HomeMy WebLinkAbout2010 STREETS PROGRAM~;:
,.
CITY OF PORT ARTHUR
Public Works Department
MEMORANDUM
TO: Stephen B. Fitzgibbons, City Manager
FROM: Ross E. Blackketter, P. E., Director of Public Works
DATE: 06 January 2010
RE: 2010 Streets Program
~'~~~'IyLcL~
_ ~'~~ ' ~ 2D10
~~~pf ~ ~L~~',~~~'t~S 4rrc'C~
a~~
Attached is the proposed Streets Program for the 2010 fiscal year for review and comment by
the City Council. Any comments received will be incorporated into a revised program that will
be submitted to the Council for approval on the 26 January 2010 agenda.
Please call if you need additional information.
cc: John A. Comeaux, PE., Assistant City Manager/Operations
Rebecca Underhill, CPA, Assistant City Manager/Administration
Kevin Jones, Streets Superintendent
Z:\engineer\documents\memos\2010 Streets Progrem.docc
Page 1 of 1
PROPOSED FY 2010 CITY STREET PROGRAM
PROJECTS LIMITS COND. TYPE LENG. WIDTH UNIT COST MATERIAL LABOR COST
23rd St. Memorial Blvd to WDE P R/C 2150 ft. 20 ft. $6.93 sq. yd. $33,110 $23,177 $56,287
Wilson Ave. Hwy 365 to Dorsey St. P R/C 2640 ft. 18 ft. $7.68 sq. yd. $40,550 $25,385 $68,936
Ashland Dr. S. Park Dr. to Lombardy Dr. P R/C 1585 ft. 21 ft. $6.93 sq. yd. $25,629 $17,941 $43,570
61st St. WPAR to Canal St. P R/C 2250 fC. 20 ft. $7.68 sq. yd. $38,400 $26,880 $65,280
62nd St. WPAR to Nick Ave. P R/C 2900 ft. 20 ft. $7.68 sq. yd. $49,493 $34,645 $84;139
4th Ave 25th St. to 36th St. P RC/CS/HMAC 2300 ft. 24 ft. $15.00 sq. yd. $92,000 $55,200 $147,200
Daisy Ave. Barbara Ln. to Maple St. P R/C 825 ft. 17 ft. $6.93 sq. yd. $12,500 $8,750 $21,250
Maple St. Roosevelt Ave. to WDE P R/C 2135 ft. 20 ft. $6.93 sq. yd. $32,879 $23,015 $55,894
41st St. Lansing Ave. to 6th Ave. P R/C 1400 ft. 20 ft. $6.93 sq. yd. $21,560 $15,092 $36,652
15th St. Peek St. to Gulfway Dr. F/P R/C 600 ft. 21 ft. $6.93 sq. yd. $9,702 $6,791 $16,493
Peek St. Gulfway Dr: to Henry St... P R/C 1615 ft. 18 ft. $6.93 sq. yd. $22,354 $15,669 $38,053
11th Ave. Lewis Dr. to 14th St. P R/C 1280 ft. 20 ft. $6.93 sq. yd. $19,712 $13,798 $33,510
14th St. Peek St. to 11th Ave. F/P R/C 135 ft. 31 ft. $6.20 sq. yd. $4,030 $2,821 $6,551
9th St. 5100 Blk. P RC/CS/New C & G 780 fC. 24 ft. $40.92 sq. yd. $85,114 $68,091 $153,204
Lake Charles Ave. Procter St. to Lakeshore Dr. P RC/CS 400 ft. 42 ft. $6.93 sq. yd. $12,936.00 $7,762 $20,698
~ERIAL LABOR COST
$500,000 $348,018 $548;017
G7.TF.RNATF. PR(l.iF.CTQ
PROJECTS LIMIT3 COND. TYPE LENG. WIDTH UNIT COST MATERIAL LABOR COST
Jack SC _ 59th St. to 60th St. F/P RC/CS 990 ft. 20 tt. $9.00 sq. yd. $19,500 $13,860 $33,660
Poole Ave. 16th St. to 17th St. F RC/CS 280 ft. 22 ft. $9.00 sq. yd. $6,160 $4,312 $10,472
15th St. Peek Ave. to 10th Ave. F/P RC/CS 622 ft. 20 ft. $9.00 sq. yd. $12,440 $8,708 $21,148
Sims Ave. 16th St. to 17th St. F/P RC/CS 315 ft. 22 ft. $9.00 sq. yd. $6,930 $4,851 $11,781
Green Ave. Gulfway Dr. to 13th St. F RC/CS 915 ft. 20 ft. $9.00 sq. yd. $18,300 $12,810 $31,110
8th Ave. 39th St. to 42nd St. F/P RC/CS 1010 ft. 20 ft. $9.00 sq. yd. $20,200 $14,140 $34,340
