water rings. Sandy loam or fine sand is recommended. B. Immediately after the tree is placed in the hole,fill in all crevices with sand and water to fill all voids. C. Sand ring shall be at least 4"height,6"-10" width. Section 02910.5 Mechanical Transplanting/Containerization D. Cover root ball with 3"-6"mulch. 3.04 Mulching A. The undesired vegetation should be cut or pull out of the root ball area before mulching, taking care not to disturb the root system of the tree. B. Apply 3"to 6"of mulch 6"beyond the root ball edge. C. Do not place mulch in contact with tree trunk. D. Complete mulching within 24 hours after planting. 3.05 Containerization A. Excavate and wire basket all materials to be containerized. B. Place in containers in plumb,upright position,so as to facilitate optimum growth and drainage. C. Backfill with specified mix in 1'lifts,and water in,using caution not to over-compact. D. Place in Owner's holding area,at Owner's designated spacing. E. Remove weeds and other undesirable growth during maintenance period, and water as necessary. 3.06 Post Planting Fertilization_(Machine Transplants-For Reference Only) A. Apply fertilizer 30-45 days after installation. B. Inject material specified in Section 2.0 with a high pressure injector into soil at depth and diameter shown below: Tree Appl. Appl.Rate Caliper Points Depth Radius Per Tree Gal. Under 2" 3 4-6" 16-18" 1 -1/2 gal. 2"-4" 3 4-6" 18-24" 2 gal. 4"-5" 4 4-6" 2'-3' 2-1/2 gal. 5"-6" 5 4-6" 3'-4' 3 gal. Above 6" 3'o.c. 4-6" Drip-Line 5 gal./100 s.f. Root Area 3.07 Insect Prevention A. Apply insecticide as required to all trees at the manufacturer's suggested rate as required for preventive and curative control of insects. Section 02910.6 Mechanical Transplanting/Containerization 3.08 Maintenance A. Once trees and shrubs required for removal have been transplanted or containerized, sanded in and mulched at temporary storage area and accepted by the Owner, the Owner shall take over the maintenance and care of this material. 3.09 Warranty A. The Contractor shall guarantee all machine-transplants for a period of one (1)year from date of substantial completion. B. The Contractor shall guarantee all containerized material for a period of 90 days from date of substantial completion. C. All materials not in good condition at the end of the guarantee period shall be replaced with material of equal size at no cost to the Owner. END OF SECTION Section 02910.7 Mechanical Transplanting/Containerization SECTION 02930 LAWNS AND GRASSES 1.00 GENERAL 1.01 Work covered in this section shall include all materials,labor,equipment and supervision re- quired for the installation of turf grass where and as described on the Drawings and in the Spec- ifications. This work includes,but is not limited to the following: A. Installation of turf by the hydroseed method. B. Establishment of turf by sodding. C. Site clean up. D. Maintenance and guarantee. 1.02 Related Sections A. Fine Grading: Section 02210 B. Planting: Section 02950 1.03 Quality Assurance A. Sod:Shall be subject to inspection and approval by Owner's representative at the site upon delivery for conformity to Specifications. Such approval shall not impair the right of inspection and rejection during progress of the work. Owner's representative reserve the right to refuse inspection at this time is in his judgement,a sufficient quantity of sod is not available for inspection. B. Seed:The Owner's representative shall be furnished a signed copy of statement from vendor, certifying that each container or bag of seed delivered is labeled in accordance with the Federal Seed Act and is at least equal to requirement previously specified. Seed analysis shall be furnished prior to commencement of planting operations. Each lot of seed may be resampled and retested in accordance with latest Rules and Regulations under the Federal Seed Act at the discretion of the Owner's representative. If these tests reveal the seed to be below the specified pure live seed content,the Contractor shall be required to plant additional seed to compensate for the deficiency at no cost too the Owner. C. The Owner reserves the right to take or request samples of materials for conformity to spec- ifications at any time. Contractor shall furnish samples upon request. Rejected materials shall be immediately removed from the site at Contractor's expense. Cost of replacement of materials not meeting specifications shall be paid by Contractor. 1.04 Inspections A. Make written request for inspection after seeding of sodding operation have been completed. Such inspection is for the purpose of establishing maintenance period. Section 02930.1 Lawn and Grasses B. Submit written requests for inspection to the Owner's representative at least 7 days prior to anticipating inspection date. 2.00 SUBMITTAL A. Furnish required copies of manufacturers'literature,certifications,or laboratory analytical data for the following items: 1. Sod and seed source(certification) 2. Fiber mulch(laboratory analytical data) 3. Tank mix fertilizer(certification or laboratory analytical data) 4. Top-dress fertilizer(certification) 3.00 MATERIALS 3.01 Seed A. All seed used shall be labeled in accordance with U.S. Department of Agriculture Rules and Regulations under the Federal Seed Act in effect on the date of Invitation for Bids. All seed shall be furnished in sealed standard containers,unless exception is granted in writing by the Owner's representative. Seeds which have become wet,moldy,or otherwise damaged in transit or in storage will not be acceptable. B. The minimum percentage by weight of pure live seed in each lot of seed shall be as follows and seed shall be planted at the rate per acre indicated under pure live seed required per acre Pounds Pure Live Seed Minimum%Pure Live Required Kind of Seed Seed Required Per Acre (Summer Mix) Common Bermuda Grass(Hulled) 85 65 Apply between September-November and/or March-May (Winter Mix) Common Bermuda Grass(Un-Hulled) 85 65 Winter Rye 90 200 Apply between October-December only. Note: %Pure Live Seed=%Purity X%Germination=100 3.02 Weed seed shall not exceed ten percent(10%)by weight of the total of pure live seed and other material in the mixture. Johnson grass,nut grass,or other noxious weak seeds will not be al- lowed. 3.03 Fertilizer for Tank Mix Section 02930.2 Lawn and Grasses A. The additives shall be delivered to the site in bags or other convenient containers,each fully labeled,conforming to the applicable state fertilizer laws,and bearing the name or trademark and warranty of the producer. Fertilizer to conform to following for 1,000 S.F. 20 lbs.(3-13-13)NPK for Turf 3.04 Wood Cellulose Fiber Mulch A. Wood cellulose fiber mulch,for use with the hydraulic application of grass seed and fertilizer,shall consist of specially prepared wood cellulose fiber. It shall be processed in such a manner that it will not contain germination or growth-inhibiting factors. It shall be dyed an appropriate color to allow visual metering of its application. The wood cellulose fibers shall have the property of becoming evenly dispersed and suspended when agitated in water. When sprayed uniformly on the surface of the soil,the fibers shall form a blotter-like groundcover which readily absorbs water and allows infiltration to the underlying soil. Weight specifications from suppliers for all applications shall refer only to air dry weight of the fiber,a standard equivalent to 18%moisture. The mulch material shall be supplied in packages having a gross weight not in excess of 100 lbs.and be marked by the manufacturer to show the dry weight content. Suppliers shall be prepared to certify that laboratory and field testing of their product has been accomplished and that it meets all of the foregoing requirements. 3.05 Water Shall be free from oil,acid,alkali,salt,and other substances harmful to growth of grass. The water source shall be subject to approval prior to use. 3.06 Slurry Mix Components Per Acre Wood Cellulose Fiber Mulch 2,000 pounds Grass Seed (as specified) Fertilizer(13-13-13) 800 pound 3.07 Top Dress and Lawn Fertilizer for Existing Lawn(Delayed Application) Complete fertilizer,fifty percent(50%)of the nitrogen to be derived from natural organic sources or urea-form. Available phosphoric acid shall be from superphosphate,bone,or tankage. Potash shall be derived from muriate of potash containing sixty percent(60%)potash with elemental 20%iron sulfate equivalent to 400 lbs/acre: 16% Nitrogen 6% Phosphoric Acid 8% Potash 3.08 Sod A. Sod shall be one(1)year old and shall contain Bermuda grass and St.Augustine grass. Sod shall be dense with grass having been mowed at one and one inch(1")height before lifting from field. All sod delivered to the site for the duration of the project shall be uniformly cut Section 02930.3 Lawn and Grasses by the same sod cutter or multiple machines adjusted to cut the same thickness of sod root/soil mass. B. Sod shall be in vigorous condition,dark green in color,free of disease and harmful insects and grown on fumigated soil. C. Do not stack for more than 24 hours between time of cutting and time of delivery. D. The Landscape Architect reserves the right to reject any sod deemed unacceptable for installation. 4.00 EXECUTION 4.01 Hydromulch Seeding on Prepared Finished Grade A. Bed Preparation:Immediately after the finished grade has been approved,begin hy- droseeding operation to reduce excessive weed growth. B. The Contractor shall apply seed,fertilizer and mulch by spraying them on the previously prepared seedbed in the form of an aqueous mixture and by using the methods and equipment described herein. The rates of application shall be as specified above. C. Spraying Equipment:The spraying equipment shall have a container or water tank equipped with a liquid level gauge calibrated to read in increments not larger than 50 gallons over the entire range of the tank capacity,mounted to be visible to the nozzle operator. The container or tank shall also be equipped with a mechanical power driven agitator capable of always keeping all the solids in the mixture in complete suspension until used. The unit shall also be equipped with a pressure pump capable of delivering 100 gallons per minute at a pressure of 100 pounds per square inch. The pump shall be mounted in a line which will recirculate the mixture through the tank whenever it is not being sprayed from the nozzle. All pump passages and pipelines shall be capable of providing clearance for 5/8- inch solids. The power unit for the pump and agitator shall have controls mounted so as to be accessible to the nozzle operator. There shall be an indicating pressure gauge connected and mounted immediately at the back of the nozzle. D. Homogeneously mix a slurry containing up to forty(40)pounds of fiber plus a combined total of seventy(70)pounds of fertilizer solids for each one hundred(100)gallons of water. The slurry distribution lines shall be large enough to prevent stoppage. The discharge line shall be equipped with a set of hydraulic spray nozzles which provide even distribution of the slurry on the slopes to be seeded. Nozzles or spray shall never be directed toward the ground in such a manner as might produce erosion or runoff. The slurry tank shall have a minimum capacity of eight hundred(800)gallons and shall self-propelled or drawn with a separate unit which will place the slurry tank and spray nozzles within sufficient proximity to the areas to be seeded to provide uniform distribution without waste. The Landscape Architect may authorize equipment with smaller tank capacity provided that the equipment has the necessary agitation system and sufficient pump capacity to spray the slurry in a uniform coat. Section 02930.4 Lawn and Grasses E. Particular care shall be exercised to ensure that the application is made uniformly and at the prescribed rate and to guard against miss and overlapped areas. Proper predetermined quantities of the mixture in accordance with specifications shall be used to cover specified sections of known area. Check on the rate and uniformity of application may be made by ob- serving the degree of wetting of the ground or by distributing test sheets or paper or pans over the area at intervals and observing the quantity of material deposited thereon. F. Operators of hydromulching equipment shall be thoroughly experienced in this type of ap- plication. Apply specified slurry mix in a motion to form a uniform mat at specified rate. G. Keep hydromulch within areas designated and keep from contact with other plant material. H. Slurry mixture which has not been applied within four(4)hours of mixing shall not be used and shall be removed from the site. I. After application,the Contractor shall not operate any equipment over the covered area. J. Immediately after application, thoroughly wash any plant material,planting areas,or paved areas not intended to receive slurry mix. Keep all paved and planting areas clean during maintenance operations. K. The Contractor shall guarantee a good healthy stand of grass. Areas which fail to germinate within a reasonable period shall be reseeded until a healthy stand of grass is attained. 4.02 Top Dress Fertilizer A. Apply top dress fertilizer at the rate of six(6)pounds per 1,000 square feet at 25 days after seeding or sodding. 4.03 Sodding on Prepared Finished Grade:(For Reference Only) A. Do not commence sodding operation until irrigation system is certified completely by the Landscape Architect and Owner. B. Bed Preparation:Immediately after the finished grade has been approved,begin sodding operations to reduce excessive week growth. If soil is dry immediately prior to sod installation,dampen surface with a fine mist of water. C. Installation: 1. Lay sod so that adjacent strips butt tightly with no spaces between strips. Sod joints shall butt evenly with no overlap. Discard sod with irregular edges, discolored,uneven thickness or insufficient topsoil. Lay sod on mounds and slopes with strips parallel to contours. Stagger joints. Sodded areas shall be flush with adjoining seeded areas. 2. Peg sod on slopes three to one or steeper with pegs driven through sod into soil until pegs are plush with turf. Space pegs 18 inches on center. Pegs to be one inch(1")square by six inches(6")long pine or six inch(6")lengths of lath or similar approved device. 3. Water sod thoroughly within 45 minutes of laying with water truck,fire hose or similar method to deliver quick application of water. Section 02930.5 Lawn and Grasses 4. Trim all sod edges and planting bed edges by the end of the same day as adjacent sod is laid. Hand water trim pieces as above. 5. Immediately after installation of the sod,remove sod clumps and soil. Keep all areas clean during the maintenance period. 4.04 Repair of Existing Turf A. All areas within this contract not disturbed by construction or where repair of grade is not required shall be overseeded with a cyclone or equivalent type machine at one half the rate of the specified hydroseed mix. B. Apply full rate of post seeding fertilizer as specified above. 4.05 Maintenance by the Contractor A. Maintenance under this contract shall commence immediately and include the care and pe- riodical mowing as required to keep the site clean and presentable. B. The Contractor's maintenance period shall begin upon issuance of the Notice to Proceed and shall not be complete until final acceptance by the Owner or Owner's representative. C. The Contractor's maintenance of new turf planting shall consist of watering,weeding,repair of all erosion and resodding as necessary to establish a uniform stand of specified grasses. Contractor shall guarantee growth and coverage of planting under this contract to the effect that all turf areas will be covered with specified planting after sixty(60)days with no bare spots greater than four(4)square feet. Any sod panels that are dead or dying shall be replaced. D. Mowing shall be performed by the Owner. E. The Contractor shall not be held responsible for failures due to neglect by the Owner,van- dalism,etc.,during the Guarantee Period. Report such conditions to the Landscape Architect in writing. 4.06 Final Acceptance (End of Maintenance Periods Work under this section will be accepted by Landscape Architect upon satisfactory completion of all work,but exclusive of re-application under the Guarantee Period. Final Acceptance of lawn establishment shall be as follows: Full coverage of all areas hydroseeded with full even coat of hydroseed mulch. Thin areas shall be reapplied. Schedule overseeding operations with Owner or Landscape Architect for observation of method and confirmation of application and conformity to rates specified. 4.07 Clean Up Section 02930.6 Lawn and Grasses Keep all areas of work clean,neat,and orderly always. Keep all paved areas clean during lawn installation operations. Clean up and remove all deleterious materials and debris from the entire work area prior to Final Acceptance to the satisfaction of Landscape Architect. END OF SECTION Section 02930.7 Lawn and Grasses SECTION 02950 PLANTING 1.00 GENERAL 1.01 Work Included A. This Section includes specifications for furnishing and installing planting materials including: 1. Organic fertilizer 2. Chemical fertilizer 3. Mulch 4. Planting accessories 5. Inspecting material 1.02 Related Sections A. Fine Grading: Section 02210 B. Planting Media: Section 02900 C. Irrigation: Section 02810 1.03 Standards A. American National Standards Institute(ANSI)/American Association of Nurserymen (AAN):ANSI Z60.1 1-069"Nursery Stock". B. "Grades and Standards",latest edition,Texas Association of Nurserymen Specifications,Austin,Texas 78704. C. Perform work in accordance with all applicable laws,codes,and regulations required by authorities having jurisdiction over such work and provide for all inspections and permits required by Federal,State,and local authorities in furnishing, transporting, and installing materials. 1.04 Material Inspections A. Plants shall be subject to inspection and approval by Landscape Architect at place of growth and upon delivery for conformity to specifications. Landscape architect may reject plant material that in his opinion does not conform to specifications. Submit a written or verbal request for inspection of plant material to Landscape Architect at least five(5)days prior to preferred date. The Landscape Architect reserves the right to refuse inspection at this time if,in his judgment,a sufficient quantity of plants is not Section 02950.1 Planting available for inspection. The Contractor shall submit a primary and alternate source for material. Should neither of those sources be acceptable, additional cost incurred by the Owner to find and approve suitable material shall be back charged from this contract. B. Substitutions of plant materials will not be permitted unless authorized in writing by Landscape Architect. If proof is submitted that any plant specified is not obtainable,a proposal will be considered for use of the nearest equivalent size or variety with corresponding adjustment of Contract Price. Such proof shall be substantiated and submitted in writing to Landscape Architect at least thirty(30)days prior to start of Work under this Section. These provisions shall not relieve Contractor of the responsibility of obtaining specified materials in advance if special growing conditions, or other arrangements must be made to supply specified materials. C. Inspection:Make written request for inspection after planting operation has been completed. Such inspection is for the purpose of establishing the maintenance period. D. Submit written request for inspections to the landscape architect 5 working days prior to anticipated inspection date. 1.05 SUBMITTALS A. Furnish required copies of manufacturers' literature,samples,certifications,or laboratory analytical data for the following items: 1. Tree,shrubs and groundcovers(Samples and/or photographs) 2. Planting backfill mix(31bs) 3. Mulch(manufacturer's literature and samples) 4. Tree and shrub planting fertilizer(certification or laboratory analytical data) 5. Tree paint(manufacturer's,literature) 6. Subdrainage materials(pipes,gravel,soil separator) 7. Geotextile Fabric 1.06 Plant Material Delivery, Storage and Handling A. The following considerations for product handling shall be evaluated: 1. During hot weather and when practical,the Contractor may be required to transport plant materials between sunset and sunrise if transported in an open trailer or unrefrigerated van. 2. Dug materials should be maintained and watered as required at the nursery to guarantee their vitality and health until shipping. 3. Protect from all damage trunks,stems,branches and root balls during tree tying, wrapping and loading operations. 4. Load containers onto transport vehicles and secure in a manner that protects the structural integrity of the root balls and branches. Section 02950.2 Planting 5. The Contractor shall be solely responsible for the safe transportation of plants to the site and their condition upon arrival. Trees damaged,dehydrated or abused during transit and storage will be rejected. 6. Plant materials should not be stored on concrete or left exposed to examples of climate without adequate protection. 8. Protect the root balls and water regularly until planting. If trees are left in storage over the weekend or holiday provide a means of periodical watering and inspection of container moisture. 9. B&B material shall be stored and maintained in a manner which affords protection from dehydration and damage of root ball. Balls shall be wrapped and stored in mulch or approved containers. B. The Landscape Architect may inspect any phase of this operation and may reject any plant material improperly handled during any point of this operation. C. Nothing in this Section shall be interpreted as relieving the Contractor of his responsibil- ity to provide healthy,viable plants,nor shall it have any effect upon the terms of the warranty specified herein. 1.07 Incidental Repairs A. The Landscape Contractor shall coordinate repairs of damage to irrigation system incidental to the planting operation by either own forces or by Irrigation Subcontractor. Above repairs shall be made immediately to not interfere with the automatic cycling of the irrigation system. All repairs shall be permanent and include all flushing required to clean the lines of debris deposited by such damage. B. Incidental damage to work by other subcontractors during landscape installation shall be made immediately and at no extra cost to the owner. 2.00 MATERIALS 2.01 Plants A. Plants shall be nursery grown in accordance with good horticultural practices under climatic conditions similar to those of project for at least 12(twelve)months unless specifically otherwise authorized by Landscape Architect in writing. Unless specifically noted otherwise,all plants shall be heavy,symmetrical,tightly knit,so trained or favored in development and appearance as to be superior in form,number of branches,compactness and symmetry. B. Plants shall be sound,healthy and vigorous,well branched and densely foliated when in leaf. They shall be free of disease,insect pests,eggs,or larvae,and shall havehealthy, well developed root systems. They shall be free from physical damage or adverse conditions that would prevent thriving growth. Section 02950.3 Planting C. Plants shall be true to species and variety and shall conform to measurements specified except that plants larger than specified may be used if approved by Landscape Architect. Use of such plants shall not increase Contract price. If larger plants are approved,the ball of earth or container size shall be increased as specified under"Applicable Standards"and subject to the approval of the Landscape Architect. D. Plants shall be measured when branches are in their normal position. Height and spread dimensions specified refer to main body of plant and not branch tip to tip. Caliper measurement shall be taken at a point on the trunk six inches(6")above natural ground four inches(4")in caliper and at a point twelve inches(12")above the natural ground line for trees over four inches(4")in caliper. If a range of size is given, no plant shall be less than the minimum size and not less than 40%of the plants shall be as large as the maximum size specified. The measurements specified are the minimum size acceptable and are the measurements after pruning,where pruning is required. Plants that meet the measurements specified,but do not possess a normal balance between height and spread shall be rejected. E. Container stock shall have grown in the containers in which delivered for at least six months,but not over two years. Samples must prove that no rootbound conditions exists. No container plants that have cracked or broken balls or earth when taken from container shall be planned. Container stock shall not be pruned before delivery. Field grown plants recently transplanted into containers will not be accepted. F. Balled and bur lapped trees,when accepted,shall have a root ball size of ten(10X)times the caliper. 1. Nursery grown B&B material shall be first pruned and thinned at the place of growth immediately prior to digging as required for packaging and safe moving.Methods or pruning shall be as approved in the field by the Landscape Architect. Do not remove self-locking tags during this pruning prior to delivery to site. Final pruning shall take place at the site. G. Trees which have damaged or crooked leaders,or multiple leaders,unless specified, will be rejected. Trees with abrasions of the bark,sun scalds,disfiguring knots,or fresh cuts of limbs over 3/4"which have not completely callused,will be rejected. H. Method of pruning shall be as approved in the field by the Landscape Architect. Do not remove self-locking tags during this pruning prior to delivery to site. Final pruning shall take place at the site. 2.02 Guying Materials The Contractor shall use guying materials necessary to meet the requirements herein. A. Tree Stake Solutions- TREE STAKE SOLUTIONS LLC 9973 FM 521 ROAD ROSHARON,TX 77583 Section 02950.4 Planting PHONE:(281)778-1400 ALTERNATE PHONE:(903)676-6143 FAX:(281)778-1425A. For Palm Tree A. As Shown on Detail 2.03 Water A. Furnished by Owner. Transport as required. 2.04 Pre-Emergence Weed Control A. In areas of Woody Ornamental Plants Eptam or Eptam-5-G as manufactured by Greenlight Products Company,San Antonio,Texas 78217. Under no circumstances shall this be done in areas that are to be seeded. 2.05 Mulch A. Shredded pine,oak,or hardwood bark;shall be the product of standard stripping of bark from pine trees for fiber or pulp manufacturing. Bark shall be shredded in a manner where large pieces are at a minimum. The mulch shall be free of debris. 2.06 Pipe for Watering Tube A. Shall be perforated Polyvinyl Chloride pipe,Type(SDR 35),gray in color. 2.07 Planting Mix A. See Section 02900"Planting Media". 2.08 Fertilizer(trees and shrubs) A. Post planting fertilization(shrubs and groundcover) 1. "Osmocote"Sierra blend. Apply at manufacturer's recommendation rate. 2.09 Steel Edging A. Shall be equal to that manufactured by the Ryerson Steel Company of Houston,Texas. 2.10 Geotextile Fabric A. Typar#3401 terminally spunbonded polypropylene,non-woven,weed control fabric,4.0 oz/lineal yard weight(American Excelsior or equal).Needle punched material is not acceptable. 3.00 EXECUTION Section 02950.5 Planting 3.01 Layout and Excavation of Planting Areas A. Layout plants in locations shown on drawings. Use wire stakes color-coded for each specie of plant material. Stake location of each tree and major shrub and outline of shrub and groundcover beds. B. The Landscape Architect will check location of plants in the field and shall adjust to exact position before planting begins. C. If underground obstructions are encountered notify the Landscape Architect as to whether an adjustment or change of location is possible within the design intent. If the Contractor is allowed to adjust or change location,rather than remove the obstruction, he shall make the change at no expense to the Owner. Backfill and tamp abandoned pits have obstructions which cannot be removed. See contract drawings for further information. 3.02 Excavation to Subgrade for Planting Area and Verification of Finished Grade A. Excavate all planting areas(pit and beds)to required depth as hereinafter specified and stockpile enough material to prepare planting mix for all plants. Remove excess material from site. B. Verify that required grades are within two(2")inches of required subgrade provided under a separate contract and excavate further as may be required. C. Subsoil shall not be worked when moisture content is so great that excessive compaction will occur,nor when it is so dry that clods will not break readily. Water shall be applied,if necessary,to bring soil to an optimum moisture content before tilling and planting. D. Do not excavate tree pits more than 24 hours in advance of planting operation. Excavate container grown tree pits to the following dimensions: Excavation for Width Depth Boxed Trees Box+24 in. Ball+6 in. Container grown Trees Cont.+18 in. Ball+6 in. B&B Trees Ball+12 in. Ball+6 in. Container grown Shrubs Cont.+12 in. Ball+4 in 1. Excavation for trees pits in areas of select fill(crushed and compacted limestone or similar)shall be twice as wide and twice as deep as given root ball. Fill bottom four inches of tree pit with gravel and cover with soil separator before backfilling pit. E. Excavate shrubs and ground cover beds to the following depths: Excavation for Width Depth Section 02950.6 Planting Shrubs& Entire Bed Cont.+4 in.,not to be less than Groundcover Entire Bed Cont.+4 in.,not less than 8 in F. Rip or cultivates subgrade in pits and beds to a depth of three(3")inches minimum. 