Loading...
HomeMy WebLinkAboutPR 16991: EMERGENCY REPAIRS TO FORCE MAIN JUNCTION BOX ON DRYDEN ROAD MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: John Comeaux, P.E., Acting City Manager FROM: Kelly Eldridge, Director of Utility Operations ti(� DATE: April 9, 2012 / RE: Proposed Resolution No. 16991 COMMENTS RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 16991 authorizing payment for Emergency Repairs to a Force Main Junction Box on Dryden Road at the OId KCS ROW by Infrastructure Rehabilitation DBA Poly - Triplex of Texas, in the estimated amount of $11,740. BACKGROUND There is a structural failure in the force main junction box on Dryden Road at the old KCS ROW. This box is the junction between the 20" FM from the Pioneer Park LS, the 24" FM from the 46 St. LS, and the beginning of a 42" VCP gravity sewer leading to the Main WWTP. As such, a lot of H2S gas is released there, which causes the corrosion of the box, and a tremendous amount of odor. It also makes extended shutdown impossible. Repair alternatives are limited, with conventional -type repairs involving constructing a new 96" 0 fiberglass junction box downstream of the existing box, re- routing the FM's to the new box, and then abandoning /filling the existing structure. The estimate totals $76,331, with the work taking 2.5 weeks. A more modern, alternative approach is to reconstruct & line the interior of the existing box using a fiberglass polyester resin material. The material is pre- formed, then hand - applied (in this case) to the interior of the structure and cured in place. The procedure takes a matter of hours and can be done during an acceptably short shut down time. Infrastructure Rehabilitation, Inc. DBA Poly - Triplex of Texas is the authorized, certified installer for this material. Their quote totals $11,740 and is recommended for approval. BUDGET /FISCAL EFFECT Funds are available in the O &M budget account #410- 1255 - 532.33 -00. STAFFING /EMPLOYEE EFFECT Existing City staff will coordinate the shutdown & repairs with the contractor. SUMMARY I recommend that the City Council approve Proposed Resolution No. 16991 authorizing payment for Emergency Repairs to a Force Main Junction Box on Dryden Road at the OId KCS ROW by Infrastructure Rehabilitation DBA Poly - Triplex of Texas, in the estimated amount of $11,740. P. R. No. 16991 04/09/12 RESOLUTION NO. A RESOLUTION AUTHORIZING PAYMENT FOR EMERGENCY REPAIRS TO A FORCE MAIN JUNCTION BOX FOR THE UTILITY OPERATIONS DEPARTMENT TO INFRASTRUCTURE REHABILITATION DBA POLY - TRIPLEX OF TEXAS, IN THE TOTAL AMOUNT OF ELEVEN THOUSAND SEVEN HUNDRED FORTY -AND NO /100 DOLLARS ($11,740). FUNDS ARE AVAILABLE IN ACCOUNT NO. 410-1255-532.33-00. WHEREAS, there is currently a structural failure in a Sanitary Sewer Force Main Junction Box near Dryden Road and the old KCS right -of -way; and, WHEREAS, the nature of this facility does not permit extended shutdown of our sanitary sewer systems flowing through this box; and, WHEREAS, City staff received quotes (convention and alternative) for the necessary repairs to this structure, with the quote from Infrastructure Rehabilitation DBA Poly - Triplex of Texas being the lowest and best bid for this work; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Council hereby authorizes payment for Emergency Repairs to a Force Main Junction Box to Infrastructure Rehabilitation DBA Poly- Triplex of Texas, in the total amount of ELEVEN THOUSAND SEVEN HUNDRED FORTY AND NO /100 DOLLARS ($11,740.); and, THAT a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , 2012 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: P. R. No. 16991 04/09/12 Page 2 of 3 AYES: Mayor Councilmembers: NOES: Deloris Prince Mayor ATTEST: APPROVED AS TO FORM: Sherri Bellard Valecia izeno City Secretary City Attorney APPROVED: FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: � .- � � T John Comeaux, P.E., eborah Echols Acting City Manager Director of Finance Account No. 410 - 1255 - 532.33 -00 Ross Blackketter, P.E. Director of Public Works cc•t$ ,L0 Kelly E • 'dge Shawna Tubbs Director of Utilities Purchasing Manager