HomeMy WebLinkAboutPR 15833: EDC/BUSINESS PARK UTILITY/STREET IMPROVEMENTSInteroffnce MEMORANDUM To: Mayor, City Council, City Manager From: Floyd Batiste, CEO Date: April 13, 2010 Subject: P. R. No. 15833; Council Meeting of Apri120, 2010 Attached is P. R. No. 15833 approving Change Order in the amount of $5,163.90, as it pertains to the construction of Port Arthur Highway 73 Business Park utility and street improvements as approved by the City of Port Arthur Section 4A Economic Development Corporation P.R. No. 15833 4/13/2010 RESOLUTION NO. A RESOLUTION APPROVING CHANGE ORDER IN THE AMOUNT OF 55,163.90, AS 'IT PERTAINS TO THE CONSTRUCTION OF PORT ARTHUR HIGHWAY 73 BUSINESS PARK UTILITY AND STREET IMPROVEMENTS AS APPROVED BY THE CITY OF PORT ARTHUR SECTION 4A ECONOMIC DEVELOPMENT CORPORATION WHEREAS, the City of Port Arthur Section 4A Economic Development Corporation (the "PAEDC") entered into a contract with Doughtie Construction Company for $480,804.75 as it pertains to Job No. EDC-100 for utility and street improvements; and WHEREAS, Arceneaux & Gates Consulting Engineers, Inc. has requested that Doughtie Construction Company submit this Change Order request in the amount of $5,163.90 to add an additional 6" fire water service connection (the "Connection") for the two lots located between the Business Park road that parallels Highway 73; and WHEREAS, the Connection was not included in the original design and is now required by the City of Port Arthur.(the "City") for commercial subdivision water systems; and WHEREAS, the estimated cost to install the Connection is $5,163.90 including materials furnished and installed by the City;.and WHEREAS, this Change Order has been approved unanimously by the Board ofDirectors of the PAEDC on Apri15, 2010. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: Section i. That the facts and opinions in the preamble are true and correct. Section 2. That the Change Order in the amount of $5,163.90 is herein approved as denoted in Exhibit "A". Section 3. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED on this _ day of A.D., 2010, at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: NOES: ATTEST: DELORIS "BOBBIE" PRINCE, MAYOR TERRI HANKS, CITY SECRETARY APPROVED: FLOYD BATISTE, PAEDC CEO Page 2 X758859 APPROVED. AST ORM: GUY N. GOODSON, PAEDC ATTORNEY APPROVED AS TO FORM: 9~/f V ~~iC / VALECIA R. TIZENO~ ITY A RNEY #758859 Page 3 EXHIBIT "A" AxcExEAVx GATES CON6DLTplO EMOIpEEBl, QIO. SUBSTANTIAL COMPLETION INSPECTION PUNCH LIST DATE: March 15, 2010 PROJECT: Water, Sanitary Sewer, Paving and Drainage Facilities to Serve the HWY 73 Bu siness Park A&G Job No. EDC-E00 ATTENDEES: Bill McCracken - Doughtie Construction (DC) Ross Blackketter, PE , City of Port Arthur (CPA) Brian Linthicum - (CPA} Jerome Hudson - (CPA) Warren Guidry - (CPA} Charles Sha}ari - (CPA) Kelly Eldridge - (CPA) Keestan Cole - Arceneaux & Gates Consulting Engrs., Inc. (A&G) Joe M. Wilson Jr., PE - (A&G) The following items are to be corrected or completed to comply with the Contract Documents: GENERAL ITEMS 1. Provide protection at all storm sewer inlets per SW3P. 2. Complete tie in at sanitary sewer manhole at Station 4+30.95. (DC) coordinate with (CPA) to pump down system in order to complete work. 3. Paint sanitary sewer stake marking sewer services (green). Paint water service stakes (blue). ' 4. Sanitary sewer manhole covers and rings not CPA standard. Replace with CPA standard ring and cover. (See Detail Sheet'12). 5. Grout riser rings on storm sewer inlets (all locations). 6. Clean and re-paint fire hydrant to CPA standard color (white). 7. Sign Post at Stop Sign and Speed Limit Signs.not per plans. Provide post per TxDOT Standard Detail Sheet No.'s 20 thru 43. 8. Provide cost to install approximately 75 L.F. 6" - C-900 PVC per attached sketch. CPA will provide 8" T.S.&V. Contractor to provide remaining components. END OF PUNCH LIST Page 1 of t . 13.90' LT. JLEi _ \ ~ - STA. 3+31.52 32.50' LT. STA 3+37 52 PROP. GRATE INLET ' . . FIRE HYDRANT ASSEMBLY RIM EL=101.20 WITH LEAD ~ 18" FL=98.58' z o ``~ z~ <uwi STA. 3+31.52 18.50' LT. w~ PROP. STM. INLET LS.&V. Q w RIM EL=103.00' ° ' tEDUCER 3 < ' z " 18 FL=98.55 18" RCP 24" FL=98 55' ~ 0.25% o~ . TC EL=103.00' rnin 7 -~• ,.n .-... ~ 1 -- 2" SDR-9 WATER SERVICE 8" 6" SAN. SERVICE L.F. ~ 8" SDR-26 SAN. SEWER ®0.33% y ~6" SAN. SERVICE ' RT. BENCHMARK TABLE Point # Northing Easting _ Description Elevation 1 N/A N/A 60D NAIL IN PP 103.20' ELEVATIONS SHOWN HEREON BASED ON CITY OF PORT ARTHUR DATUM MONUMENT NUMBER C1 EL=2.83' MSL PLUS 100'. ~ w ST0. 3+31.52 5.00' RT. w ~ PROP. STM. SEWER MH 1-6"X6"X6" TEE ~~ RIM EL=102.84' 2-6" M.J. PLUGS o 24" FL EL=98.50' 24" FL EL=98.50' 30" FL EL=97.98' STA. 3+31.52 18.50' RT. PROP. STM. INLET RIM EL=103.00' 18" FL=98.53' 24" FL=98.53' TC EL=103.00' ~ 11 L.F. 18" RCP STA. 3+31.52 3: PROP. GRATE INI RIM EL=101.30' 18" FL=98.56'