HomeMy WebLinkAboutPO 6014: AMENDING THE CITY'S FLOOD ORDINANCE
CITY OF' POR T ARTHUR
PLA NNI NG D EPT.
Memo
To: Steve Fitzgibbons, City Manager and City Council
From: Colleen Russell, Planning Director
Dater 3/4/2010
Re: P.O.6014 -which is ameriding Section 42 of the Code of Oniinance to
be accurate and in accordance with FEMA regulations
Background:.
FEMA revised. some terminologies that are essential to the National
Flood Insurance Map provisions; these terms are added,to Section 42
Floods regarding the letter of map revision (LOMR): Sections42 35,42-
62, 42-63 and 42-94 are therefore amended to include these terms,
while subsections (f) through (h) of section 42-64 are deleted to make
the Code current with FEMA and the Texas Water Development Board
(TWDB) requirements.
Budgetary Effects
These changes make us more compliant with FEMA and the Texas
Water Development Board regulations and allow the City to maintain our
CRS (Community Rating System) so we can continue being a member
of the National Flood Insurance Program.
Summary:
The Flood Administrator is complying with the TWDB request to update
ourCodes so it shall be accurate and reflect current regulations`
Colleen Russell, Planning Director
February 5, 2010
The Honorable Deloris "Bobbie" Prince
Mayor
City of Port Arthur
444 4"' Street
Port Arthur, Texas 77640
~.a C~~~
. ~ ~~~..
,~:-
•; .,. F~61g2010
~~~
L~G~~Ep?-B .
Ae: Community Assistance Visit far City of Port Arthnr'
Dear Mayor Prince:
Please be advised that this is the second notice in an attempt to resolve an open Community
Assistance Visit (CAV) conducted on the City of Port Arthur on April 20-23, 2009. The purpose of
a CAV is to maintain. contact with communities in their efforts to carry out the Federal Emergency
Management Agency's (FEMA) National Flood Insurance Program (NFIP) regulations, and to
evaluate local floodplain management Ordinances and enforcement practices to determine their
effectiveness. The CAV included a driving tour of the regulatory floodplain and .a meeting with
Steve Fitzgibbons, Lawrence Baker, and Colleen Russell of the City of Port Arthur, and Mike
Howard and Debbie Cahoon of the State.
A letter was sent to your attention on June 18, 2009-that included the CAV report and the timeframe
for suspected violations to be resolved. I received a letter on August 27, 2009 by Mr. Baker that
addressed some of the problems documented in the CAV; however, as of February 1, 2010,
notification of the full resolution to the CAV has not been received by this office. Consequently, this
CAV remains open.
The floodplain tour conducted during the CAV revealed a few structures that appeazed to be in
violation of the NFIP's regulations. One such azea involved temporary buildings placed five (5) feet
below the required base flood elevation on Sabine Independent School District property. Pictures
taken on June 9, 2009 revealed that the temporary buildings were still in place and had not been
properly elevated. The letter sent to your attention on June 18"' included those photographs. A
subsequent visitto the area on January 15, 2010 showed that the temporary school buildings were in
the same location and had not been elevated. New construction was occurring next to the permanent.
school building and that structure seemed to be compliant (photos attached); however, the temporary
buildings looked to be in use and were non-compliant
Also included in the CAV report was a list of addresses where a review'of elevation certificates
revealed either missing information on~the form or issues where the lowest floor was not elevated
above the base flood elevation at time of construction. A letter from Mr. Baker sent on August 27,
2009 addressed approximately 23 of the 95 structures listed with the remaining. 72 issues left
unanswered. A response to these remaining issues is.required, as well as an explanation as to the
City's approval for construction below the base flood elevation.
Our Mission
To provide leadership, planning, financial assistance, information, and education for the conservation and responsible development of waterjor.Texas.
P.O. Box 13231 • 1700 N. Congress Avenue • Austin, Texas 78711-3231
Tetephone (512) 463-7847 • Fax (512) 475-2053 • 1-800-RELAYTX (for the hearing impaired)
www.twdb.state.tx.us•info(3a twdb.state.tz.us 'rA]~]~
TNRIS -Texas Natural Resource3.InfomaaHon System • v'ww.tnris.state.tx.us Q (~ L
' A Member of the Texan Geographic lnfonnatian Coanci! (Z'GICJ
James E. Herring, Chairman ~ Jack Hunt, Vice Chairman
.Lewis H. McMahan, Member - ~ ~ J. Kevin Wazd ~ Thomas Weir Labatt.JII, Member
Edwazd G: Vaughan, Member Executive Administrator - Joe M. Crutcher, Member
,_ ,
The Honorable Deloris "Bobbie" Prince
February 5, 2010
Page 2 .