3.03 Drainage,Detrimental Soils and Obstructions A. Test drainage of plant beds and pits by filling them with water twice in succession. Conditions permitting the retention of water in planting beds for more than twenty-four (24)hours or percolation of less than one(1")inch per hour shall be brought to the attention of the Landscape Architect. B. Notify the Landscape Architect of all soil or drainage conditions Contractor considers detrimental to growth of plant material. (State condition and submit proposal and cost estimate for correcting condition.) C. If rock,hardpan,underground construction work,tree roots or other obstructions are encountered in the excavation of plant pits and beds, alternate locations may be selected by Landscape Architect. Where locations cannot be changed, submit the required cost to remove the obstructions to a depth of not less than six(6")inches below the required pit or bed depth. Proceed with work after approval. 3.04 Preparing Plant Materials for Planting A. Container grown stock shall be removed carefully and handled only by the root ball. Do not lift or handle container plants by tops, stems,or trunks at any time. B. Do not bind or handle any plant with wire or rope at any time so as to damage bark or break branches. Lift and handle plants only from bottom of ball. C. Balled and bur lapped (B&B)plants shall have firm balls of earth. Plants moved with a ball will not be accepted if the ball is cracked or broken before or during planting operations. B&B material shall be dug only when dormant. Pre-dug stored B&B material shall be inspected and approved at the storage site. 3.05 Installation of Pit Planted Materials A. Do not commence any planting until the irrigation system is completely automated or can be operated manually. B. Fill plant pits with soil mix to compact depth to receive plant root ball,so top of root ball is two(2")inches above finished grade. C. Install PVC watering tubes in tree pits,vertically, at edge of pit as shown. D. Scarify the walls and bottom of all plant pits immediately prior to the placement of plant and backfill mix. The Contractor shall remove all glazing caused by an auger or mechanical hole digger. Section 02950.7 Planting E. For boxed&container grown material,break vertical bands and remove top and bottom of container. Carefully lower plant into pit with backhoe or approved method and adjust elevation. Cut horizontal banks and remove sides. Prune away girdled roots and tease root hair masses. Carefully fill pit and compact by watering in to support root ball. F. Place B&B plants carefully in the prepared planting pit. Do not disturb root ball or untie twine or rope until backfill settlement is complete and tree is staked,if applicable. Fill planting pit by flooding each eight(8")inches of backfill for balls greater than 24"diameter. Wrap trunks with double layer of tree wrap. G. Smooth planted areas to conform to specified grades after full settlement has occurred. Contractors shall bear final responsibility for proper surface drainage of planted areas. Any discrepancy in the drawings or specifications,obstructions on the site,or prior work done by another party,which Contractor feels precludes establishing proper drainage, shall be brought to the attention of the Landscape Architect in writing. H. Mulch circles shall not exceed width of root mass by more than 4". Mulch circles shall meet lawn or bed grades evenly and smoothly. I. Water all plants immediately again after planting. J. Apply pre-emergent weed control material in areas to receive mulch. K. Spread mulch in required areas to the compacted depth of two(2")inches. 3.06 Installation of Bed Planted Materials A. Install steel edging where shown. Anchor with steel stakes spaced not more than three (3')feet O.C.or as per often as necessary to have smooth radius or straight tangent. Drive stake to one(1")inch below top of edging. B. Fill all shrub and groundcover beds with plant bed mix to finished grade(compacted) plus two(2")inches minimum. C. Excavate in planting mix for individual plant and install as required. Set plant plumb and brace rigidly in position until planting soil mix has been tamped solidly around the ball and roots. D. When plant pits have been backfilled approximately two-thirds(2/3)full,fertilizer per manufacturer's recommendations at the maximum rate. D. Water plant thoroughly,saturating root ball,before installing remainder of the planting soil to top of pit,eliminating all air pockets. Top of root ball shall be two(2")inches above finished grade. E. Smooth planting areas to conform to specified grade after full settlement has occurred. Contractor shall bear final responsibility for proper surface drainage of planting areas. Section 02950.8 Planting F. Water all plants immediately again after planting. G. Apply pre-emergent weed control material over entire area to receive mulch. H. Mulch all shrub and groundcover beds to three(3")thick. 3.07 Surface Drainage of Planting Areas A. Contractor shall bear final responsibility for proper surface drainage of planted areas. Any discrepancy in the drawings or specifications,obstructions on the site,or prior work done by another party,which Contractor feels precludes establishing proper drainage, shall be brought to the attention of the Landscape Architect in writing. 3.08 Post Planting Fertilization A. Tree Planting 1. Apply fertilizer 30-45 days after installation. 2. Inject material specified in Section 2 with a high-pressure injector into soil at depth and diameter shown below. Tree Caliper Application Radius Depth Application Points Rate Per Tree Under 2" 3 4"-6" 16"-18" 1-1/2 2"-4" 3 4"-6" 18"-24" 2 4"-5" 4 4"-6" 2'-3' 2-1/2 5"-6" 5 4"-6" 3'-4' 3 Above 6" 3'0.C. 4"-6" 5 gal./100 sq.ft. Root Area (Drip Line) 3.09 Pruning A. Prune containerized plants only at time of planting and according to standard horticultural practice to preserve the natural character of the plant. Prune by removing entangled branching and by removing crotches. Avoid removing branch tips wherever possible. Pruning shall be done under supervision of the Landscape Architect. B. Remove all dead wood,suckers,and broken or badly bruised branches. Use only clean, sharp tools. C. Prune lower branching from trees to a height of 18"above ground per 1 1/4"caliper. Section 02950.9 Planting D. Prune B&B material in addition to place of growth as may be directed by Landscape Architect by removing a percentage of interior branching proportional to the root loss during digging(up to 1/3). 3.10 Staking A. The Contractor will be responsible for material remaining plumb and straight for all given conditions through the guarantee period. Tree support shall be done as outlined on the following tables and as illustrated on the details. B. Trees should be staked during the same day as planting. Plants shall stand plumb after staking. C. Stake all trees under 3 inches caliper in accordance with the following table: Tree Caliper Stakes Length Stake Size To 1-3/4 in. 2 8' Lodge/pole(2"dia) 2 in.to 3 in. 2 8' Lodge/pole(2"dia) 3.11 Guying A. Guying shall be completed immediately after planting in accordance with the following table. Where manufactured product is specified,install per manufacturer's instructions. Plants shall stand plumb after guying. B. Guy trees at points of branching with guys spaced equally around and outside perimeter of ball. Wrap rubber tire straps at points of contact with bark positioned at crotches and fasten to a Deadman with specified cable with double crimp clamp. One turnbuckle shall be provided for each guy. Tree Caliper at No. Cable 12"Above Grade Guys Size Deadmen 3-1/4"to 4-1/2" 3 1/8"Diam. Duck Bill 7 x 7 Galvanized Earth Anchor Steel Cable Model 68 DTS Kit 4-3/4"to 6" 3 1/8"Diam. Duck Bill System 7 x 7 Galvanized Model 68 DTS Kit Steel Cable 6-1/4"to 8" 3 3/16"Diam. Duck Bill System Model 88 DTS Kit 3.12 Maintenance by the Contractor A. The Contractor shall begin maintenance after each plant is installed and continue until Final Acceptance. Section 02950.10 Planting B. The Contractor's Maintenance Period shall begin upon inspection and approval at Substantial Completion and shall be for ninety(90)days. C. The Contractor's maintenance of new planting shall consist of watering,cultivating, weeding,mulching,re-staking,tightening and repair of guys,resetting plants to proper grades or upright position,and furnishing and applying such pesticide sprays and invigorates as are necessary to keep the plantings free of insects and disease and in thriving condition. D. Always protect planting areas and plants against damage of all kinds for duration of maintenance period. Maintenance includes temporary protection barriers and signs as required for protection. If any plants become damaged or injured,because sufficient protection was not provided,treat or replace as directed by Landscape Architect at no additional cost to Owner. 3.13 Final Acceptance A. Work under this Section will be accepted by Landscape Architect upon satisfactory completion of all work,including maintenance,but exclusive of replacement of plant materials under the Warranty Period.Upon termination of maintenance period,the Owner will assume responsibility for maintenance of the work. 3.14 Warranty A. Planting shall be warranted by the Contractor to remain alive and healthy for a period of 12 months after the date of Substantial Completion. Plants in an impaired,dead or dying condition after initial acceptance or within 12 months shall be removed and replaced. New planting and method of placing shall comply with the requirements of the specifications. Plants replacing those removed during the guarantee period shall also be guaranteed to remain alive and healthy for an additional 12 months after installation and acceptance. B. Contractor shall not be held responsible for failure due to neglect by Owner,vandalism, Acts of God,during Warranty Period. Report such conditions to the Landscape Architect in writing when discovered. C. Submit a letter of warranty containing the following information: 1. "We hereby guarantee that the landscape planting we have furnished and installed is free from disease and in good condition,and the work has been completed in accordance with the drawings and specifications,ordinary wear and tear and unusual abuse,or neglect excepted. We agree to repair or replace any defects in material or workmanship which may develop during the period of one(1)year from acceptance,and to repair or replace any damage resulting from the repairing or replacing of such defects,at no additional cost to the Owner. We shall make such repairs or Section 02950.11 Planting replacements within a reasonable time,as determined by the Owner,after receipt of written notice. In the event of our failure to make such repairs or replacements within a reasonable time after receipt of written notice from the Owner by Certified Mail,we authorize the Owner to proceed to have said repairs or replacements made at our expense,and we will pay the costs and charges therefore,upon demand." 3.15 Clean Up A. Clean up all areas as required for complete and acceptable inspection. B. It is Contractor's responsibilities to replace or restore any damaged or disturbed areas during planting operation back to it's original condition. 3.16 Inspections A. Make written request for inspections after planting operations are completed. B. Submit requests for inspections to the Landscape Architect at least five(5)days prior to anticipated inspection date. END OF SECTION Section 02950.12 Planting 4 SECTION 02970 LANDSCAPE GROUND MAINTENANCE 1.00 GENERAL 1.01 Scope A. Maintenance required under this contract shall conform to the specifications and criteria in this section. Items included in this section include,but are not limited to,the following: 1. Mowing,edging and trimming of lawn areas 2. Application of pesticides,as required 3. Weeding,cultivating and cleaning of all plantings 4. Application of herbicides 5. Adjustment of irrigation clocks for weather and growth conditions 6. General site clean up. Removal of trash and products of maintenance 7. Hand watering of machine-transplanted trees 8. Truck watering of trees and turf,via manual system 1.02 Contract Period A. These specifications shall govern all maintenance work on completed and partially completed project areas,commencing at the Notice to Proceed and terminating ninety (90) days after the issuance of Notice of Substantial Completion. 1.03 Intent of the Contract A. It is the intent of the contract to provide the Owner with a project site that is attractive in appearance,and to keep all plant materials and lawns in a healthy and vigorous condition. 1.04 Contractor's Performance A. The Contractor shall perform all work as often as necessary to fulfill the spirit and intent of the contract. The workmen shall be neat in appearance,perform their work in a professional manner,keep noise to a minimum,and stage their work from a location on the site out of the way of the mainstream of the users. In general,the Contractor's presence on the site shall be as inconspicuous as possible. 1.05 Neglect and Vandalism Section 02970.1 Landscape Ground Maintenance A. Turf,shrubs,trees or plants that are damaged or killed due to Contractor's operations, negligence,or chemicals shall be replaced at no expense to the Owner. B. Sprinklers or structures that are damaged due to the Contractor's operation must be replaced by the Contractor promptly. C. All damage to,or thefts of landscape elements not caused or allowed by the Contractor subsequent to the issuance of the Certificate of Substantial Completion shall be corrected by the Contractor at the Owner's expense,upon receipt of written authorization to proceed. D. Damage due to thefts or vandalism prior to the date of the Certificate of Substantial Completion shall be at the Contractor's expense. 1.06 Emergencies A. The Contractor shall answer emergency or complaint calls regarding conditions in landscaped areas regarding fallen trees or branches,or shrubs or trees that obstruct the driveways,and shall correct the problem or place warning signs and advise the Owner of the need for major work to be performed. 2.00 MATERIALS 2.01 Machinery A. Machinery requirements listed under this Section are not intended to be restrictions of specific manufacturers or models unless so stated. Specific mention of manufacturers is intended as a guide to illustrate the final product of maintenance operations desired. 1. Lawn Mowers a. Shall be of the rotary-type in good working order,finely turned to protect the lawn from excessive exhaust fumes. b. Blades shall be sharp,to reduce shredding of the cut grass. 2. Lawn Edgers a. Shall be of a rigid or flexible blade-type that will produce a fine,clean edge where lawns meet walkways,pavements, or curbs. 3. Fertilizer Spreaders a. Cyclone-type spreader,or equal. b. No visible underlapping of applications will be permitted. Section 02970.2 Landscape Ground Maintenance 4. Pruning Tools a. Shall be maintained in good working order. b. Cutting edges shall be sharp. c. Disinfect all tools when used for the removal of diseased limbs with a solution of Clorox and water,mixed at a 1:5 ratio. 5. Watering Truck&Pump a. Minimum 1200 gal.tank/pump. b. Pressure at nozzle:35 PSI(1 1/2"outlet). 3.00 EXECUTION 3.01 General A. All maintenance operations shall be performed by the Contractor's own force, superintended by personnel familiar with the job. Subcontracting of maintenance work shall not be allowed. B. Maintenance Period shall commence immediately upon the issuance of the contract. It will be the Contractor's sole responsibility to maintain plantings in original intended condition throughout the Maintenance Period of this contract. C. Accidental damage to the landscape plantings beyond the control of the Contractor shall be reported immediately to the Owner. 3.02 Irrigation System A. Irrigation system maintenance shall generally be construed as any activity or activities necessary to keep the system 100%operational. Irrigation system maintenance shall include,but not be limited to: 1. Replacement of equipment damaged by Contractor operations. 2. Repair of other equipment damaged or malfunctioning on a time and material basis. (As requested by the Owner.) 3. Adjustment and cleaning of heads so as to correct miss-directional throw, improper coverage and damage to equipment. B. The Contractor shall monitor and program the irrigation controllers to maintain optimum moisture levels in all planted areas. C. Irrigation cycles shall be set to take place after 11:00 pm and prior to sunrise(4:00 am- Section 02970.3 Landscape Ground Maintenance 5:00 am),unless otherwise instructed by the Owner,except during visits of grounds maintenance personnel. During such visits,the irrigation system may be operated as desired by those personnel. D. Irrigation cycles should gradually be reduced from September to the winter,in order to generally reduce late season plant growth and vigor,and to stimulate hardening off and dormancy of plant material. 3.03 Staking and Guying A. Contractor shall maintain staking and guying of trees at all times and shall be responsible for any damage to trees or plant materials caused by chafing or breaking of foliage or limbs coming in contact with stakes,ties,guys,eye bolts, or bracing materials. Periodically adjust broken stakes and ties as needed. If ties are too tight,they must be replaced or adjusted. All labor and material costs shall be considered in base bid for the initial 90-day maintenance period. B. Trees and large shrubs that may require guys,stakes or special care during the winds and rains shall receive the required care prior to and immediately after anticipated and actual occurrences, to insure that no damage results to the plant material. 3.04 Pruning A. Contractor shall prune regularly,as required. Remove dead wood and aesthetically horticulturally balance the planting,as directed by the Landscape Architect. All suckers and undesired growth shall be removed immediately. B. Do not prune limbs from trunks more than 12"above ground per 1"caliper(min.8"). C. Pruning shrubs should create a uniformly dense plant. Selectively thin and tip back annually. Prune to enhance natural branching effect of plants. Do not change shape of shrubs by pruning. Refer to schedule. 3.05 Turf Maintenance A. Mowing 1. During periods of cool weather,mow at one and one-half inches(1 1/2"),but during hot weather should not be lower than two inches(2")from the soil. 2. Regular weekly mowing is strongly recommended. Never scalp the lawn or cut more than one-third(1/3)of the existing top growth in one mowing. 3. Remove excessive clippings,never allow clippings to remain on lawn surface for more than four(4)hours. B. Watering Section 02970.4 Landscape Ground Maintenance 1. Provide a regular,deep watering program. The established turf should not be kept wet but should dry out under regular conditions. If it is hot or windy, water more often. 2. In very hot weather, a fast watering with fine spray will cool the turf zone and can supplement the regular deeper watering program. 3. In shaded areas caused by trees or shrubs,water more frequently because of the competition for soil moisture. 4. If lawn wilts(shows gray brown),water more frequently. C. In areas of new planting and lawns,allow new lawn to grow over tree ball. Maintain height of grass at tree trunk with hand clippers. Do not use weed whips around tree trunks. 3.06 Manual Watering(Quick Coupler System). A. Water all trees twice weekly(minimum 30 gal.total),or as necessary to maintain materials in thriving condition. Frequency may be reduced, as directed by the Landscape Architect during periods of wet weather. 3.07 General Clean Up A. The Contractor shall dispose of all waste materials or refuse from his operations off the property,except where other arrangements have been made with the Owner. B. Keep all expansion and score joints free of any vegetation which may appear and apply appropriate herbicide to discourage future growth in these areas. C. Leaves,papers,grass clippings or other debris shall be removed weekly,or at each visit from all areas. D. Remove dead animals from the site immediately,as they are encountered. 4.00 SCHEDULE 4.01 Schedules A. The Schedule as included herein shall be used as a guide for the specified work,which may fall within the post-construction maintenance period. Should the Contractor require an alteration of the Schedule,contact the Landscape Architect. SCHEDULE"A" FUNCTIONS FREQUENCY Tan. Feb. Mar. Apr. May Tun. July Aug. Sept. Oct. Nov. Dec. Section 02970.5 Landscape Ground Maintenance Mowing 3 3 4 5 5 5 4 4 5 4 4 4 Edging 1 1 4 5 5 4 4 4 5 4 1 1 Debris Removal 2 2 4 4 5 5 5 5 5 5 4 4 Pruning 1 1 Weed Control Beds 1 1 1 1 1 1 1 1 1 1 Clean/Sweep Curbs/Gutters 2 2 4 4 5 4 5 4 4 5 4 4 Overseed Rye 1* Index Irrigation 1 1 1 1 1 1 1 1 1 1 1 1 Spray for Borers 1 1 1 1 *Depending on Prevailing Weather END OF SECTION Section 02970.6 Landscape Ground Maintenance SECTION 26 0200 BASIC MATERIALS AND METHODS PART 1 -GENERAL 1.01 SECTION INCLUDES A. Tests B. Inspections C. Submittals D. Project Coordination E. RELATED SECTIONS 1. General Conditions 2. Supplementary Conditions 3. Division One F. COOPERATION WITH TRADES: 1. Cooperation with trades of adjacent, related, or affected materials or operations, shall be considered a part of this work in order to affect timely and accurate placing of work and bring together in proper and correct sequence, the work of such trades. G. REFERENCES 1. National Electrical Code (NEC) 2. American Society for Testing and Materials (ASTM) 3. Underwriter's Laboratories, Inc. (UL) 4. Insulated Cable Engineer's Association (ICEA). 5. National Electrical Manufacturer's Association (NEMA). 6. Institute of Electrical and Electronic's Engineers(IEEE). 7. American National Standards Institute (ANSI). 8. National Fire Protection Association (NFPA). Rosehill Park 26 0200 - 1 BASIC MATERIALS AND METHODS JE Project#5133 9. International Energy Conservation Code (IECC). H. COMPLETE FUNCTIONING OF WORK: 1. All work fairly implied as essential to the complete functioning of the electrical systems shown on the Drawings and Specifications shall be completed as part of the work of this Division unless specifically stated otherwise. It is the intention of the Drawings and Specifications to establish the types of the systems, but not set forth each item essential to the functioning of the system. In case of doubt as to the work intended, or in the event of amplification or clarification thereof, the Contractor shall call upon the Architect for supplementary instructions, Drawings, etc. 2. Contractor shall review all pertinent Drawings and adjust his work to all conditions shown there on. Discrepancies between Plans, Specifications, and actual field conditions shall be brought to the prompt attention of the Architect. a. Approximate location of transformers, feeders, branch circuits, outlets, lighting and power panels, outlets for special systems, etc., are indicated on the Drawings. However, the Drawings, do not give complete and accurate detailed locations of such outlets, conduit runs, etc., and exact locations must be determined by actual field measurement. Such locations will, at all times, be subject to the approval of the Architect. b. Communicate with the Architect and secure his approval of any outlet(light fixture, receptacle, switch, etc.) location about which there may be the least question. Outlets obviously placed in a location not suitable to the finished room or without specific approval, shall be removed and relocated when so directed by the Architect. Location of light fixtures shall be coordinated with reflected ceiling plans. 3. Additional coordination with mechanical contractor may be required to allow adequate clearances of mechanical equipment, fixtures and associated appurtenances. Contractor to notify Architect and Engineer of unresolved clearances, conflicts or equipment locations. I. SCHEMATIC NATURE OF CONTRACT DOCUMENTS 1. The contract documents are schematic in nature in that they are only to establish scope and a minimum level of quality. They are not to be used as actual working construction drawings. The actual working construction drawings shall be the approved shop drawings. J. CONTRACTOR'S QUALIFICATIONS Rosehill Park 26 0200 -2 BASIC MATERIALS AND METHODS JE Project#5133 1. An approved contractor for the work under this division shall be: a. A specialist in this field and have the personnel, experience,training, and skill, and the organization to provide a practical working system. b. Able to furnish evidence of having contracted for and installed not less than 3 systems of comparable size and type that have served their Owners satisfactorily for not less than 3 years. c. Perform work by persons qualified to produce workmanship of specified quality. Persons performing electrical work shall be required to be licensed. Onsite supervision,journeyman shall have minimum of journeyman license. Helpers, apprentices shall have minimum of apprentice license. K. DATE OF FINAL ACCEPTANCE 1. The date of final acceptance shall be the date of owner occupancy, or the date all punch list items have been completed or final payment has been received. Refer to Division One for additional requirements. 2. The date of final acceptance shall be documented in writing and signed by the architect, owner and contractor. L. DELIVERY, STORAGE, AND HANDLING 1. Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification. 2. Deliver products to the project at such time as the project is ready to receive the equipment, pipe or duct properly protected from incidental damage and weather damage. 3. Damaged equipment shall be promptly removed from the site and new, undamaged equipment shall be installed in its place promptly with no additional charge to the Owner. M. SUBMITTALS 1. Coordinate with Section 01 33 00 for submittal requirements 2. Materials and equipment which are purchased or installed without shop drawing review shall be at the risk of the Contractor and the cost for removal and replacement of such materials and equipment and related work which is judged unsatisfactory by the Owner or Engineer for any reason shall be at the expense of the Contractor. The responsible Contractor shall remove the material and Rosehill Park 26 0200 -3 BASIC MATERIALS AND METHODS JE Project#5133 equipment noted above and replace with specified equipment or material at his own expense when directed in writing by the Architect or Engineer. 3. Shop Drawing Submittals shall be complete and checked prior to submission to the Engineer for review. 4. Furnish detailed shop drawings, descriptive literature, physical data and a specification critique for each section indicating "compliance" and/or"variations" for the following items: a. Motor Control Centers b. Electrical Meters c. Distribution Panelboards d. Lighting and Appliance Panelboards e. Heavy Duty Disconnect Switches f. Lighting Fixtures g. Lighting Contactors h. Time Clocks i. Lighting Control System j. Photocells k. Wiring Devices and Plates I. Conduit and Fittings m. Wire n. Lightning Protection o. Switchboards p. Dry Type Transformers q. Sound Reinforcing System r. Busways s. Transient Voltage Surge Suppressors (TVSS) Rosehill Park 26 0200 -4 BASIC MATERIALS AND METHODS JE Project#5133 5. Refer to each specification section for additional requirements. N. OPERATION AND MAINTENANCE MANUALS 1. Prepare maintenance manuals in accordance with Division 01 and in addition to the requirements specified in Division 1, include the following information for equipment items: a. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of replacement parts. b. Manufacturer's printed operating procedures to include start-up, break-in, and routine and normal operating instructions; regulation, control, stopping, shutdown, and emergency instructions; and summer and winter operating instructions. c. Maintenance procedures for routine preventative maintenance and troubleshooting; disassembly, repair, and reassembly; aligning and adjusting instructions. d. Servicing instructions and lubrication charts and schedules. O. MAINTENANCE MANUALS 1. Coordinate with Division 01 for maintenance manual requirements, unless noted otherwise bind together in "D ring type" binders by National model no. 79-883 or equal, binders shall be large enough to allow IA" of spare capacity. Three (3) sets of all approved shop drawing submittals,fabrication drawings, bulletins, maintenance instructions, operating instructions and parts exploded views and lists for each and every piece of equipment furnished under this Specification. All sections shall be typed and indexed into sections and labeled for easy reference and shall utilize the individual specification section numbers shown in the Electrical Specifications as an organization guideline. Bulletins containing information about equipment that is not installed on the project shall be properly marked up or stripped and reassembled. All pertinent information required by the Owner for proper operation and maintenance of equipment supplied by Division 16 shall be clearly and legibly set forth in memoranda that shall, likewise, be bound with bulletins. 2. Prepare maintenance manuals in accordance with Special Project Conditions, in addition to the requirements specified in Division 26, include the following information for equipment items: a. Identifying names, name tags designations and locations for all equipment. Rosehill Park 26 0200 -5 BASIC MATERIALS AND METHODS JE Project#5133 b. Fault Current calculations and Coordination Study. c. Reviewed shop drawing submittals with exceptions noted compliance letter. d. Fabrication drawings. e. Equipment and device bulletins and data sheets clearly highlighted to show equipment installed on the project and including performance curves and data as applicable, i.e., description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and model numbers of replacement parts. f. Manufacturer's printed operating procedures to include start-up, break-in, and routine and normal operating instructions; regulation, control, stopping, shutdown, and emergency instructions; and summer and winter operating instructions. g. Maintenance procedures for routine preventative maintenance and troubleshooting; disassembly, repair, and reassembly; aligning and adjusting instructions, servicing instructions and lubrication charts and schedules. h. Equipment name plate data. i. Wiring diagrams. j. Exploded parts views and parts lists for all equipment and devices. k. Color coding charts for all painted equipment and conduit. I. Location and listing of all spare parts and special keys and tools furnished to the Owner. m. Furnish recommended lubrication schedule for all required lubrication points with listing of type and approximate amount of lubricant required. 