Loading...
HomeMy WebLinkAboutPR13293: ARCENEAUX & GATES PUBLZC WORKS DEPARTMENT COUNCZL ACTZON t, tEf, tO TO Steve Fitzgibbons, City Manager FROI~I John A. Comeaux, P.E., Director of Public Works SUB.1ECT P.R. #13293 - Chg of Scope for Arceneaux & Gates for Redesign of Boardwalk Ext. DATE October :~1, 2005 RECOI41~IENDAI']ON: ! recommend that the City Council approve Proposed Resolution No. 13293, revising the scope of the contract with Arceneaux & Gates Consulting Engineers, Inc. for the design and construction phase services for the Pedestrian Boardwalk and Walking Trail project, increasing the budget for these services by $32,700 to a total of $256,600. BACKGROUND: On December 9, 2003, the City entered into a contract with Arceneaux & Gates Consulting Engineers, !nc. (Arceneaux) for the engineering design and construction phase services for the Pedestrian Boardwalk and Walking Trail project, which is funded by a Texas Department of Transportation (TxDOT) grant. The original budget for this project was based on an estimated construction cost of $1,677,000, but the lowest to construct the extension was $615,000 over budget. In order to bring the project within the original budget, the City Council has previously approved reducing the scope of this project. Arceneaux has proposed to do the necessary redesign for an amount of $32,700. BUDGETARY/FISCAL EFFECT: Funding is available in CIP 202, 303-:~603-591.54-00. EI~tPLOYEE/STAFF EFFECT: None. SUf4t4ARY I recommend that the City Council approve Proposed Resolution No. 13293, revising the scope of the contract with Arceneaux & Gates Consulting Engineers, Inc. for the design and construction phase services for the Pedestrian Boardwalk and Walking Trail project, increasing the budget for these services by $32,700 to a total of $256,600. Comeaux, P.E. Director of Public Works .1AC/reb Z:\engineer\Documents\Cams\A&G-ChgofScope2.doc P.R. No. 13293 10/11/05 reb RESOLUTI'ON NO. A RESOLUTION AUTHORIZI'NG ADDITI~ONAL SERV]~CES FOR THE CONTRACT DATED DECEMBER 19, 2003 BETWEEN THE C]~TY OF PORT ARTHUR AND ARCENEAUX & GATES CONSULTING ENGINEERS, 1*NC. OF PORT ARTHUR, TEXAS FOR REDESIGN OF THE BOARDWALK EXTENSTON AND INCREAS]~NG THE BUDGET FOR THIS ENGINEERi'NG SERVl~CE BY $32,700 TO A TOTAL OF $256,600. CIP 202, 303-1603-591.54-00. WHEREAS, on December 9, 2003, the City Council of the City of Port Arthur authorized a contract with Arceneaux & Gates Consulting Engineers of Port Arthur, Texas for the design and construction phase services in the amount of $188,900 for the Pedestrian Boardwalk and Walking Trail project which is being funded by a Texas Department of Transportation grant; and, WHEREAS, the City Council approved a change of scope for the design of this project, increasing the budget for engineering services by $35,000 to a total of $223,900 in March 2005; and, WHEREAS, the lowest bid for construction of this project was $615,000 over budget; and, WHEREAS, the City Council approved a redesign of the Pedestrian Boardwalk and Walking Trail project reducing the scope to bring the project within the original project budget; and, WHEREAS, Arceneaux & Gates Consulting Engineers, Inc. is the design engineer for this project and has submitted an estimate of $32,700 (see Exhibit "A'~ for the redesign; now, therefore, P.R. No. 13293 Page 2 BE I~T RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, revising the scope of services for the Pedestrian Boardwalk and Walking Trail project and increasing the budget for engineering design and construction phase services by $32,700 to a total of $256,600 (CIP 202, 303-1603-591.54-00) is herein approved; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the __ day of , A.D. 2005 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Mayor Attest: City Secretary P.R, No. 13293 Page 3 APPROVED ASTO FORM: City Attorney APPROVED FOR ADMINISTRATION: Steve Fitzgibbons City Manager Rebecca Underhill, C.P.A. Director of Finance 3ohn A. Comeaux, P.E. Director of Public Works Z:\engineer\Documents\Resolutions\PR13293.doc EXHIBZT A CENF UX & GAI S September 16, 2005 Mr. Ross Blackketter, PE City Engineer/Asst. Director of Public Works CITY OF PORT ARTHUR PO Box 1089 Port Arthur, Texas 77641-1089 RE: Proposal for Additional Authorization City of Port Arthur Boardwalk Redesign Project No. 03-CPA-320 CSJ 0920-38-t 6t; Federal Aid Project No. STP2002(t t t)TE Dear Mr. Blackketter: We have reviewed the revised scope of the proposed project improvements. In general, the revised project will eliminate the elevated boardwalk and replace it with a pedestrian route along Waco Ave. and 4th Street, connecting with the proposed walkway near Shreveport Avenue. We will inspect the existing sidewalk along 4th Street to determine if any part meets the accessibility requirements under ADA and make recommendations for modification or replacement of the walk. From discussion with TxDOT, it is apparent that we will need to reissue the plans rather than attempt to strikeout portions that no longer apply. The project control stationing will be placed along the centedine of the new route as designed and the sheets will be cut from that new alignment. We estimate that approximately 28 sheets from the original plans will be deleted and approximately 40 sheets will either be created or modified as a result of the changes. We propose to be compensated on the basis of rates defined in our current contract for this project and will not exceed the sum of Thirty-two Thousand Seven Hundred Dollars ($32,700.00). We will begin work promptly after Notice to Proceed and complete the work in approximately 75 days. We look forward to beginning this work for you. Very truly yours, ARCENEAUX & GATES CONSULTING ENGINEERS, INC. One Turtle Creek Scl'um'e 3501 ~ Creek Dr., Suite 102 Po~ Adhur~ TX 77642 409~24-7888 FAX 409/724-1447