Loading...
HomeMy WebLinkAboutPR 16812: CHANGE ORDER NO. 6 TO CONTRACT WITH ALLCO, INC. FOR SANITARY SEWER REHAB BY THE PIPE BURSTING AND SLIPLINING METHODS PROJECT MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: Stephen Fitzgibbons, City Manager FROM: Kelly Eldridge, Director of Utility Operations DATE: December 5, 2011 SUBJECT: Proposed Resolution No. 16812 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 16812 authorizing the execution of Change Order No. 6 to the contract between the City and ALLCO, Inc., of Beaumont, Texas, increasing the contract amount by $95,534.44, for the Sanitary Sewer Rehabilitation by the Pipe Bursting and Sliplining Methods, Basins PA64C & PA66, Contract No. 6, City Project No. 404PB6. BACKGROUND This project was for the cleaning, television inspection, and rehabilitation of approximately 83,000 feet of sanitary sewer mains, plus the replacement of every service connection served by these main lines in the Port Acres area. The original project scope included the inspection of all lines that used older - technology pipe material, with an estimate of having to replace /rehabilitate about 80% of those lines. Change Order No. 6 addresses three separate items. The first item deals with the replacement of a 60" drop manhole on the 30" diameter gravity sewer along WPA Road near the DD #7 Pump Station. In the course of performing line repairs and manhole rehabilitation under Changer Order No. 4, the contractor discovered what we had thought to be a line cave -in to actually be a catastrophic drop manhole failure. Drop MH's are used where at major elevation changes in the flow lines of the incoming and outgoing sewer lines. This failure was considered a safety hazard due to its proximity to the adjacent highway and railroad tracks, and had to completed ASAP. Railroad and TXDOT personnel were on site to observe the extent of repairs. The second item is due to the alignment of the sanitary sewer line along a section of 61 S' Street. The gravity sewer line along 61' St. is generally in the shoulder of the roadside ditch. However, a 138 foot section juts out into the pavement, apparently in an effort to avoid other very close infrastructure in the immediate area. This will force the contractor to remove & replace this short, but deep section under pavement. The last item simply restores some previously deleted manhole rehabilitation work. A previous changer order deleted more than originally thought. BUDGET/FISCAL EFFECT Change Order No. 6 increases the contract amount by $95,534.44. Note that we are already over the grant amount, so these funds will have to come out of the City Sewer Bond Fund. STAFF/EMPLOYEE EFFECT None. SUMMARY I recommend that the City Council approve Proposed Resolution No. 16812. P.R. No. 16812 12/05/11 RESOLUTION NO. A RESOLUTION AUTHORIZING THE EXECUTION OF CHANGE ORDER NO. 6 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND ALLCO, INC. FOR THE SANITARY SEWER REHABILITATION BY THE PIPE BURSTING AND SLIPLINING METHODS PROJECT, BASINS PA64C & PA66, CONTRACT NO. 6, INCREASING THE CONTRACT AMOUNT BY $95,534.44, ACCOUNT NO. 404-1625-532.83-00, Project No. 404PB6. WHEREAS, the City is currently under an Agreed Order with the TCEQ to rehabilitate its sanitary sewer system; and, WHEREAS, there exists a need to reduce flows and eliminate sanitary sewer overflows in our collection and treatment systems; and, WHEREAS, on October 20, 2009, by Resolution No. 09 -489, the City Council awarded the Sanitary Sewer Rehabilitation by the Pipe Bursting and Sliplining Methods, Basins PA64C & PA66, Contract No. 6, City Project No. 404PB6 to ALLCO, Inc.; and, WHEREAS, subsequent to the work already performed under this contract, there exists a need to amend the bid schedule to reflect the actual project scope and to perform additional work associated with the TCEQ Agreed Order, and such changes must be done by a contract change order; and, WHEREAS, Arceneaux & Gates Consulting Engineers, Inc. recommends Change Order No. 6, increasing the contract amount by $95,534.44, and not changing contract time; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT the City Council of the City of Port Arthur hereby authorizes the City Manager to execute Change Order No. 6 (attached as Exhibit "A ") to the contract between the City of Port P.R. No. 16812 12/05/11 Page 2 of 3 Arthur and ALLCO, Inc. for the Sanitary Sewer Rehabilitation by the Pipe