The CAV further included a review of the City of Port Arthur's Flood Damage Prevention Ordinance.
The results of that review were given to the City. As of the date of this letter, a revised ordinance has
not been received by this office. ~,
The City of Port Arthur. is currently a Class 9 in the Community Rating. System (CRS), a program
that provides policyholders a five percent discount on their flood insurance. It is critical that the
City maintainthe minimum standazds of the NFIP to ensure their CRS standing remains intact.
I strongly encourage the City of Port Arthur staff to make every effort possible to resolve the open
issues of this CAV. The timeframe between these letters. has given the City several opportunities to
rectify the issues at hand. At-this time, I am requesting that the City of Poit Arthur respond to this
letter within. 60 days with either a resolution to the identified issues or a plan. of remediation. If no
action is taken on the part of the City, the State will have no choice but to turn the CAV over to
FEMA which may result in the loss of the CRS discount and possible suspension from the NFIP.
Should you have questions or comments regazding the fmdings of this CAV, please contact me at
(281) 895-6555 or at debbie.cahoonCc+~twdbstate.tx.us. I look forwazd to working with. you on
improving the City of Port Arthur's floodplain management program.
Sincerely, ~ ~
Debbie Cahoon, CFM
.Houston NFIP Field Representative
Attachments
Cc: Mike Segner, TWDB
Donnie Blanlot, FEMA Region VI
Linda Delamaze, FEMA Region VI
Lawrence Baker, City of Port Arthur
Colleen Russell, City of Port Arthur
Photographs taken on January 1 S, 2010
Non-compliant temporary buildings; Sabine Independent School District
New school building in construction; Sabine Independent School District
P.O. No. 6014
02/5/10 CWR-
ORDINANCE NO.
AN ORDINANCE AMENDING SECTIONS 42-35, 42-62,
42-63, AND 42-94 OF THE CODE OF ORDINANCE IN
THE CITY OF PORT ARTHUR; AND DELETING
SUBSECTIONS (.n THROUGH (I) OF SECTION 42-64
WIIEREAS, it is necessary to amend the following provisions of the City's Flood
Ordinance (Sections 42-35, 42-62, 42-63, and 42-94) in order to maintain compliance with FEMA
Regulations and Texas Water Development Board Requirements; and,
WHEREAS it is also necessary to delete subparts f through h of Section 42-64 on granting
variances subsections (a) - (e), (i) will remain as written and (j) will be revised; and,
WHEREAS, these aforementioned sections of the Code of Ordinarices Port Arthur, Texas,.
shall be revised to be current and accurate with our present patterns of development the
Comprehensive Plan and FEMA (federal emergency mariagement agency) regulations.
BE IT ORDAINED BY THE. CITY COUNCIL OF THE CTTY OF PORT ARTHUR
SECTIONI. That Section 42-35 -Definitions, shall be amended to add definitions for the
following acronyms and words- Freeboazd, LOMA, LOMC, LOMA-F and LOMB as delineated
in Exhibit "A'".
SECTION 2. Section 42-62 Duties and Responsibilities of Chief Building Official -
shall'be amended to add (10) LOMA-F is required when fill is to be used (as also delineated in
4.
Exhibit "B").
SECTION 3. This Section 42-63 Permit Procedures -shall be amended as delineated in
Exhibit "C".
P.O. No. 6014
2/5/10
Page 2 of 5
SECTION 4. That Section 42-94-Standards for subdivision proposal shall be amended as
delineated in Exhibit "D".
SECTION 5. That Section 42-64- Variance Procedures subsection (f) through (h) shall
be deleted.
