HomeMy WebLinkAboutPR 17412: INSTALLATION OF FLOORING AT CIVIC CENTER Memorandum
City of Port Arthur, Texas
Civic Center Department
TO: Floyd T. Johnson, City Manager
FROM: Adam J. Saunders, Civic Center Director
DATE: 11/19/12
SUBJECT: Proposed Resolution No. 17412
RECOMMENDATION
The Civic Center request the City Council's approval to enter the City of Port Arthur into a
contract with Intex Flooring, of Houston, Texas for demolition and installation of flooring in the
lobby of the Robert A "Bob" Bowers Civic Center in the amount of $51,575.
BACKGROUND
The price is done on Texas Multiple Award Schedule Programs (TXMAS) pricing, where the
State and the Federal Government have competitively awarded these contracts, and no other
pricing is required.
BUDGETARY AND FISCAL EFFECT
Charge to Account Number 001 - 1061 - 518.32 -00.
STAFFING EFFECT
None
SUMMARY
The Civic Center request the City Council's approval to enter the City of Port Arthur into a
contract with Intex Flooring, of Houston, Texas for demolition and installation of flooring in the
Lobby of the Robert A "Bob" Bowers Civic Center in the amount of $51,575.00.
P. R.NO.17412
11/19/12 AJS
PAGE 1
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER
INTO A CONTRACT WITH INTEX FLOORING OF HOUSTON,
TEXAS, FOR DEMOLITION AND INSTALLATION OF FLOORING IN
THE LOBBY OF THE ROBERT A "BOB" BOWERS CIVIC CENTER IN
THE AMOUNT OF $51,575; FUNDING AVAILABLE IN ACCOUNT NO.
001 - 1061 - 518.32 -00
WHEREAS, the Civic Center Lobby floor is in need of repair due to the tile coming up
in several locations; and,
WHEREAS, the Civic Center Lobby floor damage has become a tripping hazard and it is
in the best interest of the City to have it repaired; and,
WHEREAS, Intex Flooring of Houston, Texas, agrees to demolish the existing tile
flooring and replace with new flooring at a cost of $51,575; and,
WHEREAS, the Civic Center Lobby flooring project is procured through (TXMAS)
Texas Multiple Award Schedule Programs, where the State and the Federal Government have
competitively awarded these contracts; and,
WHEREAS, the City Council deems it is in the best interest of the City to enter into a
contract with Intex Flooring of Houston, Texas for demolition and installation of flooring of the
lobby of the Robert A "Bob" Bowers Civic Center in the amount of $51,575.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
THAT, the facts and opinions in the preamble are true and correct.
THAT, the City Council authorizes the City Manager to enter into a contract with Intex
Flooring, of Houston, Texas, for demolition and installation of flooring in the Lobby of the
Robert A "Bob" Bowers Civic Center in the amount of $51,575, in substantially the same form
as attached as Exhibit "A ".
THAT, an authorized representative of Intex Flooring of Houston, Texas, shall sign this
Resolution agreeing to the terms hereof.
THAT a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
P. R. NO. 17412
11/19/12 AJS
PAGE 2
READ, ADOPTED, AND APPROVED, this day of November, 2012, AD, at a
Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote:
AYES:
Mayor: ;
Councilmembers: ;
•
NOES: .
Deloris "Bobbie" Prince, Mayor
ATTEST:
•
Sherri Bellard, City Secretary
APPROVED S TO FORM:
\COQ c • b
Val�ecia Tizen,ity • nrney
APPROVED FOR ADMINISTRATION:
Floyd T. Johnson, City Manager
APPROVED AS TO FUND AVAILABILITY:
Adateileriad
Deborah Echols, ,F Finance Director
Shawna Tubbs, Purchasing Manager
P. R. NO. 17412
11/19/12 AJS
PAGE 3
AGREED TO:
INTEX FLOORING
By:
Print Name:
Title:
EXHIBIT "A"
CONTRACT FOR DEMOLITION AND REPLACEMENT OF TILE FLOORING AT
ROBERT A "BOB" BOWERS CIVIC CENTER LOBBY
THIS AGREEMENT, made this day of November, 2012, by and between the City of Port
Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called
"OWNER" or "CITY ", and by and through Intex Flooring of Houston, Texas, hereinafter called
"CONTRACTOR ".
WITNESSETH: That, for and in consideration of, the payment terms, conditions, and
agreements set forth herein, OWNER and CONTRACTOR agree as follows:
1. The work to be performed under this Contract will be completed within 30 days after the
start date on the Notice to Proceed.
2. The CONTRACTOR will perform the work as delineated in the Scope of Work, which is
included in the Project Proposal, and Specifications attached hereto.
3. During the term of this Contract, the Contractor will furnish at this own expense all of the
materials, supplies, tools, equipment, labor and other services necessary to connection
therewith, excepting those supplies specifically not required of Contractor in the
Specifications and Scope of Work noted in the Project Proposal.
