Loading...
HomeMy WebLinkAboutPR 12974:METHANE GAS MONITORING P.R. 12974 0~./~.3/05 AMENDED RESOLUTt'ON NO. A RESOLUTI'ON AUTHORI'ZI'NG THE CI'TY MANAGER TO EXECUTE A THREE YEAR AGREEMENT W~'I'H T&N LABORATORI'ES & ENGi'NEERI'NG OF BEAUMONT, TEXAS TO PROVI'DE METHANE GAS MONI'TORI'NG SERVi'CES AT THE Ci'TY'S MUNI'CI'PAL LANDFI'LL, MSW PERMI'T NO. 181S, I'N THE CI'TY OF PORT ARTHUR, TEXAS, I'N THE AMOUNT OF $2,400 PER YEAR FOR A TOTAL OF $7,200. FUNDS ARE AVA~'LABLE IN THE PUBL'rC WORKS-SOL1'D WASTE DI'VI'SI'ON FY 200S BUDGET ACCOUNT NO. 403-1274-533.S4-00 EACH SUBSEQUENT YEAR WI'LL BE BUDGETED FOR i'N THAT YEAR'S BUDGET. WHEREAS, the City of Port Arthur must conduct quarterly monitoring of Methane Gas at the Municipal Landfill in order to comply with the Texas Commission on Environmental Quality's regulations; and, WHEREAS, this is a specialized professional service requiring the use of companies that can provide such services with a high degree of accuracy; now, therefore, BE IT RESOLVED BY THE CITY COUNCTL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Manager be and he is hereby authorized to execute on behalf of the City, a three year agreement with T&N Laboratories & Engineering of Beaumont, Texas for calendar years 2005, 2006, and 2007 Methane Gas monitoring services in the annual amount of $2,400 for a total of $7,200, a copy of said agreement being attached hereto and made a part hereof as Exhibit "A"; and, P.R. 12974 Page 2 THAT, funds for the services are available in the Public Works-Solid Waste Division FY 2005 Budget Account No. 403-1274-533.54-00 and other Solid Waste Division accounts in which balances exist; and, THAT, the City can terminate this contract at its convenience which includes, but is not limited to, funding not being available in any budget cycle with thirty days written notice; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED at a Ayes: AND APPROVED this the day of , A.D. 2005 meeting of the City of Port Arthur, Texas by the following vote: __ Mayor: Councilmembers: Noes: Attest: Mayor City Secretary P.R. 12974 Page 3 APPROVED AS TO FORM: City Attorney APPROVED FOR ADMINISTRATION: Steve Fitzgibbons City Manager Rebecca Underhill Director of Finance John A. Comeaux, P.E. Director of Public Works Z:\engineer\Documents\Resolutions\PR12974.doc EXHTBTT A FROM : T&N LABS pHONE NO. : 409+?~+6~1 "'7 / t,ind & Associates, I.nc. dba N Laboratories & Engineering ~~ ~02~ Jerr~ W;~< I)r, (~T ~IONAL AIRPORT) B~AUMONT, TX 777~fi PI ION~: (409) 7~7-6291 FAX: (40~) 722.6961 Jan. 1~ 2085 12:4~M P2 January 13, 2005 Mr. ~rotm Comcaux, P, E. Director of Public Works City of Port Arthur P. O. Box t089 Port Arthur, Texas 77641-1089 Telephone: Telefax: (409) 983-8182 (409) 983-8291 RE: Cost Estimate, Methane Gas Monitoring for 2005 through 2007, City of Port Arthur Landfill (T&N Proposal No. 04-059 - Revised) Dear Mr, Comeaux: As requested, Lind & Associates, Inc. dba T & N Laboratories & Engineering (T & N) is pleased to present this proposal to provide methane gas monitoring services at your landfill during the period of 2005 through 2007. The scope of services and costs associated with this work are discussed below. SCOPE OF WORK The scope of work for this project will be to monitor the exist~g gas probes for the presence of methane on a quarterly basis throughout 2005, 2006 and 2007. The monitoring will include the seven existing gas probes, at the gatehouse, at the pump station, and in a barhole probe near monitor well MW-3. During each monitoring event, the presence of methane gas will be checked with a calibrated gas analyzer, and the presence of water in each probe will be verified with an electronic water level meter. Prior to checking for gas in each probe, a pressure gauge will be attached to the probe to measure the pressure in each well. Upon completion of the field activities, a brief report of the findings of the monitoring will be prepared for the City. If no gas is detected, then the report will be provided to the City only, for their files. If gas is detected, then the report will be provided to the TCEQ. ~ao~r~:,~aoo~x~^o^~ T & N LABOR~TORII~; & ENGINEERING FROM : T~N LABS RHONE NO. : 4~+722+6961 San. 13 2005 l~:40PM P3 Mr. John Comeaux, PiE. January 13, 2005 Page 2 ESTIMATED COST A detailed cost estimate is presentc-d on Table 1. As shown on the table, we estimate the cost per quarter to be approxirnately $600. The total annual cost for 2005 through 2007 will be approximately $2.400. This cost estimate may be accepted by signing in the appropriate space below, and returning one original signed cost estimate to T & N We assume that the City will issue a work order or purchase order for this project, or issue a contract to T & N The City may terminate this contract at its convenience which includes but is not limited to, funding not being available in any budget cycle with ~irty days written notice. We appreciate the opportunity, to be of service to the City on this project. If we can be of any further service, please feel free to cai1 our office. Sincerely, LIND & ASSOCIATES, INC. dba T & N LABORATORIES & ENGINEERING Presidet~t Attachment AUTHORIZED BY: Signature Date Printed Name Title T & N LAIt01tATORI'~I & ENGIIqEEglNO FROM : T&N LABS PHONE NO. : 409+722+6961 Jan. 13 2005 12:41PM P4 TABLE 1 COST ESTIMATE METH.~NE GAS MONITORING YEARS 2005 Tt-IROUGH 2007 CITY OF PORT ARTHUR LANDFILL DESCRIPTION To'NITS UNIT COST TOTAL COST Enviromnental Technici~xn 6 Hours $4000 $24000 Gas Monitoring .Equipment 1 Day $80.00 $80.00 Projec.[ Manager 3 Hours $80.00 $240.00 Misc. Expenses 1 Each LumP Sum $40.00 Subtotal Per Quarter $600.00 TOTAL ANNUAL COST $2,400.00 TOTAL COST FOR 2005 THROUGH..2007 $7,20.0.00