City of Port Arthur, Texas.
Mayor and City Council Communication
REFERENCE SUBJECT
NUMBER Approval of Purchase of a Radio Telemetry System for the Sea Rim
CC-SC~D^0S Pump Station and GST, Utility Operations Department, Water
Distribution Division.
PAGE
1 ofl
RECOM3{ENDATION
We recommend that the City Council approve the purchase of a Radio Telemetry System for the Sea Rim Pump Stat/on and
Ground Storage Tank from BLOC Design Build, LLC of Longview, Texas in the amount of $7,686.00.
BACKGROUND
The Sea Rim Pump Station and GST is currently the last such ~vater installation without a radio telemetry system to report its
status back to the Water Purification Plant. Over the last few years, we have been upgrading our City-wide radio telemetry
system to include as many remote sites as we can afibrd within our operating budgets, while proceeding in pnor/ty order. Data
Flow Systems manufacturers the remote telemetry system we currently utilize. BLOC Design Build, LLC is the exclusive Value
Added Reseller (VAR) in Texas.
BUDGET/FISCAL EFFECT
ha December 2004, the City Council rejected a pr/ce of $13,856.10 for this equipment. Since then, we met with the vendor,
modified our specifications, and propose to have much of the installation performed by City forces instead of this out-of-town
vendor. The current price is slightly over the budgeted mount of $7,000, which was based on previous unit prices for this same
type equipment (but in a much larger overall project proposal). This small ovcm-un is offset by savings akeady realized this
budget year. O&M account # 410-1253-532.92-00.
SUMMARY
We recommend that the City Council approve the purchase of a Radio Telemetry System for the Sea Rim Pump Station and
Ground Storage Tank from BLOC Design Build, LLC of Longview, Texas in the amount of $7,686.00.
RECOMMENqDED:
tor of Utility._QOperations
Rebecca Underhill
Director of Finance
410 Water & Sewer Operating Budget
1253 Water Distribution
532 Water Utilities
92 Capital Equipment
oCse~l:~ Broussard
Purchasing Coordinator
PREPARED BY:
APPROVED BY
City Manager
DISPOSITION BY COU2~CIL:
[]APPROVE
[] OTHER (DESCRIBE)
PROCESSED
BY
CITY
SECRETARY
DATE
03/04/2005 18:51 9032~7779 KS~ ENSINE£~S P~E 0~/04
March 3, 2005
RE: Data Flow Systems Inc.
Value Added Reseller Status
To whom it may concern:
This letter is intended to notify all interested parties that BLOC Design Build. LLC of
Longv[ew, Texas is Data Flow Systems' (DFS) exclusive Value Added Reseller (VAR) iq '[he
States of Texss and Oklahoma.
Should you have any questions or require additional information, please do not hesitate t:3
contact me at 321-259-5009.
Sincerely,
Data Flow Systems, Inc,
David S. Walker Jr,
Director of Sales
L E
~RID~IN'~ T~ LIN~B OF C.O~,MLINI~ATION
140 £. Tyler St,. Suite 600
P,O, Box ! 552
901,247.9444
90~,236.7779 f~
March 4. 2005
John Tomplalt
City of Port Arthur
P.O. Box 1089
4~.4 4m Street
Port Arthur, TX 77841
Re: RTU for Sea Rim GST
Subj.: Quotation 5252a-PA
v!a fax: 409-983-5,~ 51
Dear Mr. Tomplait:
Thank you for your interest in Bloc Design.Build's Instrumentation and Control Services.
