Finance Office Memorandum To: Mayor and Council Cc: John Comeaux, Acting City Manager In ,,~/From: Rebecca Underhill, Assistant City Manager/A~tr.ion Date: January 18, 2012 Re: Pleasure
Island Request for Funding-Public Restrooms Mr. Jimmy Dike submitted the attached letter, as well as the referenced project worksheet and Engineers plans, regarding the restoration of
public restrooms on Pleasure Island. At the August 9, 2011 City Council Meeting, a letter from Mr. Dike, dated July 29, 2011 was discussed at length. That letter included an amount for
the Public Restrooms of $26,109 with a 10% match of $2,619. Mr. Dike indicated that he felt this number was extremely low. The request received is for $129,892.90. FEMA funding was limited
by the "Mandatory NFIP Reduction", (Flood Insurance was mandatory on these facilities.) During budget discussions last year, City Council directed the PIC to bring these projects forward
on a case by case basis for consideration. No funding was provided in the City's budget for for this project. Please advise as how to proceed. If the Council desires to fund this project,
a budget amendment will be required, and can be presented at the next Council Meeting; along with a Resolution to authorize this funding.
Pleasure Island Commission 520 Pleasure Pier Boulevard • Port Arthur, TX 77640 • (409) 982-4675 January 9,2012 Rebecca Underhill Assistant City Manager City of Port Arthur P. O. Box
1089 Port Arthur, TX 77641-1089 Dear Ms. Underhill: Enclosed is the FEMA worksheet to replace the public restrooms on Pleasure Island. Also enclosed are the plans, bidding procedure,
bid tabulation and engineer cost. As you can see from the Project Worksheet, $71,554.00 was deducted because the restrooms were in a flood zone. Several requests over a three year period
have been made to replace the funds, but to date none have been replaced. The total amount requested to replace the public restrooms will be $129,902.90. The Pleasure Island Commission
awaits the city council direction. Restroom Cost $119,608.00 Engineering Cost 33,783.00 $153,391.00 Minus FEMA Advance 23,498.10 $129,892.90 Respectfully, Jimmy Dike Director Pleasure
Island Commission Enclosures
l c;;) I-' "Sid TellulaUan Far1be: 10 c;;) OJ "ARCENEAUX & OATES C:Ol'iJlllltTll'ilG El!«IllflleN.INC. Recrealional Facllliles To SarYe Pleasure 1sfantl CommlSlllIC'n Job Numbllr: PICo441l
Bids opened: Dsilembllt 7. 2011 at 3:00 P .~1. N c;;) I-' N N I-' .c.. ""-I 'A' OTV. 1. & LGeneral Contractors BBs\lmant, TIl Unit PriCll ArncuiJt McInnIs Conslrucllon, fnc. Silsbee,
TIl: L'n1 Pr.a. Alr.ount Smell". General .ccnslluctlon Eleaumaol\t,1)I lInt f"f>:a I MlWllt Brystar C'(Inllacling Seaumont, TIl: Unit Price ArnIlunt DEII1k1ls BuUding .. CQl'!$lrtlCllon,lnC'
• EI'1!a1Jmant, TIl: Unit Pnce .Mlwnt $ ~2.262.00 I$ 42~.aa 1:$ 36,100.00 I $ :ae.700.00 I$ 2J),2.00.Q1) I;$ J;:O,2on.QI.lI $ 41.0(1).00 L$ 41,000.(1) I $ 33,500.00 I$ 33,O(lO.OO IS
1~~~r~Bi~~~~~ s· I • I $ :la.loo.oill is 36.100.00 S 3IMOO.O(} S :J9,6(}(}.C() S 30.300.00 S 30.300.00 $ 40.000.00 " () h 11Il,e08.00 S 123.BC<I.(O S 123,800.00 $ 1 52.500.00 S 1o!2.500.00
$ 131,000.00 $ T owl Bll.se Bid 11fJf1JS IS '97,970.00 $ 2oo,aoo.00 -$ 208.00fJ.OO $ WilIfam80n Conslruclion &. -Equipment,lnc. Lumberton,TX U'cl~ Pdce Mlwnt 00.700.00 I S ijO,~o.oo
O(f.ao 1$ 51,100£0 $ 185,aoo£0 297,4(JQ.GO .c.. c;;) LD ""-I N .c.. I-' .c.. .c.. ""-I 1'oftlJ Amcunt BIdI $ 1974970.00 I S 200,000.00 I $ Z"3,lNNI. DO! S 214OOD.tNI $ 239,801J..00 $
2"?s40tUIO 1> :;0 ~ ZAftC15NIAUX. (JATO CONSU1.TING ENGINElERlNG, INC. ~TEXAS REQISTERED ENQINEERING FIRM C X* F·31} * I?O G:I 1> ~ (J)( 12-8-11 Se91 ~ c;;) N "c;;) N
PA-06-TX-1791-PW-07085(1) .P, Applicant Name: Application Title: PLEASURE ISLAND COMMISSION JJZ-045 Playground Restrooml Pavillion Period of Performance Start: Period of Performance
End: 09-13-2008 03-13-2010 Date Awarded Bundle Reference # (Amendment #) PA-06-TX-1791-State-0343(341 ) 07-14-2009 Subgrant Application -FEMA Form 90-91 Note: The Effective Cost Share
for this application is 90% FEDERAL EMERGENCY MANAGEMENT AGENCY PROJECT WORKSHEET O,M,B, No, 1660-0017 Expires: 10/31/2008 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden
for this form is estimated to average 90 minutes per response, The burden estimate includes the time for reviewing instructions. searching existing data sources, gathering and maintaining
the needed data. and completing. reviewing. and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the
upper right hand corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Collections Management.
