Loading...
HomeMy WebLinkAboutPR 15766: NATIONAL NETWORKS LLC. CHANGE ORDERMemorandum City of Port Arthur, Texas Information Systems Division To: Stephen Fitzgibbons, City Manager From: Fay Young, Information Technology Manager ~. (,(ptiL,~ Date: March 4, 2010 V Subject: Proposed Resolution 15766 RECOMMENDATION The Information Systems Division, recommends that the City Council approve the change order submitted by National Networks, LLC, in regards to the network cabling project. The changes to be made will not have a financial impact on the project. BACKGROUND On September 8, 2009 the City entered into a contract with National Networks, LLC for the upgrading of the network infrastructure in City Hall and City Hall Annex in the amount of $45,048.47. Due to the physical layout of City Hall, the termination points for network drops have to be changed, reducing the number of IDFs required. Also, since the start of the project, the need fortwo additiorial network drops has been identified. BUDGETARY AND FISACL EFFECT The change order does not have a budgetary impact. STAFFING EFFECT Nane SUMMARY Information Systems recommends that the City Council approve the change order submitted by National Networks, LLC, to (1) add two additional network drops, and (2) relocate the termination. points for network drops, and (3) reduce the number of IDFs: PR 15766 P.R. 15766 03/04/10 fy Page 1 RESOLUTION NO. A RESOLUTIONAUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER 01 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND NATIONAL NETWORKS, LLC FOR UPGRADING THE NETWORKINFRASTRUCTURE. PROJ CIP913, 301-1601-591-54- 00: ' WHEREAS, on September 8, 2009, the City entered into a contract with National Networks, LLC for the upgrading of the network infrastructure in City Hall and City Hall Annex in the amount of $45,048.47; and, WHEREAS, National Networks, LLC has requested Change Order 01, attached hereto as Exhibit "A"; to (1) add two additional network drops, (2) terminate connections located' in the basement and on the second floor to an IDF located on the secohd floor rather than the first floor, and (3) terminate connections located on the third floor to the fourth floor rather than the second flo6r, and due to a lack of a pathway from basement to first floor, eliminate first floor IDF a,nd the fiber that would have been required for the installation of an IDF on the first floor; and, WHEREAS, approval of Change Order 01, which does not change the amount of the contract, is herein deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct. THAT, Change Order is herein approved and the City Manager is authorized to execute said Change Order. THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. P.R. 16766 03/04/10'fy Page 2 READ, ADOPTED AND APPROVED this the _ day of A.D. 2010 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor. Councilmembers: N Mayor Attest: City Secretary APPROVED AS TO FORM: -v City Attorney APPROVED FOR ADMINISTRATION: Stephen B. Fitzgibbons Shawna Tubbs City Manager - Purchasing Manager P. R. 15766 03/04/10 fy Page 3 ~~~~. Deborah Echols Director of Finance Fay Young Information Technology Manager ROVED AS TO AVAILABILITY OF FUNDS: Rebecca Underhill, CPA Assistant City Manager/Administration EXHIBIT e4 .. r. s~ ®r1~cs Scope of Work Change Order 01/05/09 City of Port Arthur P.O. Box 1089 Port Arthur, Texas 77641 Project: Network Infrastructure Upgrade Citv Hall: The original scope called for an IDF to be placed on the first floor. It was discovered there is no pathway from the basement to the first floor, therefore'there will be no IDF located on the first floor. Fiber will not be run between the first and second floor. Cables from the basement floor will terminate in the second floorlDF. Cables on the first floor will terminate on the second floor. Cables on the third floor will terminate on the fourth floor. An additional drop will be added in the City Manager's File Room. Annex Buildine: Add 1 drop on second' floor of the Annex building. see Fay Young for location. Agreed upon by: .Agreed up by: City of Port Arthur National Networks, LLC, National Networks, L.L.C. - 2909 spurlock Rd. Nederland, Texas 77627 PH: 409.724.0440 FAX: 409.724.0664 www. nationalnetworks.com