Loading...
HomeMy WebLinkAboutPR 16870: AGREEMENT WITH DASHIELL FOR ELECTRICAL TESTING FOR WATER PURIFICATION PLANT MEMORANDUM PUBLIC WORKS DEPARTMENT TO: John A. Comeaux, P.E., Acting City Manager FROM: Ross Blackketter, P.E., Director of Public Works SUBJECT: P.R. # 16870, Electrical Testing for Water Purification Plant DATE: January 30, 2012 RECOMMENDATION: It is recommended that the City Council approve Proposed Resolution No. 16870 authorizing the City Manager to execute an agreement with Dashiell of Sulphur, Louisiana for the Port Arthur Water Purification Plant 15kV Switchgear Testing for the amount of $12,612. BACKGROUND: The installation of the emergency generator at the Water Purification Plant requires that the 15kv switchgear be tested for proper operation prior to being energized. Since the new generator will produce 2.5 MW at 13,200 volts, the safety of all personnel involved is at issue. The electrical engineering subconsultant, Peak Electrical, solicited proposals from three companies who are qualified to perform this service. There are no Port Arthur vendors who are qualified to perform this testing. Dashiell submitted the lowest quote for performing this service for the amount of $12,612, and is recommended by Peak Electrical. BUDGETARY /FISCAL EFFECT: Funding will be provided for in Project ORWTPG, 141 - 1201 - 532.59 -00. EMPLOYEE /STAFF EFFECT: None. SUMMARY: It is recommended that the City Council approve Proposed Resolution No. 16870 authorizing the City Manager to execute an agreement with Dashiell of Sulphur, Louisiana for the Port Arthur Water Purification Plant 15kV Switchgear Testing for the amount of $12,612. to / �� Ross E. Blackketter, P.E. Director of Public Works "Remember, we are here to serve the citizens of Port Arthur" S: \engineer \Documents \CAMS \2012 \Dashiell -Elec Test -WPP CAM.docx E L E C T R I C A L EAK Engineers • Constructors P.O. Box 969 1618 Port Neches Ave Port Neches, TX 77651 409 - 729 -2226 Texas Board of Professional Engineers Registration # F -10815 Texas Electrical Contractor License # 25686 January 30, 2012 Arceneaux & Gates Consulting Engineers, Inc. Attn: Mr. Joe M. Wilson, Jr., PE 3501 Turtle Creek Drive Suite 102 Port Arthur, Texas 77642 RE: Recommendation for Award of Contract Port Arthur Water Treatment Plant 15kV Switchgear Testing Dear Joe, This letter is in reference to the bids received for the Port Arthur Water Treatment Plant 15kV Switchgear Testing received on January 20, 2012. Three bids were received per the scope of work and are listed in order from low to highest for base bid as follow: 1. Dashiell $ 12,612.00 a. Test left side of switchgear $6,360.00 b. Test right side of switchgear $6,360.00 2. Absolute Testing $ 13,990.00 a. Test left side of switchgear $9,480.00 b. Test right side of switchgear $4,510.00 3. Square D $ 14,000.00 a. Test left side of switchgear $6,800.00 b. Test right side of switchgear $7,200.00 All three bids submitted per the original scope and specifications were found to be technically acceptable. Therefore, it is Peak Electrical's recommendation to award the project of Port Arthur Water Treatment Plant 15kV Switchgear Testing to the low bidder: Dashiell. Thank you, Josh Landry Peak Electrical, LLC joshlandry@peakelectricall1c.com (409) 729 -2226 • P. R. 16870 01/30/12 reb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH DASHIELL OF SULPHUR, LOUISIANA FOR THE PORT ARTHUR WATER PURIFICATION PLANT 15KV SWITCHGEAR TESTING FOR THE AMOUNT OF $12,612. PROJECT ORWTPG, 141- 1201 - 532.59 -00. WHEREAS, it is necessary to provide for testing of the existing switchgear at the Water Purification Plant prior to connection of the new emergency generator; and, WHEREAS, the electrical engineer, Peak Electrical, has recommended Dashiell of Sulphur, Louisiana to perform the required testing for the amount of $12,612 as shown in Exhibit "A "; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Manager is hereby authorized to execute an agreement with Dashiell of Sulphur, Louisiana for the Port Arthur Water Purification Plant 15kV Switchgear Testing in the not to exceed amount of $12,612, attached hereto and made a part hereof as Exhibit "A ", funding to be provided in ORWTPG, 141 - 1201 - 532.59 -00; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED this the day of , A.D. 2012 at a meeting of the City of Port Arthur, Texas by the following vote: AYES: Mayor Councilmembers: P. R. 16870 Page 2 Noes: Mayor ATTEST: City Secretary APPROVED AS TO FORM: 4 City Attorney r p APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: 41 /Lied John A. Comeaux, P.E. Deborah Echols, CPA Acting City Manager Director of Finance 7 4‘-1e14 Ross E. Blackketter, P.E. Kelly Eldridge Director of Public Works Director of Utility Operations Q c i'L.!/it _L Shawna Tubbs, CPPO Purchasing Manager S: \engineer \Documents \Resolutions \PR16870 EXHIBIT A CONTRACT FOR PORT ARTHUR WATER PURIFICATION PLANT 15kV SWITCHGEAR TESTING THIS AGREEMENT, made this 14 day of February , 2012, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY ", and Dashiell a(n) Corporation herein acting by and Individual, firm, partnership, or corporation through Kirk E. Leber hereinafter called "CONTRACTOR ". WITNESSETH: That for and in consideration of the payment terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The term of this Contract shall be for a term of N/A from the date of execution. 2. During the term of this Contract, the CONTRACTOR will furnish at his own expense all of the materials, supplies, tools, equipment, labor, and other services necessary to connection therewith, excepting those supplies specifically not required of CONTRACTOR in the Specifications. 