SECTION 6. That the Building Official and the Duector of Planning aze authorized. and
directed to make all necessary changes to the Code of Ordinance of the City of Port Arthur, Texas
on file in the offices of the Building Official and if any section, subsection, sentence, clause, phrase
orportion of this Ordinance is for any reason held invalid or unconstitutional by any court of.
competent jurisdiction, such portion shall be deemed a separate, distinct, and independent
provision and such holding shall not affect the validity of the remaining portions hereof All
ordinances and parts of ordinances in conflict herewith are hereby repealed.
SECTION 7. That any parson, firm or corporation who violates any provision bf this
Ordinance or the City's Zoning Ordinance shall be guilty of a misdemeanor and shall be punished
by a fine not exceeding Two Thousand ($2,000.00) Dollazs as provided in General Provision -
Section 1-13 of the Code of Ordinances, and each day such violation shall. be pemutted to exist
shall constitute a sepazate offense.
SECTION 8. That this Ordinance or its caption and penalty shall.be published at least
one (1) time within ten days after final passage hereof in the official newspaper of the City of Port
Arthur. This Ordinance shall take effect immediately after the date of such publication.
READ, ADOPTED AND APPROVED this day of March, A.D., 2010 at a
Regulaz Mceting of the City Council of the City of-Port Arthur, Texas by the following votes:
AYES:MAYOR
P.O. No. 6014
2/5/10
Page 3 of 5
COUNCILMEMBERS:
NOES:
Mayor
ATTEST:
City Secretary
APPROVED AS TO FORM:
City Attorney G~7~
APPROVED FOR ADMINISTRATION:
City alter
Director of Planning
~ ~~~~
EXHIBIT "A°
Section 42-35, Definitions, is hereby amended as to add the
Freeboard - this is the term used to request an
elevation above the highest point bf right of
way (road/bridges)" elevation that-could impact
the householder or business owner as well as the
a measure of one or two feet about the written
flood elevation required. The City of Port Arthur
is requiring this due to recent years of heavy
flooding after droughts and hurricanes. In
addition to consideration of increased in right
-of -way construction,~neighborhood levees and a
lack of culvert in many areas where ditches
exist.
LOMA also LOMC - Letter of Map Amendment- this
request of the flood administrator and FEMA shall
be due to in accurate topography or fill added. to
the land, hence a reference to a LOMA-F. LOMC is
also used as LOMA, but is termed a Letter of Map
Change .
LOMA-F - Letter of Map Amendment for fill land.
This process of adding fill-shall be done by
applying to FEMA, the BFE (Base floor elevation
shall be attained). The soil shall be tested and
analysis presented if the .City is skeptical but .
the ultimate responsibility of obtaining clean -
fi11 belongs to the person buying and property
owner using said "Fill" (F).
LAI~t- Letter of Map Revision shall have
technical or scientific data to support a reduced
risk of flooding due to Channel modification,
bridge, culvert an or levee(floodwall) changes.
These changes often infer .not only a reduced. risk.
of flooding but at times that the structure is
removed from such a risk.
EXTi2BIT "B"
Duties and Responsibilities of the Chief
as
(10) A LAMB-F shall be obtained prior to doing fill
work. The source of "Fill" shall be known by the
property owner and or buyer as either party bares
the sole responsibility for the accuracy of this
information.
.,
..~„
42-68, Permit Schedules, is hereby amended (as,
ted in blue) as follows:
(1) Elevation in relation to. mean sea 'level, of the
lowest floor (including the basement) of all new
or substantially improved structures; that shall
be (l) foot above the required elevation
requested (freeboard). This was requested by our
.local FEMA representatives at the Texas Water
Development Board, due to -all the storms events
and erosion that naturally, ensued; an engineer
shall substantiate this fact to the Building
Official.
2) Elevation in relation to mean sea level, to which
any nonresidential as well as residential
structure shall be flood proofed one foot above
the required elevation;, hence the P'II`IE' (minimum
finished floor) shall be revealed is contrast to
mean sea level or base floor elevation (BFE). '
(3) A certificate from a registered surveyor,
registered/licensed .professional engineer or
registered/licensed architect that the non-
residential or residential flood proofed structure
shall meet the flood proofing criteria in section
42-92(2): h
(4) Description of the extent to which any
watercourse or natural drainage will be altered
or relocated as a result of proposed development.
(57 Maintain a record of all such information in
accordance with section 42-62(1).
EXHIBIT "D"
Section. 42-64, Variances procedures,
is hereby amended as 'to delete subsections f-h