HomeMy WebLinkAboutPR 16069: ALLCO, INC., CHANGE ORDER #3 MEMORANDUM
CITY OF PORT ARTHUR
UTILITY OPERATIONS DEPARTMENT
TO: Stephen Fitzgibbons, City Manager
FROM: Kelly Eldridge, Director of Utility Operations !�
DATE: August 30, 2010
SUBJECT: Proposed Resolution No. 16069
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 16069 authorizing the
execution of Change Order No. 3 to the contract between the City and ALLCO, Inc., of Beaumont,
Texas, at no additional cost for the Sanitary Sewer Rehabilitation by the Pipe Bursting and Sliplining
Methods, Basins PA64C & PA66, Contract No. 6, City Project No. 404PB6.
BACKGROUND
This project is for the cleaning, television inspection, and rehabilitation of approximately 80,000 feet
of sanitary sewer mains, plus every service connection served by these main lines. City contracts
routinely utilize Davis -Bacon Wage Rates for various types of projects. The TWDB provided the
wage decision for inclusion into our current projects. The TWDB is now requiring us to change from
the decision provided with our bid documents, General Decision TX20080046 to General Decision
TX20100102. This new decision will apply to all wages paid on the project from project start. I have
attached a copy of an email from the TWDB `explaining' the need for the new decision. There will
be similar change orders for the other projects.
The 34 time extension has nothing to do with the wage decision, but is to cover inclement weather
delays since the project initiation.
BUDGET/FISCAL EFFECT
None, as this is a $0 change order.
STAFF/EMPLOYEE EFFECT
None.
SUMMARY
I recommend that the City Council approve Proposed Resolution No. 16069 authorizing the
execution of Change Order No. 3 to the contract between the City and ALLCO, Inc., of Beaumont,
Texas, at no additional cost for the Sanitary Sewer Rehabilitation by the Pipe Bursting and Sliplining
Methods, Basins PA64C & PA66, Contract No. 6, City Project No. 404PB6.
TWDB EMAIL
Original Message
From: Jerry Laman [ mailto :Jerry.Laman @twdb.state.tx.us]
Sent: Wednesday, July 28, 2010 10:33 AM
To: jwilson @ageng.com
Cc: James Bronikowski; John Steib; Michael Day
Subject: Port Arthur ARRA -CWSRF G100003 - Davis Bacon issue
Dear Mr. Wilson,
During our telephone conversation yesterday you ask me to send an email or
letter summarizing the guidance and explanations that we were discussing. I
trust this email covers the key elements of our discussion. Let me know if you
have additional questions.
The primary issue is the use of the appropriate Davis Bacon Wage Rate schedule
in all 5 of the contracts being funded through the ARRA program. As per our
normal procedures, TWDB approved all 5 sets of contract documents as ready to
bid. As it turns out TWDB did not notice that several of the contracts
contained a Davis Bacon Wage Rate Schedule for "Highway" rather than the
"Heavy Construction" schedule. All the contracts should have contained the
"Heavy Construction" wage rate schedules. I can only say that the pace of work
required by the ARRA time lines forced us to complete a review in a much
shorter time frame than is normal for TWDB, and obviously we missed the fact
that the submitted contract documentation contained Davis Bacon "Highway" wage
rate schedule in several of the contracts.
As I mentioned the ARRA legislation contained considerable oversite
provisions. As a result, our files for the ARRA program are being audited by
several Federal and State agencies. These audits have begun and will continue
until everyone is satisfied that the State of Texas has complied with the ARRA
legislation. From numerous discussions with auditors, it is clear to me that
we need to document compliance with the ARRA legislation for every ARRA funded
contract.
Now that we know Port Arthur has several contracts with the incorrect Davis
Bacon wage rate schedule, we strongly encourage. Port Arthur to take corrective
action and make these contracts comply with the ARRA program requirements. I
am not the best source of information on precisely the best way to remedy the
situation. I do believe that inserting the correct Davis Bacon Wage Schedule
by amending the contract through a change order will make the contract
documentation compliant with the ARRA requirements. The consequence of the
change order(s) may involve adjustments to the amount paid to certain workers.
