HomeMy WebLinkAboutPR 17117: PURCHASE OF THREE 12-14 CY TANDEM DUMP TRUCKS PUBLIC WORKS DEPARTMENT
COUNCIL ACTION MEMO
TO: John A. Comeaux, P.E., Acting City Manager
FROM: Ross E. Blackketter, P.E., Director of Public Works
SUBJECT: P.R. #17117 — Purchase of Three 12 -14 CY Tandem Dump Trucks
DATE: 04 June 2012
RECOMMENDATION:
I recommend that the City Council approve Proposed Resolution No. 17117, approving
the purchase of three (3) 12 -14 cubic yard dump trucks from Houston Freightliner of
Houston, Texas through H -GAC in the amount of $278,113.
BACKGROUND:
We are requesting to purchase three (3) 12 -14 cubic yard dump trucks for the Streets
and Drainage Divisions. Accordingly, Purchasing obtained the following H -GAC quote:
Vendor Unit Price Quant. Total
Houston Freightliner $92,371 3 $ 277,113
H -GAC fee $ 1,000 1 $ 1,000
Total $ 278,113
These trucks will be used for the Streets and Drainage work to be accomplished in the
second round of the Hurricanes Ike and Dolly Recovery Grant.
BUDGETARY /FISCAL EFFECT:
To be purchased through a lease purchase agreement with BancLeasing, Inc.
EMPLOYEE STAFF EFFECT:
None
SUMMARY
I recommend that the City Council approve Proposed Resolution No. 17117, approving
the purchase of three (3) 12 -14 cubic yard dump trucks from Houston Freightliner of
Houston, Texas through H -GAC in the amount of $278,113.
/ //
Ross E. Blackketter, P.E.
Director of Public Works
REB /reb
5: \ engineer\ Documents\ CAMS\ EquipPurch \TndmDmpTrckPurch- 12.docx
P.R. 17117
06/04/12 reb
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE PURCHASE OF THREE
(3) 12 -14 CUBIC YARD TANDEM DUMP TRUCKS FROM
HOUSTON FREIGHTLINER /STERLING OF HOUSTON, TEXAS
THROUGH H -GAC IN THE AMOUNT OF $278,113.
WHEREAS, Chapter 271 of the Local Government Code allows a city, by
resolution of its governing body, to participate in cooperative purchasing programs,
such as H -GAC, as an alternative to a formal bid process; and,
WHEREAS, in Resolution 11 -196, the City of Port Arthur entered into an
interlocal agreement for cooperative purchasing with the H -GAC Cooperative Purchasing
Program (H -GAC); and,
WHEREAS, in order to adequately perform the work required for Streets and
Drainage construction, quotes were obtained via H -GAC for three (3) 12 -14 cubic yard
tandem dump trucks from Houston Freightliner /Sterling of Houston, Texas in the
amount of $278,113; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR:
THAT, the facts and opinions in the preamble are true and correct; and,
THAT, purchase of these vehicles via H -GAC in the amount of $278,113 is
hereby approved, purchase to be through a lease purchase agreement with
BancLeasing, Inc.; and,
THAT, a copy of the caption of this Resolution be spread upon the Minutes of
the City Council.
P.R. 17117
Page 2
READ, ADOPTED AND APPROVED this the day of , A.D. 2012
at a meeting of the City of Port Arthur, Texas by the following vote:
Ayes: Mayor:
Councilmembers:
Noes:
Mayor
Attest: APPROVED AS TO FORM:
Z%
Sherri Bellard Valecia 7 eno
City Secretary City Attorney
APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF
FUNDS:
John A. Comeaux, P.E. Deborah Echols, CPA
Acting City Manager Director of Finance
LPL
Ross E. Blackketter, P.E. Shawna Tubbs, CPPO
Director of Public Works Purchasing Manager
S:\engineer\Documents\Resolutions\PR17117.docx
EXHIBIT A
I
CONTRACT PRICING WORKSHEET Contract Date
HT11-09 4/19/2012
For Standard Equipment Purchases No.: Prepared:
This Form .must be prepared by Contractor, and provided to End User to attach to Purchase Order, with copy to H -GAC.
The H-GAC administrative fee shall be calculated and shown as a separate line item. Please type or print legibly.
Buying C of Port Arthur Contractor: Houston Freightliner /Sterling
Agency:
Pe a
Cliff Williams Prepared Michael McCarthy
Phone: Phone: 713 - 580 - 8122
•
Fax: Fax: 713- 672 -9449
Email: Email: Mike. McCarthy(STRHouston.com
I Product D3 I Description: 2013 Freightliner M2- 106-80 I
Code:
IA. Product Item Base Unit Price Per Contractor's H -GAC Contract: $64,986
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
Vertical Exhaust 335 11/32x3.5x10 5/16 Frame 411
Allison 3500 RDS Transmission 5073 1/4" Frame Liner 680
1100 SQ IN Radiator 48 0
Body Builder Connection and PDM mtd BOC 157 Fuel /Water Separator 138
•
Electronic Transmission Access Connector BOC 139 Air Cab Mounts 93
40k TuffTrac Rear Suspension 2426 0
BW AD -9 Air Dryer 314 Subtotal From Additional Sheet(s): II 141701
188 " Wheelbase 356 11 Subtotal B: 243401
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description Cost Description Cost
2013 Model Year 1500
1
Subtotal From Additional Sheet(s): 11 I
1 1 Subtotal C: 15001
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit For this transaction the percentage is: 6%
Price plus Published Options (A +B).
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description Cost Description Cost
0
0
Freight 1545 (1 Subtotal D: 15451
E. Total Cost Before Any Applicable Trade -In / Other Allowances / Discounts (A +B+C +D) 92371
Quantity Ordered:11 3 1 X Subtotal of A + B + C + D: 1 92371 1 1 = Subtotal E: 2771131
I F. H -GAC Fee Calculation (From Current Fee Tables) II Subtotal F: 1000
G. Trade -Ins / Other: Allowances / Special Discounts
Description Cost Description Cost
1 Subtotal G: 01
I Delivery Date: 1 H. Total Purchase Price (E +F +G): II 278113