4. The CONTRACTOR agrees to perform all the work described in the specifications and
contract documents and to comply with the terms therein for the following amount of
$51,575.
5. The CONTRACTOR will commence the work required by the Contract Documents upon
Receipt of a Notice to Proceed.
6. The term "Contract Documents" means and includes the following"
a. Agreement
b. Specifications
c. Quote
d. Notice to proceed
7. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors and assigns.
8. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed
by their duly authorized officials, this Agreement in (2 copies) each of which shall be
deemed an original on the date first above written
CITY OF PORT ARTHUR
BY:
Floyd T. Johnson
City Manager
CONTRACTOR:
INTEX FLOORING
BY:
Print Name:
Title:
( NI - EX PROJECT PROPOSAL
FLOORING TXMAS- 8- 721A010 -4
asaundersPportarthur.net
Adam Saunders Phone: 832 - 247 -2833
Port Arthur Civic Center
3401 Cultural Center Drive
Port Arthur , TX Date: 11/19/2012
Commercial Flooring Proposal for: Port Arthur Civic Center
Demo and Replace all Ceramic tile
Dear Adam :
Intex Flooring Co, is pleased to provide the following quotation for the above referenced facility.
SCOPE OF WORK: Demo /Cut Out Existing Tile, replace with new, include epoxy grout in Restrooms
Materials:
Style: Color Name / #: Sin #
Fidenza 18x18 tiles Cafe FD02 563 -26 5710 sqft @ $1.40 = $7,994.00
Labor:
Ceramic Tile Installation, with Pattern 563 -98 5710 sqft @ $4.25 = $24,267.50
Tile Demo 563 -98 5710 sqft @ $3.25 = $18,557.50
Installation of 6" Resilient Base 563 -98 840 ft @ $0.90 = $756.00
TOTAL: $51,575.00
NOTES:
Field Measure by: Scott Beckham
1. Work to be completed during normal working hours
2. Grout color selection to be made prior to commencing work
3. additional phasing will result in a trip charge
4. This proposal does not include bonding
5. Demo of existing ceramic base may damage existing walls, this proposal does not include patching where damage occurs
EXCLUSIONS (unless specifically included in the above scope of work): Night/Weekend Labor
Protection of Floors Attic Stock Cost Mats
Dumpster Cost Bonding Removal & Disposal
Preformed Corners Trip Charges Extensive Floor Preparation
Resilient Flooring Asbestos Abatement Border Carpet
Carpet Cleaning Furniture/Fixture Moving Installation of Base j
Demo of Existing VCT Major Floor Preparation
TERMS OF PAYMENT: (Subject to Credit Approval)
* All Materials and Labor - Net 30 Days After Invoice
1. Change Orders: Any work not included in the above scope of work will require a signed change order
before work can be performed.
JJ
1
2. Term of Quote: Prices given are firm for thirty days from proposal date.
3. Lead Times: Please note that lead times vary depending upon final selection and initial production will not begin
until we have a signed purchase order, or a FULLY - EXECUTED contract in house.
Note that normal lead times are as follows for carpet:
• Fast Track/ Quick Ship Carpets, two weeks plus shipping;
• Running Line Carpets, six weeks plus shipping;
• Custom Carpets, eight weeks plus shipping;
• Lead times are approximate and do not start until after the purchase order or fully- executed contract is received.
4. Floor Preparation: Additional floor preparation may be required as a result of an unforeseen condition
of the floor. Costs associated with this floor preparation will be negotiated on a job-to-job basis. Our product
performs properly when installed on floors that are free of DIRT, OIL, PAINT AND EXCESSIVE MOISTURE.
Floors that have moisture readings greater than 3.0 lbs. per 1,000 feet in 24 hours will not meet specification
and will require further curing time or treatment prior to carpet installation.
Intex recommends only wet scraping or mechanical removal of all non -water based adhesives.
5. Asbestos Abatement: This quote DOES NOT include asbestos abatement. Intex is not
responsible for the handling, removal or abatement of asbestos contained floor material or
adhesive. Further, Intex's policy is to request an Asbestos Hazard Emergency Response Act (AHERA) report
prior to proceeding with any floor material or floor adhesive removal. Intex considers it the
owner's responsibility to produce this report prior to executing this contract.
If any chemical stripping agents such as those commonly used in asbestos abatement have been used,
Intex may require additional measures be taken prior to installation of any flooring product.
These measures may affect the price of this quote. Please contact Intex at 832 -545 -8794 for more details.
Thank you for considering Intex Flooring. Intex Flooring
CC: 5625 FM 1960 West. Ste. 408
Houston, Tx 77069
(0) 281 - 397 -7760
(F) 281- 397 -7764
Page 2 of 2