In implementing the pay adjustments, it is important to obtain clear
documentation showing how the pay adjustments were implemented and that the
worker(s) actually received the proper wage amounts for the work done. The
existing system that the city has in place now to monitor and certify Davis
Bacon compliance may provide sufficient documentation, but if an additional
document (final pay certification from
contractor) or step is needed, I encourage to go the extra mile. Having
documentation on file that clearly shows compliance with ARRA requirements
will save you, Port Arthur and us considerable amounts of time in satisfying
future audit requests.
I do not know the amount of the back pay that might be involved once the
workers are re- classified under the "Heavy Construction" wage rate schedule.
As I understand the status of your contracts, there is a good possibility some
of them will be completed at less than the expected amount. We will be assist
you in making available ARRA funds to make the back pay adjustments provided
there are sufficient ARRA funds in the total project. This may involve change
orders approvals and TWDB internal budget management issues. We will work with
you to implement the revisions to the contract documents and to document the
use of ARRA funds as required by the ARRA program.
We briefly discussed the situation where some of the contracts may be
completed at less than the contracted amount. Since the funding for the
contracts contained both ARRA funds and local funds, there was question about
how to move or apply ARRA funds between 5 contracts. Please proceed to
document the final contract amount for each contract. The final contract
amount must be the same in your files and our files. As per the ARRA
requirements, TWDB reimburses the City when the City submits invoices through
the outlay process. Continue to send invoices associated with each contract
through the outlay process. When a final contract amount is adjusted to a
lessor amount than originally in the contract, TWDB can adjust our internal
budget tracking system to show that a contract is complete and then adjust our
internal budget tracking system to show that the remaining ARRA funds are
available for use on other contracts. You can apply the available the ARRA
funds to any contract that is within the ARRA funding agreement. We will make
the full ARRA grant amount available to you. If this results in Port Arthur
using less local funds than originally anticipated, then that is good news. We
do need to keep the accounting correct and transparent so that we can document
with invoices and change orders where the ARRA funds were used. We will assist
you in getting the documentation needed for the City to use all the available
ARRA funding on your ARRA funded project.
This email has not went through our normal internal review process. I used
this email to save time for you and you said an email would be a satisfactory
method to summarize our discussion. I believe I have given you correct
guidance to you, but I will qualify this email by saying if I learn that I
have mislead you or stated something incorrectly, I will get right back to you
with the correct information as fast as I can.
Let me know if you had different understanding after our conversation
yesterday or if you need further clarification.
Sincerely,
Jerry Laman
Team Lead - ARRA Program
08/30/10
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE EXECUTION
OF CHANGE ORDER NO. 3 TO THE CONTRACT
BETWEEN THE CITY OF PORT ARTHUR AND
ALLCO, INC. AT NO ADDITIONAL COST FOR THE
SANITARY SEWER REHABILITATION BY THE PIPE
BURSTING AND SLIPLINING METHODS PROJECT,
BASINS PA64C & PA66, CONTRACT NO. 6,
ACCOUNT NO. 404 - 1625 - 532.83 -00, Project No.
404PB6. P.R. No. 16069
WHEREAS, the City is currently under an Agreed Order with the TCEQ to rehabilitate its
sanitary sewer system; and,
WHEREAS, there exists a need to reduce flows and eliminate sanitary sewer overflows in
our collection and treatment systems; and,
WHEREAS, on October 20, 2009, by Resolution No. 09 -489, the City Council awarded the
Sanitary Sewer Rehabilitation by the Pipe Bursting and Sliplining Methods, Basins PA64C & PA66,
Contract No. 6, City Project No. 404PB6 to ALLCO, Inc.; and,
WHEREAS, the Texas Water Development Board has changed/updated the wage decision
for this project and this change must be done by contract change order; and,
WHEREAS, Arceneaux & Gates Consulting Engineers, Inc. recommends Change Order No.
