Loading...
HomeMy WebLinkAboutPR 15758: 2010 STREETS PROGRAMMEMORANDUM PUBLIC WORKS DEPARTMENT TO: Stephen B. Ftrgibbons, City Manager FROM: Ross E. Blackketter, P.E., Director of Public Works SgB7ECT: P. R.# 15758, 2010 Streets Program DATE: 16 February 2010 RECOMMENDATION: It is recommended that the City Council approve Proposed Resolution No. 15758 approving the 2010 Streets Program. Funds are to be available in account 001-1203-531.86-00. BACKGROUND: The proposed 2010 Streets Program was presented twice to the City Council. Based on input received from Councilmembers, the list of proposed streets to be reconstructed was .revised as shown in the current recommendation. BUDGETARY/FISCAL EFFECT: Funds are to be available in account 001-1203-531.86-00, contingent on passing a budget amendment. EMPLOYEE/STAFF EFFECT: None. SUMMARY: It is recommended that the City Council approve Proposed Resolution No. 15758 approving the 2010 Streets Program. Funds are to be available in account 001-1203-531.86-00. Ross E. Blackketter, P.E.~~ Director of Public Works REB/reb Z:\engineer\Documents\CAMS\Streets Program-l0.doa P.R. No. 15758 02/16/i0 reb RESOLUTION NO. A RESOLUTION APPROVING THE 2010 CITY STREETS PROGRAM IN THE CITY OF PORT ARTHUR, WITH. FUNDING TO BE AVAILABLE IN ACCOUNT 001-1203-531.86-00. WHEREAS; the Public Works Department of the City of Port Arthur has developed a 2010 City Streets Program as shown in Exhibit "A", attached hereto and made a part hereof; and, WHEREAS, this program has previously been reported on to Council and revised according to the discussions resulting therefrom; and, WHEREAS, funding for the. City Streets Program is to be available in account 001-1203-531.86-00, contingent upon approval of the budget amendment on this agenda; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the recommended 2010 City Streets Program as shown in. 6chibit "A" is hereby approved; and, THAT, the City Staff is hereby instructed to take all steps necessary to effect the above referenced 2010 City Streets Program in a timely and cost-effective manner; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of A.D. 2010 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: P:R. No. 15758 Page. 2 Councilmembers: Mayor Attest: City Secretary APPROVED AS TO FORM: APPROVED AS TO AVAILABILITY OF FUNDS: City Attome r Deborah Echols, CPA ~~'@,~iN01~ Director of Finance APPROVED FOR ADMINISTRATION: Stephen B. Fitzgibbons City Manager . ~~, Ross E. Blackketter, P.E. Director of Public Works Z:\engineer\documents\Resolutions\PR15758.doc EXHIBIT A y y~va~vua;y~ y~a ~uyv l.ll i J1ic.C.Cl 1'1CVlr1(E11V1 23rd St. Memorial Blvd [o WDE V P TYPE LENG. WIDTH UNIT Wilson Ave. Hwy 365 [o Dorsey SL P RC/HMAC 2150 ft. 20 ft. $10.12 60th SC Roosevelt to Railroad Track RC HMAC / 2640 tt. 18 ft. $10 12 61st St. s WPAR to Canal St. F/P P RC HMAC / ~ 2640 fL 24 ft. . $10.12 62nd SC. WPAR to Nick Ave. P RC/HMAC 2250 ft. 20 ft, $10.12 4th Ave 25th St. [0 36th SL P RC HMAC / 2900 ft. 20 ft $10.12 Daisy Ave. Barbara Ln. to Maple St p RC/HMAC 2300 ft. 24 ft. $10 12 Maple St. . Roosevelt Ave. to WDE P RC/HMAC 825 ft. 17 R. . $10.12 41st St. Lansing Ave. to 6th Ave. P RC/HMAC 2135 ft. 20 R. $10.12 15th St. Peek St. to 10th Ave, p p / RC HMAC / 1400 ft. 20 tt. $10.12 11th Ave. Lewis Dr, to 14th St. P RC/HMAC 600 ft. 21 ft. $10.12 14th St. Peek St. [0 11th Ave. F/P RC/HMAC R 1280 fi. 20 ft. $10.12 9th St. 5100BIk. P C/HMAC '135 ft. 31 ft. $10.12 ~, Charles Ave. Procter St, to Lakeshore D RC/HMAC/New C 8s G 780 ft. 24 ft. $39.79 ; r. p RC/HMAC 400 ft. 42 tt. R1n to PROJECTS ~.ueum uc 5. Park Dr, to LombaM~ Peek SL Oulfway Dr. to Henry Jack St 59th St. to 60th St. Poole Ave. 16th St. [0 17th St. Sims Ave. 16th St. to 17th St. 8th Ave. 39th St. to 42nd St. 6th Ave. 39th St. to 42nd St. 12th St. Woodworth Blvd. to 3rd keshore Dr. Duff Dr. to Williams Ai 'ecoa Ave. 7th St. to Procter St keshore Dr. Stadium Roed to 13th St. R 9th Ave. Evergreen Dr. to 25th F ze ¢. y:10.12 sq 1 1 C BsG C 8s G 728 tt. 23 ft. $39.79 sq. C 8s G 900 ft. 22 ft. $39.79 sq. \C/(SO) 5400 ft. 36 tt. Goan o„ 315 ft. 22 tt. $10.12 sq 010 ft. 20 ft. $10.12 sq. 010 ft. 20 ft. $10.12 sq. 940 tt. 28 ft. $39.79 sq. MATERIAL LABOR CMM CYMA COST $591,552 $269,726 $77,168 $23,712 $861,279 CITY n„t.on.. .....__ 14 77 170 1 MATERW, LABOR CMM CYMq COST $659,854 $466,873 $107,293 $55,936 $1,126,727 ALTERNATE PROJECTS Florida Ave. Florida AVe. 7th St. to 10th St. 10th. St. to 11th St COND. P P TypE RC/HMAC LENG. 1025 tt. WIDTH 20 ft. UNIT COST $10.12 s Yd 9 MATERIAL $23 051 11 r:r't'Y LABOR $ Outsi CMM de Labor CYMA COST Florida Ave. S 11th St. to Thomas Blvd. p RC HMAC / RC/HMAC 345 ft. 20 ft. . • 10.12 sq. yd. , . 7,758.67 9,220 $3,103 $5,353 $1 802 32 272 abine Ave. Di Lewis Dr, to Gultway Dr. p RC/HMAC 310 ft. 20 ft. $10.12 s q. yd. $6,971.56 $2,789 , $1 619 10,862 amond Ave. Diamond Av Mimosa St. to 63rd S[. P RC HMAC / 1975 ft. 1500 tt 20 ft. 10.12 sq. yd. , 44,415.56 $17,766 , ,10,314 9,760 $62 182 e. Event Area Sidewallc Mimosa St. to 60th St. F/P RC HMAC / . 1500 R 20 ft. 20 ft 10.12 sq. yd. $33,733.33 13,493 $7,833 , 47 227 Cambridge Ave. Downtown Area Hwy 73 to W D E P Re ]ace Sidewalk P 900 ft. . 