3. Refer to Division 01 78 23 for additional information on Operating and Maintenance Manuals. 4. Operating and Maintenance Manuals shall be turned over to the Owner or Engineer a minimum of 14 working days prior to the beginning of the operator training period. P. OPERATOR TRAINING 1. The Contractor shall furnish the services of factory trained specialists to instruct the Owner's operating personnel. The Owner's operator training shall include 12 hours of on site training in three 4 hour shifts. Rosehill Park 26 0200 -6 BASIC MATERIALS AND METHODS JE Project#5133 2. Before proceeding with the instruction of Owner Personnel, prepare a typed outline in triplicate, listing the subjects that will be covered in this instruction, and submit the outline for review by the Owner. At the conclusion of the instruction period obtain the signature of each person being instructed on each copy of the reviewed outline to signify that he has a proper understanding of the operation and maintenance of the systems and resubmit the signed outlines. 3. Refer to other Division 01 79 00 for additional Operator Training requirements. Q. SITE VISITATION 1. Visit the site of the proposed construction in order to fully understand the facilities, difficulties and restriction attending the execution of the work. 2. Before submitting a bid, it will be necessary for each Contractor whose work is involved to visit the site and ascertain for himself the conditions to be met therein in installing his work and make due provision for same in his bid. It will be assumed that this Contractor in submitting his bid has visited the premises and that his bid covers all work necessary to properly install the equipment shown. Failure on the part of the Contractor to comply with this requirement shall not be considered justification for the omission or faulty installation of any work covered by these Specifications and Drawings. 3. Understand the existing utilities from which services will be supplied; verify locations of utility services, and determine requirements for connections. 4. Determine in advance that equipment and materials proposed for installation fit into the confines indicated. R. WARRANTY 1. The undertaking of the work described in this Division shall be considered equivalent to the issuance, as part of this work, of a specific guarantee extending one year beyond the date of completion of work and acceptance by Owner, against defects in materials and workmanship. Materials, appliances and labor necessary to effect repairs and replacement so as to maintain said work in good functioning order shall be provided as required. Replacements necessitated by normal wear in use or by Owner's abuse are not included under this guarantee. PART 2 -PRODUCTS 2.01 SUBSTITUTIONS A. The names and manufacturers and model numbers have been used in the Contract documents to establish types of equipment and standards of quality. Where more than one manufacturer is named for a specific item of equipment, only one of the specified Rosehill Park 26 0200 -7 BASIC MATERIALS AND METHODS JE Project#5133 manufacturers will be considered for approval. Where only one manufacturer is mentioned with the phrase "or approved equal", Contractor may submit an alternate manufacturer for consideration, provided the following conditions are met: 1. Submit alternate equipment with complete descriptive data in shop drawing form. Provide sample of equipment upon request for review by Architect. Samples will be returned if requested in writing. 2. Alternate equipment must be equal from the standpoint of materials, construction and performance. 3. Alternate submittal must be presented to the Engineer/Architect ten (10) days prior to bid date for approval. 4. The Architect and Engineer shall be the sole judge of quality and equivalence of equipment, materials and methods. 2.02 ALL MATERIALS AND PRODUCTS USED ON THIS PROJECT SHALL BE LISTED BY UNDERWRITERS' LABORATORIES. 2.03 ACCESS DOORS A. Wherever access is required in walls or ceilings to concealed junction boxes, pull boxes, equipment, etc., installed under this Division, furnish a hinged access door and frame with flush latch handle to another Division for installation. Doors shall be as follows: 1. Plaster Surfaces: Milcor Style K. 2. Ceramic Tile Surfaces: Milcor Style M. 3. Drywall Surfaces: Milcor Style DW. 4. Install panels only in locations approved by the Architect. 2.04 EQUIPMENT PADS A. Unless noted otherwise 4" high concrete pads for floor mounted equipment shall be installed under Division 3. Pads shall conform to the shape of the equipment with a minimum of 3" margin at equipment supports. Top and sides of pads shall be troweled to a smooth finish, equal to floor. External corners shall be bullnosed to a 3/4" radius, unless shown otherwise. 2.05 ESCUTCHEONS A. Provide heavy chrome or nickel plated plates, of approved pattern, on conduit passing through walls,floors and ceilings in finished areas. Where conduit passes through a Rosehill Park 26 0200 -8 BASIC MATERIALS AND METHODS JE Project#5133 sleeve, no point of the conduit shall touch the building construction. Caulk around such conduit with sufficient layers of two hour rated firesafing by Thermafiber 4.0 P.C.F. density, U.S.G. fire test 4/11/78 and seal off openings between conduit and sleeves with non-hardening mastic prior to application of escutcheon plate. Escutcheons shall be Gravler Sure-Lock, or approved equal. 2.06 SPACE LIMITATIONS A. Equipment shall be chosen which shall properly fit into the physical space provided and shown on the drawings, allowing ample room for access, servicing, removal and replacement of parts, etc. Adequate space shall be allowed for clearances in accordance with Code requirements. Physical dimensions and arrangement of equipment shall be subject to the approval of the Architect. 2.07 PAINTING A. All factory assembled equipment for electrical work, except light fixtures, that normally is delivered with a factory applied finish shall be delivered with a hard surface factory applied finish such as baked-on machinery enamel which will not require additional field painting. The finish shall consist of not less than 2 coats of medium gray color paint USA No. 61 Munsell Notation 8-3G, 6. 10/0.54 enamel. This Contractor shall protect this finish from damage due to construction operations until acceptance of the building. He shall be responsible for satisfactorily restoring any such finishes or replacing equipment that becomes stained or damaged. 2.08 ELECTRICAL SYSTEM IDENTIFICATION A. Conduit Systems: Provide adequate marking of major conduit which is exposed or concealed in accessible spaces to distinguish each run as either a power or signal/communication conduit. Except as otherwise indicated, use orange banding with black lettering. Provide self-adhesive or snap-on type plastic markers. Indicate voltage for that raceway. Locate markers at ends of conduit runs, on pull boxes, on junction boxes, near switches and other control devices, near items of equipment served by the conductors, at points where conduit passes through walls or floors, or enters non- accessible construction and at spacings of not more than 50 feet along each run of conduit. Switch-leg conduit and short branches for power connections do not have to be marked, except where conduit is larger than 3/4 inch. Branch circuit conduits, junction boxes and pull boxes shall be marked with a permanent marker indicating panel name and branch circuit numbers. B. Underground Cable Identification: Bury a continuous, preprinted, bright colored plastic ribbon cable marker with each underground cable (or group of cables), regardless of whether conductors are in conduit, duct bank, or direct buried. Locate each directly over cables, 6 to 8 inches below finished grade. Rosehill Park 26 0200 -9 BASIC MATERIALS AND METHODS JE Project#5133 C. Identification of Equipment: 1. All major equipment shall have a manufacturer's label identifying the manufacturer's address, equipment model and serial numbers, equipment size, and other pertinent data. Care shall be taken not to obliterate this nameplate in any way. 2. A black-white-black laminated plastic engraved identifying nameplate shall be secured by stainless steel screws to each automatic transfer switch, switchboard, distribution panel, motor control center, motor starter panels and panelboards. a. Identifying nameplates shall have inch high engraved letters and shall contain the following information: 1) Name 2) Voltage 3) Phase 4) "3" or"4" wire, and 5) Where it is fed from. (a) An example of a panelboard nameplate is: (1) Center Panel— 1HB (2) 480/277 volt, 3 phase, 4 wire (3) Center Fed from DP2 (b) An example of an automatic transfer switch nameplate is: (1) Center ATS#2 (2) 480/277 volt, 3 phase, 4 wire, 4 pole (3) Center Fed from MSB and DPE b. Each feeder device in a switchboard, distribution panel, and motor control center device shall have a nameplate showing the load served in '/z inch high engraved letters. c. A black-white-black laminated plastic engraved identifying nameplate shall be secured by screws to each safety switch, disconnect switch, individual motor starter, enclosed circuit breaker, wireway, and terminal cabinet. Rosehill Park 26 0200 10 BASIC MATERIALS AND METHODS JE Project#5133 1) Identifying nameplates shall have'/4 inch high engraved letters and shall indicate the equipment served. 2) An example if a disconnect switch is: AHU-1. d. Cardholders and directory cards shall be furnished for circuit identification in panelboards. Cardholder shall be located on inside of panel door and shall be in a metal frame with clear plastic front. Circuit lists shall be typewritten. Circuit descriptions shall include location and name of each item of equipment served. Spares and spaces shall be written in erasable pencil for future use. Circuit directory shall show the room served by each circuit. The final graphs/signage room numbers shall be used. Do not use Architectural numbering on plans. e. Prohibited Markings: Markings which are intended to identify the manufacturer, vendor, or other source from which the material has been obtained are prohibited for installation within public,tenant, or common areas within the project. Also, prohibited are materials or devices which bear evidence that markings or insignias have been removed. Certification, testing (example, Underwriters' Laboratories, Inc.), and approval labels are exceptions to this requirement. f. Warning Signs: Provide warning signs where there is hazardous exposure associated with access to or operation of electrical facilities. Provide text of sufficient clarity and lettering of sufficient size to convey adequate information at each location; mount permanently in an appropriate and effective location. Comply with recognized industry standards for color and design. g. Operational Tags: Where needed for proper and adequate information on operation and maintenance of electrical system, provide tags of plasticized card stock, either preprinted or hand printed. Tags shall convey the message, example: "DO NOT OPEN THIS SWITCH WHEN BURNER IS OPERATING." PART 3 - EXECUTION 3.01 EXCAVATING AND BACKFILLING A. Trenching and backfilling and other earthwork operations required to install the facilities specified herein shall conform to the applicable requirements of Division 2 (95% of maximum standard density). Where trenching or excavation is required in improved areas, the backfill shall be compacted to a condition equal to that of adjacent undisturbed earth and the surface of the area restored to the condition existing prior to trenching or excavating operations. Provide a minimum of 3"of sand underneath all conduits. The plans indicate information pertaining to surface and sub-surface Rosehill Park 26 0200 - 11 BASIC MATERIALS AND METHODS JE Project#5133 obstructions; however, this information is not guaranteed. Should obstructions be encountered whether or not shown, the Contractor shall alter routing of new work, reroute existing lines, remove obstructions where permitted, or otherwise perform whatever work is necessary to satisfy the purpose of new work and leave existing surfaces and structures in a satisfactory and serviceable condition. All work shall comply with OSHA Standards. 3.02 WORKMANSHIP AND CONCEALMENT A. The work of this Section shall be performed by workman skilled in their trade. Installation shall be consistent in completeness whether concealed or exposed. Each item of electrical work shall be concealed in walls, chases, under floors and above ceilings except: 1. Where shown to be exposed. 2. Where exposure is necessary to the proper function. 3.03 SLEEVES, CUTTING AND PATCHING A. This section shall be responsible for placing sleeves for all conduit passing through walls, partitions, sound walls, beams,floors, roof, etc. Sleeves through below-grade walls shall use water-tight fitting manufactured by O.Z. Gendey. B. All cutting and patching will be done under another Division, but this Section will be responsible for timely performance of this work and layout of holes and setting sleeves. C. All un-used sleeves shall be sealed with 2 hour UL approved fire sealant manufactured by"3M"or approved equal. D. Refer to 16110 for additional requirements. 3.04 ELECTRICAL GEAR A. Install all electrical equipment in accordance with the National Electrical Code and as shown on the drawings. B. Lighting contractors, time clocks, disconnect switches, etc. mounted in mechanical/electrical rooms shall be mounted at a working height not requiring a ladder, when wall space is available. Installation of these devices at greater elevations shall be approved by the Engineer. Contractor shall provide a coordination sketch of each mechanical/electrical room noting locations and mounting heights of all electrical devices(note bottom and top elevations)shown to be installed. Sketches shall be provided to the Engineer for review, and the general contractor for coordination with other trades working in these rooms. Rosehill Park 26 0200 - 12 BASIC MATERIALS AND METHODS JE Project#5133 3.05 CLEANING A. Clean lighting fixtures and equipment. B. Touch-up and refinish scratches and marred surfaces on panels, switches, starters, and transformers. 3.06 TESTS AND INSPECTIONS A. Tests and inspection requirements shall be coordinated with Division I. B. Date for final acceptance test shall be sufficiently in advance of completion date of contract to permit alterations or adjustments necessary to achieve proper functioning of equipment prior to contract completion date. C. Conduct re-tests as directed by Architect on portions of work or equipment altered or adjusted as determined to be necessary by final acceptance test. No resultant delay or consumption of time as a result of such necessary re-test beyond contract completion date shall relieve Contractor of his responsibility under contract. D. Put circuits and equipment into service under normal conditions, collectively and separately, as may be required to determine satisfactory operation. Demonstrate equipment to operate in accordance with requirements of these specifications. Perform tests in the presence of Architect. Furnish instruments and personnel required for tests. E. Final Inspection: 1. At the time designated by the Architect, the entire system shall be inspected by the Architect and Engineer. The contractor or his representative shall be present at this inspection. 2. Panelboards, switches, fixtures, etc., shall be cleaned and in operating condition. 3. Certificates and documents required hereinbefore shall be in order and presented to the Architect prior to inspection. 4. Panel covers,junction box covers, etc., shall be removed for visual inspection of the wire, bus bars, etc. 5. After the inspection, any items which are noted as needing to be changed or corrected in order to comply with these specifications and the drawings shall be accomplished without delay. 6. The contractor shall provide a thermographic test using an independent testing laboratory using an infrared scanning device. This test shall include but not Rosehill Park 26 0200 - 13 BASIC MATERIALS AND METHODS JE Project#5133 limited to all switchboards, distribution panelboards, panelboards, automatic transfer switches and other electrical distribution devices. This test shall be conducted to locate high temperature levels. This test shall be conducted between 3 to 8 months after occupancy, but not beyond the one year warranty period. Submit test to the architect and engineer using test reporting forms. All unacceptable conditions shall be corrected prior to the end of the warranty period. END OF SECTION 26 02 00 26 0200 Rosehill Park 26 0200 14 BASIC MATERIALS AND METHODS JE Project#5133 SECTION 26 0500 COMMON WORK RESULTS FOR ELECTRICAL PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.02 SUMMARY A. Section Includes: 1. Electrical equipment coordination and installation. 2. Sleeves for raceways and cables. 3. Sleeve seals. 4. Grout. 5. Common electrical installation requirements. 1.03 DEFINITIONS A. EPDM: Ethylene-propylene-diene terpolymer rubber. B. NBR: Acrylonitrile-butadiene rubber. 1.04 SUBMITTALS A. Product Data: For sleeve seals. 1.05 COORDINATION A. Coordinate arrangement, mounting, and support of electrical equipment: 1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated. 2. To provide for ease of disconnecting the equipment with minimum interference to other installations. 3. To allow right of way for piping and conduit installed at required slope. 4. So connecting raceways, cables, wireways, cable trays, and busways will be clear of obstructions and of the working and access space of other equipment. Rosehill Park 26 0500 - 1 Common Work Results For Electrical JE Project#5133 B. Coordinate installation of required supporting devices and set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed. C. Coordinate location of access panels and doors for electrical items that are behind finished surfaces or otherwise concealed. Access doors and panels are specified in Division 08 Section "Access Doors and Frames." D. Coordinate sleeve selection and application with selection and application of firestopping specified in Division 07 Section "Penetration Firestopping."." PART 2 PRODUCTS 2.01 SLEEVES FOR RACEWAYS AND CABLES A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized steel, plain ends. B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated. C. Sleeves for Rectangular Openings: Galvanized sheet steel. 1. Minimum Metal Thickness: a. For sleeve cross-section rectangle perimeter less than 50 inches and no side more than 16 inches, thickness shall be 0.052 inch. b. For sleeve cross-section rectangle perimeter equal to, or more than, 50 inches and 1 or more sides equal to, or more than, 16 inches, thickness shall be 0.138 inch. 2.02 SLEEVE SEALS A. Description: Modular sealing device, designed for field assembly, to fill annular space between sleeve and raceway or cable. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Advance Products & Systems, Inc. b. Calpico, Inc. c. Metraflex Co. d. Pipeline Seal and Insulator, Inc. Rosehill Park 26 0500 -2 Common Work Results For Electrical JE Project#5133 2. Sealing Elements: EPDM interlocking links shaped to fit surface of cable or conduit. Include type and number required for material and size of raceway or cable. 3. Pressure Plates: Carbon steel. Include two for each sealing element. 4. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating of length required to secure pressure plates to sealing elements. Include one for each sealing element. 2.03 GROUT A. Nonmetallic, Shrinkage-Resistant Grout: ASTM C 1107, factory-packaged, nonmetallic aggregate grout, noncorrosive, nonstaining, mixed with water to consistency suitable for application and a 30-minute working time. PART 3 EXECUTION 3.01 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION A. Comply with NECA 1. B. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit for wall-mounting items. C. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide maximum possible headroom consistent with these requirements. D. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity. E. Right of Way: Give to piping systems installed at a required slope. F. Wiring to all non dedicated receptacles and switches are required to utilize parallel circuiting by the use of"pig tails"to each device so that if an outlet is removed or fails, electrical continuity of the circuit will not be compromised. G. All electrical wiring must be properly spliced by twisting the wires together and use of approved and listed compression wire nuts fo the application.. H. Do not use end to end butt-splicing connections for any wiring. Rosehill Park 26 0500 -3 Common Work Results For Electrical JE Project#5133 3.02 SLEEVE INSTALLATION FOR ELECTRICAL PENETRATIONS A. Electrical penetrations occur when raceways, cables, wireways, cable trays, or busways penetrate concrete slabs, concrete or masonry walls, or fire-rated floor and wall assemblies. B. Concrete Slabs and Walls: Install sleeves for penetrations unless core-drilled holes or formed openings are used. Install sleeves during erection of slabs and walls. C. Use pipe sleeves unless penetration arrangement requires rectangular sleeved opening. D. Fire-Rated Assemblies: Install sleeves for penetrations of fire-rated floor and wall assemblies unless openings compatible with firestop system used are fabricated during construction of floor or wall. E. Cut sleeves to length for mounting flush with both surfaces of walls. F. Extend sleeves installed in floors 2 inches above finished floor level. G. Size pipe sleeves to provide 1/4-inch annular clear space between sleeve and raceway or cable, unless indicated otherwise. H. Seal space outside of sleeves with grout for penetrations of concrete and masonry 1. Promptly pack grout solidly between sleeve and wall so no voids remain. Tool exposed surfaces smooth; protect grout while curing. I. Interior Penetrations of Non-Fire-Rated Walls and Floors: Seal annular space between sleeve and raceway or cable, using joint sealant appropriate for size, depth, and location of joint. Comply with requirements in Division 07 Section "Joint Sealants.". J. Fire-Rated-Assembly Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at raceway and cable penetrations. Install sleeves and seal raceway and cable penetration sleeves with firestop materials. Comply with requirements in Division 07 Section "Penetration Firestopping." K. Roof-Penetration Sleeves: Seal penetration of individual raceways and cables with flexible boot-type flashing units applied in coordination with roofing work. L. Aboveground, Exterior-Wall Penetrations: Seal penetrations using steel pipe sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals. Rosehill Park 26 0500 -4 Common Work Results For Electrical JE Project#5133 M. Underground, Exterior-Wall Penetrations: Install cast-iron pipe sleeves. Size sleeves to allow for 1-inch annular clear space between raceway or cable and sleeve for installing mechanical sleeve seals. 3.03 SLEEVE-SEAL INSTALLATION A. Install to seal exterior wall penetrations. B. Use type and number of sealing elements recommended by manufacturer for raceway or cable material and size. Position raceway or cable in center of sleeve. Assemble mechanical sleeve seals and install in annular space between raceway or cable and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal. 3.04 FIRESTOPPING A. Apply firestopping to penetrations of fire-rated floor and wall assemblies for electrical installations to restore original fire-resistance rating of assembly. Firestopping materials and installation requirements are specified in Division 07 Section "Penetration Firestopping." END OF SECTION 260500 26 0500 Rosehill Park 26 0500 - 5 Common Work Results For Electrical JE Project#5133 SECTION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 GENERAL 1.01 SECTION INCLUDES A. Single conductor building wire. B. Wiring connectors. C. Electrical tape. D. Heat shrink tubing. E. Oxide inhibiting compound. F. Wire pulling lubricant. G. Cable ties. 1.02 RELATED REQUIREMENTS A. Section 07 8400- Firestopping. B. Section 26 0526-Grounding and Bonding for Electrical Systems: Additional requirements for grounding conductors and grounding connectors. C. Section 26 0553- Identification for Electrical Systems: Identification products and requirements. D. Section 31 2316- Excavation. E. Section 31 2323- Fill: Bedding and backfilling. 1.03 REFERENCE STANDARDS A. ASTM B3-Standard Specification for Soft or Annealed Copper Wire; 2013. B. ASTM B8-Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft; 2011. C. ASTM B33-Standard Specification for Tin-Coated Soft or Annealed Copper Wire for Electrical Purposes; 2010 (Reapproved 2014). D. ASTM B787/B787M -Standard Specification for 19 Wire Combination Unilay-Stranded Copper Conductors for Subsequent Insulation; 2004 (Reapproved 2014). Rosehill Park 26 0519 - 1 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 E. ASTM D3005-Standard Specification for Low-Temperature Resistant Vinyl Chloride Plastic Pressure-Sensitive Electrical Insulating Tape; 2010. F. ASTM D4388-Standard Specification for Nonmetallic Semi-Conducting and Electrically Insulating Rubber Tapes; 2013. G. NECA 1 -Standard for Good Workmanship in Electrical Construction; 2010. H. NEMA WC 70 - Nonshielded Power Cable 2000 V or Less for the Distribution of Electrical Energy; 2009. I. NETA ATS -Acceptance Testing Specifications for Electrical Power Equipment and Systems; 2013. J. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. K. UL 44 -Thermoset-Insulated Wires and Cables; Current Edition, Including All Revisions. L. UL 83-Thermoplastic-Insulated Wires and Cables; Current Edition, Including All Revisions. M. UL 486A-486B -Wire Connectors; Current Edition, Including All Revisions. N. UL 486C- Splicing Wire Connectors; Current Edition, Including All Revisions. O. UL 486D - Sealed Wire Connector Systems; Current Edition, Including All Revisions. P. UL 510- Polyvinyl Chloride, Polyethylene, and Rubber Insulating Tape; Current Edition, Including All Revisions. 1.04 SUBMITTALS A. See Section 01 3000-Administrative Requirements, for submittal procedures. B. Product Data: Provide manufacturer's standard catalog pages and data sheets for conductors and cables, including detailed information on materials, construction, ratings, listings, and available sizes, configurations, and stranding. C. Qualification Data: For testing agency. D. Field quality-control test reports. 1.05 QUALITY ASSURANCE A. Conform to requirements of NFPA 70. Rosehill Park 26 0519 -2 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 B. Testing Agency Qualifications: An independent agency, with the experience and capability to conduct the testing indicated, that is a member company of the InterNational Electrical Testing Association or is a nationally recognized testing laboratory (NRTL) as defined by OSHA in 29 CFR 1910.7, and that is acceptable to authorities having jurisdiction. 1. Testing Agency's Field Supervisor: Person currently certified by the InterNational Electrical Testing Association or the National Institute for Certification in Engineering Technologies to supervise on-site testing specified in Part 3. C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. 1.06 DELIVERY, STORAGE,AND HANDLING A. Receive, inspect, handle, and store conductors and cables in accordance with manufacturer's instructions. 1.07 COORDINATION A. Set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed. PART 2 PRODUCTS 2.01 CONDUCTOR AND CABLE APPLICATIONS A. Do not use conductors and cables for applications other than as permitted by NFPA 70 and product listing. B. Provide single conductor building wire installed in suitable raceway unless otherwise indicated, permitted, or required. C. Nonmetallic-sheathed cable is not permitted. D. Underground feeder and branch-circuit cable is not permitted. E. Service entrance cable is not permitted. F. Armored cable is not permitted. G. Metal-clad cable is not permitted. 2.02 CONDUCTOR AND CABLE GENERAL REQUIREMENTS A. Provide products that comply with requirements of NFPA 70. Rosehill Park 26 0519 - 3 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 B. Provide products listed, classified, and labeled as suitable for the purpose intended. C. Unless specifically indicated to be excluded, provide all required conduit, boxes, wiring, connectors, etc. as required for a complete operating system. D. Comply with NEMA WC 70. E. Thermoplastic-Insulated Conductors and Cables: Listed and labeled as complying with UL 83. F. Thermoset-Insulated Conductors and Cables: Listed and labeled as complying with UL 44. G. Conductor Material: 1. Provide copper conductors only. Aluminum conductors are not acceptable for this project. Conductor sizes indicated are based on copper. 2. Copper Conductors: Soft drawn annealed, 98 percent conductivity, uncoated copper conductors complying with ASTM B3,ASTM B8, or ASTM B787/B787M unless otherwise indicated. 3. Tinned Copper Conductors: Comply with ASTM B33. H. Conductor Color Coding: 1. Color code conductors as indicated unless otherwise required by the authority having jurisdiction. Maintain consistent color coding throughout project. 