As you requested this letter will serve as our proposal to prowde a Remote Telemetry Unit
at the Sea Rim GST and incorporate t into the existing SCADA system for the City of F~ort
Arthur. The second Yogi antenna will be installed on the Sabine Pass GST to provide
communication between those two sites: Sabine Pass RTU will then dig~peat the Sea Rim
data to the central site, The total cost [or this quotation ia $7,686.00,
Scope of Work
RTU for Sea Rim GST
NEMA 4X Fiberglass Enclosure
Modular Backplane (MBP202)
Power Supply Module (PSM003)
Radio Interface Modute (RIM006-18)
Analog Monitor Module (AMMOD2}
PLC Bypass Card (PBC001)
Panel Fabrication Labor
RTU Surge Protection Kit
2,6 aH Backup Battery
(2)gdB Yogi Antenna wtCoaxial Cable & Connectors
Radio License Fee
Polyphaser Cos×iai Surge Protector
Installation Labor IConduit, Wire and Raceway Installation by City)
PRICE: $ 7,886.00
Data Flow Sfstems, Inc. (DFS) warrants all hardware and software provided under !:h~s
contract against all defec~ in material and workmanship for a period of one year. ']"he
Cost Propoe~l
Page 2 of ')
functlen modules utilized in the remote terminal unit carry an additional 2-year return-
to-factory warranty. The 2-year return-to-factory warranty aJso covers damage due to
lightning end surge.
Original MantJfacturer's warranty applies for all non-DFS equipment.
QUOTATION NOTES 1. F.O.B. jc3b site
2. Only fl~ose items specifically listed above in the "Bill of Materials" are included in
this quotation.
3. No services, other than those described in the "Scope of Work' a~e includ~(i' in
this quotation.
4. Provider of instrumentation and devices are responsible for signal/noise quality
to meet the requirements of the control/telemetry system.
5. Surge protection to protect devices outside of the DFS panel is the responsibility
of instrumentation/device providers.
6. All conduits to be installed by others.
7. All wire to be pulled from field devices to panel by others. (Wire shall be #14
stranded copper wire),
8. This quotation assumes ~at ent~'y by our employees into "Confined Spaces"
and/or ~Pen-nit4Required Confined Spaces" as defined by OSHA, is not reqLdred
by the scope of the work to be performed under this quotation.
9. This quotation assumes that all electrical equipment to be accessed by our
employees can be temporarily removed from service.
10,This quoter!on assumes that BLOC Design-Build employees will be assisted by
+.he Cities ~urrent SC, ADA technician, dudng the RTU installation,
MATERIAL NOTES
1. Instrumentation not specifically Stated es being supplied by BLOC Des[gn-B~ild,
is no+. included.
2. Existing instrumentation is assumed to be, properly installed, calibrated arid in
good working condition.
3. No services, other than those described in this quotation are included.
4. Provider of instrumentation and devices is responsible for signal noise qualh~,' to
meet the requirements of the controt and SCADA system,
,5, Surge protection '~o pro*.ect devices outside of the RTL/ Equipment is I:~e
'esponsibility of others
6. Taps, hot shots and impu!se tubing, for instrumentation, by others,
7, All required freeze protection materials are the responsibility of othem,
IIO REQUIREMENTS
I. All cii~ital inputs to the DFS RTU will be of a dry contac~ type.
2. Mixing of multiple sources of oower will nol be permitted.
3. All digital outputs from the DFS RTU will be dry contacts and provide for
120VAC at 10amp capacity,
4. All analog inputs will be 4-20mA,
5. 4-20mA signals, at a m[nimum, to provide 500.ohm impedance drive.
a3/~4/~ao5 lo:51 ~o323~???s KSA EHGIHEERS PAGE 03/04
Conditions
1, Lead-time is 8-12 weeks ARe. Prices are F.O.B. job site. Bloc payment t(.~rms
are 60% upon delivery of equipment, 30% at start-up ant 10% NET 30. This
quote will be honored until March 27, 2005.
2, We have assumed that this w~rk is tax exempt and have not inciuded any s-"~les
tax in the price,
If this proposal is acceptable, please sign below and return one copy to serve as our
notice to proceed, ffthere are any questions ~[ease call me at 903.247.9444,
Sincerely,
Bloc Design-Build LLC
Director of Business Development
Proposal Accepted and Wo~k Authorized By:
For City of Port Arthur
Date:
Custoreer PO Number: