HomeMy WebLinkAboutPR 12943: SAFE ROUTES TO SCHOOLinteroffice
MEMORANDUM
TO: Mayor, City Council, City Manager
From: Mark T. Sokolow, City Attorney ~ ~
Date: December 3, 2004
Subject: P. R. No. 12943; Council Meeting of December 7, 2004
Attached is P. R. No. 12943 as it pertains to retaining
Chica & Associates to prepare engineering plans for the ~Safe
Routes to School" Program. (Requested by City Manager). Exhibit
mA" has the memo from the Director of Planning describing the
project. The Director of Planning has also forwarded the JOHRTS
Candidate Project Submission Form as to the Hike and Bike Trail.
bEES:ts
Attachment
cc: Director of Planning
z.pr12943.memo
JOHRTS CANDIDATE PROJECT SUBMISSION FORM
SPONSOR INFORMATION
:Project Sponsor City of Port Arthur~ TEXas
Contact Person Les'l'ie ]~. HcHahen, P.
Address P. O. Box I089
City/Zip Port A.~thur, Texas 77641-1089
'Phone Number (409) 983-8182
Fax Number (409) 983-8294
Email Address ATS~LOaO~ATL.COt~
PROJECT INFORMATION
Project Description
General Project
Description aiV. e aaa sike
Street Name/Functional
Classification'tho=as Soulevard M~,,or ~e~al
Lo~ti0n From a~ton Avenue
Lo~tion To Vo~o~th Souleva~d ..
Length in Miles 1.8 ~[es
E~sfing To~l Lanes s/~
Futura To~l ~nes ~/&
24 houm Traffic Volume s/~ ~ Pement Tracks: ~/~
Year of Traffic Count ~/&
Project Cost
Estimated To~l Cost t 28o,ooo
Fedeml/S~te Share t
Lo~l Share Commi~ed?
~ 56~oo0 Do~mentation A~ched?
Does the Io~1 share
exceed minimum match
mquimmen~ so
Project Readings
Proje~ Sta~s - Phase Environmental Pmlimina~ Eng. Right-of-Way
Pement Complete s/~ ]ooz s/A
Estimated Early S~
Date v~ ~o(2) a~ths of ftn~l contract approval
Estimated Yearn for
Constm~ion . 0.5 {6 aonths) .
Project Contribution to Current MTP Goals~
Project Description: Hike and Bike Trail on Thomas Boulevard
Preserve and Maintain the Existing Transportation System.
Construction of the Hike and Bike Trail will not detract from the existing
transportation system nor will it add additional vehicular capacity to the system.
2. improve the Operation Efficiency of the Transportation Network.
Construction of the Hike and Bike Trail will improve the operational efficiency of
the transportation network by getting walkers, joggers and cyclists off of Thomas
Boulevard.
3. Enhance the Safety and Security of the Transportation Community,
Construction of the Hike and Bike Trail will enhance the safety and security of
~he transportation community by eliminating conflicts with the non-vehicular uses
of Thomas Boulevard.
4. Protect and ]mprove the Environment,
Construction of the Hike and Bike Trail will protect and improve the environment
by encouraging walking, jogging or cycling in place of travel by car, and
encourage additional school children to walk to schools along the trail.
5. Maximize the Social Benefits of the Transportation System.
Construction of the Hike and Bike Trail will maximize the social benefits of the
transportation system by providing a convenient and healthy means to access
schools and parks without traveling by vehicle, or just for exercise purposes.
6. Foster Economic Development.
Construction of the Hike and Bike Trail is not expected to foster economic
development, though extensive use of the trail and other park amenities might
result in "mom and pop type operations serving the users of the trails and parks.
7. Maintain Financial Responsibility in the Development and Preservation of
the Transportation System.
Construction of the Hike and Bike Trail will maintain financial responsibility in the
development and preservation of the transportation system by being a Iow cost
option to alleviate some vehicular travel on Thomas Boulevard, thus delaying the
need to improve capacity of Thomas.
Z.IOHRTS MTP-2025. Page ~.-3 Section "Vision Statement, Goals and Objective."
Estimated Construction Cost Worksheet
Please provide a detailed cost estimate for the proposed project.