3 at no additional cost, and increasing contract time by 34 calendar days due to inclement weather;
NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT the City Council of the City of Port Arthur hereby authorizes the City Manager to
execute Change Order No. 3 (attached as Exhibit "A ") to the contract between the City of Port
Arthur and ALLCO, Inc. for the Sanitary Sewer Rehabilitation by the Pipe Bursting and Sliplining
Methods, Basins PA64C & 66, Contract No. 6, City Project No. 404PB6 at no addition cost, and
increasing contract time by 34 calendar days due to inclement weather, which simply changes to the
P.R. No. 16069
08/30/10
Page 2 of 3
current General Decision TX20100102; and,
THAT this Change Order No. 3 be sent to the TWDB for processing and approval; and,
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
READ, ADOPTED AND APPROVED THIS day of , 2010
at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
•
AYES: Mayor
Councilmembers:
NOES:
Deloris Prince
Mayor
ATTEST:
Sherri Bellard
Acting City Secretary
08/30/10
Page 3 of 3
APPROVED FOR ADMINISTRATION:
Stephen Fitzgibbons
City Manager
/ /4 -
Ross Blackketter, P.E.
Director of Public Works P.R. No. 16069
/Lyres
Kelly Eldlidge I
Director of Utility Operations
APPROVED AS TO AVAILABILITY OF FUNDS:
/Zati/Iteft614/y6
Deborah Echols
Director of Finance
Account No.: 404 - 1625 - 532.83 -00
Project No.: 404PB6
APPROVED AS TO FORM:
CITY AT ORNEY
EXHIBIT A
(Change Order No. 3)
ARCENEAUX
GATES
CONSULTING
ENGINEERS, INC.
CHANGE ORDER No. 3
DATE: August 30, 2010 JOB NO. CPA -490 -6
AGREEMENT DATE: November 13, 2009
NAME OF PROJECT: SANITARY SEWER REHABILITATION by PIPE BURSTING
and SLIP LINING METHODS, BASINS PA64C & 66
OWNER: City of Port Arthur
CONTRACTOR: ALLCO, Inc.
The following changes are hereby made to the CONTRACT DOCUMENTS:
1. Add the following Items to the Contract Documents and Technical Specifications:
Replace the Labor Classification and Minimum Wage
Scale, General Decision TX20080046 dated 02/08/2008
with General Decision TX20100102. This new General
Decision shall apply to all wages paid on the project from
project start.
[ $ 0.00
TOTAL $ 0.00
CHANGE ORDER NO. 3
August 30, 2010
ARCENEAUX Job No. CPA -490, Contract No. 6
GATES
CONSULTING
ENGINEERS, INC.
CHANGE TO CONTRACT PRICE:
ORIGINAL CONTRACT PRICE: $2,748,577.00
CURRENT CONTRACT PRICE adjusted by previous y p s CHANGE ORDER(S): $3,132,513.50
The CONTRACT PRICE due to this CHANGE ORDER will be fifiefeases14 flee- icased}
by: $0.00 Dollars
The new CONTRACT PRICE, including this CHANGE ORDER, will be $3,132,513.50
CHANGE TO CONTRACT TIME:
ORIGINAL CONTRACT TIME: 550 Calendar Days
CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 550 Calendar Days
CURRENT DATE OF COMPLETION: August 13, 2011
CONTRACT TIME due to this CHANGE ORDER will be increased by 34 Days
The New DATE OF COMPLETION: September 16, 2011
No other Terms and Conditions of the Contract are changed as a result of this Change Order.
Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs
incurred by Contractor in his performance of the work covered by the Change Order.
RECOMMENDED BY ENGINEER: ACCEPTED BY:
ARCENEAUX & GATES [CONTRACTOR, OFFICER OR OWNER]
CONSULTING ENGINEERS, INC. ALLCO, Inc.
ACCEPTED BY:
CITY of PORT ARTHUR
2 of 2