Loading...
HomeMy WebLinkAboutPR 17040: CHANGE ORDER 1 TO CONTRACT WITH DIKITA ENGINEERING City of Port Arthur Memorandum To: John Comeaux, PE, Acting City Manager From: Dr. Albert T. Thigpen, IPMA -CP, CAS, CCP, Director of Human Resources, Civil C71 , 1 Service, Parks and Recreation . �:� Date: May 11, 2012 Re: Adoption of Proposed Resolution No. 17040 Authorizing the City Manager to Execute Change Order 01 to the Contract Between the City of Port Arthur and Dikita Engineering, Inc. for the Design and Construction Management of a Texas Parks and Widlife Grant Project at SSgt. Lucian Adams Park, Increasing the Time of the Contract by 487 Calendar Days until June 29, 2012, for no Additional Cost COMMENT RECOMMENDATION: I recommend that the City Council approve Proposed Resolution No. 17040 which authorizes the City Manager to execute Change Order No. 1 to the contract between the City of Port Arthur and Dikita Engineering, Inc for the design and construction management of a Texas Parks and Wildlife Grant project at SSgt. Lucian Adams Park, increasing the time of the contract by 487 calendar days for no additional cost. BACKGROUND: The City of Port Arthur received an Outdoor Grant from the Texas Department of Parks and Wildlife to make improvements to SSgt. Lucian Adams Park to provide greater utility and expanded use to citizens and visitors. These improvements include the addition of a concession stand with bathrooms as well as additional softball fields. At the original bidding of the project, the bids came in significantly higher than the project budget necessitating re- drafting of the bid specifications and re- bidding of the project. Once the project was awarded there were additional delays due to weather (rain). The time extension of 487 calendar days to June 29, 2012 will provide adequate time for the successful completion of the project. BUDGETARY /FISCAL IMPACT: Approval of Proposed Resolution No. 17040 would have no impact on budgetary/fiscal effect. STAFFING /EMPLOYEE EFFECT: None anticipated SUMMARY: I recommend that the City Council approve Proposed Resolution No. 17040 which authorizes the City Manager to execute Change Order No. 1 to the contract between the City of Port Arthur and Dikita Engineering, Inc for the design and construction management of a Texas Parks and Wildlife Grant project at SSgt. Lucian Adams Park, increasing the time of the contract by 487 calendar days for no additional cost. P. R. No. 17040 05/03/12 ca RESOLUTION NO. A RESOLUTION AUTHORIZING THE EXECUTION OF CHANGE ORDER NO. 1 TO THE CONTRACT BETWEEN CITY OF PORT ARTHUR AND DIKITA ENGINEERING, INC. FOR THE DESIGN AND CONSTRUCTION MANAGEMENT OF A TEXAS PARKS AND WILDLIFE GRANT PROJECT AT SSGT LUCIAN ADAMS PARK, INCREASING THE TIME OF THIS CONTRACT BY 487 CALENDAR DAYS UNTIL JUNE 29, 2012, FOR NO ADDITIONAL COST. WHEREAS, the City of Port Arthur was a recipient of an Outdoor Grant in the amount of $400,000 from the Texas Parks and Wildlife Department; and, WHEREAS, the City Council of the City of Port Arthur pursuant to Resolution No. 10 -189 authorized a contract with Dikita Engineering, Inc. for professional engineering and construction management services; and, WHEREAS, this project has been delayed due to unforeseen weather conditions; and, WHEREAS, it is recommended to approve Change Order No. 1, attached hereto as Exhibit "A ", for a 487 calendar day extension until June 29, 2012; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: Section 1. That the facts and opinions in the preamble are true and correct. Section 2. That the City Council of the City of Port Arthur hereby authorizes the City Manager to execute Change Order No. 1 to the contract between the City of Port Arthur and Dikita P. R. No. 17040 05/03/12 ca Engineering, Inc. for the engineering design and construction management of park improvements, which does not change the contract amount and increases the contract time by 487 calendar days until June 29, 2012. Section 3. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED on this day of , A.D., 2012, at a Regular Meeting of the City Council of the City of Port Arthur, by the following vote: AYES: Mayor Councilmembers NOES: MAYOR DELORIS "BOBBIE" PRINCE ATTEST: SHERRI BELLARD, CITY SECRETARY P. R. No. 17040 05/03/12 ca APPROVED AS TO ORM: Vat # VALECIA TIZENO, CIA ATTO Y APPROVED FOR ADMINISTRATION: JOHN A. COMEAUX, P.E., ACTING CITY MANAGER MET f DR. ALBE• T. 'HIGPEN, DIRECTOR OF PARKS AND RECREATION Exhibit "A" r•/' \ PlAITA Dikita Enterprises, Inc. Divisions: May 11, 2012 Dikita Engineering Dr. Albert Thigpen, IPMA -CP, CAS, CCP Dikita Director of Parks and Recreation Management City Hall Services 444 Fourth Street Port Arthur, Texas 77640 www.dikita.com RE: Change Order #01 Adams Park Improvements- Additional Contract Time -487 Days Dear Dr. Thigpen, The City of Port Arthur contracted with Dikita Engineering to provide engineering and design services effective July 13, 2010 with an anticipated end date of February 28, 2011. However, initial project bids came in substantially over project budget necessitating re- working of bid construction documents and re- bidding of project. Once construction started weather (rain) further delayed project. The project is anticipated to be completed on or before June 29, 2012. Total contract extension time recommended is 487 calendar days. Sincerely, D a/ie David F. Tayyari, P.E., PMP, CFM, LEED GA Sr. Project Manager Dikita Enterprises, Inc. Cc: Chandra Alpough, Ronnie Smith, 1420 W. Mockingbird Lane • Suite 600 Dallas,Texas 75247 • Ph:(214) 634.8844 Fax: (214) 638 -7406