Loading...
HomeMy WebLinkAboutPR 18013: N & T CONSTRUCTION CONTRACT P.R.18013 11/04/13 rtb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NOS. 05 AND 06 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND N & T CONSTRUCTION CO., INC. FOR A CHANGE IN SCOPE FOR WORK TO THE DOWNTOWN PAVILION DECREASING THE CONTRACT AMOUNT BY THE SUM OF $2,040.37 TO A NEW TOTAL OF $486,085.63 AND INCREASING THE CONTRACT TIME BY FOUR (4) DAYS TO A NEW TOTAL OF THREE HUNDRED THIRTY ONE (331) DAYS. WHEREAS, on 15 October 2012, the City entered into a contract with N. & T. Construction Co., Inc. for the Renovation for the Downtown Pavilion in the amount of $453,000 and for a term of 130 days; and, WHEREAS, per Resolution 13 -172, Change Order No. 1, N & T Construction Co., Inc.'s contract was increased by eighty (80) days to a new contract term of two hundred ten (210) days due to lost time associated with earlier changes; and, WHEREAS, per Resolution 13 -220, Change Order No. 2, N & T Construction Co., Inc.'s contract amount was increased in the amount of $35,126 to a new total of $488,126.00; and, WHEREAS, per Resolution 13 -375, Change Order No. 3, N & T Construction Co., Inc.'s contract was increased by fifty -seven (57) days to a new contract term of two hundred sixty seven (267) days due to additional material delays; and, WHEREAS, per Resolution 13 -481, Change Order No. 4, N & T Construction Co., Inc.'s contract was increased by sixty (60) days to a new contract term of three hundred twenty seven (327) days due to lost days associated with awaiting additional drawing details to clarify the Request for Information (RFI's) to aid in the preparation of shop drawings for the metal panels and framing; and,