Hike and Bike Trail on Thomas Boulevard
Mobilization 20,000
Trail construction (flexible base, B~AC, etc) 186,500
Signs and Markings 65,000
l~tscellaneous Items 8,500
TO?AL $ 280,000
P.R. No. 12].64
0'l/22/03 vkl
A RESOLUTZON APPROVI'NG 'THE CITY MANAGER OF THE CI'TY OF
PORT ARTHUR TO SUBI~IZT THRE~E (3) GRANT APPLZCATZONS TO
THE SOUTHEAST TEXAS REGt'ONAL PLANNING COMMISS:[ON FOR
ELTGTBLE CONGEST/ON MIT~GAT/ON AND A/R QUAL/TY
PRO3 ECTS.
WHEREAS, the South East TeXas Regional Planning Commission (SETRPC) has
issued a Special Project Call for Congestion Hitigation and Air Quality (CHAQ) projects
aimed at reduction in vehicular emissions and improving the environment; and,
WHEREAS, the terms of the grant funding for a project requires the requesting
entity to furnish 20% of the project(s) cost; and,
WHEREAS, the City of Port Arthur has three (3) eligible projects that could be
considered for funding under the CklAQ program, those being:
1. Hike and Bike Trail - Houston Avenue to Gilham Orcle
Total Estimated Cost $ 280,000
CHAQ funds (80%) $ 224,000
Oty funds (20%) $ 56,000
2. Safe Routes to Schools - Sidewalks Serving Six (6) Schools
Total Estimated Cost $ 650,000
CMAQ funds (80%) $ 520,000
City funds (20%) $ 130,000
3. Local Share of Highway 365/Spur 93 Overpass
Total Estimated Cost $1,120,000
CMAQ funds (80%) $ 896,000
Oty funds (20%) $ 224,000; and,
WHEREAS, the completed grant applications, on the forms attached hereto and ....
made a part hereof as .Exhibit '%", are due at bhe SETRPC office by 12:00 noon, Friday,
P.IL No. 12164
Page #2
May 16, 2003; now, therefore,
BE ZT RESOLVED BY THE CI~TY COUNCZL OF THE CITY OF PORT
ARTHUR:
THAT the City Manager be and he is hereby authorized to submit on behalf of
the City of Port Arthur three (3) grant applications to the SETRPC for CMAQ funds for
the following projects:
1. Hike and Bike Trail $ 280,000
2. Safe Routes to Schools Sidewalk $ 650,000
3. Local Share of Highway 365/Spur 93 Overpass $1,120,000; and,
THAT funding for the City's 20% sham of the projects is available or will be
made available, subject to the budget amendment or adoption process in the following
amounts:
1. Hike and Bike Trail $ 56,000
2. Safe Routes to Schools Sidewalks $130,000
3. Local Sham of Highway 365/Spur 93 Overpass $224,000; and,
THAT, a copy of the capUon of this Resolution be spread upon the Minutes of
the City Council.
READ, ADOPTED AND APPROVED this the/~ day of , A.D. 2003
at a ~ meeting of the City of Port Arthur, Texas by the following vote:
Ayes: ~' Mayor: ~
P.R. No. :1Z1.6¢
Page #3
APPROVED AS TO FORH:
City Attorney
APPROVED FO.R ADMINISTRATION
Steve Fitzgibbons
City Manager
Leslie E. McMahen, P.E.
Director of Pubic Works
J~ROVED AS.~) A.V,~. BL~' OF
Rel:~:ca Underhill
Finance Director
file c:. ~Bsol~ons~-~pcgr~nU
Exhibit "A"
P.~- No. 12164
I of 5
JOHRTS CANDIDATE PROJECT SUBMISSION FORM
SPONSOR INFORMATION
Project Sponsor
Contact Person
Address
City/Zip
Phone Number
Fax Number
· Email Address
PROJECT INFORMATION
Project Description
General Project
Description ' '
Street Name/Functional
Classification
Location From
Location To
Length in Miles
Existing To~l Lanes
Future Total Lanes
24 hours Traffic Volume ~ Pement Trucks:
Year of TrafFic Count !
Project Cost
Estimated Total Cost
Federal/State Share
Local Shara Committed?
Documentation Attached?
Does the local shara
exceed minimum match
requirement?
Project Readiness
Project Status - Phase Environmental Preliminary Eng. Right-of-Way
Percent Complete
Estimated Early Start
Date
Estimated Years for
Construction
Exhibit
P.P.. No. 12164
:2 of~
Project Contdbution to Current MTP Goals~
Project Description:
1, Preserve and Maintain the Existing Transportation System,
2. · Improve the Operational Efficiency of the Transportation Network.
3. Enhance the Safety and Security of the Transportation Community.
4. Protect and Improve the Environment.
5. Maximize the Social Benefits of the Transportation System.
6. Foster Economic Development.
7. Maintain Financial ReSponsibility in the Development and Preservation of the
Transportation System.