3. The CONTRACTOR agrees to perform all the work described in the Specifications and Contract Documents and comply with the terms therein for the prices as stated in the attached proposal for the amount of $12,612. 4. The term "Contract Documents" means and includes the following: (A) Agreement (€) Gefiefal-Infermadeft (D) Specifications (E) Bid Proposal (F) Bidder's Information Sheet (G) Notice to Proceed 5. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 6. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two (2) copies, each of which shall be deemed an original on the date first written above. S:\ engineer\ Documents \Contracts \Dashiell -WPP Elec Test Cont- 12.docx Page 1 OWNER CONTRACTOR Dashiell BY: BY: City Manager Kirk E. Leber (Printed Name) S:\ engineer\ Documents \Contracts \Dashiell -WPP Elec Test Cont- 12.docx Page 2 DASHIELL QUANTA • CNCaCns coHSTRUCT9r1 SERVICES caIPANn DASHIELL :Eul E. WtN,AEuN S.II P111JF I OI,IFIANS. 7 , ^ ,EE.°. FAX N.' ens v "r$: January 13, 2012 Peak Electrical Engineers P. O. Box 969 1618 Port Neches Ave. Port Neches Texas, 77651 Attention: Mr. Josh Landry Reference: City Of Port Arthur Waste Treatment Plant 2012 Outage Dashiell Proposal: FSN120006 Dear Mr. Landry Dashiell is pleased to present this Estimated Price proposal to provide Dashiell field service to perform standard maintenance testing services associated with the scheduled switchgear maintenance outage on electrical apparatus at the Port Arthur Waste Water Treatment facility. SCOPE OF WORK Dashiell proposes to provide all required field service support to successfully complete the referenced work. Scope of perspective test to be performed and apparatus associated with this negotiation were supplied by a site visit. Associated attachment with this email has been included for clarification. 13.2 KV Bus assembly: 3 Cubicles Remove bolted covers top and bottom in the rear cubicles, perform visual inspect front and rear, clean cubicles upon completion of visual inspection perform DC Hipot. Additionally, CPTS and PT will be included with the bus inspection no additional testing to be performed on these potential devices. Breakers: 5 each 15KV Square D VR Breakers, i Clean, visually inspect, verify contact wipe, lubricate, operate, perform DC Hipot test, cycle time and perform minimum trip tests utilizing breaker test station. Relays: 12 each Basler BEI-50/51B-107 and 3 each General Electric PVD relays Clean, visually inspect, utilize customer supplied settings to verify minimum pickup and time curve calibration tests results. Power Cables: 2 each With cables left attached to the local and remote switchgears, perform potential test equal to operating potentials, recommended DC test is 1.41.% of operating AC potential value or 10.7 KVDC. i) A S H I E L L QUANTA • CNGNMS- CONSii?UCPAIS SEFIVICE DAEHIELL - " -- - _ - - -- - _ ' Lilt?! E. WSP; 4 U I 5,11 PHUF I (11.IFI.N. T &EER P-IJVh 447 .iYL5.37i17 FAX N' ens .rrU`r ESTIMATED PRICE PROPOSAL Our estimated price proposal to perform this work is as follows Total Price = $6,306.00 Additional Price Too Perform The Same Testing For Opposite End Of Switch Gear Lineup. Price = $6,306.00 This price includes Dashiell manpower, test equipment, and miscellaneous cleaning materials. COMMENTS AND CLARIFICATIONS Our proposal to perform this work is based on the following comments and or clarifications: 1. All equipment to be serviced will be readily available and accessible to our technicians without significant delay. 2. Coordination and all switching activity associated with this project will be the responsibility of others. 3. Work scope has been estimated for a standard 8 hour, five -day workweek Monday through Friday, no overtime has been included. We estimate the work to take two days per side. 4. We have assumed construction test power (120 volt / 20 amps) will be available within 100' of the test area. 5. All drawings and relay set points are the responsibility of others; Dashiell would also request previous test results for comparative reasons. 6. The testing in this proposal is based on site visit and one line drawing supplied by Peak on sit representative. 7. Normal consumable materials, rags, de- greaser, lubricants and stab greases have been included. Possible discoverable defective items detected during the inspection program have not been included with this proposal. 8. Services are anticipated to take two days for three Dashiell technicians. Due to the present abnormally large work load in Port Arthur area. 9. Travel time has been included. TERMS OF SALE Our standard Terms and Conditions will be utilized to perform this work. Terms between our companies have not yet been established, these terms must be established prior to job inception. PURCHASE ORDERS Purchase Orders should be sent to the following fax number. The purchase order must reference the contract / agreement number between Dashiell and your company. Dashiell 4681 E. Napoleon Sulphur, LA 70663 Fax Number 337 -625 -5095 DASH I ELL SER • CNGIVCCIS CONSTI?UCTON) [OM�PAE S DAEHIELL -_ - - - -- - — -- - .HI E. 1:..P L.EU1 $.II PHUF 1 (CI.IFIANA ? l! Y-Iu i ss7,aCi.;JJJ FAX n7 /75 Taf. Remit to Address Dashiell P.O. Box 840946 Dallas, TX 75284 - 0946 If you should have any questions regarding our proposal, please contact me at your convenience in our Port Arthur Texas 409 - 7362158.. Sincerely, ,b4Z racer Dashiell Kirk E. Leber Beaumont Operations Manager