Bursting and Sliplining Methods, Basins PA64C & 66, Contract No. 6, City Project No. 404PB6, increasing the contract amount by $95,534.44, and not changing contract time; and, THAT, the City Secretary shall provide a copy of this Resolution with an original Change Order No. 6 to Arceneaux & Gates Consulting Engineers for forwarding to the TWDB for processing and approval; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , 2011 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Deloris Prince Mayor ATTEST: APPROVED AS TO FORM: * Vcc, Sherri Bellard Valecia Tizeno ` City Secretary City Attorney P.R. No. 16812 12/05/11 Page 3 of 3 APPROVED FOR ADMINISTRATION: Stephen Fitzgibbons City Manager Ross Blackketter, P.E. Director of Public Works C4 Kelly Ethridge Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: 4,144,ti-10,4/ Deborah Echols Director of Finance Account No.: 404 - 1625 - 532.83 -00 Project No.: 404PB6 EXHIBIT A (Change Order No. 6) ARCENEAUX ' GATES CONSULTING ENGINEERS, INC. CHANGE ORDER No. 6 DATE: November 21, 2011 JOB NO. CPA -490 -6 AGREEMENT DATE: November 13, 2009 NAME OF PROJECT: SANITARY SEWER REHABILITATION by PIPE BURSTING and SLIP LINING METHODS, BASINS PA64C & 66 OWNER: City of Port Arthur r--- — --� CONTRACTOR: ALLCO, Inc. The following changes are chan hereby made to tht D Y 1. ADD the following Items and /or qui Technical Specifications: A. 1 EA. 60 -Inch Fiberglass Manh ($32,007.87/EA.) '.87 B. 138 L.F. 10 -Inch Sanitary Sew€ ($ 361.18/L.F.) .76 C. Bid Item No. 29, Rehab of Man■ ,o,c vvairwIu one -- - inch Coating Liner material of approved mix Design 276 V.F. @ $ 95.00 [ +] $ 26,220.00 SUBTOTAL $ 108,070.63 BID ADJUSTMENT FACTOR [X] 0.884 TOTAL ADJUSTED BID $ 95,534.44 r CHANGE ORDER NO. 6 ® November 21, 2011 ARCENEAUX Job No. CPA -490, Contract No. 6 GATES CONSULTING ENGINEERS, INC. CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $2,748,577.00 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $3,328,841.62 The CONTRACT PRICE due to this CHANGE ORDER will be [increased] {deer-eased] by: $95,534.44 Dollars The new CONTRACT PRICE, including this CHANGE ORDER, will be $3,424,376.06 CHANGE TO CONTRACT TIME: ORIGINAL CONTRACT TIME: 550 Calendar Days CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 550 Calendar Days CURRENT DATE OF COMPLETION: March 17, 2012 CONTRACT TIME due to this CHANGE ORDER will be increased by 0 Days The New DATE OF COMPLETION: March 17, 2012 No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order. RECOMMENDED BY ENGINEER: ACCEPTED BY: // ARCS X &G ATES [CONTRACTOR, OFFICER OR OWN"] CON • ING ENGINEERS, INC. ALLCO, Inc. ACCEPTED BY: CITY of PORT ARTHUR 2 of 2 1 ARCENEAUX ' GATES CONSULTING ENGINEERS, INC. CHANGE ORDER No. 6 DATE: November 21. 2011 JOB NO. CPA -490 -6 AGREEMENT DATE: November 13. 2009 NAME OF PROJECT: SANITARY SEWER REHABILITATION by PIPE BURSTING and SLIP LINING METHODS, BASINS PA64C & 66 OWNER: City of Port Arthur CONTRACTOR: ALLCO, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: 1. ADD the following Items and /or quantities to the Contract Documents and Technical Specifications: A. 1 EA. 60 -Inch Fiberglass Manhole ($32,007.87/EA.) [ +] $ 32,007.87 B. 138 L.F. 10 -Inch Sanitary Sewer Main ($ 361.18/L.F.) [ +] $ 49.842.76 C. Bid Item No. 29, Rehab of Manhole Wall with one inch Coating Liner material of approved mix Design 276 V.F. @ $ 95.00 [ +] $ 26,220.00 SUBTOTAL $ 108,070.63 BID ADJUSTMENT FACTOR [X] 0.884 TOTAL ADJUSTED BID $ 95,534.44 CHANGE ORDER NO. 6 ® November 21, 2011 ARCENEAUX Job No. CPA -490, Contract No. 6 & GATES CONSULTING ENGINEERS. INC. CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $2.748,577.00 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $3.328.841.62 The CONTRACT PRICE due to this CHANGE ORDER will be [increased] {decreased} by: $95.534.44 Dollars The new CONTRACT PRICE, including this CHANGE ORDER, will be $3.424.376.06 CHANGE TO CONTRACT TIME: ORIGINAL CONTRACT TIME: 550 Calendar Days CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 550 Calendar Days CURRENT DATE OF COMPLETION: March 17. 2012 CONTRACT TIME due to this CHANGE ORDER will be increased by 0 Days The New DATE OF COMPLETION: March 17. 2012 No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order. RECOMMENDED BY ENGINEER: ACCEPTED BY: / t �. ... d ARCE , I X & GATES (CONTRACTOR, OFFICER OR OWN' ' ] IP CON • ING ENGINEERS, INC. ALLCO, Inc. ACCEPTED BY: CITY of PORT ARTHUR 2 of 2