10 tt. 10.12 s 9~ Yd. 4 00 s d 33,733.33 4 000 $13,493 7,833 . $47 227 Sharon Dr, . , . Cambridge Ave. to Queen Dr P P RC/HMAC/NEW C & G 2650 ft. 25 tt. . q, y . 39.79 s d. q y , ,00 292 898 61 6,000 175 2,350 $10,000 Ridgewood Ave. . Hvry 347 to Eyre Dr. F/P RC/HMAC/NEW C & G 1056 fL 25 ft. $39.79 s 4~ Yd. , . 116 717.33 ,739 $70 030 $17,299 6 8 80,560 $468,638 61st SL Garnet Ave. to 1500f[ Eest P RC HMAC / RC HM 1625 fL 24 ft. 10.12 sq. yd , 43,853.33 , 17 541 , 93 10 183 32,102 186,748 61st St• Garnet Ave. to Jade Ave. p / AC RC H 1500 ft. 21 ft. 10.12 s q~ yd. $35,420.00 , $14 168 , $8 225 61,395 62nd St. Garnet Ave. to Jade Ave. p / MAC RC HM 2570 R. 21 ft 10.12 sq. yd. 60,686 , 275 $24 , 14 092 49,588 62nd St. Nick Ave. to Garnet Ave. P / AC RC HMAC / 2570 ft. 20 ft. 10.12 sq. yd. 57,796.44 , $23,119 , 13 421 84,961 80 9 10th Ave. B Gultway Dr. to 15th St. P RC/HMAC 1510 ft. 265 R 20 Ct. 10.12 sq. yd. 33,958.22 13,583 , $7,886 , 15 47 542 ernhard[ Ber h d Giifn Dr. to Forest Dr. p RC HMAC / . 675 ft 31 ft. ' 10.12 s 9~ Yd. 9,237.31 $3,695 2,145 , '12 932 n ar t Bernhardt Sunken Court to Forest Dr, p RC/HMAC . 540 tt 26 ft . 26 ft 10.12 sq. yd. 19,734.00 7,894 $4,583 , 27,628 6th Ave. Sunken Court to 32nd St. 32nd St to 39th St F RC HMAC / . 1415 ft. . 26 ft. 10.12 s 4 Yd. $10.12 sq d 15,787.20 41 368 3 $6,315 3,666 22, L02 Forest Dr. . . Orlffin Dr. to Evergreen Dr. p F RC/HMAC 2625 ft. 19 tt. . y . 10.12 s q. Yd. , . 1 $56 081.67 16,547 22 433 9,606 13 02 57,916 8th Ave. 25th St to 9auth 1300R. P RC HMAC / RC/HMAC 750 R. 1320 f 27 tt. 10.12 sq, yd. , 22,770.00 , 9,108 , 3 2 $5, 88 $78,514 $31 878 24th St 22nd St Memorial 81vd. to 4th Ave. P RC HMAC / t. 1615 ft 21 ft. 21 ft 10.12 s 4~ Yd~ 31,169.60 $12,468 7,238 , 43,637 . Memphis Ave. Memorial Blvd. to E.D.E. 10th St 1 p RC/HMAC . 3200 ft. . 21 R. 10.12 sq. yd. 10 12 5 d 38,135.53 75 15,254 8,856 53,390 2nd Ave.. . to 1th St Gultway Dr. to 19th SL p P RC/HMAC 310 Ct. 20 ft. . . q~ y 10.12 sq. yd. ,562.67 $6 971.56 $30,225 $2 789 $17,547 1 105,788 13th St. Rosedale Dr. to 11th Ave. P RC/HMAC RC HMAC / 1040 R. 23 ft 10.12 sq. yd. , 26,A96.71 , $10,759 ,619 6 246 9,760 37 6 12th S[. Rosedale Dr. [0 11th Ave. p RC/HMAC 1290 ft. 1290 f 19 ft. $10.12 sq. yd. $27,560.13 $11,024 , 6,400 , 55 $38 584 11th Ave. Neches Ave. Lewis Dr. to 14th 9t. Cewts O P RC/HMAC t. ].290 ft. 19 Cf. 20 It, 10.12 sq, yd. $10 12 s d 27,560.13 $29 0 11,024 $6,400 , 38,584 26th St r. to 13th St. Memorial Blvd. to 4th Ave. p p RC/HMAC RC 950 ft. 19 ft. . q. y .. $10.12 sq. yd. , 10.67 20,296.22 11,604 $8 118 6,737 $4 713 '40,fi 15 Fort Worth Ave• Thomas Blvd. to 9th St. P /HMAC RC HMAC / 2100 ft. 1075 22 ft. 10.12 s 9• Yd. 51,949.33 , - 20,780 , $12,063 $28,415 72 729 Fort Worth Ave. Thomas Blvd. to 13th St. p RC/HMAC tt. 700 ft 24 ft. $10.12 sq. yd. 29,010.67 11,604 6,737 , $40 615 . 