HomeMy WebLinkAboutPR 17742: EDC EXECUTE CHANGE ORDER 3 & 4 TO CONTRACT WITH R.L. ABATEMENT, INC. Interoffice
MEMORANDUM
To: Mayor, City Council, Acting City Manager
From: Floyd Batiste, CEO —/
Date: June 19, 2013 '
Subject: P. R. No. 17742; Council Meeting on June 25, 2013
A RESOLUTION AUTHORIZING THE CITY OF PORT
ARTHUR SECTION 4A ECONOMIC DEVELOPMENT
CORPORATION TO EXECUTE CHANGE ORDER 03 AND
04 TO THE CONTRACT BETWEEN PAEDC AND R.L.
ABATEMENT, INC. FOR ASBESTOS, LEAD AND MOLD
ABATEMENT AT 501 PROCTER STREET, INCREASING
THE CONTRACT AMOUNT BY $23,500.00 AND $7,300.00
RESPECTIVELY
P.R. No. 17742
6/19/2013
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY OF PORT
ARTHUR SECTION 4A ECONOMIC DEVELOPMENT
CORPORATION (PAEDC) TO EXECUTE CHANGE
ORDERS NUMBERS 3 AND 4 TO THE CONTRACT
BETWEEN PAEDC AND R.L. ABATEMENT, INC. FOR
ASBESTOS, LEAD AND MOLD ABATEMENT AT 501
PROCTER STREET, INCREASING THE CONTRACT
AMOUNT BY $23,500.00 AND $7,300.00 RESPECTIVELY
WHEREAS, per Resolution 13 -151 the City of Port Arthur Section 4A Economic
Development Corporation (the "PAEDC ") entered into a contract with R.L. Abatement, Inc. for
asbestos, lead and mold abatement at 501 Procter Street; and
WHEREAS, pursuant to Resolution 13 -215, the City Council approved Change Order 01
increasing the contract amount by $6,500.00 to remove the plaster pipe chase to expose and
remove the asbestos pipe throughout the building and clean any visible loose asbestos debris
from concrete columns; and
WHEREAS, pursuant to the City Council approved Change Order 02 increasing the
contract amount by $17,900.00 to remove and dispose of asbestos debris throughout basement
floor including filtering the water for asbestos; and
WHEREAS, R.L. Abatement, Inc. has requested Change Order 03 increasing the
contract amount by $23,000.00 to remove and dispose approximately 700 square feet of plaster
associated with metal lath along with clay brick (10 to 12 inches thick) to expose and remove
asbestos materials from approximately 400 linear feet of gas lines and remove approximately 20
gas heaters on the first and second floors (levels) as denoted in Exhibit "A "; and
WHEREAS, R.L. Abatement, Inc. has requested Change Order 04 to remove and
dispose approximately 600 square feet of floor tile with mastic, including approximately 250
linear feet of ACM material on piping and approximately 15 linear feet of asbestos duct work
insulation within the basement at 501 Procter as denoted in Exhibit "B "; and
WHEREAS, approval of Change Order 03 and 04 increases the total contract amount to
$295,100.00; and
WHEREAS, on June 24, 2013, the PAEDC Board of Directors voted approve Change
Order 03 and 04 by R.L. Abatement, Inc. to remove and dispose approximately 700 square feet
of plaster associated with metal lath along with clay brick (10 to 12 inches thick) to expose and
remove asbestos materials from approximately 400 linear feet of gas lines and remove
approximately 20 gas heaters on the first and second floors (levels) and to remove and dispose
approximately 600 square feet of floor tile with mastic, including approximately 250 linear feet
of ACM material on piping and approximately 15 linear feet of asbestos duct work insulation
within the basement at 501 Procter as denoted in Exhibit "A" and "B "; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR, TEXAS:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That the City Council approved Change Order 03 to remove and dispose
approximately 700 square feet of plaster associated with metal lath along with clay brick (10 to
12 inches thick) to expose and remove asbestos materials from approximately 400 linear feet of
gas lines and remove approximately 20 gas heaters on the first and second floors (levels) and
Change Order 04 to remove and dispose approximately 600 square feet of floor tile with mastic, I'
including approximately 250 linear feet of ACM material on piping and approximately 15 linear
feet of asbestos duct work insulation within the basement at 501 Procter as denoted in Exhibit
"A" and `B "; and
Section 3. That Change Order 03 and 04 increases the total contract amount to
$295,100.00
#1003069 Page 2
1
i
Section 4. That a copy of the caption of this Resolution be spread upon the Minutes
of the City Council.