Federal Emergency Management Agency. 500 C Street SW, Washington, DC 20472. Paperwork Reduction Project (3067-0151). Submission of the form is required to obtain benefits under the Public
Assistance Program, NOTE: Do nol send your completed form to the above address. DISASTER PROJECT NO. PAID NO. 245-0E14A-00 DATE 04-06-2009 CATEGORY E FEMA 11791 I-I!-TX DAMAGED FACILITY
, Playground Restrooml Pavillion WORK COMPLETE AS OF 03·17-2009; 0 % APPLICANT: PLEASURE ISLAND COMMISSION 1 COUNTY: Jefferson LOCATION: South Levee Enterance Road LATITUDE: 29.85946
LONGITUDE: . 93.92978 DAMAGE DESCRIPTION AND DIMENSIONS Extreme winds and storm surge generated by Hurricane Ike during the incident period from September 7,2008 to October 2, 2008 caused
extensive damage to the Restroom I Pavilion building at the playgrounds on Pleasure Island. The building is owned by Pleasure Island. GPS coordinates were taken at the bathroom building.
Facility was in operation prior to the storm, The building has a total footprint of 48' x 24', concrete block construction building. It is on a concrete slab foundation with a wood framed,
asphalt shingled roof. The building had a 16' x 24' bathroom section with a covered, open 32' x 24' Picnic/Pavilion area with concrete block pillars. Each bathroom had one (1) toilet
and one {1} sink; in addition, the men's room had one (1) wall mounted urinal. Building was completely destroyed and left as a pile of debris on the existing slab. SCOPE OF WORK This
PW Qualifies for 75% FEMA Funding. This pw qualifies for 75% FEMA funding. WORK TO BE COMPLETED: SEE Cost Estimate for more in-depth Scope. Photos of building before disaster can also
been seen in the photos section. 1.Use existing concrete slab, on grade. 2. Replace 16' x 24' concrete black building https:llisource.fema.netiemmie/internalIntegration?applicationId=39670
7129/2009
to current codes and standards for an A 10 Flood Zone 3Jnstall 56 VLF concrete black columns and 896 SF ~l" split face reinforced concrete black walls to support roofing system 4. I
nstallation of three (3) 3' x 7' metal door units and hardware 5.lnstall a 1456 SF wooden framed roof system with 17 sa of asphalt shingles over 15# felt 6.lnstall plumbing for two (2)
sinks, two (2) water closets, one (1) urinal and hot water heater. 7.lnstall electrical for one (1) 100 amp panel. 8 receptacles. 6 toggle switches and 5 recess fluorescent light fixtures,
9 surface mount fluorescent light fixtures, and 6 exterior wall mounted quartz fixtures. Does the Scope of Work change the pre-disaster conditions at the site? l'i Yes lili No Special
Considerations included? ra; Yes Ci No Hazard Mitigation proposal included? II Yes II No Is there insurance coverage on this facility? lia Yes rna No PROJECT COST ITEM CODE NARRATIVE
QUANTITY/UNIT UNIT PRICE COST 1 0000 Work to be Completed OILS $0.00 $ O~OO 2 9000 CEF Estimate 1/LS $ 96,813.00 $ 96.813.00 3 9901 Direct Administrative 1/LS $ 850.00 $ 850.00Costs
(Subgrantee) 0000 lnsurance Adjustments OILS $0.00 $ 0.00 1 5902 Mandatory NFIP Reduction -Maximum 1/LS $ -71,554.00 $ -71,554.00 Proceeds Available TOTAL $ 26,109.00COST PREPARED BY
Joseph Zambito TITLE Project Specialist SIGNATURE APPLICANT REP~ Jimmy Dike TITLE Director SIGNATURE https:llisource.fema.netlemmielinternalIntegration?applicationId=39670 7/2912009