6th Ave. 39th St. to 42nd St. F/P RC/CS 1010 ft. 20 ft. $9.00 sq. yd. $20,200 $14,140 $34,340
12th St. Woodworth Blvd. to 3rd Ave. F/P RC/CS/Curb work 940 ft. 28 ft. $23.00 sq. yd. $67,262 $53,810 $121,072
Lakeshore Dr. Duff Dr. to Williams Ave. F/P RC/HMAC/Curb work 728 ft. 23 ft. $22.00 sq. yd. $40,930 $32,744 $73,674
Pecos Ave. 7th St. to Procter St. F/P RC/HMAC/NEW C & G 900 ft. 22 ft. $26.00 sq. yd. $57,200 $45,760 $102,960
Lakeshore Dr. Stadium Road to 13th St. R.O.W F Conc. Repairs/HMAC/(SO) 5400 ft. 36 ft. $9.00 sq. yd. $194,400 $155,520 $349,920
9th Ave. Evergreen Dr. to 25th St. F CONCRETE 400 ft. 45 ft. $125.00 cu yd $35,000 $28,000 $63,000
MATERIAL LABOR COST
$498,822 $388,655 $887,477
PROPOSED FY 2010 CITY STREET PROGRAM
ALTERNATE PROJECTS
PROJECTS LIMITS COND. TYPE LENG. WIDTH UNIT COST MATERIAL LABOR COST
.Event Area Sidewalk Downtown Area P Replace Sidewalk 900 ft. 10 ft. $4.00 sq. yd. $4,000.00 $6,000 $10
000
Cambridge Ave. Hwy 73 to W.D.E. P RC/HMAC/NEW C & G 2650 ft. 25 ft. $26.00 sq. yd. $191,388.89 $287,083 ,
$478,472
Sharon Dr. Cambridge Ave. to Queen Dr. P RC/HMAC/NEW C & G 1056 ft. 25 ft. $26.00 sq. yd. $76,266.67 $114,400 $190,667
60th St. Roosevelt to Railroad Tracks F/P RC/HMAC 2640 ft. 24 ft. $13.00 sq. yd. $91,520.00 $137,280 $228
800
Ridgewood Ave. Hwy 347 to Eyre Dr. F/P RC/CS 1625 ft. 24 ft. $6.93 sq. yd. $30,030.00 $18,018 ,
$48,048
61st St. Gaznet Ave. to 1500ft East P R/C 1500 ft. 21 ft. $6.93 sq. yd. $24,255.00 $14,553 $38,808
61st St. Garnet Ave to Jade Ave. P R/C 2570 ft. 21 ft. $6.93 sq. yd. $41,557 $24,934 $66,491
62nd St. Garnet Ave. to Jade Ave. P R/C 2570 it. 20 ft. $7.68 sq. yd. $43,861.33 $26,317 $70,178
62nd St. Nick Ave. to Garnet Ave. P R/C 1510 ft. 20 ft. $7.68 sq. yd. $25,770.67 $15,462 $41,233
10th Ave. Gulfway Dr. to 15th St. P R/C 265 ft. 31 ft. $6.17 sq. yd. $5,631.84 $3,379 $9,011
Bernhardt Giffin Dr. to Forest Dr. P RC/CS 675 ft. 26 ft. $6.93 sq. yd. $13,513.50 $8,108 $21
622
Bernhazdt Sunken Court to Forest Dr. F RC/CS 540 ft. 26 ft. $6.93 sq. yd. $10,810.80 $6,486 ,
$17,297
Bernhazdt Sunken Court to 32nd St. F RC/CS 1415 ft. 26 ft. $6.93 sq. yd. $28,328.30 $16,997 $45,325
6th Ave. 32nd St. to 39th St. P R C
/
2625 ft.
19 ft.
$6.93 sq. yd.
$38,403.75
$23,042
$61,446
MATERIAL LABOR COST
$625,338 $702,061 $1,327,398
Total Cost All Protects
MATERIAL LABOR COST
$1,624,159 $1,438,733 $3,062,892
DEFINITIONS:
RC Reconstruction (addition to significant amount of base material)
LT.RC Light reconstruction (very little additional base material required)
HMAC Hot Mix Asphaltic Concrete Surtace
RECYCLE Recycle exiting HMAC Surface
CS Chip Seal Surface
C Nr, G Curb and Gutter Replacement
SO Surface only Replacement
ADD. Additive to base material such as lime, cement, or asphalt
MILL The removal of old HMAC surface prior to the replacement of new HMAC surface
INDUST. CONSTRUCTIO Additional base ] 0 to 12 " to accommodate heavy traffic loads
POP Property Owner Participation
CIP Capital Improvement Projects
JOHRTS Jefferson, Orange, Hardin Regional Transportation System
'1"~'V/edn se d'a~y,~'Jenuary{0'6~„201Q~
~, 5 u. eft yn.