24 ft. 10.12 sq. yd. 18,890.67 7,556 $4,387 , $26,447 MATERIAL LABOR CMM CYMA COST 1,342,986 $623,518 $242,354 $112,662 $1,966,504 11\Vy VJliL 1'; LV 1V V;y y Jly~l].Cil 11\VVN11Y1 ALTERNATE PROJECTS PROJECTB 7th Ave LIMITS 32nd St. to S.D.E. - COND. F/P TYPE LENO. WIDTH UN[T COST MATERIAL CITY LABOR Outside Laboz CMM Lavender Ave. Oleander Ave. to Ray Ave. F/G RC/HMAC RC 1280 R 17 ft $10.12 sq. yd. $24,467.91 $9 787 CYMA $5 682 COST Lavender Ave. Pastel Ave. to Oleander Ave. p HMAC / R 2050 ft 19 ft $10.12 sq. yd. $43,797.11 , $17 519 , $10 170 $34,255 Oleander Ave. Hvry 73 to Shirley P C/HMAC RC 925 tt 19 ft $10.12 sq. yd. $19,762.11 , $7 905 , $4 589 $61,316 Bluebonnet Ave. Oliham Circle to Gulfwa Dr. Y P /HMAC Mill/Conc. Repairs/HMAC 1290 ft 3100 R 21 C[ $10.12 sq. yd. $30,461.20 , $12,184 , $7,074 $27,667 $42 646 Bluebonnet Ave, Gulfway Dr, [0 19th St. P Mil]/Conc. Repairs/HMAC 2100 tt 36 It $14.68 s 4~ Yd $182,032.00 $72,813 $29,140 , $254 845 Dryden Rd. 9th Ave. to Rosedale Dr. F/P RC HMAC / 2585 f 36 R $14.68 s 9~ Yd $123,312.00 $49,325 $19,740 , $172 637 Dryden Rd. Rosedale Dr. to Twin Cit Y F/P RC/HMAC t 26 27 ft $10.12 sq. yd $78,480.60 $31,392 $18,224 , $109 873 Woodrow Dr. 32nd St. to 36th St. F/P RC/HMAC 10 Ct 12 0 27 ft $12.62 s , yd q $98,814.60 $39,526 $18,401 , $138 340 36th St. 9th Ave. to Eest 2600 Blk. p RC/HMAC 8 ft 2q It $10.12 sq. yd $34,542.93 $13,817 $8,021 , $48 360 36th St 9th Ave. to srr, a„o _ __ ,__ _ _ 2600 ft 24 ft $10.12 sq. Yd $70.165.x3 xoa naa x, ~ .,..~ , _ _ _ _ MATERIAL, LABOR CMM CYMA COST $734,171.80 $293,669 $143,914 $0 $1,027,841 DEFINITIONS: 3C ~ Reconstruction (addition to significant aznount of base material) :T.RC Light reconstruction (very little additional base material required) iMAC Hot Mix Asphaltic Concrete Surface 2ECYCLE Recycle exiting HMAC Surface 3S Chip Seel Surface g' G Curb and Outter Replacement >G Surface only Replacement 1DD. Additive to base material such as lime, cement, or asphalt NILL The removal of old HMAC surface prior to the replacement of new HMAC surface 'NDUST. CONSTRUCT Additional base 10 to 12 " to accommodate heavy traffic loads ?OP Property Owner Participation ]IP Capital Improvement Projects IOHRTS Jefferson, Orange, Hardin Regional Transportation System