COUNCIL ACTION MEMO
TO Stephen B. Fitzgibbons, City Manager
FROM Ross E. Blackketter, P.E., Director of Public Works
SUBJECT P.R. #16731 — Resolution to the Texas Transportation Commission
DATE 07 October 2011
RECOMMENDATION:
It is recommended that the City Council approve Proposed Resolution No. 16731, urging the
Texas Transportation Commission to dedicate funding to complete the construction of IH -10 in
Orange County.
BACKGROUND:
The South East Texas Regional Planning Commission- Metropolitan Planning Organization
(SETRPC -MPO) has requested the City Council pass a resolution urging the Texas
Transportation Commission to dedicate funding to complete the construction of IH -10 in Orange
County (letter attached).
BUDGETARY /FISCAL EFFECT:
None.
EMPLOYEE /STAFF EFFECT:
None.
SUMMARY
It is recommended that the City Council approve Proposed Resolution No. 16731, urging the
Texas Transportation Commission to dedicate funding to complete the construction of IH -10 in
Orange County.
jZ°
Ross E. Blackketter, P.E.
Director of Public Works
REB /reb
S: \engineer \Documents \Cams\ TxDOT I- 10.docx
rftt21141BILL�� i
September 20, 2011
■■. TO: SOUTH EAST TEXAS REGIONAL PLANNING COMMISSION -
METROPOLITAN PLANNING ORGANIZATION (SETRPC -MPO)
PRESIDENT TRANSPORTATION PLANNING COMMITTEE (TPC)
EVERETTE "BO° ALFRED
County Commissioner
Jefferson County FROM: BOB DICKINSON, DIRECTOR, TRANSPORTATION & ENVIRONMENTAL
1st VICE- PRESIDENT RESOURCES, SOUTH EAST TEXAS REGIONAL PLANNING COMMISSION
KEN PELT
County Commissioner
Hardin County RE: RESOLUTION URGING THE TEXAS TRANSPORTATION COMMISSION
2nd VICE - PRESIDENT TO PROVIDE REQUIRED FUNDING TO COMPLETE RECONSTRUCTION
DAVID DUBOSE
County Commissioner OF THE IH -10 CORRIDOR IN ORANGE COUNTY
Orange County
3rd VICE- PRESIDENT As you are aware, the SETRPC -MPO TPC for the Jefferson - Orange- Hardin Regional
GLENN JOHNSON
Mayor Transportation Study (JOHRTS) area met on Friday, September 9, 2011 and
City of Port Neches approved the selection of projects to be funded with Proposition 12 Bond funds for
TREASURER the JOHRTS area.
FRED WILLIAMS
Mayor
City ofKountze The SETRPC -MPO TPC voted to obligate its allocation of $11.304 million of
SECRETARY Proposition 12 funds for (1) US 69 from IH -10 to Lucas Drive in Jefferson County
KIRK ROCCAFORTE
Mayor and (2) for IH -10 from West of Adam's Bayou to East of SH 87 in Orange County.
City of Bridge City The SETRPC -MPO's funds for IH -10 are being combined with the TxDOT- Beaumont
LEGAL COUNSEL District's funds to extend the limits of the project proposed by the TxDOT-
RONNIE TURNER
Provost Umphrey, LLP Beaumont District for its Rehabilitation & Safety allocation. However, even with this
combination of funding, two miles of the IH -10 Corridor will remain as originally
constructed.
In light of this, at the Friday, September 9, 2011 SETRPC -MPO TPC meeting the
TPC voted to pass a resolution requesting the Texas Transportation Commission to
provide the funding required to complete the reconstruction of the IH -10 Corridor in
its entirety in Orange County. Additionally, the TPC is encouraging each of its
member jurisdictions to pass a similar resolution and forward it to the Texas
Transportation Commission in order to demonstrate the regional support behind the
EXECUTIVE DIRECTOR project.
SHAUN P. DAVIS
sdavis(rDsetrpc.orq Please find attached a draft resolution that can be edited for your jurisdiction, as
2210 Eastex Freeway well as a cover memo with the appropriate contact information and mailing address
Beaumont, Texas 77703 -4929 for forwarding the resolution to the Texas Transportation Commission once it is
Telephone (409) 899 -8444
FAX (409) 347 -0138 adopted.
setrpcaSetrpc.orq
http://www.setrpc.orn
If any questions arise, please feel free to contact me at (409) 899 -8444 x7520.
BD:mc
cc: John Barton, P.E. — TxDOT Interim Executive Director
The Honorable Tommy Williams — State Senator, District 4
The Honorable Allan Ritter — State Representative, District 21
The Honorable Joe Deshotel — State Representative, District 22
The Honorable Mike Hamilton — State Representative, District 19
Bob Dickinson — Director, SETRPC -MPO
P.R. 16731
10/07/11 reb
RESOLUTION NO.
A RESOLUTION URGING THE TEXAS TRANSPORTATION
COMMISSION TO PROVIDE REQUIRED FUNDING TO
COMPLETE THE IH -10 CORRIDOR IN ORANGE COUNTY.