2. Color Coding Method: Integrally colored insulation. 3. Color Code: a. 480Y/277 V, 3 Phase, 4 Wire System: 1) Phase A: Brown. 2) Phase B: Purple. 3) Phase C: Yellow. 4) Neutral/Grounded: Gray. b. 208Y/120 V, 3 Phase, 4 Wire System: 1) Phase A: Black. 2) Phase B: Red. Rosehill Park 26 0519 -4 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 3) Phase C: Blue. 4) Neutral/Grounded: White. c. Equipment Ground, All Systems: Green. 2.03 SINGLE CONDUCTOR BUILDING WIRE A. Manufacturers: 1. Copper Building Wire: a. Alcan Products Corporation; Alcan Cable Division. b. American Insulated Wire Corp.; a Leviton Company. c. General Cable Corporation. d. Senator Wire&Cable Company. e. Southwire Company. B. Description: Single conductor insulated wire. C. Conductor Stranding: 1. Feeders and Branch Circuits: a. Size 10 AWG and Smaller: Solid. b. Size 8 AWG and Larger: Stranded. D. Insulation Voltage Rating: 600 V. E. Insulation: 1. Copper Building Wire: Type THHN/THWN or THHN/THWN-2, except as indicated below. 2.04 WIRING CONNECTORS A. Manufacturers 1. AFC Cable Systems, Inc. 2. Hubbell Power Systems, Inc. 3. O-Z/Gedney; EGS Electrical Group LLC. Rosehill Park 26 0519 -5 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 4. 3M; Electrical Products Division. 5. Tyco Electronics Corp. B. Description: Wiring connectors appropriate for the application, suitable for use with the conductors to be connected, and listed as complying with UL 486A-486B or UL 486C as applicable. C. Connectors for Grounding and Bonding: Comply with Section 26 0526. D. Wiring Connectors for Splices and Taps: 1. Copper Conductors Size 8 AWG and Smaller: Use twist-on insulated spring connectors. 2. Copper Conductors Size 6 AWG and Larger: Use mechanical connectors or compression connectors. E. Wiring Connectors for Terminations: 1. Provide terminal lugs for connecting conductors to equipment furnished with terminations designed for terminal lugs. 2. Provide compression adapters for connecting conductors to equipment furnished with mechanical lugs when only compression connectors are specified. 3. Where over-sized conductors are larger than the equipment terminations can accommodate, provide connectors suitable for reducing to appropriate size, but not less than required for the rating of the overcurrent protective device. 4. Provide motor pigtail connectors for connecting motor leads in order to facilitate disconnection. 5. Copper Conductors Size 8 AWG and Larger: Use compression connectors where connectors are required. 6. Stranded Conductors Size 10 AWG and Smaller: Use crimped terminals for connections to terminal screws. 7. Conductors for Control Circuits: Use crimped terminals for all connections. F. Twist-on Insulated Spring Connectors: Rated 600 V, 221 degrees F for standard applications and 302 degrees F for high temperature applications; pre-filled with sealant and listed as complying with UL 486D for damp and wet locations. G. Mechanical Connectors: Provide bolted type. Rosehill Park 26 0519 -6 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 H. Compression Connectors: Provide circumferential type or hex type crimp configuration. 1. Manufacturers: I. Crimped Terminals: Nylon-insulated,with insulation grip and terminal configuration suitable for connection to be made. 2.05 SLEEVE SEALS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Advance Products&Systems, Inc. 2. Calpico, Inc. 3. Metraflex Co. 4. Pipeline Seal and Insulator, Inc. B. Description: Modular sealing device, designed for field assembly, to fill annular space between sleeve and cable. 1. Sealing Elements: EPDM interlocking links shaped to fit surface of cable or conduit. Include type and number required for material and size of raceway or cable. 2. Pressure Plates: Carbon steel. Include two for each sealing element. 3. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating of length required to secure pressure plates to sealing elements. Include one for each sealing element. 2.06 WIRING ACCESSORIES A. Electrical Tape: 1. Vinyl Insulating Electrical Tape: Complying with ASTM D3005 and listed as complying with UL 510; minimum thickness of 7 mil; resistant to abrasion, corrosion, and sunlight; conformable for application down to 0 degrees F and suitable for continuous temperature environment up to 221 degrees F. 2. Rubber Splicing Electrical Tape: Ethylene Propylene Rubber(EPR)tape, complying with ASTM D4388; minimum thickness of 30 mil; suitable for continuous temperature environment up to 194 degrees F and short-term 266 degrees F overload service. Rosehill Park 26 0519 -7 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 3. Electrical Filler Tape: Rubber-based insulating moldable putty, minimum thickness of 125 mil; suitable for continuous temperature environment up to 176 degrees F. 4. Varnished Cambric Electrical Tape: Cotton cambric fabric tape, with or without adhesive, oil-primed and coated with high-grade insulating varnish; minimum thickness of 7 mil; suitable for continuous temperature environment up to 221 degrees F. 5. Moisture Sealing Electrical Tape: Insulating mastic compound laminated to flexible, all-weather vinyl backing; minimum thickness of 90 mil. B. Heat Shrink Tubing: Heavy-wall, split-resistant,with factory-applied adhesive; rated 600 V; suitable for direct burial applications; listed as complying with UL 486D. C. Oxide Inhibiting Compound: Listed; suitable for use with the conductors or cables to be installed. D. Wire Pulling Lubricant: Listed; suitable for use with the conductors or cables to be installed and suitable for use at the installation temperature. E. Cable Ties: Material and tensile strength rating suitable for application. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that interior of building has been protected from weather. B. Verify that work likely to damage wire and cable has been completed. C. Verify that raceways, boxes, and equipment enclosures are installed and are properly sized to accommodate conductors and cables in accordance with NFPA 70. D. Verify that field measurements are as indicated. E. Verify that conditions are satisfactory for installation prior to starting work. 3.02 PREPARATION A. Clean raceways thoroughly to remove foreign materials before installing conductors and cables. 3.03 INSTALLATION A. Circuiting Requirements: Rosehill Park 26 0519 -8 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 1. Unless dimensioned, circuit routing indicated is diagrammatic. 2. When circuit destination is indicated without specific routing, determine exact routing required. 3. Arrange circuiting to minimize splices. 4. Include circuit lengths required to install connected devices within 10 ft of location indicated. 5. Maintain separation of Class 1, Class 2, and Class 3 remote-control, signaling, and power-limited circuits in accordance with NFPA 70. 6. Maintain separation of wiring for emergency systems in accordance with NFPA 70. 7. Circuiting Adjustments: Unless otherwise indicated, when branch circuits are indicated as separate, combining them together in a single raceway is not permitted. a. Provide no more than six current-carrying conductors in a single raceway. Dedicated neutral conductors are considered current-carrying conductors. b. Increase size of conductors as required to account for ampacity derating. c. Size raceways, boxes, etc.to accommodate conductors. 8. Common Neutrals: Unless otherwise indicated, sharing of neutral/grounded conductors among up to three single phase branch circuits of different phases installed in the same raceway is not permitted. Provide dedicated neutral/grounded conductor for each individual branch circuit. 9. Provide oversized neutral/grounded conductors where indicated and as specified below. a. Provide 200 percent rated neutral for feeders fed from K-rated transformers. b. Provide 200 percent rated neutral for feeders serving panelboards with 200 percent rated neutral bus. B. Install products in accordance with manufacturer's instructions. C. Perform work in accordance with NECA 1 (general workmanship). D. Installation in Raceway: Rosehill Park 26 0519 -9 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 1. Tape ends of conductors and cables to prevent infiltration of moisture and other contaminants. 2. Pull all conductors and cables together into raceway at same time. 3. Do not damage conductors and cables or exceed manufacturer's recommended maximum pulling tension and sidewall pressure. 4. Use suitable wire pulling lubricant where necessary, except when lubricant is not recommended by the manufacturer. E. Direct Burial Cable Installation: 1. Provide trenching and backfilling in accordance with Sections 31 2316 and 31 2323. 2. Protect cables from damage in accordance with NFPA 70. 3. Provide underground warning tape in accordance with Section 26 0553 along entire cable length. F. Paralleled Conductors: Install conductors of the same length and terminate in the same manner. G. Secure and support conductors and cables in accordance with NFPA 70 using suitable supports and methods approved by the authority having jurisdiction. Provide independent support from building structure. Do not provide support from raceways, piping, ductwork, or other systems. H. Install conductors with a minimum of 12 inches of slack at each outlet. I. Neatly train and bundle conductors inside boxes, wireways, panelboards and other equipment enclosures. J. Group or otherwise identify neutral/grounded conductors with associated ungrounded conductors inside enclosures in accordance with NFPA 70. K. Make wiring connections using specified wiring connectors. 1. Make splices and taps only in accessible boxes. Do not pull splices into raceways or make splices in conduit bodies or wiring gutters. 2. Remove appropriate amount of conductor insulation for making connections without cutting, nicking or damaging conductors. 3. Do not remove conductor strands to facilitate insertion into connector. Rosehill Park 26 0519 - 10 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 4. Clean contact surfaces on conductors and connectors to suitable remove corrosion, oxides, and other contaminates. Do not use wire brush on plated connector surfaces. 5. Mechanical Connectors: Secure connections according to manufacturer's recommended torque settings. 6. Compression Connectors: Secure connections using manufacturer's recommended tools and dies. L. Insulate splices and taps that are made with uninsulated connectors using methods suitable for the application, with insulation and mechanical strength at least equivalent to unspliced conductors. 1. Dry Locations: Use insulating covers specifically designed for the connectors, electrical tape, or heat shrink tubing. a. For taped connections, first apply adequate amount of rubber splicing electrical tape or electrical filler tape, followed by outer covering of vinyl insulating electrical tape. b. For taped connections likely to require re-entering, including motor leads, first apply varnished cambric electrical tape, followed by adequate amount of rubber splicing electrical tape,followed by outer covering of vinyl insulating electrical tape. 2. Damp Locations: Use insulating covers specifically designed for the connectors, electrical tape, or heat shrink tubing. a. For connections with insulating covers, apply outer covering of moisture sealing electrical tape. b. For taped connections, follow same procedure as for dry locations but apply outer covering of moisture sealing electrical tape. M. Insulate ends of spare conductors using vinyl insulating electrical tape. N. Install firestopping to preserve fire resistance rating of partitions and other elements, using materials and methods specified in Section 07 8400. O. Unless specifically indicated to be excluded, provide final connections to all equipment and devices, including those furnished by others, as required for a complete operating system. Rosehill Park 26 0519 - 11 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 3.04 FIELD QUALITY CONTROL A. See Section 01 4000- Quality Requirements, for additional requirements. B. Inspect and test in accordance with NETA ATS, except Section 4. C. Perform inspections and tests listed in NETA ATS, Section 7.3.2. The insulation resistance test is required for all conductors. The resistance test for parallel conductors listed as optional is not required. D. Correct deficiencies and replace damaged or defective conductors and cables. END OF SECTION 26 0519 Rosehill Park 26 0519 - 12 Low-Voltage Electrical Power Conductors and Cables JE Project#5133 SECTION 26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Grounding and bonding requirements. B. Conductors for grounding and bonding. C. Connectors for grounding and bonding. D. Ground bars. E. Ground rod electrodes. F. Ground plate electrodes. 1.02 RELATED REQUIREMENTS A. Section 26 0500 - Electrical Common Work Results B. Section 26 0519- Low-Voltage Electrical Power Conductors and Cables: Additional requirements for conductors for grounding and bonding, including conductor color coding. C. Section 26 0553- Identification for Electrical Systems: Identification products and requirements. D. Section 26 4113- Lightning Protection for Structures. 1.03 REFERENCE STANDARDS A. NECA 1 -Standard for Good Workmanship in Electrical Construction; 2010. B. NEMA GR 1 -Grounding Rod Electrodes and Grounding Rod Electrode Couplings; 2007. C. NETA ATS-Acceptance Testing Specifications for Electrical Power Equipment and Systems; 2013. D. NFPA 70- National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. E. NFPA 780 -Standard for the Installation of Lightning Protection Systems; 2014. F. UL 467-Grounding and Bonding Equipment; Current Edition, Including All Revisions. Rosehill Park 26 0526 - 1 Grounding and Bonding for Electrical Systems JE Project#5133 1.04 SUBMITTALS A. See Section 01 3000-Administrative Requirements for submittals procedures. B. Product Data: Provide manufacturer's standard catalog pages and data sheets for grounding and bonding system components. C. Field quality control test reports. D. Operation and Maintenance Data: For grounding to include the following in emergency, operation, and maintenance manuals: 1. Tests shall be to determine if ground resistance or impedance values remain within specified maximums, and instructions shall recommend corrective action if they do not. 2. Include recommended testing intervals. E. Qualification Data: For testing agency and testing agency's field supervisor 1.05 QUALITY ASSURANCE A. Conform to requirements of NFPA 70. B. Testing Agency Qualifications: An independent agency, with the experience and capability to conduct the testing indicated, that is a member company of the InterNational Electrical Testing Association or is a nationally recognized testing laboratory(NRTL)as defined by OSHA in 29 CFR 1910.7, and that is acceptable to authorities having jurisdiction. 1. Testing Agency's Field Supervisor: Person currently certified by the InterNational Electrical Testing Association to supervise on-site testing specified in Part 3. C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. D. Comply with UL 467 for grounding and bonding materials and equipment. 1.06 DELIVERY, STORAGE,AND HANDLING A. Receive, inspect, handle, and store products in accordance with manufacturer's instructions. Rosehill Park 26 0526 -2 Grounding and Bonding for Electrical Systems JE Project#5133 PART 2 PRODUCTS 2.01 GROUNDING AND BONDING REQUIREMENTS A. Do not use products for applications other than as permitted by NFPA 70 and product listing. B. Unless specifically indicated to be excluded, provide all required components, conductors, connectors, conduit, boxes,fittings, supports, accessories, etc. as necessary for a complete grounding and bonding system. C. Where conductor size is not indicated, size to comply with NFPA 70, but not less than applicable minimum size requirements specified. D. Grounding Electrode System: 1. Provide connection to required and supplemental grounding electrodes indicated to form grounding electrode system. a. Provide continuous grounding electrode conductors without splice or joint. b. Install grounding electrode conductors in raceway where exposed to physical damage. Bond grounding electrode conductor to metallic raceways at each end with bonding jumper. 2. Metal Underground Water Pipe(s): a. Provide connection to underground metal domestic and fire protection (where present)water service pipe(s)that are in direct contact with earth for at least 10 feet at an accessible location not more than 5 feet from the point of entrance to the building. b. Provide bonding jumper(s)around insulating joints/pipes as required to make pipe electrically continuous. c. Provide bonding jumper around water meter of sufficient length to permit removal of meter without disconnecting jumper. 3. Metal In-Ground Support Structure: a. Provide connection to metal in-ground support structure that is in direct contact with earth in accordance with NFPA 70. 4. Concrete-Encased Electrode: a. Provide connection to concrete-encased electrode consisting of not less than 20 feet of either steel reinforcing bars or bare copper conductor not smaller Rosehill Park 26 0526 -3 Grounding and Bonding for Electrical Systems JE Project#5133 than 4 AWG embedded within concrete foundation or footing that is in direct contact with earth in accordance with NFPA 70. 5. Ground Rod Electrode(s): a. Provide three electrodes in an equilateral triangle configuration unless otherwise indicated or required. b. Space electrodes not less than 10 feet from each other and any other ground electrode. E. Lightning Protection Systems, in Addition to Requirements of Section 26 4113: 1. Do not use grounding electrode dedicated for lightning protection system for component of building grounding electrode system provided under this section. 2. Provide bonding of building grounding electrode system provided under this section and lightning protection grounding electrode system in accordance with NFPA 70 and NFPA 780. 2.02 GROUNDING AND BONDING COMPONENTS A. General Requirements: 1. Provide products listed, classified, and labeled as suitable for the purpose intended. 2. Provide products listed and labeled as complying with UL 467 where applicable. B. Conductors for Grounding and Bonding, in Addition to Requirements of Section 26 0526: 1. Use insulated copper conductors unless otherwise indicated. a. Exceptions: 1) Use bare copper conductors where installed underground in direct contact with earth. 2) Use bare copper conductors where directly encased in concrete (not in raceway). C. Connectors for Grounding and Bonding: 1. Description: Connectors appropriate for the application and suitable for the conductors and items to be connected; listed and labeled as complying with UL 467. Rosehill Park 26 0526 -4 Grounding and Bonding for Electrical Systems JE Project#5133 2. Unless otherwise indicated, use exothermic welded connections for underground, concealed and other inaccessible connections. 3. Unless otherwise indicated, use mechanical connectors, compression connectors, or exothermic welded connections for accessible connections. 4. Manufacturers- Mechanical and Compression Connectors: a. Copper weld b. Cad weld D. Ground Bars: 1. Description: Copper rectangular ground bars with mounting brackets and insulators. 2. Size: As indicated. 3. Holes for Connections: As indicated or as required for connections to be made. E. Ground Rod Electrodes: 1. Comply with NEMA GR 1. 2. Material: Copper-bonded (copper-clad) steel. 3. Size: 3/4 inch diameter by 10 feet length, unless otherwise indicated. F. Ground Plate Electrodes: 1. Material: Copper. 2. Size: 24 by 24 by 1/4 inches, unless otherwise indicated. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that work likely to damage grounding and bonding system components has been completed. B. Verify that field measurements are as indicated. C. Verify that conditions are satisfactory for installation prior to starting work. Rosehill Park 26 0526 -5 Grounding and Bonding for Electrical Systems JE Project#5133 3.02 INSTALLATION A. Install products in accordance with manufacturer's instructions. B. Perform work in accordance with NECA 1 (general workmanship). C. Ground Rod Electrodes: Unless otherwise indicated, install ground rod electrodes vertically.Where encountered rock prohibits vertical installation, install at 45 degree angle or bury horizontally in trench at least 30 inches (750 mm)deep in accordance with NFPA 70 or install at 45 degree angle or bury horizontally in trench at least 30 inches(750 mm)deep in accordance with NFPA 70. D. Ground Plate Electrodes: Unless otherwise indicated, install ground plate electrodes at a depth of not less than 30 inches. E. Make grounding and bonding connections using specified connectors. 1. Remove appropriate amount of conductor insulation for making connections without cutting, nicking or damaging conductors. Do not remove conductor strands to facilitate insertion into connector. 2. Remove nonconductive paint, enamel, or similar coating at threads, contact points, and contact surfaces. 3. Exothermic Welds: Make connections using molds and weld material suitable for the items to be connected in accordance with manufacturer's recommendations. 4. Mechanical Connectors: Secure connections according to manufacturer's recommended torque settings. 5. Compression Connectors: Secure connections using manufacturer's recommended tools and dies. F. Identify grounding and bonding system components in accordance with Section 26 0553. 3.03 FIELD QUALITY CONTROL A. See Section 01 4000-Quality Requirements, for additional requirements. B. Inspect and test in accordance with NETA ATS except Section 4. C. Perform inspections and tests listed in NETA ATS, Section 7.13. D. Perform ground electrode resistance tests under normally dry conditions. Precipitation within the previous 48 hours does not constitute normally dry conditions. Rosehill Park 26 0526 -6 Grounding and Bonding for Electrical Systems JE Project#5133 E. Investigate and correct deficiencies where measured ground resistances do not comply with specified requirements. END OF SECTION 26 0526 Rosehill Park 26 0526 -7 Grounding and Bonding for Electrical Systems JE Project#5133 SECTION 26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Support and attachment requirements and components for equipment, conduit, cable, boxes, and other electrical work. 1.02 RELATED REQUIREMENTS 1.03 REFERENCE STANDARDS A. ASTM A123/A123M - Standard Specification for Zinc(Hot-Dip Galvanized) Coatings on Iron and Steel Products; 2015. B. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip)on Iron and Steel Hardware; 2009. C. ASTM B633 - Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel; 2013. D. MFMA-4 - Metal Framing Standards Publication; 2004. E. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2010. F. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. 1.04 SUBMITTALS A. See Section 01 3000-Administrative Requirements, for submittal procedures. B. Product Data: Provide manufacturer's standard catalog pages and data sheets for channel (strut)framing systems, non-penetrating rooftop supports, and post-installed concrete and masonry anchors. 1.05 QUALITY ASSURANCE A. Comply with NFPA 70. B. Comply with applicable building code. 1.06 DELIVERY, STORAGE, AND HANDLING A. Receive, inspect, handle, and store products in accordance with manufacturer's instructions. Rosehill Park 26 0529 - 1 Hangers and Supports for Electrical Systems JE Project#5133 PART 2 PRODUCTS 2.01 SUPPORT AND ATTACHMENT COMPONENTS A. General Requirements: 1. Provide all required hangers, supports, anchors, fasteners, fittings, accessories, and hardware as necessary for the complete installation of electrical work. 2. Provide products listed, classified, and labeled as suitable for the purpose intended,where applicable. 3. Where support and attachment component types and sizes are not indicated, select in accordance with manufacturer's application criteria as required for the load to be supported with a minimum safety factor of . Include consideration for vibration, equipment operation, and shock loads where applicable. 4. Do not use products for applications other than as permitted by NFPA 70 and product listing. 5. Do not use wire, chain, perforated pipe strap, or wood for permanent supports unless specifically indicated or permitted. 6. Steel Components: Use corrosion resistant materials suitable for the environment where installed. a. Zinc-Plated Steel: Electroplated in accordance with ASTM B633. b. Galvanized Steel: Hot-dip galvanized after fabrication in accordance with ASTM A123/A123M or ASTM A153/A153M. B. Conduit and Cable Supports: Straps, clamps, etc. suitable for the conduit or cable to be supported. 1. Conduit Straps: One-hole or two-hole type; steel. 2. Conduit Clamps: Bolted type unless otherwise indicated. 3. Manufacturers: a. Allied Tube&Conduit. b. Cooper B-Line, Inc.; a division of Cooper Industries. c. ERICO International Corporation. d. GS Metals Corp. Rosehill Park 26 0529 -2 Hangers and Supports for Electrical Systems JE Project#5133 e. Thomas & Betts Corporation. f. Unistrut; Tyco International, Ltd. g. Wesanco, Inc. C. Outlet Box Supports: Hangers, brackets, etc. suitable for the boxes to be supported. D. Metal Channel (Strut) Framing Systems: Factory-fabricated continuous-slot metal channel (strut)and associated fittings, accessories, and hardware required for field- assembly of supports. 1. Comply with MFMA-4. E. Hanger Rods: Threaded zinc-plated steel unless otherwise indicated. F. Non-Penetrating Rooftop Supports for Low-Slope Roofs: Steel pedestals with thermoplastic or rubber bases that rest on top of roofing membrane, not requiring any attachment to the roof structure and not penetrating the roofing assembly, with support fixtures as specified. 1. Base Sizes: As required to distribute load sufficiently to prevent indentation of roofing assembly. 2. Attachment/Support Fixtures: As recommended by manufacturer, same type as indicated for equivalent indoor hangers and supports. 3. Mounting Height: Provide minimum clearance of 6 inches under supported component to top of roofing. 4. Manufacturers: a. PHP Systems/Design: www.phpsd.com/#sle. b. Unistrut, a brand of Atkore International Inc: www.unistrut.com/#sle. G. Anchors and Fasteners: 1. Unless otherwise indicated and where not otherwise restricted, use the anchor and fastener types indicated for the specified applications. 2. Concrete: Use preset concrete inserts, expansion anchors, or screw anchors. 3. Solid or Grout-Filled Masonry: Use expansion anchors or screw anchors. 4. Steel: Use beam clamps, machine bolts, or welded threaded studs. 5. Powder-actuated fasteners are not permitted. Rosehill Park 26 0529 -3 Hangers and Supports for Electrical Systems JE Project#5133 a. Use only threaded studs; do not use pins. 6. Preset Concrete Inserts: Continuous metal channel (strut)and spot inserts specifically designed to be cast in concrete ceilings, walls, and floors. a. Comply with MFMA-4. b. Channel Material: Use galvanized steel. c. Minimum Channel Thickness: Steel sheet, 12 gage, 0.1046 inch minimum base metal thickness. d. Manufacturer: Same as manufacturer of metal channel (strut)framing system. 7. Manufacturers- Mechanical Anchors: a. Hilti, Inc: www.us.hilti.com/#sle. b. ITW Red Head, a division of Illinois Tool Works, Inc: www.itwredhead.com/#sle. c. Powers Fasteners, Inc: www.powers.com/#sle. d. Simpson Strong-Tie Company Inc: www.strongtie.com/#sle. 8. Manufacturers- Powder-Actuated Fastening Systems: a. Hilti, Inc: www.us.hilti.com/#sle. b. ITW Ramset, a division of Illinois Tool Works, Inc: www.ramset.com/#sle. c. Simpson Strong-Tie Company Inc: www.strongtie.com/#sle. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field measurements are as indicated. B. Verify that mounting surfaces are ready to receive support and attachment components. C. Verify that conditions are satisfactory for installation prior to starting work. 3.02 INSTALLATION A. Install products in accordance with manufacturer's instructions. Rosehill Park 26 0529 -4 Hangers and Supports for Electrical Systems JE Project#5133 B. Perform work in accordance with NECA 1 (general workmanship). C. Provide independent support from building structure. Do not provide support from piping, ductwork, or other systems. D. Unless specifically indicated or approved by Architect, do not provide support from suspended ceiling support system or ceiling grid. E. Unless specifically indicated or approved by Architect, do not provide support from roof deck. F. Do not penetrate or otherwise notch or cut structural members without approval of Structural Engineer. G. Equipment Support and Attachment: 1. Use metal fabricated supports or supports assembled from metal channel (strut) to support equipment as required. 2. Use metal channel (strut)secured to studs to support equipment surface-mounted on hollow stud walls when wall strength is not sufficient to resist pull-out. 3. Use metal channel (strut)to support surface-mounted equipment in wet or damp locations to provide space between equipment and mounting surface. 4. Securely fasten floor-mounted equipment. Do not install equipment such that it relies on its own weight for support. H. Preset Concrete Inserts: Use manufacturer provided closure strips to inhibit concrete seepage during concrete pour. I. Secure fasteners according to manufacturer's recommended torque settings. J. Remove temporary supports. 