Loading...
HomeMy WebLinkAboutG. ALL PHASE ELECTRIC SUPPLY CO. - SWITCHGEAR City of Port Arthur Texas Mayor and City Council Communication DATE REFERENCE SUBJECT PAGE NUMBER Authorization to Purchase Switchgear for the Water Purification 08 -01 -11 201 1_WTP Plant Emergency Generator Project for the Utility Operations 1 of 1 Generator Department. Switchgear RECOMMENDATION We recommend that the City Council authorize the purchase of Switchgear for the Water Purification Plant Emergency Generator Project for the Utility Operations Department from All Phase Electric Supply Co., of Groves, Texas in the amount of $37,000. BACKGROUND We are in the process of acquiring and installing a primary emergency generator for the Water Purification Plant. This is a TDRA funded project, with an extremely short schedule for completion„ A Resolution authorizing the purchase of the generator was approved at the last City Council meeting, and we are scheduled to open bids for the installation of this equipment later this week. During the design phase of the project, our consulting engineer determined that the Square D Company (owned by Schneider Electric) is the sole source supplier for certain major switchgear needed for this work, and the delivery time for this equipment is relatively long. Quotes were sent to six Square D distributors, and Purchasing received the following two quotes. Vendor Cost All Phase Electric Supply Co., Groves, TX $37,000 Rexel, Beaumont TX $38,000 BUDGET /FISCAL EFFECT Funding for this equipment purchase is available in account no. 141-1201-532.92-00, project no. ORWTPG. SUMMARY We recommend that the City Council authorize the purchase of Switchgear for the Water Purification Plant Emergency Generator Project for the Utility Operations Department from All Phase Electric Supply Co., of Groves, Texas in the amount of $37,000. RECOMMENDED: /?E 4 ,� 2/ Kelly Eldridge Shawna Tubbs Deborah Echols Director of Utility Operations Purchasing Manager Director of Finance 141 TDRA Grant Fund 1201 Water Utilities 532 Water Utilities 92 Capital Equipment Prepared by: DISPOSITION BY COUNCIL: PROCESSED BY KE CITY APPROVED BY APPROVE SECRETARY (] OTHER (DESCRIBE) DATE City Manager