WHEREAS, the City of Port Arthur, a member of the Transportation Planning
Committee for the Jefferson- Orange- Hardin Regional Transportation Study area,
recognizes the vital role that the highway system in our region plays in meeting the
mobility needs of our citizens; and,
WHEREAS, the IH -10 Corridor in Orange County is a regional high - priority
corridor and some of the existing, original interstate sections are deteriorating and
require more than maintenance provides; and,
WHEREAS, the South East Texas Regional Planning Commission - Metropolitan
Planning Organization (SETRPC -MPO) and the TxDOT- Beaumont District continue
efforts to prepare the plans, specifications, and estimates to advance IH -10 projects to
construction; and,
WHEREAS, the IH -10 Corridor is a statewide priority, a key component of the
Texas surface transportation infrastructure as a strategic intermodal corridor for freight
movement, and a major transcontinental interstate highway; and,
WHEREAS, the SETRPC -MPO and the TxDOT- Beaumont District have
continually worked together, with support from the City of Port Arthur, to move forward
on the IH -10 Corridor projects by allocating the region's $32 million of the American
Recovery and Reinvestment Act (ARRA) funds; the $44.849 million of the TxDOT-
Beaumont District Rehabilitation /Safety Proposition 12 funds; $5.304 million of the
P.R. 16731
Page 2
SETRPC -MPO Proposition 12 funds; and all Category 2 funds through year 2021 for
reconstruction and improving the entire 26 -mile Interstate Highway 10 facility in Orange
County from the Neches River to the Sabine River; and,
WHEREAS, these current funding sources are insufficient to complete the
reconstruction of the remainder, a 2 -mile section from East of SH 87 to the Sabine
River; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR:
THAT, the facts and opinions in the preamble are true and correct; and,
THAT, the City of Port Arthur strongly urges the Texas Transportation
Commission to allocate sufficient funds in the amount of $45 million to the TxDOT-
Beaumont District to complete the reconstruction of IH -10 in Orange County; and,
THAT, the Mayor is hereby authorized to transmit the letter to the Texas
Transportation Commission, attached hereto as Exhibit "A "; and,
THAT, a copy of the caption of this Resolution be spread upon the Minutes of
the City Council.
READ, ADOPTED AND APPROVED this the day of , A.D. 2011
at a meeting of the City of Port Arthur, Texas by the following vote:
Ayes: Mayor:
Councilmembers:
P.R. 16731
Page 3
Noes:
Mayor
Attest:
City Secretary
APPROVED AS 1 0 FORM:
//, " f/I /_.%
ity Atto ry
APPROVED FOR ADMINISTRATION:
Stephen B. Fitzgibbons
City Manager
‘/ /At
Ross E. Blackketter, P.E.
Director of Public Works
S: \ engineer \Documents \Resolutions \PR16731.docc
EXHIBIT A
DELORIS "BOBBIE" PRINCE, MAYOR STEPHEN FITZGIBBONS
HAROLD DOUCE'I', SR., MAYOR PRO TEM CITY MANAGER
COUNCIL MEMBERS: City of ' SHERRI BELLARD
RAYMOND SCOTT, JR. /I Al CITY SECRETARY
ELIZABETH "LIZ" SEGLER
MORRIS ALBRIGHT, IIIi VAL TIZENO
JOHN BEARD, JR. O r t i' t h u P CITY ATTORNEY
ROBERT E. WILLIAMSON Texas
DERRICK FREEMAN
KERRY "TWIN" THOMAS
Deirdre Delisi October 18, 2011
Chair
Texas Transportation Commission
125 East 11 Street
Austin, Texas 78701 -2483
Re: RESOLUTION URGING THE TEXAS TRANSPORTATION COMMISSION TO PROVIDE REQUIRED FUNDING
TO COMPLETE THE IH -10 CORRIDOR IN ORANGE COUNTY
Dear Madam Chair:
Please find attached a resolution adopted by the City of Port Arthur urging the Texas Transportation
Commission to provide the funding required to complete the reconstruction of the IH -10 Corridor in
Orange County.
The IH -10 Orange County Corridor is a regional priority, and as such the South East Texas Regional
Planning Commission — Metropolitan Planning Organization (SETRPC -MPO) and the TxDOT- Beaumont
District, with the support of the City of Port Arthur, have continually worked together to move projects
on the IH -10 Corridor forward by allocating the region's $32 million of the American Recovery and
Reinvestment Act (ARRA) funds; the $44.849 million of the TxDOT- Beaumont District
Rehabilitation /Safety Proposition 12 funds; $5.304 million of the SETRPC -MPO Proposition 12 funds;
and all Category 2 funds through year 2021 for reconstruction and improving the entire 26 -mile IH -10
facility in Orange County from the Neches River to the Sabine River. However, even with this
combination of funding, two miles of the IH -10 Corridor in Orange County will remain as originally
constructed.
In light of this, the City of Port Arthur respectfully requests the Texas Transportation Commission to
allocate the necessary funds to complete the IH -10 Corridor reconstruction in Orange County to the
Sabine River.
If any questions arise concerning this request, please feel free to contact me at 409 - 983 -8105.
Yours truly,
Deloris "Bobbie" Prince, Mayor
cc: Bob Dickinson, Director, Transportation & Environmental Resources, SETRPC
DP /reb
S: \engineer \ Documents \ Letters \2011 \TTCLtr- 18Oct11.docx