3.03 FIELD QUALITY CONTROL A. See Section 01 4000- Quality Requirements, for additional requirements. B. Inspect support and attachment components for damage and defects. C. Repair cuts and abrasions in galvanized finishes using zinc-rich paint recommended by manufacturer. Replace components that exhibit signs of corrosion. Rosehill Park 26 0529 -5 Hangers and Supports for Electrical Systems JE Project#5133 D. Correct deficiencies and replace damaged or defective support and attachment components. END OF SECTION 26 0529 Rosehill Park 26 0529 -6 Hangers and Supports for Electrical Systems JE Project#5133 SECTION 26 0533.13 CONDUIT FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Galvanized steel rigid metal conduit(RMC). B. Aluminum rigid metal conduit(RMC). C. Intermediate metal conduit(IMC). D. PVC-coated galvanized steel rigid metal conduit(RMC). E. Flexible metal conduit(FMC). F. Liquidtight flexible metal conduit(LFMC). G. Electrical metallic tubing (EMT). H. Rigid polyvinyl chloride (PVC)conduit. I. Electrical nonmetallic tubing (ENT). J. Liquidtight flexible nonmetallic conduit(LFNC). K. Conduit fittings. L. Accessories. 1.02 RELATED REQUIREMENTS A. Section 03 3000-Cast-in-Place Concrete: Concrete encasement of conduits. B. Section 07 8400- Firestopping. C. Section 26 0526-Grounding and Bonding for Electrical Systems. D. Section 26 0529- Hangers and Supports for Electrical Systems. E. Section 31 2316- Excavation. F. Section 31 2323- Fill: Bedding and backfilling. 1.03 REFERENCE STANDARDS A. ANSI C80.1 -American National Standard for Electrical Rigid Steel Conduit(ERSC); 2005. Rosehill Park 26 0533.13 - 1 Conduit for Electrical Systems JE Project#5133 B. ANSI C80.3 -American National Standard for Steel Electrical Metallic Tubing (EMT); 2005. C. ANSI C80.6-American National Standard for Electrical Intermediate Metal Conduit (EIMC); 2005. D. NECA 1 -Standard for Good Workmanship in Electrical Construction; 2010. E. NECA 101 - Standard for Installing Steel Conduits (Rigid, IMC, EMT); 2013. F. NECA 111 -Standard for Installing Nonmetallic Raceways(RNC, ENT, LFNC); 2003. G. NEMA FB 1 - Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing, and Cable; 2012. H. NEMA RN 1 - Polyvinyl-Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit; 2005. I. NEMA TC 2- Electrical Polyvinyl Chloride (PVC)Conduit; 2013. J. NEMA TC 3- Polyvinyl Chloride (PVC) Fittings for Use with Rigid PVC Conduit and Tubing; 2015. K. NFPA 70- National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. L. UL 1 - Flexible Metal Conduit; Current Edition, Including All Revisions. M. UL 6- Electrical Rigid Metal Conduit-Steel; Current Edition, Including All Revisions. N. UL 360-Liquid-Tight Flexible Steel Conduit; Current Edition, Including All Revisions. O. UL 514E -Conduit, Tubing, and Cable Fittings; Current Edition, Including All Revisions. P. UL 651 -Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings; Current Edition, Including All Revisions. Q. UL 797- Electrical Metallic Tubing-Steel; Current Edition, Including All Revisions. R. UL 1203- Explosion-Proof and Dust-Ignition-Proof Electrical Equipment for Use in Hazardous (Classified) Locations; Current Edition, Including All Revisions. S. UL 1242 - Electrical Intermediate Metal Conduit-Steel; Current Edition, Including All Revisions. 1.04 SUBMITTALS A. See Section 01 3000-Administrative Requirements for submittals procedures. Rosehill Park 26 0533.13 -2 Conduit for Electrical Systems JE Project#5133 B. Product Data: Provide manufacturer's standard catalog pages and data sheets for conduits and fittings. 1.05 QUALITY ASSURANCE A. Conform to requirements of NFPA 70. 1.06 DELIVERY, STORAGE, AND HANDLING A. Receive, inspect, handle, and store conduit and fittings in accordance with manufacturer's instructions. PART 2 PRODUCTS 2.01 CONDUIT APPLICATIONS A. Do not use conduit and associated fittings for applications other than as permitted by NFPA 70 and product listing. B. Unless otherwise indicated and where not otherwise restricted, use the conduit types indicated for the specified applications. Where more than one listed application applies, comply with the most restrictive requirements. Where conduit type for a particular application is not specified, use galvanized steel rigid metal conduit. C. Underground: 1. Under Slab on Grade: Use galvanized steel rigid metal conduit, PVC-coated galvanized steel rigid metal conduit, or rigid PVC conduit. 2. Where rigid polyvinyl (PVC) conduit is provided, transition to galvanized steel rigid metal conduit where emerging from underground. 3. Where rigid polyvinyl (PVC) conduit larger than 2 inch (53 mm)trade size is provided, use galvanized steel rigid metal conduit elbows for bends. 4. Where steel conduit is installed in direct contact with earth where soil has a resistivity of less than 2000 ohm-centimeters or is characterized as severely corrosive based on soils report or local experience, use corrosion protection tape to provide supplementary corrosion protection or use PVC-coated galvanized steel rigid metal conduit. D. Concealed Within Masonry Walls: Use galvanized steel rigid metal conduit, intermediate metal conduit (IMC), or electrical metallic tubing (EMT). E. Concealed Within Hollow Stud Walls: Use electrical metallic tubing (EMT). F. Concealed Above Accessible Ceilings: Use electrical metallic tubing (EMT). Rosehill Park 26 0533.13 - 3 Conduit for Electrical Systems JE Project#5133 G. Interior, Damp or Wet Locations: Use galvanized steel rigid metal conduit. H. Exposed, Interior, Not Subject to Physical Damage: Use electrical metallic tubing (EMT). I. Exposed, Interior, Subject to Physical Damage: Use galvanized steel rigid metal conduit. 1. Locations subject to physical damage include, but are not limited to: a. Where exposed below 8 feet, except within electrical and communication rooms or closets. J. Exposed, Exterior: Use galvanized steel rigid metal conduit. K. Concealed, Exterior, Not Embedded in Concrete or in Contact With Earth: Use galvanized steel rigid metal conduit or intermediate metal conduit(IMC). L. Corrosive Locations Above Ground: Use PVC-coated galvanized steel rigid metal conduit, aluminum rigid metal conduit, or reinforced thermosetting resin conduit (RTRC). M. Hazardous (Classified) Locations: Use galvanized steel rigid metal conduit or PVC- coated galvanized steel rigid metal conduit. N. Connections to Luminaires Above Accessible Ceilings: Use flexible metal conduit. O. Connections to Vibrating Equipment: 1. Dry Locations: Use flexible metal conduit. 2. Damp, Wet, or Corrosive Locations: Use liquidtight flexible metal conduit. 3. Maximum Length: 6 feet unless otherwise indicated. 4. Vibrating equipment includes, but is not limited to: a. Transformers. b. Motors. P. Fished in Existing Walls, Where Necessary: Use flexible metal conduit. 2.02 CONDUIT REQUIREMENTS A. Existing Work: Where existing conduits are indicated to be reused, they may be reused only where they comply with specified requirements, are free from corrosion, and integrity is verified by pulling a mandrel through them. Rosehill Park 26 0533.13 -4 Conduit for Electrical Systems JE Project#5133 B. Provide all conduit, fittings, supports, and accessories required for a complete raceway system. C. Provide products listed, classified, and labeled as suitable for the purpose intended. D. Minimum Conduit Size, Unless Otherwise Indicated: 1. Branch Circuit Homeruns: 3/4 inch (21 mm)trade size. 2. Underground, Exterior: 1 inch (27 mm)trade size. E. Where conduit size is not indicated, size to comply with NFPA 70 but not less than applicable minimum size requirements specified. 2.03 GALVANIZED STEEL RIGID METAL CONDUIT (RMC) A. Manufacturers: 1. Allied Tube & Conduit: www.alliedeg.com/#sle. 2. Republic Conduit: www.republic-conduit.com/#sle. 3. Wheatland Tube, a Division of Zekelman Industries: www.wheatland.com/#sle. B. Description: NFPA 70, Type RMC galvanized steel rigid metal conduit complying with ANSI C80.1 and listed and labeled as complying with UL 6. C. Fittings: 1. Non-Hazardous Locations: Use fittings complying with NEMA FB 1 and listed and labeled as complying with UL 514B. 2. Material: Use steel or malleable iron. a. Do not use die cast zinc fittings. 3. Connectors and Couplings: Use threaded type fittings only. Threadless set screw and compression (gland) type fittings are not permitted. 2.04 INTERMEDIATE METAL CONDUIT (IMC) A. Manufacturers: 1. Allied Tube & Conduit: www.alliedeg.com/#sle. 2. Republic Conduit: www.republic-conduit.com/#sle. 3. Wheatland Tube, a Division of Zekelman Industries: www.wheatland.com/#sle. Rosehill Park 26 0533.13 - 5 Conduit for Electrical Systems JE Project#5133 B. Description: NFPA 70, Type IMC galvanized steel intermediate metal conduit complying with ANSI C80.6 and listed and labeled as complying with UL 1242. C. Fittings: 1. Non-Hazardous Locations: Use fittings complying with NEMA FB 1 and listed and labeled as complying with UL 514B. 2. Material: Use steel or malleable iron. a. Do not use die cast zinc fittings. 3. Connectors and Couplings: Use threaded type fittings only. Threadless set screw and compression (gland)type fittings are not permitted. 2.05 PVC-COATED GALVANIZED STEEL RIGID METAL CONDUIT(RMC) A. Manufacturers: 1. Thomas & Betts Corporation; : www.tnb.com/#sle. 2. Robroy Industries; : www.robroy.com/#sle. B. Description: NFPA 70, Type RMC galvanized steel rigid metal conduit with external polyvinyl chloride (PVC)coating complying with NEMA RN 1 and listed and labeled as complying with UL 6. C. Exterior Coating: Polyvinyl chloride (PVC), nominal thickness of 40 mil. D. PVC-Coated Fittings: 1. Manufacturer: Same as manufacturer of PVC-coated conduit to be installed. 2. Non-Hazardous Locations: Use fittings listed and labeled as complying with UL 514B. 3. Hazardous(Classified) Locations: Use fittings listed and labeled as complying with UL 1203 for the classification of the installed location. 4. Material: Use steel or malleable iron. 5. Exterior Coating: Polyvinyl chloride (PVC), minimum thickness of 40 mil. E. PVC-Coated Supports: Furnish with exterior coating of polyvinyl chloride (PVC), minimum thickness of 15 mil. Rosehill Park 26 0533.13 -6 Conduit for Electrical Systems JE Project#5133 2.06 FLEXIBLE METAL CONDUIT(FMC) A. Manufacturers: 1. AFC Cable Systems, Inc; : www.afcweb.com/#sle. 2. Electri-Flex Company; : www.electriflex.com/#sle. 3. International Metal Hose; : www.metalhose.com/#sle. B. Description: NFPA 70, Type FMC standard wall steel flexible metal conduit listed and labeled as complying with UL 1, and listed for use in classified firestop systems to be used. C. Fittings: 1. Description: Fittings complying with NEMA FB 1 and listed and labeled as complying with UL 514B. 2. Material: Use steel or malleable iron. 2.07 LIQUIDTIGHT FLEXIBLE METAL CONDUIT(LFMC) A. Manufacturers: 1. AFC Cable Systems, Inc; : www.afcweb.com/#sle. 2. Electri-Flex Company; : www.electriflex.com/#sle. 3. International Metal Hose; : www.metalhose.com/#sle. B. Description: NFPA 70, Type LFMC polyvinyl chloride (PVC)jacketed steel flexible metal conduit listed and labeled as complying with UL 360. C. Fittings: 1. Description: Fittings complying with NEMA FB 1 and listed and labeled as complying with UL 514B. 2. Material: Use steel or malleable iron. 2.08 ELECTRICAL METALLIC TUBING (EMT) A. Manufacturers: 1. Allied Tube &Conduit; : www.alliedeg.com/#sle. 2. Republic Conduit: www.republic-conduit.com/#sle. Rosehill Park 26 0533.13 -7 Conduit for Electrical Systems JE Project#5133 3. Wheatland Tube, a Division of Zekelman Industries; • www.wheatland.com/#sle. B. Description: NFPA 70, Type EMT steel electrical metallic tubing complying with ANSI C80.3 and listed and labeled as complying with UL 797. C. Fittings: 1. Description: Fittings complying with NEMA FB 1 and listed and labeled as complying with UL 514B. 2. Material: Use steel or malleable iron. a. Do not use die cast zinc fittings. 3. Connectors and Couplings: Use compression (gland)type. a. Do not use indenter type connectors and couplings. b. Do not use set-screw type connectors and couplings. 2.09 RIGID POLYVINYL CHLORIDE (PVC) CONDUIT A. Manufacturers: 1. Cantex Inc: www.cantexinc.com/#sle. 2. Carlon, a brand of Thomas&Betts Corporation: www.carlon.com/#sle. 3. JM Eagle: www.jmeagle.com/#sle. B. Description: NFPA 70, Type PVC rigid polyvinyl chloride conduit complying with NEMA TC 2 and listed and labeled as complying with UL 651; Schedule 40 unless otherwise indicated, Schedule 80 where subject to physical damage; rated for use with conductors rated 90 degrees C. C. Fittings: 1. Manufacturer: Same as manufacturer of conduit to be connected. 2. Description: Fittings complying with NEMA TC 3 and listed and labeled as complying with UL 651; material to match conduit. 2.10 ACCESSORIES A. Corrosion Protection Tape: PVC-based, minimum thickness of 20 mil. Rosehill Park 26 0533.13 -8 Conduit for Electrical Systems JE Project#5133 B. Conduit Joint Compound: Corrosion-resistant, electrically conductive; suitable for use with the conduit to be installed. C. Solvent Cement for PVC Conduit and Fittings: As recommended by manufacturer of conduit and fittings to be installed. D. Pull Strings: Use nylon cord with average breaking strength of not less than 200 pound- force. E. Sealing Compound for Sealing Fittings: Listed for use with the particular fittings to be installed. F. Modular Seals for Conduit Penetrations: Rated for minimum of 40 psig; Suitable for the conduits to be installed. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field measurements are as indicated. B. Verify that mounting surfaces are ready to receive conduits. C. Verify that conditions are satisfactory for installation prior to starting work. 3.02 INSTALLATION A. Install products in accordance with manufacturer's instructions. B. Perform work in accordance with NECA 1 (general workmanship). C. Install galvanized steel rigid metal conduit(RMC) in accordance with NECA 101. D. Install intermediate metal conduit(IMC) in accordance with NECA 101. E. Install PVC-coated galvanized steel rigid metal conduit(RMC) using only tools approved by the manufacturer. F. Install rigid polyvinyl chloride (PVC)conduit in accordance with NECA 111. G. Conduit Routing: 1. Unless dimensioned, conduit routing indicated is diagrammatic. 2. When conduit destination is indicated without specific routing, determine exact routing required. 3. Conceal all conduits unless specifically indicated to be exposed. Rosehill Park 26 0533.13 -9 Conduit for Electrical Systems JE Project#5133 4. Conduits in the following areas may be exposed, unless otherwise indicated: a. Electrical rooms. b. Mechanical equipment rooms. c. Within joists in areas with no ceiling. 5. Unless otherwise approved, do not route conduits exposed: a. Across floors. b. Across roofs. c. Across top of parapet walls. d. Across building exterior surfaces. 6. Conduits installed underground or embedded in concrete may be routed in the shortest possible manner unless otherwise indicated. Route all other conduits parallel or perpendicular to building structure and surfaces, following surface contours where practical. 7. Arrange conduit to maintain adequate headroom, clearances, and access. 8. Arrange conduit to provide no more than the equivalent of four 90 degree bends between pull points. 9. Arrange conduit to provide no more than 150 feet between pull points. 10. Route conduits above water and drain piping where possible. 11. Arrange conduit to prevent moisture traps. Provide drain fittings at low points and at sealing fittings where moisture may collect. 12. Maintain minimum clearance of 6 inches between conduits and piping for other systems. 13. Maintain minimum clearance of 12 inches between conduits and hot surfaces. This includes, but is not limited to: 14. Group parallel conduits in the same area together on a common rack. H. Conduit Support: 1. Secure and support conduits in accordance with NFPA 70 and Section 26 0529 using suitable supports and methods approved by the authority having jurisdiction. Rosehill Park 26 0533.13 - 10 Conduit for Electrical Systems JE Project#5133 2. Provide independent support from building structure. Do not provide support from piping, ductwork, or other systems. 3. Installation Above Suspended Ceilings: Do not provide support from ceiling support system. Do not provide support from ceiling grid or allow conduits to lay on ceiling tiles. 4. Use conduit strap to support single surface-mounted conduit. a. Use clamp back spacer with conduit strap for damp and wet locations to provide space between conduit and mounting surface. 5. Use metal channel (strut)with accessory conduit clamps to support multiple parallel surface-mounted conduits. 6. Use conduit clamp to support single conduit from beam clamp or threaded rod. 7. Use trapeze hangers assembled from threaded rods and metal channel (strut) with accessory conduit clamps to support multiple parallel suspended conduits. 8. Use non-penetrating rooftop supports to support conduits routed across rooftops (only where approved). 9. Use of spring steel conduit clips for support of conduits is not permitted. 10. Use of wire for support of conduits is not permitted. 11. Where conduit support intervals specified in NFPA 70 and NECA standards differ, comply with the most stringent requirements. I. Connections and Terminations: 1. Use approved zinc-rich paint or conduit joint compound on field-cut threads of galvanized steel conduits prior to making connections. 2. Where two threaded conduits must be joined and neither can be rotated, use three-piece couplings or split couplings. Do not use running threads. 3. Use suitable adapters where required to transition from one type of conduit to another. 4. Provide drip loops for liquidtight flexible conduit connections to prevent drainage of liquid into connectors. 5. Terminate threaded conduits in boxes and enclosures using threaded hubs or double lock nuts for dry locations and raintight hubs for wet locations. Rosehill Park 26 0533.13 - 11 Conduit for Electrical Systems JE Project#5133 6. Where spare conduits stub up through concrete floors and are not terminated in a box or enclosure, provide threaded couplings equipped with threaded plugs set flush with finished floor. 7. Provide insulating bushings or insulated throats at all conduit terminations to protect conductors. 8. Secure joints and connections to provide maximum mechanical strength and electrical continuity. J. Penetrations: 1. Do not penetrate or otherwise notch or cut structural members, including footings and grade beams, without approval of Structural Engineer. 2. Make penetrations perpendicular to surfaces unless otherwise indicated. 3. Provide sleeves for penetrations as indicated or as required to facilitate installation. Set sleeves flush with exposed surfaces unless otherwise indicated or required. 4. Conceal bends for conduit risers emerging above ground. 5. Seal interior of conduits entering the building from underground at first accessible point to prevent entry of moisture and gases. 6. Where conduits penetrate waterproof membrane, seal as required to maintain integrity of membrane. 7. Make penetrations for roof-mounted equipment within associated equipment openings and curbs where possible to minimize roofing system penetrations. Where penetrations are necessary, seal as indicated or as required to preserve integrity of roofing system and maintain roof warranty. Include proposed locations of penetrations and methods for sealing with submittals. 8. Install firestopping to preserve fire resistance rating of partitions and other elements, using materials and methods specified in Section 07 8400. K. Underground Installation: 1. Provide trenching and backfilling in accordance with Sections 31 2316 and 31 2323. L. Embedment Within Structural Concrete Slabs (only where approved by Structural Engineer): 1. Secure conduits to prevent floating or movement during pouring of concrete. Rosehill Park 26 0533.13 - 12 Conduit for Electrical Systems JE Project#5133 M. Concrete Encasement: Where conduits not otherwise embedded within concrete are indicated to be concrete-encased, provide concrete in accordance with Section 03 3000 with minimum concrete cover of 3 inches on all sides unless otherwise indicated. N. Hazardous(Classified) Locations: Where conduits cross boundaries of hazardous (classified) locations, provide sealing fittings located as indicated or in accordance with NFPA 70. O. Conduit Movement Provisions: Where conduits are subject to movement, provide expansion and expansion/deflection fittings to prevent damage to enclosed conductors or connected equipment. This includes, but is not limited to: 1. Where conduits cross structural joints intended for expansion, contraction, or deflection. 2. Where calculated in accordance with NFPA 70 for rigid polyvinyl chloride (PVC) conduit installed above ground to compensate for thermal expansion and contraction. 3. Where conduits are subject to earth movement by settlement or frost. P. Condensation Prevention: Where conduits cross barriers between areas of potential substantial temperature differential, provide sealing fitting or approved sealing compound at an accessible point near the penetration to prevent condensation. This includes, but is not limited to: 1. Where conduits pass from outdoors into conditioned interior spaces. 2. Where conduits pass from unconditioned interior spaces into conditioned interior spaces. Q. Provide grounding and bonding in accordance with Section 26 0526. 3.03 FIELD QUALITY CONTROL A. See Section 01 4000-Quality Requirements, for additional requirements. B. Repair cuts and abrasions in galvanized finishes using zinc-rich paint recommended by manufacturer. Replace components that exhibit signs of corrosion. C. Where coating of PVC-coated galvanized steel rigid metal conduit(RMC)contains cuts or abrasions, repair in accordance with manufacturer's instructions. D. Correct deficiencies and replace damaged or defective conduits. Rosehill Park 26 0533.13 - 13 Conduit for Electrical Systems JE Project#5133 3.04 CLEANING A. Clean interior of conduits to remove moisture and foreign matter. 3.05 PROTECTION A. Immediately after installation of conduit, use suitable manufactured plugs to provide protection from entry of moisture and foreign material and do not remove until ready for installation of conductors. END OF SECTION 26 0533.13 Rosehill Park 26 0533.13 - 14 Conduit for Electrical Systems JE Project#5133 SECTION 26 0533.16 BOXES FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Outlet and device boxes up to 100 cubic inches, including those used as junction and pull boxes. B. Cabinets and enclosures, including junction and pull boxes larger than 100 cubic inches. C. Floor boxes. 1.02 RELATED REQUIREMENTS A. Section 08 3100-Access Doors and Panels: Panels for maintaining access to concealed boxes. B. Section 26 0529- Hangers and Supports for Electrical Systems. C. Section 26 0533.13-Conduit for Electrical Systems: 1. Conduit bodies and other fittings. 2. Additional requirements for locating boxes to limit conduit length and/or number of bends between pulling points. D. Section 26 2726-Wiring Devices: 1. Wall plates. 2. Floor box service fittings. 1.03 REFERENCE STANDARDS A. NECA 1 -Standard for Good Workmanship in Electrical Construction; 2010. B. NECA 130 -Standard for Installing and Maintaining Wiring Devices; 2010. C. NEMA EN 10250- Enclosures for Electrical Equipment(1000 Volts Maximum); 2024. D. NEMA FB 1 - Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing, and Cable; 2012. E. NEMA OS 1 -Sheet-Steel Outlet Boxes, Device Boxes, Covers, and Box Supports; 2013. Rosehill Park 26 0533.16 - 1 Boxes for Electrical Systems JE Project#5133 F. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. G. UL 50- Enclosures for Electrical Equipment, Non-Environmental Considerations; Current Edition, Including All Revisions. H. UL 50E - Enclosures for Electrical Equipment, Environmental Considerations; Current Edition, Including All Revisions. I. UL 508A- Industrial Control Panels; Current Edition, Including All Revisions. J. UL 514A- Metallic Outlet Boxes; Current Edition, Including All Revisions. 1.04 SUBMITTALS A. See Section 01 3000-Administrative Requirements, for submittal procedures. B. Product Data: Provide manufacturer's standard catalog pages and data sheets for cabinets and enclosures, boxes for hazardous (classified) locations,floor boxes, and underground boxes/enclosures. 1.05 QUALITY ASSURANCE A. Conform to requirements of NFPA 70. 1.06 DELIVERY, STORAGE,AND HANDLING A. Receive, inspect, handle, and store products in accordance with manufacturer's instructions. PART 2 PRODUCTS 2.01 BOXES A. General Requirements: 1. Do not use boxes and associated accessories for applications other than as permitted by NFPA 70 and product listing. 2. Provide all boxes, fittings, supports, and accessories required for a complete raceway system and to accommodate devices and equipment to be installed. 3. Provide products listed, classified, and labeled as suitable for the purpose intended. 4. Where box size is not indicated, size to comply with NFPA 70 but not less than applicable minimum size requirements specified. Rosehill Park 26 0533.16 -2 Boxes for Electrical Systems JE Project#5133 5. Provide grounding terminals within boxes where equipment grounding conductors terminate. B. Outlet and Device Boxes Up to 100 cubic inches, Including Those Used as Junction and Pull Boxes: 1. Use sheet-steel boxes for dry locations unless otherwise indicated or required. 2. Use cast iron boxes or cast aluminum boxes for damp or wet locations unless otherwise indicated or required; furnish with compatible weatherproof gasketed covers. 3. Use suitable concrete type boxes where flush-mounted in concrete. 4. Use suitable masonry type boxes where flush-mounted in masonry walls. 5. Use raised covers suitable for the type of wall construction and device configuration where required. 6. Use shallow boxes where required by the type of wall construction. 7. Do not use "through-wall" boxes designed for access from both sides of wall. 8. Sheet-Steel Boxes: Comply with NEMA OS 1, and list and label as complying with UL 514A. 9. Cast Metal Boxes: Comply with NEMA FB 1, and list and label as complying with UL 514A; furnish with threaded hubs. 10. Boxes for Supporting Luminaires and Ceiling Fans: Listed as suitable for the type and weight of load to be supported; furnished with fixture stud to accommodate mounting of luminaire where required. 11. Boxes for Ganged Devices: Use multigang boxes of single-piece construction. Do not use field-connected gangable boxes unless specifically indicated or permitted. 12. Wall Plates: Comply with Section 26 2726. C. Cabinets and Enclosures, Including Junction and Pull Boxes Larger Than 100 cubic inches: 1. Comply with NEMA EN 10250, and list and label as complying with UL 50 and UL 50E, or UL 508A. 2. NEMA EN 10250 Environment Type, Unless Otherwise Indicated: 3. Junction and Pull Boxes Larger Than 100 cubic inches: Rosehill Park 26 0533.16 -3 Boxes for Electrical Systems JE Project#5133 a. Provide screw-cover or hinged-cover enclosures unless otherwise indicated. D. Floor Boxes: 1. Description: Floor boxes compatible with floor box service fittings provided in accordance with Section 26 2726; with partitions to separate multiple services; furnished with all components, adapters, and trims required for complete installation. 2. Manufacturer: Same as manufacturer of floor box service fittings. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field measurements are as indicated. B. Verify that mounting surfaces are ready to receive boxes. C. Verify that conditions are satisfactory for installation prior to starting work. 3.02 INSTALLATION A. Install products in accordance with manufacturer's instructions. B. Install boxes in accordance with NECA 1 (general workmanship)and, where applicable, NECA 130, including mounting heights specified in those standards where mounting heights are not indicated. C. Arrange equipment to provide minimum clearances in accordance with manufacturer's instructions and NFPA 70. D. Provide separate boxes for emergency power and normal power systems. E. Unless otherwise indicated, provide separate boxes for line voltage and low voltage systems. F. Flush-mount boxes in finished areas unless specifically indicated to be surface- mounted. G. Box Locations: 1. Locate boxes to be accessible. Provide access panels in accordance with Section 08 3100 as required where approved by the Architect. 2. Unless dimensioned, box locations indicated are approximate. 3. Locate boxes so that wall plates do not span different building finishes. Rosehill Park 26 0533.16 -4 Boxes for Electrical Systems JE Project#5133 4. Locate boxes so that wall plates do not cross masonry joints. 5. Unless otherwise indicated, where multiple outlet boxes are installed at the same location at different mounting heights, install along a common vertical center line. 6. Do not install flush-mounted boxes on opposite sides of walls back-to-back. Provide minimum 6 inches horizontal separation unless otherwise indicated. 7. Fire Resistance Rated Walls: Install flush-mounted boxes such that the required fire resistance will not be reduced. 8. Locate junction and pull boxes as indicated, as required to facilitate installation of conductors, and to limit conduit length and/or number of bends between pulling points in accordance with Section 26 0533.13. 9. Locate junction and pull boxes in the following areas, unless otherwise indicated or approved by the Architect: a. Concealed above accessible suspended ceilings. b. Within joists in areas with no ceiling. c. Electrical rooms. d. Mechanical equipment rooms. H. Box Supports: 1. Secure and support boxes in accordance with NFPA 70 and Section 26 0529 using suitable supports and methods approved by the authority having jurisdiction. 2. Provide independent support from building structure except for cast metal boxes (other than boxes used for fixture support)supported by threaded conduit connections in accordance with NFPA 70. Do not provide support from piping, ductwork, or other systems. 3. Installation Above Suspended Ceilings: Do not provide support from ceiling grid or ceiling support system. I. Install boxes plumb and level. J. Flush-Mounted Boxes: 1. Install boxes in noncombustible materials such as concrete, tile, gypsum, plaster, etc. so that front edge of box or associated raised cover is not set back from finished surface more than 1/4 inch or does not project beyond finished surface. Rosehill Park 26 0533.16 -5 Boxes for Electrical Systems JE Project#5133 2. Install boxes in combustible materials such as wood so that front edge of box or associated raised cover is flush with finished surface. 3. Repair rough openings around boxes in noncombustible materials such as concrete,tile, gypsum, plaster, etc. so that there are no gaps or open spaces greater than 1/8 inch at the edge of the box. K. Install boxes as required to preserve insulation integrity. L. Install permanent barrier between ganged wiring devices when voltage between adjacent devices exceeds 300 V. M. Install firestopping to preserve fire resistance rating of partitions and other elements, using materials and methods specified in Section 07 8400. N. Close unused box openings. O. Install blank wall plates on junction boxes and on outlet boxes with no devices or equipment installed or designated for future use. P. Provide grounding and bonding in accordance with Section 26 0526. 3.03 CLEANING A. Clean interior of boxes to remove dirt, debris, plaster and other foreign material. 3.04 PROTECTION A. Immediately after installation, protect boxes from entry of moisture and foreign material until ready for installation of conductors. END OF SECTION 26 0533.16 Rosehill Park 26 0533.16 -6 Boxes for Electrical Systems JE Project#5133 SECTION 26 0533.23 SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Surface raceway systems. B. Wireways. 1.02 RELATED REQUIREMENTS A. Section 26 0526-Grounding and Bonding for Electrical Systems. B. Section 26 0529- Hangers and Supports for Electrical Systems. 1.03 REFERENCE STANDARDS A. NECA 1 -Standard for Good Workmanship in Electrical Construction; 2010. B. NEMA EN 10250- Enclosures for Electrical Equipment(1000 Volts Maximum); 2024. C. NFPA 70- National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. D. UL 870-Wireways, Auxiliary Gutters, and Associated Fittings; Current Edition, Including All Revisions. 1.04 SUBMITTALS A. See Section 01 3000-Administrative Requirements, for submittal procedures. 1 B. Product Data: Provide manufacturer's standard catalog pages and data sheets including dimensions, knockout sizes and locations, materials, fabrication details, finishes, service condition requirements, and accessories. 1. Surface Raceway Systems: Include information on fill capacities for conductors and cables. 1.05 QUALITY ASSURANCE A. Conform to requirements of NFPA 70. 1.06 DELIVERY, STORAGE,AND HANDLING A. Receive, inspect, handle, and store products in accordance with manufacturer's instructions. Rosehill Park 26 0533.23 - 1 Surface Raceways for Electrical Systems JE Project#5133 PART 2 PRODUCTS 2.01 RACEWAY REQUIREMENTS A. Provide all components, fittings, supports, and accessories required for a complete raceway system. B. Provide products listed, classified, and labeled as suitable for the purpose intended. C. Do not use raceways for applications other than as permitted by NFPA 70 and product listing. 2.02 SURFACE RACEWAY SYSTEMS A. Manufacturers: 1. Cooper B-Line, Inc. 2. Hoffman. 3. Square D; Schneider Electric. 4. Allied 5. Triangle 6. Republic 7. Carlen 8. Wheatland 9. Centex 10. Western Tube 2.03 WIREWAYS A. Manufacturers: 1. Cooper B-Line, Inc. 2. Hoffman. 3. Square D; Schneider Electric. 4. Allied 5. Triangle Rosehill Park 26 0533.23 -2 Surface Raceways for Electrical Systems JE Project#5133 6. Republic 7. Carlen 8. Wheatland 9. Centex 10. Western Tube B. Description: Lay-in wireways and wiring troughs with removable covers; listed and labeled as complying with UL 870. C. Wireway Type, Unless Otherwise Indicated: 1. Indoor Clean, Dry Locations: NEMA EN 10250, Type 1, painted steel with screw- cover. D. Finish for Painted Steel Wireways: Manufacturer's standard grey unless otherwise indicated. E. Where wireway size is not indicated, size to comply with NFPA 70 but not less than applicable minimum size requirements specified. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field measurements are as indicated. B. Verify that outlet boxes and conduit terminations are installed in proper locations and are properly sized in accordance with NFPA 70 to accommodate raceways. C. Verify that mounting surfaces are ready to receive raceways and that final surface finishes are complete, including painting. D. Verify that conditions are satisfactory for installation prior to starting work. 3.02 INSTALLATION A. Install products in accordance with manufacturer's instructions. B. Perform work in accordance with NECA 1 (general workmanship). C. Install raceways plumb and level. Rosehill Park 26 0533.23 -3 Surface Raceways for Electrical Systems JE Project#5133 D. Arrange wireways and associated raceway connections to comply with NFPA 70, including but not limited to requirements for deflected conductors and wireways used as pullboxes. Increase size of wireway where necessary. E. Secure and support raceways in accordance with Section 26 0529 at intervals complying with NFPA 70 and manufacturer's requirements. F. Close unused raceway openings. G. Provide grounding and bonding in accordance with Section 26 0526. 3.03 PROTECTION A. Protect installed raceways from subsequent construction operations. END OF SECTION 26 0533.23 Rosehill Park 26 0533.23 -4 Surface Raceways for Electrical Systems JE Project#5133 SECTION 26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electrical identification requirements. B. Identification nameplates and labels. C. Wire and cable markers. D. Warning signs and labels. 1.02 RELATED REQUIREMENTS A. Section 26 0519- Low-Voltage Electrical Power Conductors and Cables: Color coding for power conductors and cables 600 V and less; vinyl color coding electrical tape. 1.03 REFERENCE STANDARDS A. ANSI Z535.2-American National Standard for Environmental and Facility Safety Signs; 2011. B. ANSI Z535.4-American National Standard for Product Safety Signs and Labels; 2011. C. NFPA 70- National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. D. UL 969- Marking and Labeling Systems; Current Edition, Including All Revisions. 1.04 SUBMITTALS A. See Section 01 3000-Administrative Requirements for submittals procedures. B. Product Data: Provide manufacturer's standard catalog pages and data sheets for each product. 1.05 QUALITY ASSURANCE A. Conform to requirements of NFPA 70. 1.06 FIELD CONDITIONS A. Do not install adhesive products when ambient temperature is lower than recommended by manufacturer. Rosehill Park 26 0553 - 1 Identification for Electrical Systems JE Project#5133 PART 2 PRODUCTS 2.01 IDENTIFICATION REQUIREMENTS A. Identification for Equipment: 1. Use identification nameplate to identify each piece of electrical distribution and control equipment and associated sections, compartments, and components. a. Switchboards: 1) Identify ampere rating. 2) Identify voltage and phase. 3) Identify power source and circuit number. Include location when not within sight of equipment. 4) Use identification nameplate to identify load(s)served for each branch device. Do not identify spares and spaces. b. Motor Control Centers: 1) Identify ampere rating. 2) Identify voltage and phase. 3) Identify power source and circuit number. Include location when not within sight of equipment. 4) Use identification nameplate to identify load(s)served for each branch device. Do not identify spares and spaces. c. Panelboards: 1) Identify power source and circuit number. Include location when not within sight of equipment. 2) Use typewritten circuit directory to identify load(s)served for panelboards with a door. Identify spares and spaces using pencil. 3) For power panelboards without a door, use identification nameplate to identify load(s)served for each branch device. Do not identify spares and spaces. d. Transformers: e. Transfer Switches: Rosehill Park 26 0553 -2 Identification for Electrical Systems JE Project#5133 1) Identify short circuit current rating based on the specific overcurrent protective device type and settings protecting the transfer switch. 2. Available Fault Current Documentation: Use identification label to identify the available fault current and date calculations were performed at locations requiring documentation by NFPA 70 including but not limited to the following. a. Service equipment. b. Industrial control panels. c. Motor control centers. d. Elevator control panels. e. Industrial machinery. B. Identification for Conductors and Cables: 1. Color Coding for Power Conductors 600 V and Less: Comply with Section 26 0519. 2. Use identification nameplate or identification label to identify color code for ungrounded and grounded power conductors inside door or enclosure at each piece of feeder or branch-circuit distribution equipment when premises has feeders or branch circuits served by more than one nominal voltage system. C. Identification for Raceways: 2.02 IDENTIFICATION NAMEPLATES AND LABELS A. Identification Nameplates: 1. Materials: a. Indoor Clean, Dry Locations: Use plastic nameplates. b. Outdoor Locations: Use plastic, stainless steel, or aluminum nameplates suitable for exterior use. 2. Plastic Nameplates: Two-layer or three-layer laminated acrylic or electrically non- conductive phenolic with beveled edges; minimum thickness of 1/16 inch; engraved text. a. Exception: Provide minimum thickness of 1/8 inch when any dimension is greater than 4 inches. Rosehill Park 26 0553 - 3 Identification for Electrical Systems JE Project#5133 3. Stainless Steel Nameplates: Minimum thickness of 1/32 inch; engraved or laser- etched text. 4. Aluminum Nameplates: Anodized; minimum thickness of 1/32 inch; engraved or laser-etched text. 5. Mounting Holes for Mechanical Fasteners: Two, centered on sides for sizes up to 1 inch high; Four, located at corners for larger sizes. B. Identification Labels: 1. Materials: Use self-adhesive laminated plastic labels; UV, chemical,water, heat, and abrasion resistant. 2. Text: Use factory pre-printed or machine-printed text. Do not use handwritten text unless otherwise indicated. 2.03 WIRE AND CABLE MARKERS A. Markers for Conductors and Cables: Use wrap-around self-adhesive vinyl cloth,wrap- around self-adhesive vinyl self-laminating, heat-shrink sleeve, plastic sleeve, plastic clip-on, or vinyl split sleeve type markers suitable for the conductor or cable to be identified. B. Markers for Conductor and Cable Bundles: Use plastic marker tags secured by nylon cable ties. C. Legend: Power source and circuit number or other designation indicated. D. Text: Use factory pre-printed or machine-printed text, all capitalized unless otherwise indicated. E. Minimum Text Height: 1/8 inch. F. Color: Black text on white background unless otherwise indicated. 2.04 WARNING SIGNS AND LABELS A. Comply with ANSI Z535.2 or ANSI Z535.4 as applicable. B. Warning Signs: 1. Materials: 2. Minimum Size: 7 by 10 inches unless otherwise indicated. C. Warning Labels: Rosehill Park 26 0553 -4 Identification for Electrical Systems JE Project#5133 1. Materials: Use factory pre-printed or machine-printed self-adhesive polyester or self-adhesive vinyl labels; UV, chemical, water, heat, and abrasion resistant; produced using materials recognized to UL 969. 2. Machine-Printed Labels: Use thermal transfer process printing machines and accessories recommended by label manufacturer. 3. Minimum Size: 2 by 4 inches unless otherwise indicated. PART 3 EXECUTION 3.01 PREPARATION A. Clean surfaces to receive adhesive products according to manufacturer's instructions. 3.02 INSTALLATION A. Install products in accordance with manufacturer's instructions. B. Install identification products to be plainly visible for examination, adjustment, servicing, and maintenance. Unless otherwise indicated, locate products as follows: 1. Surface-Mounted Equipment: Enclosure front. 2. Flush-Mounted Equipment: Inside of equipment door. 3. Free-Standing Equipment: Enclosure front; also enclosure rear for equipment with rear access. 4. Elevated Equipment: Legible from the floor or working platform. 5. Branch Devices: Adjacent to device. 6. Interior Components: Legible from the point of access. 7. Conduits: Legible from the floor. 8. Conductors and Cables: Legible from the point of access. C. Install identification products centered, level, and parallel with lines of item being identified. D. Secure nameplates to exterior surfaces of enclosures using stainless steel screws and to interior surfaces using self-adhesive backing or epoxy cement. E. Install self-adhesive labels and markers to achieve maximum adhesion, with no bubbles or wrinkles and edges properly sealed. Rosehill Park 26 0553 -5 Identification for Electrical Systems JE Project#5133 F. Mark all handwritten text, where permitted, to be neat and legible. 3.03 FIELD QUALITY CONTROL A. See Section 01 4000-Quality Requirements, for additional requirements. B. Replace self-adhesive labels and markers that exhibit bubbles, wrinkles, curling or other signs of improper adhesion. END OF SECTION 26 0553 Rosehill Park 26 0553 -6 Identification for Electrical Systems JE Project#5133 SECTION 26 2416 PANELBOARDS PART 1 GENERAL 1.01 SECTION INCLUDES A. Power distribution panelboards. B. Lighting and appliance panelboards. C. Load centers. D. Overcurrent protective devices for panelboards. 1.02 RELATED REQUIREMENTS A. Section 03 3000 - Cast-in-Place Concrete: Concrete equipment pads. B. Section 26 0526 - Grounding and Bonding for Electrical Systems. C. Section 26 0529- Hangers and Supports for Electrical Systems. 1.03 REFERENCE STANDARDS A. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2010. B. NECA 407 - Standard for Installing and Maintaining Panelboards; 2009. C. NEMA EN 10250- Enclosures for Electrical Equipment (1000 Volts Maximum); 2024. D. NEMA PB 1.1 - General Instructions for Proper Installation, Operation and Maintenance of Panelboards Rated 1000V or Less; 2023. E. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. F. UL 50 - Enclosures for Electrical Equipment, Non-Environmental Considerations; Current Edition, Including All Revisions. G. UL 50E - Enclosures for Electrical Equipment, Environmental Considerations; Current Edition, Including All Revisions. H. UL 67 - Panelboards; Current Edition, Including All Revisions. 1.04 DEFINITIONS A. SVR: Suppressed voltage rating. Rosehill Park 26 2416 - 1 Panelboards JE Project#5133 B. TVSS: Transient voltage surge suppressor. 1.05 SUBMITTALS A. See Section 01 3000-Administrative Requirements, for submittal procedures. B. Product Data: Provide manufacturer's standard catalog pages and data sheets for panelboards, enclosures, overcurrent protective devices, and other installed components and accessories. 1. Include characteristic trip curves for each type and rating of overcurrent protective device upon request. C. Qualification Data: For qualified testing agency. D. Field Quality Control Test Reports. 1. Test procedures used. 2. Test results that comply with requirements. 3. Results of failed tests and corrective action taken to achieve test results that comply with requirements. E. Panelboard Schedules: For installation in panelboards. F. Operation and Maintenance Data: For panelboards and components to include in emergency, operation, and maintenance manuals. In addition to items specified in Division 01 Section "Operation and Maintenance Data," include the following: 1. Manufacturer's written instructions for testing and adjusting overcurrent protective devices. 2. 1.06 QUALITY ASSURANCE A. Comply with requirements of NFPA 70. B. Testing Agency Qualifications: Member company of NETA or an NRTL. 1. Testing Agency's Field Supervisor: Currently certified by NETA to supervise on- site testing. C. Source Limitations: Obtain panelboards, overcurrent protective devices, components, and accessories from single source from single manufacturer. Rosehill Park 26 2416 -2 Panelboards JE Project#5133 D. Product Selection for Restricted Space: Drawings indicate maximum dimensions for panelboards including clearances between panelboards and adjacent surfaces and other items. Comply with indicated maximum dimensions. E. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. F. Comply with NEMA PB 1. 1.07 DELIVERY, STORAGE,AND HANDLING A. Receive, inspect, handle, and store panelboards in accordance with manufacturer's instructions and NECA 407. B. Store in a clean, dry space. Maintain factory wrapping or provide an additional heavy canvas or heavy plastic cover to protect units from dirt,water, construction debris, and traffic. C. Handle carefully in accordance with manufacturer's written instructions to avoid damage to panelboard internal components, enclosure, and finish. 1.08 PROJECT CONDITIONS A. Environmental Limitations: 1. Do not deliver or install panelboards until spaces are enclosed and weathertight, wet work in spaces is complete and dry, work above panelboards is complete, and temporary HVAC system is operating and maintaining ambient temperature and humidity conditions at occupancy levels during the remainder of the construction period. 2. Rate equipment for continuous operation under the following conditions unless otherwise indicated: a. Ambient Temperature: Not exceeding 23 deg F to plus 104 deg F. b. Altitude: Not exceeding 6600 feet. B. Service Conditions: NEMA PB 1, usual service conditions, as follows: 1. Ambient temperatures within limits specified. 2. Altitude not exceeding 6600 feet. C. Interruption of Existing Electric Service: Do not interrupt electric service to facilities occupied by Owner or others unless permitted under the following conditions and then Rosehill Park 26 2416 -3 Panelboards JE Project#5133 only after arranging to provide temporary electric service according to requirements indicated: 1. Notify Architect no fewer than two days in advance of proposed interruption of electric service. 2. Do not proceed with interruption of electric service without Owner's written permission. 3. Comply with NFPA 70E. 1.09 COORDINATION A. Coordinate layout and installation of panelboards and components with other construction that penetrates walls or is supported by them, including electrical and other types of equipment, raceways, piping, encumbrances to workspace clearance requirements, and adjacent surfaces. Maintain required workspace clearances and required clearances for equipment access doors and panels. B. Coordinate sizes and locations of concrete bases with actual equipment provided. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified in Division 03. 1.10 WARRANTY A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace transient voltage suppression devices that fail in materials or workmanship within specified warranty period. 1. Warranty Period: Five years from date of Substantial Completion. PART 2 PRODUCTS 2.01 MANUFACTURERS A. Eaton Corporation; : www.eaton.com/#sle. B. Schneider Electric; Square D Products; : www.schneider-electric.us/#sle. C. Siemens Industry, Inc; : www.usa.siemens.com/#sle. 2.02 PANELBOARDS -GENERAL REQUIREMENTS A. Provide products listed, classified, and labeled as suitable for the purpose intended. B. Unless otherwise indicated, provide products suitable for continuous operation under the following service conditions: Rosehill Park 26 2416 -4 Panelboards JE Project#5133 1. Altitude: Less than 6,600 feet. 2. Ambient Temperature: C. Short Circuit Current Rating: 1. Provide panelboards with listed short circuit current rating not less than the available fault current at the installed location as indicated on the drawings. D. Mains: Configure for top or bottom incoming feed as indicated or as required for the installation. E. Branch Overcurrent Protective Devices: Replaceable without disturbing adjacent devices. F. Bussing: Sized in accordance with UL 67 temperature rise requirements. 1. Material: Hard-drawn copper, 98 percent conductivity. 2. Provide 200 percent rated neutral bus unless otherwise indicated, with a suitable lug for each feeder or branch circuit requiring a neutral connection. 3. Provide solidly bonded equipment ground bus in each panelboard, with a suitable lug for each feeder and branch circuit equipment grounding conductor. G. Conductor Terminations: Suitable for use with the conductors to be installed. 1. Material: Hard-drawn copper, 98 percent conductivity. 2. Main and Neutral Lugs: Compression type. 3. Ground Lugs and Bus-Configured Terminators: Compression type. 4. Feed-Through Lugs: Compression type, suitable for use with conductor material. Locate at opposite end of bus from incoming lugs or main device. 5. Subfeed (Double) Lugs: Compression type suitable for use with conductor material. Locate at same end of bus as incoming lugs or main device. 6. Gutter-Tap Lugs: Compression type suitable for use with conductor material. Locate at same end of bus as incoming lugs or main device. 7. Extra-Capacity Neutral Lugs: Rated 200 percent of phase lugs mounted on extra- capacity neutral bus. H. Enclosures: Comply with NEMA EN 10250, and list and label as complying with UL 50 and UL 50E. Rosehill Park 26 2416 -5 Panelboards JE Project#5133 1. Environment Type per NEMA EN 10250: Unless otherwise indicated, as specified for the following installation locations: a. Indoor Clean, Dry Locations: Type 1. b. Outdoor Locations: Type 3R. c. Other Wet or Damp Indoor Locations: NEMA 250, Type 4. d. Indoor Locations Subject to Dust, Falling Dirt, and Dripping Noncorrosive Liquids: NEMA 250, Type 5. 2. Boxes: Galvanized steel unless otherwise indicated. a. Provide wiring gutters sized to accommodate the conductors to be installed. b. Increase gutter space as required where sub-feed lugs,feed-through lugs, gutter taps, or oversized lugs are provided. 3. Fronts: a. Fronts for Surface-Mounted Enclosures: Same dimensions as boxes. b. Finishes: 1) Panels and Trim: Steel and galvanized steel, factory finished immediately after cleaning and pretreating with manufacturer's standard two-coat, baked-on finish consisting of prime coat and thermosetting topcoat. 2) Back Boxes: Galvanized steel. 3) Fungus Proofing: Permanent fungicidal treatment for overcurrent protective devices and other components. 4. Directory Card: Inside panelboard door, mounted in transparent card holder. 5. Lockable Doors: All locks keyed alike unless otherwise indicated. 6. Hinged Front Cover: Entire front trim hinged to box and with standard door within hinged trim cover. 7. Skirt for Surface-Mounted Panelboards: Same gage and finish as panelboard front with flanges for attachment to panelboard, wall, and ceiling or floor. 8. Gutter Extension and Barrier: Same gage and finish as panelboard enclosure; integral with enclosure body. Arrange to isolate individual panel sections. Rosehill Park 26 2416 -6 Panelboards JE Project#5133 I. Service Equipment Label: NRTL labeled for use as service equipment for panelboards or load centers with one or more main service disconnecting and overcurrent protective devices J. Future Provisions: Prepare all unused spaces for future installation of devices including bussing, connectors, mounting hardware and all other required provisions. K. Panelboard Short-Circuit Current Rating: Rated for series-connected system with integral or remote upstream overcurrent protective devices and labeled by an NRTL. Include size and type of allowable upstream and branch devices, listed and labeled for series-connected short-circuit rating by an NRTL. L. Panelboard Short-Circuit Current Rating: Fully rated to interrupt symmetrical short- circuit current available at terminals. 2.03 OVERCURRENT PROTECTIVE DEVICES A. Manufacturers: 1. Eaton Electrical Inc.; Cutler-Hammer Business Unit. 2. General Electric Company; GE Consumer& Industrial - Electrical Distribution. 3. Siemens Energy&Automation, Inc. 4. Square D; a brand of Schneider Electric 2.04 PANELBOARD SUPPRESSORS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Current Technology; a subsidiary of Danahar Corporation. 2. Eaton Electrical Inc.; Cutler-Hammer Business Unit. 3. General Electric Company; GE Consumer& Industrial -Electrical Distribution. 4. Liebert Corporation. 5. Siemens Energy&Automation, Inc. 6. Square D; a brand of Schneider Electric. B. Surge Protection Device: IEEE C62.41-compliant, integrally mounted, solid-state, parallel-connected, non-modular type,with sine-wave tracking suppression and filtering Rosehill Park 26 2416 -7 Panelboards JE Project#5133 modules, UL 1449, second edition, short-circuit current rating matching or exceeding the panelboard short-circuit rating, and with the following features and accessories: 1. Accessories: a. LED indicator lights for power and protection status. b. Audible alarm, with silencing switch, to indicate when protection has failed. c. One set of dry contacts rated at 5 A and 250-V ac, for remote monitoring of protection status. C. Surge Protection Device: IEEE C62.41-compliant, integrally mounted,wired-in, solid- state, parallel-connected, modular(with field-replaceable modules)type, with sine- wave tracking suppression and filtering modules, UL 1449, second edition, short-circuit current rating matching or exceeding the panelboard short-circuit rating, and with the following features and accessories: 1. Accessories: a. Fuses rated at 200-kA interrupting capacity. b. Fabrication using bolted compression lugs for internal wiring. c. Integral disconnect switch. d. Redundant suppression circuits. e. Redundant replaceable modules. f. Arrangement with wire connections to phase buses, neutral bus, and ground bus. g. LED indicator lights for power and protection status. h. Audible alarm, with silencing switch, to indicate when protection has failed. i. Form-C contacts rated at 5 A and 250-V ac, one normally open and one normally closed, for remote monitoring of system operation. Contacts shall reverse position on failure of any surge diversion module or on opening of any current-limiting device. Coordinate with building power monitoring and control system. j. Six-digit, transient-event counter set to totalize transient surges. 2. Peak Single-Impulse Surge Current Rating: 160 kA per mode/320 kA per phase. Rosehill Park 26 2416 -8 Panelboards JE Project#5133 3. Minimum single-impulse current ratings, using 8-by-20-mic.sec.waveform described in IEEE C62.41.2. a. Line to Neutral: 70,000 A. b. Line to Ground: 70,000 A. c. Neutral to Ground: 50,000 A. 4. Withstand Capabilities: 12,000 IEEE C62.41, Category C3 (10 kA), 8-by-20- mic.sec. surges with less than 5 percent change in clamping voltage. 2.05 ACCESSORY COMPONENTS AND FEATURES A. Accessory Set: Include tools and miscellaneous items required for overcurrent protective device test, inspection, maintenance, and operation. B. Portable Test Set: For testing functions of solid-state trip devices without removing from panelboard. Include relay and meter test plugs suitable for testing panelboard meters and switchboard class relays. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field measurements are as indicated. B. Verify that the ratings and configurations of the panelboards and associated components are consistent with the indicated requirements. C. Verify that mounting surfaces are ready to receive panelboards. D. Verify that conditions are satisfactory for installation prior to starting work. E. Receive, inspect, handle, and store panelboards according to NECA 407. F. Examine panelboards before installation. Reject panelboards that are damaged or rusted or have been subjected to water saturation. G. Examine elements and surfaces to receive panelboards for compliance with installation tolerances and other conditions affecting performance of the Work. H. Proceed with installation only after unsatisfactory conditions have been corrected. 3.02 INSTALLATION A. Perform work in accordance with NECA 1 (general workmanship). Rosehill Park 26 2416 -9 Panelboards JE Project#5133 B. Install products in accordance with manufacturer's instructions. C. Install panelboards in accordance with NECA 407 and NEMA PB 1.1. D. Arrange equipment to provide minimum clearances in accordance with manufacturer's instructions and NFPA 70. E. Provide required support and attachment in accordance with Section 26 0529. F. Temporary Lifting Provisions: Remove temporary lifting eyes, channels, and brackets and temporary blocking of moving parts from panelboards. G. Install panelboards plumb. H. Mount panelboards such that the highest position of any operating handle for circuit breakers or switches does not exceed 79 inches above the floor or working platform. I. Mount floor-mounted power distribution panelboards on properly sized 3 inch high concrete pad constructed in accordance with Section 03 3000. J. Provide grounding and bonding in accordance with Section 26 0526. K. Install all field-installed branch devices, components, and accessories. L. Set field-adjustable circuit breaker tripping function settings as indicated. M. Provide filler plates to cover unused spaces in panelboards. N. Arrange conductors in gutters into groups and bundle and wrap with wire ties. O. Comply with NECA 1. 3.03 IDENTIFICATION A. Identify field-installed conductors, interconnecting wiring, and components; provide warning signs complying with Division 26 Section"Identification for Electrical Systems." B. Create a directory to indicate installed circuit loads; incorporate Owner's final room designations. Obtain approval before installing. Use a computer or typewriter to create directory; handwritten directories are not acceptable. C. Panelboard Nameplates: Label each panelboard with a nameplate complying with requirements for identification specified in Division 26 Section "Identification for Electrical Systems." Rosehill Park 26 2416 - 10 Panelboards JE Project#5133 D. Device Nameplates: Label each branch circuit device in distribution panelboards with a nameplate complying with requirements for identification specified in Division 26 Section "Identification for Electrical Systems." 3.04 FIELD QUALITY CONTROL A. See Section 01 4000-Quality Requirements, for additional requirements. B. Testing Agency: Engage a qualified testing agency to perform tests and inspections. C. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections. D. Perform tests and inspections. 1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing. E. Acceptance Testing Preparation: 1. Test insulation resistance for each panelboard bus, component, connecting supply, feeder, and control circuit. 2. Test continuity of each circuit. F. Tests and Inspections: 1. Perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification. Certify compliance with test parameters. 2. Correct malfunctioning units on-site, where possible, and retest to demonstrate compliance; otherwise, replace with new units and retest. 3. Perform the following infrared scan tests and inspections and prepare reports: a. Initial Infrared Scanning: After Substantial Completion, but not more than 60 days after Final Acceptance, perform an infrared scan of each panelboard. Remove front panels so joints and connections are accessible to portable scanner. b. Follow-up Infrared Scanning: Perform an additional follow-up infrared scan of each panelboard 11 months after date of Substantial Completion. c. Instruments and Equipment: Rosehill Park 26 2416 - 11 Panelboards JE Project#5133 1) Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device. G. Panelboards will be considered defective if they do not pass tests and inspections. H. Prepare test and inspection reports, including a certified report that identifies panelboards included and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action. 3.05 ADJUSTING A. Adjust tightness of mechanical and electrical connections to manufacturer's recommended torque settings. B. Adjust alignment of panelboard fronts. C. Set field-adjustable circuit-breaker trip ranges as specified in Division 26 Section "Overcurrent Protective Device Coordination Study." D. Load Balancing: After Substantial Completion, but not more than 60 days after Final Acceptance, measure load balancing and make circuit changes. 1. Measure as directed during period of normal system loading. 2. Perform load-balancing circuit changes outside normal occupancy/working schedule of the facility and at time directed. Avoid disrupting critical 24-hour services such as fax machines and on-line data processing, computing, transmitting, and receiving equipment. 3. After circuit changes, recheck loads during normal load period. Record all load readings before and after changes and submit test records. 4. Tolerance: Difference exceeding 20 percent between phase loads,within a panelboard, is not acceptable. Rebalance and recheck as necessary to meet this minimum requirement. 3.06 PROTECTION A. Temporary Heating: Apply temporary heat to maintain temperature according to manufacturer's written instructions. END OF SECTION 26 2416 Rosehill Park 26 2416 - 12 Panelboards JE Project#5133 SECTION 26 2726 WIRING DEVICES PART 1 GENERAL 1.01 SECTION INCLUDES A. Wall switches. B. Wall dimmers. C. Receptacles. D. Wall plates. E. Floor box service fittings. 1.02 RELATED REQUIREMENTS A. Section 26 0533.16- Boxes for Electrical Systems. 1.03 REFERENCE STANDARDS A. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2010. B. NECA 130-Standard for Installing and Maintaining Wiring Devices; 2010. C. NEMA WD 1 -General Color Requirements for Wiring Devices; 1999 (R 2010). D. NEMA WD 6-Wiring Devices- Dimensional Specifications; 2012. E. NFPA 70- National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. F. UL 514D -Cover Plates for Flush-Mounted Wiring Devices; Current Edition, Including All Revisions. G. UL 1472 -Solid-State Dimming Controls; Current Edition, Including All Revisions. H. UL 1917-Solid-State Fan Speed Controls; Current Edition, Including All Revisions. 1.04 DEFINITIONS A. EMI: Electromagnetic interference. B. GFCI: Ground-fault circuit interrupter. C. Pigtail: Short lead used to connect a device to a branch-circuit conductor. Rosehill Park 26 2726 - 1 Wiring Devices JE Project#5133 D. RFI: Radio-frequency interference. E. TVSS: Transient voltage surge suppressor. F. UTP: Unshielded twisted pair. 1.05 SUBMITTALS A. See Section 01 3000-Administrative Requirements, for submittal procedures. B. Product Data: Provide manufacturer's catalog information showing dimensions, colors, and configurations. C. B. Shop Drawings: List of legends and description of materials and process used for premarking wall plates. D. Samples: One for each type and color of device and wall plate specified. E. Field Quality Control Test Reports. F. Operation and Maintenance Data: 1. For wiring devices to include in all manufacturers' packing label warnings and instruction manuals that include labeling conditions. 1.06 QUALITY ASSURANCE A. Comply with requirements of NFPA 70. B. Source Limitations: Obtain each type of wiring device and associated wall plate through one source from a single manufacturer. Insofar as they are available, obtain all wiring devices and associated wall plates from a single manufacturer and one source. C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. D. Products: Listed, classified, and labeled as suitable for the purpose intended. 1.07 COORDINATION A. Receptacles for Owner-Furnished Equipment: Match plug configurations. 1. Cord and Plug Sets: Match equipment requirements. Rosehill Park 26 2726 -2 Wiring Devices JE Project#5133 1.08 DELIVERY, STORAGE, AND PROTECTION A. Store in a clean, dry space in original manufacturer's packaging until ready for installation. PART 2 PRODUCTS 2.01 MANUFACTURERS A. Pass& Seymour, a brand of Legrand North America, Inc: www.legrand.us B. 1. Cooper Wiring Devices; a division of Cooper Industries, Inc. (Cooper). 2.02 WALL SWITCHES A. Standard Wall Switches: Industrial specification grade, 20 A, 120/277 V with standard toggle type switch actuator and maintained contacts; single pole single throw, double pole single throw, three way, or four way as indicated on the drawings. 1. Products: a. Cooper; 2221 (single pole), 2222 (two pole), 2223 (three way), 2224 (four way). b. Hubbell; CS1221 (single pole), CS1222 (two pole), CS1223 (three way), CS1224 (four way). c. Leviton; 1221-2 (single pole), 1222-2 (two pole), 1223-2 (three way), 1224-2 (four way). d. Pass &Seymour; 20AC1 (single pole), 20AC2 (two pole), 20AC3 (three way), 20AC4 (four way). B. Pilot Light Wall Switches: Industrial specification grade, 20 A, 120/277 V with red illuminated standard toggle type switch actuator and maintained contacts; illuminated with load on; single pole single throw, double pole single throw, three way, or four way as indicated on the drawings. 1. Products: a. Cooper; 2221PL for 120 V and 277 V. b. Hubbell; HPL1221 PL for 120 V and 277 V. c. Leviton; 1221-PLR for 120 V, 1221-7PLR for 277 V. d. Pass &Seymour; PS20AC1-PLR for 120 V. Rosehill Park 26 2726 -3 Wiring Devices JE Project#5133 C. Locking Wall Switches: Industrial specification grade, 20 A, 120/277 V with lever type keyed switch actuator and maintained contacts; switches keyed alike; single pole single throw, double pole single throw, three way, or four way as indicated on the drawings. 1. Products: a. Cooper; 2221L. b. Hubbell; HBL1221 L. c. Leviton; 1221-2L. d. Pass&Seymour; PS20AC1-L. D. Momentary Contact Wall Switches: Industrial specification grade, 20 A, 120/277 V with toggle type three position switch actuator and momentary contacts; single pole double throw, off with switch actuator in center position. 1. Products: a. Cooper; 1995L. b. Hubbell; HBL1557L. c. Leviton; 1257L. d. Pass &Seymour; 1251L 2.03 WALL DIMMERS A. Wall Dimmers-General Requirements: Solid-state with continuous full-range even control following square law dimming curve, integral radio frequency interference filtering, power failure preset memory, air gap switch accessible without removing wall plate, complying with NEMA WD 1 and NEMA WD 6, and listed as complying with UL 1472; types and ratings suitable for load controlled as indicated on the drawings. B. Control: Continuously adjustable slider; with single-pole or three-way switching. Comply with UL 1472.. C. Incandescent Lamp Dimmers: 120 V; control shall follow square-law dimming curve. On-off switch positions shall bypass dimmer module. 1. 600 W; dimmers shall require no derating when ganged with other devices. Illuminated when "OFF." Rosehill Park 26 2726 -4 Wiring Devices JE Project#5133 D. Fluorescent Lamp Dimmer Switches: Modular; compatible with dimmer ballasts; trim potentiometer to adjust low-end dimming; dimmer-ballast combination capable of consistent dimming with low end not greater than 20 percent of full brightness. E. Provide locator light, illuminated with load off. 2.04 FAN SPEED CONTROLLERS A. Description: 120 V AC, solid-state, full-range variable speed, slide control type with separate on/off switch, with integral radio frequency interference filtering, fan noise elimination circuitry, power failure preset memory, complying with NEMA WD 1 and NEMA WD 6, and listed as complying with UL 1917. 1. Current Rating: 1.5 A unless otherwise indicated or required to control the load indicated on the drawings. 2.05 OCCUPANCY SENSORS A. Wall-Switch Sensors: 1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: 2. Products: Subject to compliance with requirements, provide one of the following: a. Cooper; 6111 for 120 V, 6117 for 277 V. b. Hubbell; WS1277. c. Leviton; ODS 10-ID. d. Pass&Seymour; WS3000. e. Watt Stopper(The); WS-200. 3. Description: Passive-infrared type, 120/277 V, adjustable time delay up to 30 minutes, 180-degree field of view, with a minimum coverage area of 900 sq.ft.. B. Wall-Switch Sensors: 1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: 2. Products: Subject to compliance with requirements, provide one of the following: a. Hubbell; AT120 for 120 V, AT277 for 277 V. b. Leviton; ODS 15-ID. Rosehill Park 26 2726 -5 Wiring Devices JE Project#5133 3. Description: Adaptive-technology type, 120/277 V, adjustable time delay up to 20 minutes, 180-degree field of view, with a minimum coverage area of 900 sq.ft.. C. Long-Range Wall-Switch Sensors: 1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: 2. Products: Subject to compliance with requirements, provide one of the following: a. Hubbell; ATP1600WRP. b. Leviton; ODWWV-IRW. c. Pass &Seymour; WA1001. d. Watt Stopper(The); CX-100. 3. Description: Passive-infrared type, 120/277 V, adjustable time delay up to 30 minutes, 110-degree field of view, with a minimum coverage area of 1200 sq. ft.. D. Long-Range Wall-Switch Sensors: 1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: 2. Products: Subject to compliance with requirements, provide one of the following: a. Hubbell; ATD1600WRP. b. Leviton; ODW12-MRW. c. Watt Stopper(The); DT-200. 3. Description: Dual technology, with both passive-infrared-and ultrasonic-type sensing, 120/277 V, adjustable time delay up to 30 minutes, 110-degree field of view, and a minimum coverage area of 1200 sq. ft.. E. Wide-Range Wall-Switch Sensors: 1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: 2. Products: Subject to compliance with requirements, provide one of the following: a. Hubbell; ATP120HBRP. b. Leviton; ODWHB-IRW. Rosehill Park 26 2726 -6 Wiring Devices JE Project#5133 c. Pass&Seymour; HS1001. d. Watt Stopper(The); CX-100-3. 3. Description: Passive-infrared type, 120/277 V, adjustable time delay up to 30 minutes, 150-degree field of view, with a minimum coverage area of 1200 sq. ft. 2.06 WALL PLATES A. Wall Plates: Comply with UL 514D. 1. Configuration: One piece cover as required for quantity and types of corresponding wiring devices. 2. Size: Standard; 3. Screws: Metal with slotted heads finished to match wall plate finish. 4. Finished Spaces: Stainless steel wall plates, brushed satin finish, Type 302 stainless steel. 5. Unfinished Spaces: Galvanized steel wall plates, rounded corners and edges,with corrosion resistant screws. 6. Damp Locations: Gasketed, cast aluminum, with self-closing hinged cover and corrosion-resistant screws; listed as suitable for use in wet locations with cover closed. B. Wet-Location, Weatherproof Cover Plates: NEMA 250, complying with type 3R weather-resistant, die-cast aluminum with lockable cover. 2.07 FLOOR BOX SERVICE FITTINGS A. Manufacturers: 1. Wiremold, a brand of Legrand North America, Inc: www.legrand.us/#sle. 2. Pass&Seymour/Legrand; Wiring Devices &Accessories. 3. Square D/Schneider Electric. 4. Thomas& Betts Corporation. B. Description: Service fittings compatible with floor boxes provided under Section 26 0533.16 with components, adapters, and trims required for complete installation. 1. Service Outlet Assembly: Flush type with four simplex receptacles and space for four RJ-45 jacks. Rosehill Park 26 2726 -7 Wiring Devices JE Project#5133 2. Size: Selected to fit nominal 3-inch cored holes in floor and matched to floor thickness. 3. Fire Rating: Unit is listed and labeled for fire rating of floor-ceiling assembly. 4. Closure Plug: Arranged to close unused 3-inch cored openings and reestablish fire rating of floor. 5. Wiring Raceways and Compartments: For a minimum of four No. 12 AWG conductors and a minimum of four, 4-pair, Category 5e voice and data communication cables. 2.08 MULTIOUTLET ASSEMBLIES A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Hubbell Incorporated; Wiring Device-Kellems. 2. Wiremold Company(The). B. Components of Assemblies: Products from a single manufacturer designed for use as a complete, matching assembly of raceways and receptacles. C. Raceway Material: Metal,with manufacturer's standard finish. D. Wire: No. 12 AWG. 2.09 FINISHES A. Color: Wiring device catalog numbers in Section Text do not designate device color. 1. Wiring Devices Connected to Normal Power System: As selected by Architect, unless otherwise indicated or required by NFPA 70 or device listing. 2. Wiring Devices Connected to Emergency Power System: Red. 3. TVSS Devices: Blue. 4. Isolated-Ground Receptacles: Orange. PART 3 EXECUTION 3.01 INSTALLATION A. Perform work in accordance with NECA 1 (general workmanship)and, where applicable, NECA 130, including mounting heights specified in those standards unless otherwise indicated. Rosehill Park 26 2726 -8 Wiring Devices JE Project#5133 B. Coordinate locations of outlet boxes provided under Section 26 0533.16 as required for installation of wiring devices provided under this section. 1. Mounting Heights: Unless otherwise indicated, as follows: 2. Orient outlet boxes for vertical installation of wiring devices unless otherwise indicated. 3. Where multiple receptacles,wall switches, or wall dimmers are installed at the same location and at the same mounting height, gang devices together under a common wall plate. 4. Locate wall switches on strike side of door with edge of wall plate 3 inches from edge of door frame. Where locations are indicated otherwise, notify Architect to obtain direction prior to proceeding with work. 5. Locate receptacles for electric drinking fountains concealed behind drinking fountain according to manufacturer's instructions. C. Install wiring devices in accordance with manufacturer's instructions. D. Install permanent barrier between ganged wiring devices when voltage between adjacent devices exceeds 300 V. E. Where required, connect wiring devices using pigtails not less than 6 inches long. Do not connect more than one conductor to wiring device terminals. F. Connect wiring devices by wrapping conductor clockwise 3/4 turn around screw terminal and tightening to proper torque specified by the manufacturer.Where present, do not use push-in pressure terminals that do not rely on screw-actuated binding. G. Unless otherwise indicated, connect wiring device grounding terminal to branch circuit equipment grounding conductor and to outlet box with bonding jumper. H. Install wiring devices plumb and level with mounting yoke held rigidly in place. I. Install wall switches with OFF position down. J. Install wall dimmers to achieve full rating specified and indicated after derating for ganging as instructed by manufacturer. K. Verify that dimmers used for fan speed control are listed for that application. L. Do not share neutral conductor on branch circuits utilizing wall dimmers. M. Install wall plates to fit completely flush to wall with no gaps and rough opening completely covered without strain on wall plate. Repair or reinstall improperly installed Rosehill Park 26 2726 -9 Wiring Devices JE Project#5133 outlet boxes or improperly sized rough openings. Do not use oversized wall plates in lieu of meeting this requirement. N. Install blank wall plates on junction boxes and on outlet boxes with no wiring devices installed or designated for future use. O. Adjust locations of floor service outlets and service poles to suit arrangement of partitions and furnishings. 3.02 IDENTIFICATION A. Comply with Division 26 Section "Identification for Electrical Systems." 1. Receptacles: Identify panelboard and circuit number from which served. Use hot, stamped or engraved machine printing with black-filled lettering on face of plate, and durable wire markers or tags inside outlet boxes. 3.03 FIELD QUALITY CONTROL A. See Section 01 4000-Quality Requirements, for additional requirements. B. Perform tests and inspections and prepare test reports. 1. In healthcare facilities, prepare reports that comply with recommendations in NFPA 99. 2. Test Instruments: Use instruments that comply with UL 1436. 3. Test Instrument for Convenience Receptacles: Digital wiring analyzer with digital readout or illuminated LED indicators of measurement. C. Inspect each wiring device for damage and defects. D. Operate each wall switch, wall dimmer, and fan speed controller with circuit energized to verify proper operation. E. Test each receptacle: 1. Line Voltage: Acceptable range is 105 to 132 V. 2. Percent Voltage Drop under 15-A Load: A value of 6 percent or higher is not acceptable. 3. Ground Impedance: Values of up to 2 ohms are acceptable. 4. GFCI Trip: Test for tripping values specified in UL 1436 and UL 943. 5. Using the test plug, verify that the device and its outlet box are securely mounted. Rosehill Park 26 2726 - 10 Wiring Devices JE Project#5133 6. The tests shall be diagnostic, indicating damaged conductors, high resistance at the circuit breaker, poor connections, inadequate fault current path, defective devices, or similar problems. Correct circuit conditions, remove malfunctioning units and replace with new ones, and retest as specified above. F. Test straight blade for the retention force of the grounding blade according to NFPA 99. Retention force shall be not less than 4 oz.. G. Correct wiring deficiencies and replace damaged or defective wiring devices. END OF SECTION 26 2726 Rosehill Park 26 2726 - 11 Wiring Devices JE Project#5133 SECTION 26 2816.13 ENCLOSED CIRCUIT BREAKERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Enclosed circuit breakers. 1.02 RELATED REQUIREMENTS A. Section 26 0526-Grounding and Bonding for Electrical Systems. B. Section 26 0529- Hangers and Supports for Electrical Systems. 1.03 REFERENCE STANDARDS A. NECA 1 -Standard for Good Workmanship in Electrical Construction; 2010. B. NFPA 70- National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. 1.04 DEFINITIONS A. NC: Normally closed. B. NO: Normally open. 1.05 SUBMITTALS A. See Section 01 3000-Administrative Requirements, for submittal procedures. B. Product Data: Provide manufacturer's standard catalog pages and data sheets for circuit breakers, enclosures, and other installed components and accessories. Include dimensioned elevations, sections, weights, and manufacturers'technical data on features, performance, electrical characteristics, ratings, accessories, and finishes. 1. Enclosure types and details for types other than NEMA 250, Type 1. 2. Current and voltage ratings. 3. Short-circuit current ratings (interrupting and withstand, as appropriate). 4. Include evidence of NRTL listing for series rating of installed devices. 5. Detail features, characteristics, ratings, and factory settings of individual overcurrent protective devices, accessories, and auxiliary components. Rosehill Park 26 2816.13 - 1 Enclosed Circuit Breakers JE Project#5133 6. Include time-current coordination curves (average melt)for each type and rating of overcurrent protective device; include selectable ranges for each type of overcurrent protective device 7. Include characteristic trip curves for each type and rating of circuit breaker upon request. C. Field Quality Control Test Reports. 1. Test procedures used. 2. Test results that comply with requirements. 3. Results of failed tests and corrective action taken to achieve test results that comply with requirements. D. Manufacturer's field service report. E. Operation and Maintenance Data: For enclosed switches and circuit breakers to include in emergency, operation, and maintenance manuals. In addition to items specified in Division 01 Section "Operation and Maintenance Data," include the following: 1. Manufacturer's written instructions for testing and adjusting enclosed switches and circuit breakers. 2. Time-current coordination curves (average melt)for each type and rating of overcurrent protective device; include selectable ranges for each type of overcurrent protective device. 1.06 QUALITY ASSURANCE A. Comply with requirements of NFPA 70. B. Testing Agency Qualifications: Member company of NETA or an NRTL. 1. Testing Agency's Field Supervisor: Currently certified by NETA to supervise on- site testing. C. Source Limitations: Obtain enclosed switches and circuit breakers, overcurrent protective devices, components, and accessories, within same product category,from single source from single manufacturer. D. Product Selection for Restricted Space: Drawings indicate maximum dimensions for enclosed switches and circuit breakers, including clearances between enclosures, and adjacent surfaces and other items. Comply with indicated maximum dimensions. Rosehill Park 26 2816.13 -2 Enclosed Circuit Breakers JE Project#5133 E. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 1.07 DELIVERY, STORAGE,AND HANDLING A. Store in a clean, dry space. Maintain factory wrapping or provide an additional heavy canvas or heavy plastic cover to protect units from dirt, water, construction debris, and traffic. B. Handle carefully in accordance with manufacturer's written instructions to avoid damage to enclosed circuit breaker internal components, enclosure, and finish. 1.08 PROJECT CONDITIONS A. Environmental Limitations: Rate equipment for continuous operation under the following conditions unless otherwise indicated: 1. Ambient Temperature: Not less than minus 22 deg F and not exceeding 104 deg F. 2. Altitude: Not exceeding 6600 feet. B. Interruption of Existing Electric Service: Do not interrupt electric service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electric service according to requirements indicated: 1. Notify Owner no fewer than seven days in advance of proposed interruption of electric service. 2. Indicate method of providing temporary electric service. 3. Do not proceed with interruption of electric service without Owner's written permission. 4. Comply with NFPA 70E. 1.09 COORDINATION A. Coordinate layout and installation of switches, circuit breakers, and components with equipment served and adjacent surfaces. Maintain required workspace clearances and required clearances for equipment access doors and panels. Rosehill Park 26 2816.13 -3 Enclosed Circuit Breakers JE Project#5133 PART 2 PRODUCTS 2.01 MOLDED CASE CIRCUIT BREAKERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Eaton Electrical Inc.; Cutler-Hammer Business Unit. 2. General Electric Company; GE Consumer& Industrial - Electrical Distribution. 3. Siemens Energy&Automation, Inc. 4. Square D; a brand of Schneider Electric. B. General Requirements: Comply with UL 489, NEMA AB 1, and NEMA AB 3, with interrupting capacity to comply with available fault currents. C. Thermal-Magnetic Circuit Breakers: Inverse time-current element for low-level overloads and instantaneous magnetic trip element for short circuits. Adjustable magnetic trip setting for circuit-breaker frame sizes 250 A and larger. D. Adjustable, Instantaneous-Trip Circuit Breakers: Magnetic trip element with front- mounted,field-adjustable trip setting. E. Electronic Trip Circuit Breakers: Field-replaceable rating plug, rms sensing, with the following field-adjustable settings: 1. Instantaneous trip. 2. Long-and short-time pickup levels. 3. Long-and short-time time adjustments. 4. Ground-fault pickup level, time delay, and 12t response. F. Current-Limiting Circuit Breakers: Frame sizes 400 A and smaller, and let-through ratings less than NEMA FU 1, RK-5. G. Integrally Fused Circuit Breakers: Thermal-magnetic trip element with integral limiter- style fuse listed for use with circuit breaker and trip activation on fuse opening or on opening of fuse compartment door. H. Ground-Fault, Circuit-Interrupter(GFCI)Circuit Breakers: Single-and two-pole configurations with Class A ground-fault protection (6-mA trip). Rosehill Park 26 2816.13 -4 Enclosed Circuit Breakers JE Project#5133 I. Ground-Fault, Equipment-Protection (GFEP)Circuit Breakers: With Class B ground- fault protection (30-mA trip). J. Features and Accessories: 1. Standard frame sizes, trip ratings, and number of poles. 2. Lugs: Mechanical type, suitable for number, size, trip ratings, and conductor material. 3. Application Listing: Appropriate for application; Type SWD for switching fluorescent lighting loads; Type HID for feeding fluorescent and high-intensity discharge lighting circuits. 4. Ground-Fault Protection: Comply with UL 1053; integrally mounted, self-powered type with mechanical ground-fault indicator; relay with adjustable pickup and time- delay settings, push-to-test feature, internal memory, and shunt trip unit; and three-phase, zero-sequence current transformer/sensor. 2.02 ENCLOSURES A. Enclosed Circuit Breakers: NEMA AB 1, NEMA KS 1, NEMA 250, and UL 50, to comply with environmental conditions at installed location. 1. Indoor, Dry and Clean Locations: NEMA 250, Type 1. 2. Outdoor Locations: NEMA 250,Type 3R. 3. Other Wet or Damp, Indoor Locations: NEMA 250, Type 4. 4. Indoor Locations Subject to Dust, Falling Dirt, and Dripping Noncorrosive Liquids: NEMA 250, Type 12. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field measurements are as indicated. B. Verify that the ratings of the enclosed circuit breakers are consistent with the indicated requirements. C. Verify that mounting surfaces are ready to receive enclosed circuit breakers. D. Verify that conditions are satisfactory for installation prior to starting work. Rosehill Park 26 2816.13 - 5 Enclosed Circuit Breakers JE Project#5133 3.02 INSTALLATION A. Install products in accordance with manufacturer's instructions. B. Perform work in accordance with NECA 1 (general workmanship). C. Arrange equipment to provide minimum clearances in accordance with manufacturer's instructions and NFPA 70. D. Provide required support and attachment in accordance with Section 26 0529. E. Install enclosed circuit breakers plumb. F. Except where indicated to be mounted adjacent to the equipment they supply, mount enclosed circuit breakers such that the highest position of the operating handle does not exceed 79 inches above the floor or working platform. G. Provide grounding and bonding in accordance with Section 26 0526. 3.03 IDENTIFICATION A. Comply with requirements in Division 26 Section "Identification for Electrical Systems." 1. Identify field-installed conductors, interconnecting wiring, and components; provide warning signs. 2. Label each enclosure with engraved metal or laminated-plastic nameplate. 3.04 FIELD QUALITY CONTROL A. See Section 01 4000-Quality Requirements, for additional requirements. B. Testing Agency: Engage a qualified testing agency to perform tests and inspections. C. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections. D. Perform tests and inspections. 1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing. E. Acceptance Testing Preparation: 1. Test insulation resistance for each enclosed switch and circuit breaker, component, connecting supply, feeder, and control circuit. Rosehill Park 26 2816.13 -6 Enclosed Circuit Breakers JE Project#5133 2. Test continuity of each circuit. F. Tests and Inspections: 1. Perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification. Certify compliance with test parameters. 2. Correct malfunctioning units on-site, where possible, and retest to demonstrate compliance; otherwise, replace with new units and retest. 3. Perform the following infrared scan tests and inspections and prepare reports: a. Initial Infrared Scanning: After Substantial Completion, but not more than 60 days after Final Acceptance, perform an infrared scan of each circuit breaker. Remove front panels so joints and connections are accessible to portable scanner. b. Follow-up Infrared Scanning: Perform an additional follow-up infrared scan of each circuit breaker 11 months after date of Substantial Completion. c. Instruments and Equipment: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device. 4. Test and adjust controls, remote monitoring, and safeties. Replace damaged and malfunctioning controls and equipment. G. Circuit breakers will be considered defective if they do not pass tests and inspections. H. Prepare test and inspection reports, including a certified report that identifies circuit breakers and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action. I. Correct deficiencies and replace damaged or defective enclosed circuit breakers. 