HomeMy WebLinkAboutPR 17356: CHANGE ORDER NO. 2 TO CONTRACT WITH SIEMENS INDUSTRY FOR INFRASTRUCTURE IMPROVEMENTS PUBLIC WORKS DEPARTMENT COUNCIL ACTION MEMO TO Floyd T. Johnson, City Manager FROM Ross E. Blackketter, P.E., Director of Public Works SUBJECT P.R. #17356 — PCO #2 — Siemens for Energy Performance Contract DATE 23 October 2012 RECOMMENDATION: I recommend that the City Council approve Proposed Resolution No. 17356, authorizing Proposed Change Order #2 to the contract with Siemens Industry, Inc., Building Technologies Division for the Port Arthur energy performance contract, revising the scope of services for the Health Department and increasing the contract amount by $7,560 to a new total of $3,206,376. BACKGROUND: The City Council previously executed a performance contracting agreement with Siemens for infrastructure improvements and efficiency upgrades in the amount of $3,198,816. The contracted work includes, among other things, heating, ventilation, and air conditioning (HVAC) work at the Health Department. Since the work has started, it has been found that the pump for the hot water system (heating system) needs to be replaced. The cost of providing and installing a new hot water pump is $7,560. BUDGETARY /FISCAL EFFECT: Funds are available in EPC 101, 302 - 1602 - 591.54 -00. EMPLOYEE /STAFF EFFECT: None. SUMMARY I recommend that the City Council approve Proposed Resolution No. 17356, authorizing Proposed Change Order #2 to the contract with Siemens Industry, Inc., Building Technologies Division for the Port Arthur energy performance contract, revising the scope of services for the Health Department and increasing the contract amount by $7,560 to a new total of $3,206,376. / V // Ross E. Blackketter, P.E. Director of Public Works REB /reb S: \engineer \Documents \Cams \Siemens— PCO2.docx P.R. 17356 08/28/12 reb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE PROPOSED CHANGE ORDER #2 TO THE PERFORMANCE CONTRACTING AGREEMENT BETWEEN THE CITY OF PORT ARTHUR AND SIEMENS INDUSTRY, INC., BUILDING TECHNOLOGIES DIVISION FOR INFRASTRUCTURE IMPROVEMENTS AND EFFICIENCY UPGRADES, REVISING THE SCOPE OF SERVICES AND INCREASING THE CONTRACT AMOUNT BY $7,560 TO A NEW TOTAL OF $3,206,376. EPC 101, 302 -1602- 591.54 -00. WHEREAS, in Resolution 12 -147 the City entered into a performance contracting agreement in the amount of $3,198,816 with Siemens Industry, Inc., Building Technologies Division for infrastructure improvements and efficiency upgrades; and, WHEREAS, it has been discovered that the pump for the hot water system (heating system) at the Health Department has failed and needs to be replaced; and, WHEREAS, LDF has requested Proposed Change Order #2 for providing and installing a new hot water pump for the amount of $7,560, attached hereto as Exhibit "A"; and, WHEREAS, authorization of Proposed Change Order #2 is herein deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Manager is authorized to execute Proposed Change Order #2, increasing the contract amount by $7,560 to a new total of $3,206,376, funding being P.R. 17356 Page 2 available in EPC 101, 302 -1602- 591.54 -00; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2012 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Mayor Attest: APPROVED AS TIN FORM: \1 (1 P ' Sherri Bellard Valecia Tizeno City Secretary City Attorney APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: eLkett ie Floyd T. Johnson Deborah Echols, CPA City Manager Director of Finance d4,161,/,(4,,z„ Ross E. Blackketter, P.E. Shawna Tubbs, CPPO Director of Public Works Purchasing Manager S:\ engineer\ Documents \Resolutions \PR17356.docx EXHIBIT A SIEMENS CORPORATION Contract Change Order No.: 2 Siemens Quotation No.: - 2 PROPOSED CHANGE OF WORK (PCO) # 2 To: City of Port Arthur Date: 10.9.12 444 4th Street Contract No.: 440P - 095651 Port Arthur Texas 77641 Job Name: Energy Upgrades Port Arthur Attention: Ross Blackketter P.E. Job No.: NA GENTLEMEN: Please be advised that Original Contract Amount: $3,198,816 I. This Quotation is in response to your request dated Various and instructions and drawings pertinent thereto. 2. This Quotation has been priced in accordance with the current job progress position and therefore is subject to adjustment if authorization to incorporate subject change into the work is not received by NA 3. 0 Calendar days extension of Contract Time is requested by this Quotation. 4. This Quotation is in the amount of $7,560.00 ADD No/100) 5. Description: Hot Water Pump Health Facility Total 1 Provide and install new 2HP hot water pump in the Health Facility. Per Gary Cater of Southeast Se $ 7,560.00 this pump is bad. - Includes: 1. Disconnect electric and re- connect 2 Tie in hotwate pipe and insulate. SUBTOTAL $7,560.00 — _-- TOTAL $7,560.00 Enclosures are: 1. Cost of Work Estimate Dated: NOTE: Owner's acceptance (below) of this Quotation on Change of Work constitutes a CHANGE ORDER authorizing us to proceed immediately with the above described change for the amount quoted (if any) and/or the extension of time requested (if any), to issue Subcontract supplements and to incorporate such amount, time and change into billings and contract documents as a CHANGE ORDER to the Contract Document OWNER'S ACCEPTANCE SIEMENS CORPORATION Owner: Date: By: Johnny Johnson Authorized Representative