~ JOHRTS MTP - 2025. Page 1-3 Section "Vision Statement, Goals and Objectives."
Exhibit "A"
P.P. bio. 12164
3 of~
Estimated ConstructiOn Cost Worksheet
Please provide a detailed cost estimate for the proposed project.
P. IL No. 12164
4 of~
~roj~¢t Specific Tltpical Cross-so¢tion
~leaso pro¥iOe a t~pi~l cross-section of this project.
Exhibit
P.I~. No. 12164
(You may obtain assistance with this form from the SETFtPO-MPO staff.)
Project Location Map.
Please pr°vide a location map for this project.
P. R. NO. 12943
12/03/04 ts
RESOLUTION NO.
A RESOLUTION AS IT PERTAINS TO RETAININ~ CHICA
& ASSOCIATES TO pREPARE ENGINEERING PLANS FOR
THE ~SAFE ROUTES TO SCHOOL" PROORAM (REQUESTED
BY THE CITY MANAGER)
WHEREAS, it appears that the city will obtain a ~Safe Routes
to School Program" grant, as delineated in Exhibit ~A"; and
WHEP~F~S, it is necessary to hire Chica & Associates to prepare
engineering plans; and
WHEREAS, the preliminary estimates for the engineering designs
were $62,476 as delineated in Exhibit ~A"; and
WHEREAS, Chica & Associates has indicated that after further
review of the scope of the project, that they are able to do the
project at their hourly rates which includes expenses, not to
exceed a total of $50,000.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT A~THUR, TEXAS=
Section 1. That the facts and opinions in the preamble are
true and correct.
Section 2. That the City Council is hereby authorized to
retain Chica & Associates to prepare engineering plans for the
~Safe Routes to School Program", at a not to exceed cost of
$50,0O0.
Section 3. That Chica & Associates will sign this
z.pr12943
resolution agreeing to the terms thereof.
Section &. That a copy of the caption of this resolution
be spread upon the Minutes of the City Council.
READ, ADOPTED AND APPROVED on this __ day of ,
A.D., 2004, at a Regular Meeting of the City Council of the City
of Port Arthur, Texas, by the following vote: AYES: Mayor
Councilmembers '
;
NOES:
MAYOR
ATTEST:
CITY SECRETARY
APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION:
CITY ATTORNEY CITY MANAGER
APPROVED AS TO THE AVAILABILITY OF FUNDS:
DIRECTOR OF FINANCE
z.Dr12943
CHICA & ASSOCIATES
BY ~
z.pr12943
EXHIBIT ~A"
INTEROFFICE MEMORANDUM
TO: STEVE FITZGIBBONS, CITY MANAGER
D CTOROFP ' O
S~: C~Q PROJECTS
DATE: 12/03/04
We have received approval of our request for funding under the Congestion Mitigation Air
Quality (CMAQ) program of the Hike and Bike Trail fxom Houston Ave. to Gilham Circle
and the Safe Routes to Schools sidewalks. The Hike and Bike Trail was originally funded
under the Transportation Enhancement Program at a projected cost of $150,000. By the time
construction plans were approved the project cost had almost doubled. It was decided not to
build the project. The Safe Routes to Schools application was not approved under that
program.
The region received a special allocation of CMAQ funds in 2003. We submitted the above
projects under that program and received $280,000 for the Hike and Bike Trail and $650,000
for the Safe Routes to Schools. These require a 20% local match. TXDOT, who administer
the program, anticipated doing a project at the Port of Beaumont the first year. The
remainder of the projects would be done over a 2 to 3 year period. The Port project is not
ready and TXDOT is proposing to move up any project that can be ready by March 7, 2005.
The projects would be let in August. The Hike and Bike Trail had previously been approved
for construction by TXDOT and therefore is currently ready. Plans and Specifications are
required to be done for the Safe Routes to Schools project.
Engineering costs are an eligible expense if a Request for Qualifications process is followed.
The short time available does not allow sufficient time for this process. We received a cost
est/mate from Chica and Associates of $62,476. This has since been reduced to a "not to
exceed" $50,000. The City would have to pay the full cost of this work.
The options are as follows:
1. Do not submit any project at this time.
2. Submit the Hike and Bike Trail for the August letting.
3. Pay 100% of the engineering cost for the Safe Routes to Schools project and submit both
for an August letting.
A project that is not submitted for the August 2005 letting will be delayed until 2006 or 2007.