3.05 ADJUSTING A. Adjust tightness of mechanical and electrical connections to manufacturer's recommended torque settings. B. Adjust moving parts and operable components to function smoothly, and lubricate as recommended by manufacturer. C. Set field-adjustable circuit-breaker trip ranges as specified in Division 26 Section "Overcurrent Protective Device Coordination Study". END OF SECTION 26 2816.13 Rosehill Park 26 2816.13 -7 Enclosed Circuit Breakers JE Project#5133 SECTION 26 2816.16 ENCLOSED SWITCHES PART 1 GENERAL 1.01 SECTION INCLUDES A. Enclosed safety switches. 1.02 RELATED REQUIREMENTS A. Section 26 0526 - Grounding and Bonding for Electrical Systems. B. Section 26 0529- Hangers and Supports for Electrical Systems. 1.03 REFERENCE STANDARDS A. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2010. B. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. 1.04 DEFINITIONS A. NC: Normally closed. B. NO: Normally open. C. SPDT: Single pole, double throw. 1.05 SUBMITTALS A. See Section 01 3000 -Administrative Requirements, for submittal procedures. B. Product Data: Provide manufacturer's standard catalog pages and data sheets for enclosed switches and other installed components and accessories. Include dimensioned elevations, sections, weights, and manufacturers'technical data on features, performance, electrical characteristics, ratings, accessories, and finishes. 1. Enclosure types and details for types other than NEMA 250, Type 1. 2. Current and voltage ratings. 3. Short-circuit current ratings (interrupting and withstand, as appropriate). 4. Include evidence of NRTL listing for series rating of installed devices. Rosehill Park 26 2816.16 - 1 Enclosed Switches JE Project#5133 5. Detail features, characteristics, ratings, and factory settings of individual overcurrent protective devices, accessories, and auxiliary components. 6. Include time-current coordination curves (average melt)for each type and rating of overcurrent protective device; include selectable ranges for each type of overcurrent protective device. C. Field Quality Control Test Reports. 1. Test procedures used. 2. Test results that comply with requirements. 3. Results of failed tests and corrective action taken to achieve test results that comply with requirements. D. Manufacturer's field service report. E. Operation and Maintenance Data: For enclosed switches and circuit breakers to include in emergency, operation, and maintenance manuals. In addition to items specified in Division 01 Section "Operation and Maintenance Data," include the following: 1. Manufacturer's written instructions for testing and adjusting enclosed switches and circuit breakers. 2. Time-current coordination curves (average melt)for each type and rating of overcurrent protective device; include selectable ranges for each type of overcurrent protective device. 1.06 QUALITY ASSURANCE A. Comply with requirements of NFPA 70. B. Testing Agency Qualifications: Member company of NETA or an NRTL. 1. Testing Agency's Field Supervisor: Currently certified by NETA to supervise on- site testing. C. Source Limitations: Obtain enclosed switches and circuit breakers, overcurrent protective devices, components, and accessories, within same product category,from single source from single manufacturer. D. Product Selection for Restricted Space: Drawings indicate maximum dimensions for enclosed switches and circuit breakers, including clearances between enclosures, and adjacent surfaces and other items. Comply with indicated maximum dimensions. Rosehill Park 26 2816.16 -2 Enclosed Switches JE Project#5133 E. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. 1.07 PROJECT CONDITIONS A. Environmental Limitations: Rate equipment for continuous operation under the following conditions unless otherwise indicated: 1. Ambient Temperature: Not less than minus 22 deg F and not exceeding 104 deg F. 2. Altitude: Not exceeding 6600 feet. B. Interruption of Existing Electric Service: Do not interrupt electric service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electric service according to requirements indicated: 1. Notify Owner no fewer than seven days in advance of proposed interruption of electric service. 2. Indicate method of providing temporary electric service. 3. Do not proceed with interruption of electric service without Owner's written permission. 4. Comply with NFPA 70E. 1.08 COORDINATION A. Coordinate layout and installation of switches, circuit breakers, and components with equipment served and adjacent surfaces. Maintain required workspace clearances and required clearances for equipment access doors and panels. PART 2 PRODUCTS 2.01 MANUFACTURERS A. Eaton Corporation; : www.eaton.com/#sle. B. Schneider Electric; Square D Products; : www.schneider-electric.us/#sle. 2.02 MOLDED-CASE SWITCHES A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: Rosehill Park 26 2816.16 -3 Enclosed Switches JE Project#5133 1. Eaton Electrical Inc.; Cutler-Hammer Business Unit. 2. General Electric Company; GE Consumer& Industrial - Electrical Distribution. 3. Siemens Energy&Automation, Inc. 4. Square D; a brand of Schneider Electric. B. General Requirements: MCCB with fixed, high-set instantaneous trip only, and short- circuit withstand rating equal to equivalent breaker frame size interrupting rating. C. Features and Accessories: 1. Standard frame sizes and number of poles. 2. Lugs: Mechanical type, suitable for number, size, trip ratings, and conductor material. 3. Ground-Fault Protection: Comply with UL 1053; remote-mounted and powered type with mechanical ground-fault indicator; relay with adjustable pickup and time- delay settings, push-to-test feature, internal memory, and shunt trip unit; and three-phase, zero-sequence current transformer/sensor. 2.03 ENCLOSURES A. Enclosed Switches: NEMA AB 1, NEMA KS 1, NEMA 250, and UL 50, to comply with environmental conditions at installed location. 1. Indoor, Dry and Clean Locations: NEMA 250, Type 1. 2. Outdoor Locations: NEMA 250, Type 3R. 3. Other Wet or Damp, Indoor Locations: NEMA 250, Type 4. B. Indoor Locations Subject to Dust, Falling Dirt, and Dripping Noncorrosive Liquids: NEMA 250, Type 12. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field measurements are as indicated. B. Verify that the ratings of the enclosed switches are consistent with the indicated requirements. C. Verify that mounting surfaces are ready to receive enclosed safety switches. Rosehill Park 26 2816.16 -4 Enclosed Switches JE Project#5133 D. Verify that conditions are satisfactory for installation prior to starting work. 3.02 INSTALLATION A. Install products in accordance with manufacturer's instructions. B. Perform work in accordance with NECA 1 (general workmanship). C. Arrange equipment to provide minimum clearances in accordance with manufacturer's instructions and NFPA 70. D. Provide required support and attachment in accordance with Section 26 0529. E. Install enclosed switches plumb. F. Except where indicated to be mounted adjacent to the equipment they supply, mount enclosed switches such that the highest position of the operating handle does not exceed 79 inches above the floor or working platform. G. Provide grounding and bonding in accordance with Section 26 0526. 3.03 IDENTIFICATION A. Comply with requirements in Division 26 Section "Identification for Electrical Systems." 1. Identify field-installed conductors, interconnecting wiring, and components; provide warning signs. 2. Label each enclosure with engraved metal or laminated-plastic nameplate. 3.04 FIELD QUALITY CONTROL A. See Section 01 4000- Quality Requirements, for additional requirements. B. Correct deficiencies and replace damaged or defective enclosed safety switches or associated components. C. Testing Agency: Engage a qualified testing agency to perform tests and inspections. D. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections. E. Perform tests and inspections. 1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing. Rosehill Park 26 2816.16 -5 Enclosed Switches JE Project#5133 F. Acceptance Testing Preparation: 1. Test insulation resistance for each enclosed switch and circuit breaker, component, connecting supply, feeder, and control circuit. 2. Test continuity of each circuit. G. Tests and Inspections: 1. Perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification. Certify compliance with test parameters. 2. Correct malfunctioning units on-site, where possible, and retest to demonstrate compliance; otherwise, replace with new units and retest. 3. Perform the following infrared scan tests and inspections and prepare reports: a. Initial Infrared Scanning: After Substantial Completion, but not more than 60 days after Final Acceptance, perform an infrared scan of each enclosed switch. Remove front panels so joints and connections are accessible to portable scanner. b. Follow-up Infrared Scanning: Perform an additional follow-up infrared scan of each enclosed switch 11 months after date of Substantial Completion. c. Instruments and Equipment: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device. 4. Test and adjust controls, remote monitoring, and safeties. Replace damaged and malfunctioning controls and equipment. H. Enclosed switches will be considered defective if they do not pass tests and inspections. I. Prepare test and inspection reports, including a certified report that identifies enclosed switches and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action. 3.05 ADJUSTING A. Adjust tightness of mechanical and electrical connections to manufacturer's recommended torque settings. Rosehill Park 26 2816.16 -6 Enclosed Switches JE Project#5133 B. Adjust moving parts and operable components to function smoothly, and lubricate as recommended by manufacturer. END OF SECTION 26 2816.16 Rosehill Park 26 2816.16 -7 Enclosed Switches JE Project#5133 SECTION 26 4300 SURGE PROTECTIVE DEVICES PART 1 GENERAL 1.01 SECTION INCLUDES A. Surge protective devices for distribution locations. 1.02 RELATED REQUIREMENTS 1.03 ABBREVIATIONS AND ACRONYMS A. EMI/RFI: Electromagnetic Interference/Radio Frequency Interference. B. SPD: Surge Protective Device. 1.04 REFERENCE STANDARDS A. NEMA EN 10250- Enclosures for Electrical Equipment (1000 Volts Maximum); 2024. B. UL 1449 - Standard for Surge Protective Devices; Current Edition, Including All Revisions. 1.05 SUBMITTALS A. See Section 01 3000 -Administrative Requirements, for submittal procedures. B. Product Data: Include detailed component information, voltage, surge current ratings, repetitive surge current capacity, voltage protection rating (VPR)for all protection modes, maximum continuous operating voltage (MCOV), nominal discharge current (I- n), short circuit current rating (SCCR), connection means including any required external overcurrent protection, enclosure ratings, outline and support point dimensions, weight, service condition requirements, and installed features. 1. SPDs with EMI/RFI filter: Include noise attenuation performance. C. Certificates: Manufacturer's documentation of listing for compliance with the following standards: 1. UL 1449. 2. UL 1283 (for Type 2 SPDs). Rosehill Park 26 4300 - 1 Surge Protective Devices JE Project#5133 PART 2 PRODUCTS 2.01 SURGE PROTECTIVE DEVICES -GENERAL REQUIREMENTS A. Description: Factory-assembled surge protective devices (SPDs)for 60 Hz service; listed, classified, and labeled as suitable for the purpose intended; system voltage as indicated on the drawings. B. Unless otherwise indicated, provide field-installed, externally-mounted or factory- installed, internally-mouonted SPDs. C. List and label as complying with UL 1449, Type 1 when connected on line side of service disconnect overcurrent device and Type 1 or 2 when connected on load side of service disconnect overcurrent device. D. Protected Modes: E. UL 1449 Voltage Protection Ratings (VPRs): F. UL 1449 Maximum Continuous Operating Voltage (MCOV): Not less than 115%of nominal system voltage. G. Enclosure Environment Type per NEMA EN 10250: Unless otherwise indicated, as specified for the following installation locations: END OF SECTION 26 4300 Rosehill Park 26 4300 -2 Surge Protective Devices JE Project#5133 SECTION 265600 EXTERIOR LIGHTING PART 1 GENERAL 1.01 SECTION INCLUDES A. Exterior luminaires. B. Ballasts. C. Lamps. D. LED replacement lamps. E. Poles and accessories. F. Luminaire accessories. 1.02 RELATED REQUIREMENTS A. Section 033000-Cast-in-Place Concrete: Materials and installation requirements for concrete bases for poles. B. Section 260200-BASIC MATERIALS AND METHODS C. Section 260500-Common Work Results For Electrical D. Section 260519-RIB-Low-Voltage Electrical Power Conductors and Cables E. Section 260526-Grounding and Bonding for Electrical Systems. F. Section 260529-Hangers and Supports for Electrical Systems. G. Section 260533.13- RIB-Conduit for Electrical Systems H. Section 260533.16- Boxes for Electrical Systems. I. Section 260533.23- RIB-Surface Raceways for Electrical Systems J. Section 260533- RIB-Identification for Electrical Systems K. Section 262726-Wiring Devices: Receptacles for installation in poles. L. Section 262726 -Wiring Devices M. Section 262826.13- RIB-Enclosed Circuit Breakers N. Section 262816.16- RIB-Enclosed Switches O. Section 264300-26 RIB-Surge Protective Devices 1.03 REFERENCE STANDARDS A. IES LM-79-Approved Method: Optical and Electrical Measurements of Solid-State Lighting Products; 2024. B. IES LM-80-Approved Method: Measuring Maintenance of Light Output Characteristics of Solid-State Light Sources; 2021. C. NECA 1 -Standard for Good Workmanship in Electrical Construction; 2023. D. NECA/IESNA 501 -Standard for Installing Exterior Lighting Systems; 2000 (Reaffirmed 2006). E. NFPA 70- National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements. F. UL 1598-Luminaires; Current Edition, Including All Revisions. G. UL 8750- Light Emitting Diode(LED) Equipment for Use in Lighting Products; Current Edition, Including All Revisions. 1.04 SUBMITTALS A. See Section 013000-Administrative Requirements, for submittal procedures. Rose Hill Park 265600- 1 Exterior Lighting B. Product Data: Provide manufacturer's standard catalog pages and data sheets including detailed information on luminaire construction, dimensions, ratings, finishes, mounting requirements, listings, service conditions, photometric performance, weight, effective projected area (EPA), and installed accessories; include model number nomenclature clearly marked with all proposed features. 1. LED Luminaires: a. Include estimated useful life, calculated based on IES LM-80 test data. C. Certificates for Poles and Accessories: Manufacturer's documentation that products are suitable for the luminaires to be installed and comply with designated structural design criteria. D. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of product. E. Operation and Maintenance Data: Instructions for each product including information on replacement parts. 1.05 DELIVERY, STORAGE, AND HANDLING A. Receive, handle, and store products according to NECA/IESNA 501 and manufacturer's written instructions. B. Keep products in original manufacturer's packaging and protect from damage until ready for installation. 1.06 WARRANTY A. See Section 017800-Closeout Submittals,for additional warranty requirements. PART 2 PRODUCTS 2.01 LUMINAIRE TYPES A. Furnish products as indicated in luminaire schedule included on the drawings. B. Substitutions: Not permitted. 2.02 LUMINAIRES A. Manufacturers: 1. Refer to Lighting Schedule Sheet L3.01 B. Provide products that comply with requirements of NFPA 70. C. Provide products that are listed and labeled as complying with UL 1598, where applicable. D. Provide products listed, classified, and labeled as suitable for the purpose intended. E. Unless otherwise indicated, provide complete luminaires including lamp(s)and all sockets, ballasts, reflectors, lenses, housings and other components required to position, energize and protect the lamp and distribute the light. F. Unless specifically indicated to be excluded, provide all required conduit, boxes,wiring, connectors, hardware, poles,foundations, supports, trims, accessories, etc. as necessary for a complete operating system. G. Provide products suitable to withstand normal handling, installation, and service without any damage, distortion, corrosion, fading, discoloring, etc. H. LED Luminaires: 1. Components: UL 8750 recognized or listed as applicable. 2. Tested in accordance with IES LM-79 and IES LM-80. 3. LED Estimated Useful Life: Minimum of 50,000 hours at 70 percent lumen maintenance, calculated based on IES LM-80 test data. I. LED Tape Lighting Systems: Provide all power supplies, drivers, cables, connectors, channels, +tl covers, mounting accessories, and interfaces as necessary to complete installation. 1. LED Tape-General Requirements: Rose Hill Park 265600-2 Exterior Lighting a. Listed. b. Designed for field cutting in accordance with listing. 2.03 BALLASTS AND DRIVERS A. Manufacturers: 1. Where a specific manufacturer or model is indicated elsewhere in the luminaire schedule or on the drawings, substitutions are not permitted unless explicitly indicated. B. Ballasts/Drivers-General Requirements: 1. Provide ballasts containing no polychlorinated biphenyls(PCBs). 2. Minimum Efficiency/Efficacy: Provide ballasts complying with all current applicable federal and state ballast efficiency/efficacy standards. 2.04 LAMPS A. Manufacturers: 1. Where a specific manufacturer or model is indicated elsewhere in the luminaire schedule or on the drawings, substitutions are not permitted unless explicitly indicated. B. Lamps-General Requirements: 1. Unless explicitly excluded, provide new, compatible, operable lamps in each luminaire. 2. Verify compatibility of specified lamps with luminaires to be installed. Where lamps are not specified, provide lamps per luminaire manufacturer's recommendations. 3. Minimum Efficiency: Provide lamps complying with all current applicable federal and state lamp efficiency standards. 4. Color Temperature Consistency: Unless otherwise indicated, for each type of lamp furnish products which are consistent in perceived color temperature. Replace lamps that are determined by the Landscape Architect to be inconsistent in perceived color temperature. 2.05 POLES A. Manufacturers: 1. Refer to schedule sheet L3.01 B. All Poles: 1. Provide poles and associated support components suitable for the luminaire(s) and associated supports and accessories to be installed. 2. Mounting: Install on concrete foundation, height as indicated on the drawings, unless otherwise indicated. 3. Unless otherwise indicated, provide with the following features/accessories: a. Top cap. b. Anchor bolts with leveling nuts or leveling shims. c. Anchor base cover. d. Provision for pole-mounted weatherproof GFI receptacle where indicated. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that field measurements are as indicated. B. Verify that outlet boxes are installed in proper locations and at proper mounting heights and are properly sized to accommodate conductors in accordance with NFPA 70. C. Verify that suitable support frames are installed where required. D. Verify that branch circuit wiring installation is completed, tested, and ready for connection to luminaires. E. Verify that conditions are satisfactory for installation prior to starting work. 3.02 INSTALLATION Rose Hill Park 265600-3 Exterior Lighting A. Coordinate locations of outlet boxes provided under Section 260533.16 as required for installation of luminaires provided under this section. B. Install products in accordance with manufacturer's instructions. C. Install luminaires in accordance with NECA/IESNA 501. D. Provide required support and attachment in accordance with Section 260529. E. Install luminaires plumb and square and aligned with building lines and with adjacent luminaires. F. Pole-Mounted Luminaires: 1. Foundation-Mounted Poles: a. Install foundations plumb. b. Install poles plumb, using leveling nuts or shims as required to adjust to plumb. c. Tighten anchor bolt nuts to manufacturer's recommended torque. 2. Grounding: a. Bond luminaires, metal accessories, metal poles, and foundation reinforcement to branch circuit equipment grounding conductor. 3. Install separate service conductors, 12 AWG copper, from each luminaire down to handhole for connection to branch circuit conductors. G. Install accessories furnished with each luminaire. H. Bond products and metal accessories to branch circuit equipment grounding conductor. I. Install lamps in each luminaire. 3.03 CLEANING A. Clean surfaces according to NECA/IESNA 501 and manufacturer's instructions to remove dirt, fingerprints, paint, or other foreign material and restore finishes to match original factory finish. 3.04 PROTECTION A. Protect installed luminaires from subsequent construction operations. END OF SECTION Rose Hill Park 265600-4 Exterior Lighting SECTION 047100 MANUFACTURED BRICK MASONRY PART 1 GENERAL 1.01 SECTION INCLUDES A. Adhered manufactured brick masonry veneer(AMBMV). B. Installation materials. 1.02 REFERENCE STANDARDS A. ASTM C1670/C1670M - Standard Specification for Adhered Manufactured Stone Masonry Veneer Units; 2024a. B. ICC-ES AC51 -Acceptance Criteria for Adhered Manufactured Stone Masonry Veneer; 2018, with Editorial Revision (2021). 1.03 SUBMITTALS A. See Section 013000-Administrative Requirements,for submittal procedures. B. Selection Samples: Submit two samples of mortar, illustrating mortar color and color range. 1.04 MOCK-UP A. Construct mock-up panel 4 feet(_m)long by 6 feet(1.8 m) high; include AMBMV, mortar, accessories, substrate, and representative wall openings in mock-up. B. Locate where directed. 1.05 DELIVERY, STORAGE,AND HANDLING A. Store products in manufacturer's unopened packaging until ready for installation. B. Prevent mechanical damage and contamination by other materials. C. Protect products from precipitation combined with freezing temperatures. Do not install products with visible frozen moisture. D. Protect Portland cement based materials from moisture and humidity. Store under cover off the ground in a dry location. 1.06 WARRANTY A. See Section 017800 -Closeout Submittals,for additional warranty requirements. B. Provide 50 year manufacturer warranty for AMBMV. C. Provide 15 year manufacturer warranty for mortar and other installation materials used in exterior installations over steel or wood framing. PART 2 PRODUCTS 2.01 ADHERED MANUFACTURED BRICK MASONRY VENEER(AMBMV) A. AMBMV: Cast masonry units using a mixture of cement, lightweight aggregates, concrete additives and color pigments to replicate appearance of brick and designed to be applied with a cementitious mortar to a backing surface, complying with ASTM C1670/C1670M and ICC-ES AC51. 1. Style: As indicated on drawings. 2. Color, Texture, Range, Special Shapes: As indicated on drawings. 2.02 MORTAR APPLICATIONS A. Field-mix the mortar. B. Mortar Color: Natural gray unless otherwise indicated. PART 3 EXECUTION 3.01 PREPARATION A. Dampen masonry surfaces to reduce excessive suction. Rose Hill Park 047100- 1 Manufactured Brick Masonry B. Clean concrete surfaces of foreign matter using approved acid solutions, solvents, or detergents, and then rinse surfaces thoroughly with clean water. C. Roughen smooth concrete surfaces and apply bonding compound in accordance with manufacturer's written installation instructions. 3.02 INSTALLATION -AMBMV A. Bond: Flemish. B. Mortar Joints: Concave. C. Caps: Install capstones at locations indicated on drawings. D. Seal all joints at wall openings and penetrations with sealant approved for use with AMBMV. E. Apply repellent in accordance with repellent manufacturer's application instructions. 3.03 TOLERANCES A. Maximum Variation From Unit to Adjacent Unit: 1/16 inch (1.6 mm). B. Maximum Variation from Level Coursing: 1/8 inch in 3 feet(3 mm in 1 m)and 1/4 inch in 10 feet(6 mm in 3 m); 1/2 inch in 30 feet(13 mm in 9 m). 3.04 CUTTING AND FITTING A. Cut and fit for pipes and conduit. Coordinate with other sections of work to provide correct size, shape, and location. 3.05 CLEANING A. Remove excess mortar and mortar smears as work progresses. B. Clean soiled surfaces with cleaning solution. END OF SECTION Rose Hill Park 047100-2 Manufactured Brick Masonry SECTION T ADDENDUMS Cin of , -CITY OF PORT ARTHUR,TEXAS ort rthur ADDENDUM NO. ONE (1) Texas AUGUST 26, 2026 BID FOR: ROSE HILL PARK HARDSCAPE&LANDSCAPE IMPROVEMENTS BID: P26-54 The following clarifications, amendments, deletions, additions,revision and/or modifications are made a part of the contract documents and change the original documents only in the manner and to the extent hereinafter stated and shall be incorporated in the contract documents. Provisions of this addendum shall take precedence over requirements of the original contract documents and all BIDDERS ARE REQUESTED TO ACKNOWLEDGE SAID PROVISIONS IN THE SUBMISSION OF THEIR BID. Addendum as follows 1. Attached is correct Page 3. 2. Attached is Corrected Table of Contents. 3. Attached is Addendum 1 Clarifications from Burditt. 4. Attached is revised pages for drawing. 5. Contingency of$200,000 included in bid. 6. Attached is the Bid Schedule. 7. Please Submit the Bid Sheet and Bid Schedule. If you have any questions,please contact the Purchasing Division at 409-983-8160. NOTE: ALL PAGES OF ADDENDA MUST BE SIGNED AND SUBMITTED WITH YOUR BID DOCUMENTS. Cli Willia Purc ing M ger Jd7J?i, Sig ature of Proposer Date n1Yu C"1U'1 Ca )n G Company Vendor Name IV 4 -CITY OF PORT ARTHUR, TEXAS ort rrj�r r ADDENDUM NO. TWO (2) Tow AUGUST 31, 2026 BID FOR: ROSE HILL PARK HARDSCAPE&LANDSCAPE IMPROVEMENTS BID: P26-54 The following clarifications, amendments, deletions, additions, revision and/or modifications are made a part of the contract documents and change the original documents only in the manner and to the extent hereinafter stated and shall be incorporated in the contract documents. Provisions of this addendum shall take precedence over requirements of the original contract documents and all BIDDERS ARE REQUESTED TO ACKNOWLEDGE SAID PROVISIONS IN THE SUBMISSION OF THEIR BID. Addendum as follows 1. Attached Sealed Bid submittal must be received and time stamped by 3:00 p.m., Central Standard Time,Wednesday, September 16, 2026. (The clock located in the City Secretary's office will be the official time.) All bids received will be read aloud at 3:15 p.m. on Wednesday, September 16, 2026 in the City If you have any questions, please contact the Purchasing Division at 409-983-8160. NOTE: ALL PAGES OF ADDENDA MUST BE SIGNED AND SUBMITTED WITH YOUR BID DOCUMENTS. eye.yrw. 6tAzi CliCtion Willi Pur sing M n ger 9 Id( 1.x, Si ature of Proposer Date i Company Vendor Name c�n•tf -CITY OF PORT ARTHUR, TEXAS ADDENDUM NO. THREE (3) nrt rtltur SEPTEMBER 11, 2026 BID FOR: ROSE HILL PARK HARDSCAPE &LANDSCAPE IMPROVEMENTS BID: P26-54 The following clarifications, amendments, deletions, additions, revision and/or modifications are made a part of the contract documents and change the original documents only in the manner and to the extent hereinafter stated and shall be incorporated in the contract documents. Provisions of this addendum shall take precedence over requirements of the original contract documents and all BIDDERS ARE REQUESTED TO ACKNOWLEDGE SAID PROVISIONS IN THE SUBMISSION OF THEIR BID. Addendum as follows 1. Attached is Addendum 3 Clarifications for Burditt. 2. Attached is corrected Addendum 1 Clarifications for Burditt. 3. Attached Sealed Bid submittal must be received and time stamped by 3:00 p.m., Central Standard Time, Wednesday, September 23, 2026. (The clock located in the City Secretary's office will be the official time.) All bids received will be read aloud at 3:15 p.m. on Wednesday, September 23, 2026 in the City If you have any questions,please contact the Purchasing Division at 409-983-8160. NOTE: ALL PAGES OF ADDENDA MUST BE SIGNED AND SUBMITTED WITH YOUR BID DOCUMENTS. • Cli William Pur sing Ma ger 9-1 2-(,i Si ature of Proposer Dat N 4`C CenStAKfri6V\ CI) , Inc Company Vendor Name City of -CITY OF PORT ARTHUR, TEXAS nrt rtliur ADDENDUM NO. FOUR(4) lerue SEPTEMBER 14, 2026 BID FOR: ROSE HILL PARK HARDSCAPE & LANDSCAPE IMPROVEMENTS BID: P26-54 The following clarifications, amendments, deletions, additions, revision and/or modifications are made a part of the contract documents and change the original documents only in the manner and to the extent hereinafter stated and shall be incorporated in the contract documents. Provisions of this addendum shall take precedence over requirements of the original contract documents and all BIDDERS ARE REQUESTED TO ACKNOWLEDGE SAID PROVISIONS IN THE SUBMISSION OF THEIR BID. Addendum as follows 1. Attached is Addendum 4 Clarifications for Burditt. 2. Attached is Geotechnical Report. 3. Attached is the Boring Location Map. If you have any questions,please contact the Purchasing Division at 409-983-8160. NOTE: ALL PAGES OF ADDENDA MUST BE SIGNED AND SUBMITTED WITH YOUR BID DOCUMENTS. Clieige8511., Williams Pur sing M ager 11l Si ature of Proposer Date etT [ fCokc . Company Vendor Name -CITY OF PORT ARTHUR, TEXAS urt rtHu c"� ADDENDUM NO. FIVE (5) Terns SEPTEMBER 5, 2026 BID FOR: ROSE HILL PARK HARDSCAPE &LANDSCAPE IMPROVEMENTS BID: P26-54 The following clarifications, amendments, deletions, additions, revision and/or modifications are made a part of the contract documents and change the original documents only in the manner and to the extent hereinafter stated and shall be incorporated in the contract documents. Provisions of this addendum shall take precedence over requirements of the original contract documents and all BIDDERS ARE REQUESTED TO ACKNOWLEDGE SAID PROVISIONS IN THE SUBMISSION OF THEIR BID. Addendum as follows 1. Attached is Addendum 5 Clarifications for Burditt. 2. Attached is Revised Drawing Sheets 3. Attached is the estimate Water Line Extension. If you have any questions,please contact the Purchasing Division at 409-983-8160. NOTE: ALL PAGES OF ADDENDA MUST BE SIGNED AND SUBMITTED WITH YOUR BID DOCUMENTS. G(24,1.,:a4424- Chit&Williams Pure sing nager Ct [21 I Sig ture of Proposer Dat kc CiPn -tvlAc/h(N\ C6.1 111 . Company Vendor Name