READ, ADOPTED AND APPROVED on this day of A.D., 2013,
at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES:
Mayor ,
Councilmembers ,
NOES: .
Deloris "Bobbie" Prince, Mayor
ATTEST:
Sherri Bellard, Acting City Secretary
i
APPROVED:
Floyd Batiste, PAEDC CEO
APPROV • % ', S TO FORM:
Guy N. Goodson, PAEDC Attorney
#1003069 Page 3
APPROVED AS TO FORM:
/a
Valecia R. Tiz + o, City Attor
#1003069 Page 4
1
EXHIBIT "A"
R.L. ABATEMENT, INC.
P.O. BOX 332
WESLACO, TEXAS 78599
TEL: 956 -968 -2265 FAX: 956 - 968 -3301
Email: rlai @rlabatement.com
CHANGE ORDER NO. 3
Proposal No: 13 -2085
Date: 05 -30 -2013
Project: Former Port Arthur Savings and Loan
501 Procter Street
Port Arthur, Texas
RE: ABATEMENT
BID ITEM: To remove and dispose approximately 700 sq. ft. of plaster associated with metal lath along with
clay brick (10 to 12 inches thick) to expose and remove approximately 400 In. ft. of asbestos gas
lines and approximately 20 gas heaters associated with asbestos material within the 1 and 2 "
Level.
Cost for the above item. $23,500.00
(Twenty -three Thousand Five Hundred Dollars and Zero Cents.)
Exclusion:
*Hiring an Asbestos Consultant who will need to prepare specifications, conduct air monitoring and
clearance testing.
R.L. ABATEMENT, INC. will provide insurances. Proposal is subject to change in accordance with the project's
specifications as prepared by an asbestos consultant. All rules and regulations will be enforced according to the Texas
Dept. of Health, OSHA, EPA, and any other state and federal regulations.
Submitted by: (RafaelrJaramilla Print Name: Rafael Jaramillo Title: Project Manager Date: 05 / 30 / 2013
Acceptance of Proposal: The above price, specifications and conditions are satisfactory and hereby accepted. You are
authorized to do the work as specified.
Signature: Print Name: Title: Date:
Note: This proposal is good for 30 days from date submitted. If your firm is exempt from any and all taxes, please provide our office
with a Tax Exempt Form.
EXHIBIT "B"
R.L. ABATEMENT, INC.
P.O. BOX 332
WESLACO, TEXAS 78599
TEL: 956- 968 -2265 FAX: 956- 968 -3301
Email: rlai @rlabatement.com
CHANGE ORDER NO. 4
Proposal No: 13 -208`
Date: 06 -18 -201:
Project: Former Port Arthur Savings and Loan
501 Procter Street
Port Arthur, Texas
ZE: ABATEMENT
HD ITEM: To remove and dispose approximately 600 sq. ft. of asbestos floor tile with mastic, including
approximately 2501n. ft. of ACM material on piping and approximately 15 In. ft. of asbestos duct
work insulation within the basement. Price may change based on the water that may incur within
the basement.
Cost for the above item. $7,300.00
(Seven Thousand Three Hundred Dollars and Zero Cents.)
klternate: Remove and dispose approximately 2,200 sq. ft. of asbestos wall plaster.
Cost for Alternate. .$16,500.00
(Sixteen Thousand Five Hundred Dollars and Zero Cents.)
:xclusion:
*Hiring an Asbestos Consultant who will need to prepare specifications, conduct air monitoring and
clearance testing.
Z.L. ABATEMENT, INC. will provide insurances. Proposal is subject to change in accordance with the project's
: pecifications as prepared by an asbestos consultant. All rules and regulations will be enforced according to the Texas
)ept. of Health, OSHA, EPA, and any other state and federal regulations.
submitted by: aerfirel oYaramil/o Print Name: Rafael Jaramillo Title: Project Manager Date: 06 / 18 / 2013
kcceptance of Proposal: The above price, specifications and conditions are satisfactory and hereby accepted. You are
Luthorized to do the work as specified.
signature: Print Name: Title: Date:
tote: This proposal is good for 30 days from date submitted. If your firm is exempt from any and all taxes, please provide our office
vith a Tax Exempt Form.